| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - CON-TERRA, INC |
- 2 - C,W & W CONTRACTORS, INC. |
- 3 - T.L. CONSTRUCTION INC |
- 4 - RMK CONSTRUCTION CO. LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
5,000.00 |
5,000.00 |
7,000.00 |
7,000.00 |
10,000.00 |
10,000.00 |
4,000.00 |
4,000.00 |
| 203-08 |
borrow (vehicular measurement)
|
210   |
CUYD |
20.00 |
4,200.00 |
15.00 |
3,150.00 |
12.00 |
2,520.00 |
10.00 |
2,100.00 |
| 701-01-M/N |
cross drain pipe (36" rcp/pcp or 42" cmp)
|
112   |
LNFT |
60.00 |
6,720.00 |
72.50 |
8,120.00 |
85.00 |
9,520.00 |
125.00 |
14,000.00 |
| 701-01-Q |
cross drain pipe (60" rcp/pcp)
|
112   |
LNFT |
170.00 |
19,040.00 |
200.00 |
22,400.00 |
240.00 |
26,880.00 |
225.00 |
25,200.00 |
| 701-15 |
concrete collar
|
2   |
EACH |
750.00 |
1,500.00 |
1,000.00 |
2,000.00 |
500.00 |
1,000.00 |
750.00 |
1,500.00 |
| 711-01-C |
riprap (30 lb, 10" thick)
|
70   |
SQYD |
60.00 |
4,200.00 |
55.00 |
3,850.00 |
45.00 |
3,150.00 |
40.00 |
2,800.00 |
| 711-04 |
geotextile fabric
|
70   |
SQYD |
1.00 |
70.00 |
2.00 |
140.00 |
7.00 |
490.00 |
2.00 |
140.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
12,000.00 |
12,000.00 |
| 724-01-B |
pavement patching (12" minimum thickness)
|
145   |
SQYD |
50.00 |
7,250.00 |
105.00 |
15,225.00 |
96.00 |
13,920.00 |
60.00 |
8,700.00 |
| 726-01 |
bedding material
|
85.0 |
CUYD |
60.00 |
5,100.00 |
60.00 |
5,100.00 |
40.00 |
3,400.00 |
65.00 |
5,525.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
5,000.00 |
5,000.00 |
8,000.00 |
8,000.00 |
5,000.00 |
5,000.00 |
13,905.00 |
13,905.00 |
| 739-01 |
hydro-seeding
|
0.13 |
ACRE |
1,500.00 |
195.00 |
10,000.00 |
1,300.00 |
5,000.00 |
650.00 |
1,000.00 |
130.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
63,275.00 |
|
81,285.00 |
|
86,530.00 |
|
90,000.00 |
|