| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - R. E. HEIDT CONSTRUCTION CO., INC. |
- 2 - PRAIRIE CONTRACTORS INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
342   |
LNFT |
9.75 |
3,334.50 |
5.00 |
1,710.00 |
|
|
|
|
| 202-02-I |
removal of railroad crossings
|
2   |
EACH |
7,100.00 |
14,200.00 |
5,000.00 |
10,000.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
133   |
CUYD |
46.30 |
6,157.90 |
30.00 |
3,990.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
24,349.9 |
TON |
42.75 |
1,040,958.22 |
44.50 |
1,083,570.55 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete (paved drives and
turnouts) |
581.5 |
TON |
73.00 |
42,449.50 |
58.00 |
33,727.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
120,088   |
SQYD |
0.57 |
68,450.16 |
1.10 |
132,096.80 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 5,838   |
CUYD |
1.00 |
- 5,838.00 |
20.00 |
- 116,760.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
262.5 |
LNFT |
16.25 |
4,265.62 |
16.00 |
4,200.00 |
|
|
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
50.0 |
LNFT |
35.00 |
1,750.00 |
34.00 |
1,700.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
36.00 |
3,600.00 |
35.00 |
3,500.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
2   |
EACH |
1,700.00 |
3,400.00 |
1,600.00 |
3,200.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
108,000.00 |
108,000.00 |
|
|
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
150   |
LNFT |
0.21 |
31.50 |
0.20 |
30.00 |
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
495   |
LNFT |
0.63 |
311.85 |
0.60 |
297.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
15.420 |
MILE |
100.00 |
1,542.00 |
300.00 |
4,626.00 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
15.420 |
MILE |
100.00 |
1,542.00 |
1.00 |
15.42 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
32.782 |
MILE |
100.00 |
3,278.20 |
1.00 |
32.78 |
|
|
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
6   |
EACH |
53.00 |
318.00 |
1.00 |
6.00 |
|
|
|
|
| 713-06-B |
temporary pavement legends and symbols (double arrow)
|
6   |
EACH |
63.00 |
378.00 |
1.00 |
6.00 |
|
|
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
3   |
EACH |
63.00 |
189.00 |
1.00 |
3.00 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
1,426   |
SQYD |
35.00 |
49,910.00 |
45.00 |
64,170.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
30,000.00 |
30,000.00 |
108,000.00 |
108,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
8   |
EACH |
58.00 |
464.00 |
55.00 |
440.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
70.00 |
280.00 |
65.00 |
260.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
988   |
EACH |
5.25 |
5,187.00 |
5.00 |
4,940.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
50   |
LNFT |
0.84 |
42.00 |
1.00 |
50.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
165   |
LNFT |
2.50 |
412.50 |
2.50 |
412.50 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
10.927 |
MILE |
1,800.00 |
19,668.60 |
1,700.00 |
18,575.90 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
5.140 |
MILE |
630.00 |
3,238.20 |
600.00 |
3,084.00 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
2   |
EACH |
132.00 |
264.00 |
125.00 |
250.00 |
|
|
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
2   |
EACH |
158.00 |
316.00 |
150.00 |
300.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
1   |
EACH |
158.00 |
158.00 |
150.00 |
150.00 |
|
|
|
|
| 735-01 |
mailboxes
|
35   |
EACH |
1.05 |
36.75 |
1.00 |
35.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
28   |
EACH |
122.00 |
3,416.00 |
100.00 |
2,800.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
2   |
EACH |
180.00 |
360.00 |
125.00 |
250.00 |
|
|
|
|
| 735-04 |
mailbox supports (multiple)
|
1   |
EACH |
320.00 |
320.00 |
310.00 |
310.00 |
|
|
|
|
| 736-09 |
loop detector
|
96   |
LNFT |
33.60 |
3,225.60 |
20.00 |
1,920.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
3,700.00 |
3,700.00 |
100.00 |
100.00 |
|
|
|
|
| S-001 |
rumble strips (ground-in)
|
10.3 |
MILE |
610.00 |
6,283.00 |
600.00 |
6,180.00 |
|
|
|
|
| S-002 |
special anchor section
|
2   |
EACH |
840.00 |
1,680.00 |
800.00 |
1,600.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,329,280.10 |
|
1,487,777.95 |
|
|
|
|
|