Letting of 6/30/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 193-31-0027
Parish: CALCASIEU
Routes: LA 397
Description: JCT. LA. 14 - JCT. U.S. 90
Type Const: cold planing asphaltic concrete, superpave asphaltic concrete overlay and related
work.
 
RankLicenseBidderAmount
100183 R. E. HEIDT CONSTRUCTION CO., INC. $1,329,280.10
234356 PRAIRIE CONTRACTORS INC. $1,487,777.95
 
Item Number Item Description Quantity Unit of Measure - 1 -
R. E. HEIDT CONSTRUCTION CO., INC.
- 2 -
PRAIRIE CONTRACTORS INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 342      LNFT 9.75 3,334.50 5.00 1,710.00        
202-02-I removal of railroad crossings 2      EACH 7,100.00 14,200.00 5,000.00 10,000.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
133      CUYD 46.30 6,157.90 30.00 3,990.00        
502-01 superpave asphaltic concrete 24,349.9    TON 42.75 1,040,958.22 44.50 1,083,570.55        
502-01-A superpave asphaltic concrete (paved drives and
turnouts)
581.5    TON 73.00 42,449.50 58.00 33,727.00        
509-01 cold planing asphaltic pavement 120,088      SQYD 0.57 68,450.16 1.10 132,096.80        
509-02 contractor retained reclaimed asphaltic pavement - 5,838      CUYD 1.00 - 5,838.00 20.00 - 116,760.00        
704-03 blocked out guard rail 262.5    LNFT 16.25 4,265.62 16.00 4,200.00        
704-07-A guard rail bridge attachments (single thrie beam) 50.0    LNFT 35.00 1,750.00 34.00 1,700.00        
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 36.00 3,600.00 35.00 3,500.00        
704-11-A guard rail end treatment (flared) 2      EACH 1,700.00 3,400.00 1,600.00 3,200.00        
713-01 temporary signs & barricades lump      LUMP 10,000.00 10,000.00 108,000.00 108,000.00        
713-03-C temporary pavement markings (8" width) 150      LNFT 0.21 31.50 0.20 30.00        
713-03-E temporary pavement markings (24" width) 495      LNFT 0.63 311.85 0.60 297.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
15.420  MILE 100.00 1,542.00 300.00 4,626.00        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
15.420  MILE 100.00 1,542.00 1.00 15.42        
713-05-A temporary pavement markings (solid line)(4" width) 32.782  MILE 100.00 3,278.20 1.00 32.78        
713-06-A temporary pavement legends and symbols (arrow) 6      EACH 53.00 318.00 1.00 6.00        
713-06-B temporary pavement legends and symbols (double arrow) 6      EACH 63.00 378.00 1.00 6.00        
713-06-C temporary pavement legends and symbols (only) 3      EACH 63.00 189.00 1.00 3.00        
724-01-B pavement patching (12" minimum thickness) 1,426      SQYD 35.00 49,910.00 45.00 64,170.00        
727-01 mobilization lump      LUMP 30,000.00 30,000.00 108,000.00 108,000.00        
729-16-B object marker assembly (type 2) 8      EACH 58.00 464.00 55.00 440.00        
729-16-C object marker assembly (type 3) 4      EACH 70.00 280.00 65.00 260.00        
731-02 reflectorized raised pavement markers 988      EACH 5.25 5,187.00 5.00 4,940.00        
732-01-C plastic pavement striping (8" width) 50      LNFT 0.84 42.00 1.00 50.00        
732-01-E plastic pavement striping (24" width) 165      LNFT 2.50 412.50 2.50 412.50        
732-02-A plastic pavement striping (solid line) (4" width) 10.927  MILE 1,800.00 19,668.60 1,700.00 18,575.90        
732-03-A plastic pavement striping (broken line)(4" width) 5.140  MILE 630.00 3,238.20 600.00 3,084.00        
732-04-A plastic pavement legends & symbols (arrow) 2      EACH 132.00 264.00 125.00 250.00        
732-04-B plastic pavement legends & symbols (double arrow) 2      EACH 158.00 316.00 150.00 300.00        
732-04-C plastic pavement legends & symbols (only) 1      EACH 158.00 158.00 150.00 150.00        
735-01 mailboxes 35      EACH 1.05 36.75 1.00 35.00        
735-02 mailbox supports (single) 28      EACH 122.00 3,416.00 100.00 2,800.00        
735-03 mailbox supports (double) 2      EACH 180.00 360.00 125.00 250.00        
735-04 mailbox supports (multiple) 1      EACH 320.00 320.00 310.00 310.00        
736-09 loop detector 96      LNFT 33.60 3,225.60 20.00 1,920.00        
740-01 construction layout lump      LUMP 3,700.00 3,700.00 100.00 100.00        
S-001 rumble strips (ground-in) 10.3    MILE 610.00 6,283.00 600.00 6,180.00        
S-002 special anchor section 2      EACH 840.00 1,680.00 800.00 1,600.00        
                       
 CONTRACTOR TOTAL       1,329,280.10   1,487,777.95        