| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - BOH BROS. CONSTRUCTION CO., LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-08 |
borrow (vehicular measurement)
|
100   |
CUYD |
25.00 |
2,500.00 |
5.00 |
500.00 |
|
|
|
|
| 502-01-A-01 |
superpave asphaltic conc wearing course (level 1f)
|
356.3 |
TON |
80.00 |
28,504.00 |
79.00 |
28,147.70 |
|
|
|
|
| 502-01-D |
superpave asphaltic concrete, incidental paving (level
a) |
50.8 |
TON |
80.00 |
4,064.00 |
100.00 |
5,080.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
3,349   |
SQYD |
3.00 |
10,047.00 |
2.50 |
8,372.50 |
|
|
|
|
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
8   |
LNFT |
50.00 |
400.00 |
80.00 |
640.00 |
|
|
|
|
| 701-05-G |
side drain pipe (18")
|
120   |
LNFT |
50.00 |
6,000.00 |
85.00 |
10,200.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
2   |
EACH |
3,500.00 |
7,000.00 |
4,600.00 |
9,200.00 |
|
|
|
|
| 702-04 |
adjusting valve boxes
|
1   |
EACH |
100.00 |
100.00 |
250.00 |
250.00 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
1   |
EACH |
100.00 |
100.00 |
700.00 |
700.00 |
|
|
|
|
| 702-04-B |
adjusting catch basins
|
1   |
EACH |
600.00 |
600.00 |
700.00 |
700.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
7,000.00 |
7,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
378   |
LNFT |
0.05 |
18.90 |
0.10 |
37.80 |
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
719   |
LNFT |
0.15 |
107.85 |
0.15 |
107.85 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
1.771 |
MILE |
20.00 |
35.42 |
100.00 |
177.10 |
|
|
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
2   |
EACH |
20.00 |
40.00 |
10.00 |
20.00 |
|
|
|
|
| 724-02 |
pavement widening
|
1,018.2 |
SQYD |
25.00 |
25,455.00 |
35.00 |
35,637.00 |
|
|
|
|
| 726-01 |
bedding material
|
24.6 |
CUYD |
50.00 |
1,230.00 |
50.00 |
1,230.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
11,000.00 |
11,000.00 |
12,000.00 |
12,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
289   |
EACH |
6.50 |
1,878.50 |
6.00 |
1,734.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
126   |
LNFT |
1.00 |
126.00 |
1.00 |
126.00 |
|
|
|
|
| 732-01-C-01 |
plastic pavement striping (8" width) preformed marking
tape (dotted) |
90   |
LNFT |
5.00 |
450.00 |
5.00 |
450.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
240   |
LNFT |
3.00 |
720.00 |
3.00 |
720.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.590 |
MILE |
2,500.00 |
1,475.00 |
2,500.00 |
1,475.00 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
2   |
EACH |
170.00 |
340.00 |
175.00 |
350.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
2   |
EACH |
200.00 |
400.00 |
200.00 |
400.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
109,591.67 |
|
128,254.95 |
|
|
|
|
|