DBE GOAL FED
Lead Project: 037-02-0037
Parish: W CARROLL
Routes: LA 2
Description: MOREHOUSE PL - JCT. MT. ZION RD.
Type Const: grading, superpave asphaltic concrete overlay, pavement patching, and related work.
 
RankLicenseBidderAmount
105789 D & J CONSTRUCTION CO., INC. $1,295,679.50
212487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,374,696.50
 
Item Number Item Description Quantity Unit of Measure - 1 -
D & J CONSTRUCTION CO., INC.
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 1,000.00 1,000.00 20,000.00 20,000.00        
202-02-H removal of guard rail 363      LNFT 20.00 7,260.00 3.25 1,179.75        
203-08 borrow (vehicular measurement) 500      CUYD 30.00 15,000.00 27.00 13,500.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
2,413      CUYD 42.00 101,346.00 45.00 108,585.00        
502-01 superpave asphaltic concrete 13,765.0    TON 57.00 784,605.00 56.39 776,208.35        
502-01-A superpave asphaltic concrete, paved drives and
turnouts
1,015.1    TON 68.00 69,026.80 195.70 198,655.07        
509-01 cold planing asphaltic pavement 266      SQYD 50.00 13,300.00 27.14 7,219.24        
704-03 blocked out guard rail 212.6    LNFT 19.00 4,039.40 15.42 3,278.29        
704-07-A guard rail bridge attachments (single thrie beam) 50.0    LNFT 40.50 2,025.00 33.55 1,677.50        
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 46.50 4,650.00 34.63 3,463.00        
704-11-A guard rail end treatment (flared) 4      EACH 2,150.00 8,600.00 1,731.50 6,926.00        
713-01 temporary signs & barricades lump      LUMP 62,000.00 62,000.00 19,000.00 19,000.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
13.077  MILE 165.00 2,157.70 380.00 4,969.26        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
13.002  MILE 140.00 1,820.28 270.50 3,517.04        
713-05-A temporary pavement markings (solid line)(4" width) 28.023  MILE 1.00 28.02 541.03 15,161.28        
724-01-C pavement patching (18" minimum thickness) 200      SQYD 175.00 35,000.00 200.00 40,000.00        
727-01 mobilization lump      LUMP 129,000.00 129,000.00 73,775.00 73,775.00        
729-16-C object marker assembly (type 3) 4      EACH 75.00 300.00 70.34 281.36        
731-02 reflectorized raised pavement markers 575      EACH 7.50 4,312.50 4.87 2,800.25        
732-02-A plastic pavement striping (solid line) (4" width) 9.341  MILE 3,000.00 28,023.00 1,916.00 17,897.35        
732-03-A plastic pavement striping (broken line)(4" width) 4.334  MILE 1,200.00 5,200.80 649.00 2,812.76        
735-01 mailboxes 55      EACH 6.00 330.00 13.00 715.00        
735-02 mailbox supports (single) 35      EACH 145.00 5,075.00 175.00 6,125.00        
735-03 mailbox supports (double) 5      EACH 200.00 1,000.00 250.00 1,250.00        
735-04 mailbox supports (multiple) 2      EACH 290.00 580.00 350.00 700.00        
740-01 construction layout lump      LUMP 10,000.00 10,000.00 45,000.00 45,000.00        
                       
 CONTRACTOR TOTAL       1,295,679.50   1,374,696.50        