Lead Project: 092-01-0014
Parish: NATCHITOCHES, RAPIDES
Routes: LA 156, LA 1203
Description: CULVERT REPLACEMENT PROJECTS IN DISTRICT 08 (04)(CM)
Type Const: removal of structues & obstructions, cross drain pipe, concr ete collar, riprap,
geotextile fabric, pavement patching, bedding material, hydro-seeding and related work.
 
RankLicenseBidderAmount
128292 CON-TERRA, INC $63,275.00
218546 C,W & W CONTRACTORS, INC. $81,285.00
335849 T.L. CONSTRUCTION INC $86,530.00
439104 RMK CONSTRUCTION CO. LLC $90,000.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
CON-TERRA, INC
- 2 -
C,W & W CONTRACTORS, INC.
- 3 -
T.L. CONSTRUCTION INC
- 4 -
RMK CONSTRUCTION CO. LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 5,000.00 5,000.00 7,000.00 7,000.00 10,000.00 10,000.00 4,000.00 4,000.00
203-08 borrow (vehicular measurement) 210      CUYD 20.00 4,200.00 15.00 3,150.00 12.00 2,520.00 10.00 2,100.00
701-01-M/N cross drain pipe (36" rcp/pcp or 42" cmp) 112      LNFT 60.00 6,720.00 72.50 8,120.00 85.00 9,520.00 125.00 14,000.00
701-01-Q cross drain pipe (60" rcp/pcp) 112      LNFT 170.00 19,040.00 200.00 22,400.00 240.00 26,880.00 225.00 25,200.00
701-15 concrete collar 2      EACH 750.00 1,500.00 1,000.00 2,000.00 500.00 1,000.00 750.00 1,500.00
711-01-C riprap (30 lb, 10" thick) 70      SQYD 60.00 4,200.00 55.00 3,850.00 45.00 3,150.00 40.00 2,800.00
711-04 geotextile fabric 70      SQYD 1.00 70.00 2.00 140.00 7.00 490.00 2.00 140.00
713-01 temporary signs & barricades lump      LUMP 5,000.00 5,000.00 5,000.00 5,000.00 10,000.00 10,000.00 12,000.00 12,000.00
724-01-B pavement patching (12" minimum thickness) 145      SQYD 50.00 7,250.00 105.00 15,225.00 96.00 13,920.00 60.00 8,700.00
726-01 bedding material 85.0    CUYD 60.00 5,100.00 60.00 5,100.00 40.00 3,400.00 65.00 5,525.00
727-01 mobilization lump      LUMP 5,000.00 5,000.00 8,000.00 8,000.00 5,000.00 5,000.00 13,905.00 13,905.00
739-01 hydro-seeding 0.13   ACRE 1,500.00 195.00 10,000.00 1,300.00 5,000.00 650.00 1,000.00 130.00
                       
 CONTRACTOR TOTAL       63,275.00   81,285.00   86,530.00   90,000.00