| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - COASTAL BRIDGE CO., L.L.C. |
- 2 - BARBER BROS. CONTRACTING CO., L.L.C |
- 3 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
- 4 - BARRIERE CONSTRUCTION CO., LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
710   |
LNFT |
7.00 |
4,970.00 |
5.00 |
3,550.00 |
3.00 |
2,130.00 |
6.00 |
4,260.00 |
| 203-08 |
borrow (vehicular measurement)
|
1,779   |
CUYD |
1.00 |
1,779.00 |
12.00 |
21,348.00 |
13.00 |
23,127.00 |
14.00 |
24,906.00 |
| 502-01 |
superpave asphaltic concrete
|
7,758.5 |
TON |
45.50 |
353,011.75 |
45.00 |
349,132.50 |
40.00 |
310,340.00 |
52.00 |
403,442.00 |
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
963.2 |
TON |
1.00 |
963.20 |
60.00 |
57,792.00 |
70.00 |
67,424.00 |
1.00 |
963.20 |
| 509-01 |
cold planing asphaltic pavement
|
24,098   |
SQYD |
5.90 |
142,178.20 |
2.00 |
48,196.00 |
1.50 |
36,147.00 |
1.80 |
43,376.40 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 669   |
CUYD |
25.00 |
- 16,725.00 |
FREE |
FREE |
0.10 |
- 66.90 |
6.00 |
- 4,014.00 |
| 701-02-E/F |
cross drain pipe arch (30" equiv. rcpa or 36" equiv.
cmpa) |
60   |
LNFT |
85.00 |
5,100.00 |
210.00 |
12,600.00 |
225.00 |
13,500.00 |
170.00 |
10,200.00 |
| 701-08 |
relaying pipe
|
4   |
LNFT |
100.00 |
400.00 |
60.00 |
240.00 |
60.00 |
240.00 |
140.00 |
560.00 |
| 701-10-G |
reinforced concrete pipe (extension)(18")
|
8   |
LNFT |
250.00 |
2,000.00 |
125.00 |
1,000.00 |
115.00 |
920.00 |
180.00 |
1,440.00 |
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
20   |
LNFT |
200.00 |
4,000.00 |
150.00 |
3,000.00 |
150.00 |
3,000.00 |
200.00 |
4,000.00 |
| 701-15 |
concrete collar
|
8   |
EACH |
750.00 |
6,000.00 |
600.00 |
4,800.00 |
600.00 |
4,800.00 |
900.00 |
7,200.00 |
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
200.0 |
LNFT |
30.00 |
6,000.00 |
32.00 |
6,400.00 |
30.00 |
6,000.00 |
32.00 |
6,400.00 |
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
310.0 |
LNFT |
30.00 |
9,300.00 |
30.00 |
9,300.00 |
30.00 |
9,300.00 |
32.00 |
9,920.00 |
| 704-03 |
blocked out guard rail
|
175.0 |
LNFT |
16.50 |
2,887.50 |
20.00 |
3,500.00 |
17.00 |
2,975.00 |
18.00 |
3,150.00 |
| 704-11-A |
guard rail end treatment (flared)
|
8   |
EACH |
1,750.00 |
14,000.00 |
2,000.00 |
16,000.00 |
1,800.00 |
14,400.00 |
1,900.00 |
15,200.00 |
| 711-02-C |
riprap (30 lb)
|
10   |
CUYD |
100.00 |
1,000.00 |
150.00 |
1,500.00 |
100.00 |
1,000.00 |
270.00 |
2,700.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
8,500.00 |
8,500.00 |
20,000.00 |
20,000.00 |
49,000.00 |
49,000.00 |
14,400.00 |
14,400.00 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
5.544 |
MILE |
275.00 |
1,524.60 |
400.00 |
2,217.60 |
500.00 |
2,772.00 |
130.00 |
720.72 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
0.900 |
MILE |
200.00 |
180.00 |
300.00 |
270.00 |
100.00 |
90.00 |
20.00 |
18.00 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
21.228 |
MILE |
100.00 |
2,122.80 |
300.00 |
6,368.40 |
20.00 |
424.56 |
10.00 |
212.28 |
| 724-01-B |
pavement patching (12" minimum thickness)
|
2,200   |
SQYD |
25.00 |
55,000.00 |
48.00 |
105,600.00 |
50.00 |
110,000.00 |
42.00 |
92,400.00 |
| 724-02 |
pavement widening
|
5,336.7 |
SQYD |
24.00 |
128,080.80 |
25.00 |
133,417.50 |
27.00 |
144,090.90 |
27.00 |
144,090.90 |
| 726-01 |
bedding material
|
20.1 |
CUYD |
75.00 |
1,507.50 |
60.00 |
1,206.00 |
50.00 |
1,005.00 |
60.00 |
1,206.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
50,000.00 |
50,000.00 |
20,000.00 |
20,000.00 |
45,000.00 |
45,000.00 |
80,000.00 |
80,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
20   |
EACH |
65.00 |
1,300.00 |
72.00 |
1,440.00 |
65.00 |
1,300.00 |
70.00 |
1,400.00 |
| 731-02 |
reflectorized raised pavement markers
|
251   |
EACH |
4.75 |
1,192.25 |
5.00 |
1,255.00 |
6.00 |
1,506.00 |
5.00 |
1,255.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
7.076 |
MILE |
1,800.00 |
12,736.80 |
2,000.00 |
14,152.00 |
2,000.00 |
14,152.00 |
1,800.00 |
12,736.80 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.300 |
MILE |
700.00 |
210.00 |
800.00 |
240.00 |
800.00 |
240.00 |
700.00 |
210.00 |
| 735-01 |
mailboxes
|
44   |
EACH |
1.00 |
44.00 |
1.00 |
44.00 |
1.00 |
44.00 |
1.00 |
44.00 |
| 735-02 |
mailbox supports (single)
|
44   |
EACH |
100.00 |
4,400.00 |
110.00 |
4,840.00 |
120.00 |
5,280.00 |
100.00 |
4,400.00 |
| 739-01 |
hydro-seeding
|
2.24 |
ACRE |
1,000.00 |
2,240.00 |
1,200.00 |
2,688.00 |
850.00 |
1,904.00 |
900.00 |
2,016.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
13,500.00 |
13,500.00 |
6,000.00 |
6,000.00 |
18,000.00 |
18,000.00 |
5,000.00 |
5,000.00 |
| S-001 |
u-channel post installation
|
58   |
ea |
45.00 |
2,610.00 |
45.00 |
2,610.00 |
45.00 |
2,610.00 |
40.00 |
2,320.00 |
| S-002 |
cleaning existing ditches
|
100   |
LNFT |
10.00 |
1,000.00 |
15.00 |
1,500.00 |
10.00 |
1,000.00 |
21.00 |
2,100.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
823,013.40 |
|
862,207.00 |
|
893,654.56 |
|
898,233.30 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
710   |
LNFT |
3.16 |
2,243.60 |
|
|
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
1,779   |
CUYD |
11.06 |
19,675.74 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
7,758.5 |
TON |
51.53 |
399,795.50 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
963.2 |
TON |
118.51 |
114,148.83 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
24,098   |
SQYD |
1.69 |
40,725.62 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 669   |
CUYD |
0.10 |
- 66.90 |
|
|
|
|
|
|
| 701-02-E/F |
cross drain pipe arch (30" equiv. rcpa or 36" equiv.
cmpa) |
60   |
LNFT |
89.50 |
5,370.00 |
|
|
|
|
|
|
| 701-08 |
relaying pipe
|
4   |
LNFT |
52.65 |
210.60 |
|
|
|
|
|
|
| 701-10-G |
reinforced concrete pipe (extension)(18")
|
8   |
LNFT |
105.30 |
842.40 |
|
|
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
20   |
LNFT |
115.83 |
2,316.60 |
|
|
|
|
|
|
| 701-15 |
concrete collar
|
8   |
EACH |
685.00 |
5,480.00 |
|
|
|
|
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
200.0 |
LNFT |
31.59 |
6,318.00 |
|
|
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
310.0 |
LNFT |
31.59 |
9,792.90 |
|
|
|
|
|
|
| 704-03 |
blocked out guard rail
|
175.0 |
LNFT |
17.37 |
3,039.75 |
|
|
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
8   |
EACH |
1,850.00 |
14,800.00 |
|
|
|
|
|
|
| 711-02-C |
riprap (30 lb)
|
10   |
CUYD |
63.18 |
631.80 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
4,400.00 |
4,400.00 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
5.544 |
MILE |
369.00 |
2,045.73 |
|
|
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
0.900 |
MILE |
210.00 |
189.00 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
21.228 |
MILE |
421.00 |
8,936.98 |
|
|
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
2,200   |
SQYD |
61.70 |
135,740.00 |
|
|
|
|
|
|
| 724-02 |
pavement widening
|
5,336.7 |
SQYD |
20.82 |
111,110.09 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
20.1 |
CUYD |
36.85 |
740.68 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
27,100.00 |
27,100.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
20   |
EACH |
68.44 |
1,368.80 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
251   |
EACH |
5.26 |
1,320.26 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
7.076 |
MILE |
1,792.00 |
12,680.19 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.300 |
MILE |
737.00 |
221.10 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
44   |
EACH |
12.00 |
528.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
44   |
EACH |
205.00 |
9,020.00 |
|
|
|
|
|
|
| 739-01 |
hydro-seeding
|
2.24 |
ACRE |
843.00 |
1,888.32 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
6,900.00 |
6,900.00 |
|
|
|
|
|
|
| S-001 |
u-channel post installation
|
58   |
ea |
79.00 |
4,582.00 |
|
|
|
|
|
|
| S-002 |
cleaning existing ditches
|
100   |
LNFT |
2.90 |
290.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
954,385.59 |
|
|
|
|
|
|
|