| Lead Project: 242-01-0008 |
| Parish: ST MARY |
| Routes: LA 322, LA 3069 |
| Description: MINOR OVERLAY PROJECTS IN DISTRICT 03 (04) (CM) |
Type Const:
superpave asphaltic concrete,temporary pavement markings, pavement patching, reflectorized
raised pavement markers, plastic pavement striping, surface preparation &related work |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - H & S CONSTRUCTION CO., INC. |
- 2 - BARRIERE CONSTRUCTION CO., LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
191   |
CUYD |
44.00 |
8,404.00 |
40.00 |
7,640.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
1,384.0 |
TON |
56.00 |
77,504.00 |
80.00 |
110,720.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete,paved drives & turnouts
|
281.4 |
TON |
60.00 |
16,884.00 |
80.00 |
22,512.00 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
4   |
EACH |
400.00 |
1,600.00 |
100.00 |
400.00 |
|
|
|
|
| 702-04-B |
adjusting catch basins
|
2   |
EACH |
1,500.00 |
3,000.00 |
400.00 |
800.00 |
|
|
|
|
| 702-04-D |
adjusting water valves
|
1   |
EACH |
200.00 |
200.00 |
100.00 |
100.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
12,000.00 |
12,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
0.866 |
MILE |
600.00 |
519.60 |
10.00 |
8.66 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
3.089 |
MILE |
632.00 |
1,952.24 |
10.00 |
30.89 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
531   |
SQYD |
44.85 |
23,815.35 |
55.00 |
29,205.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
16,000.00 |
16,000.00 |
22,000.00 |
22,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
121   |
EACH |
5.70 |
689.70 |
5.00 |
605.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
3.089 |
MILE |
2,300.00 |
7,104.70 |
2,000.00 |
6,178.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
3,000.00 |
3,000.00 |
2,500.00 |
2,500.00 |
|
|
|
|
| S-001 |
surface preparation
|
lump |
LUMP |
6,000.00 |
6,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
178,673.59 |
|
222,699.55 |
|
|
|
|
|