| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - JAMES CONSTRUCTION GROUP LLC |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - DENTON-JAMES LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
80,000.00 |
80,000.00 |
10,000.00 |
10,000.00 |
175,000.00 |
175,000.00 |
|
|
| 202-02-A |
removal of bridges (sta 5+475, 96.7m conc slab span
bridge) |
1   |
ea |
50,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
100,000.00 |
100,000.00 |
|
|
| 202-02-B-01 |
removal of concrete box culverts (sta 3+270; 3-2.7m x
2.7m x 30m rcb) |
1   |
ea |
1,000.00 |
1,000.00 |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
|
|
| 202-02-B-02 |
removal of concrete box culverts (sta 4+025; 1-0.6m x
0.6m x 13.2m rcb) |
1   |
ea |
1,000.00 |
1,000.00 |
3,000.00 |
3,000.00 |
1,500.00 |
1,500.00 |
|
|
| 202-02-B-03 |
removal of concrete box culverts (sta 4+268; 1-1.5m x
0.9m x 13.8m rcb) |
1   |
ea |
1,000.00 |
1,000.00 |
3,000.00 |
3,000.00 |
2,500.00 |
2,500.00 |
|
|
| 202-02-B-04 |
removal of concrete box culverts (sta 10+090; 1-0.5m x
0.9m x 13.3m rcb) |
1   |
ea |
1,000.00 |
1,000.00 |
3,000.00 |
3,000.00 |
1,500.00 |
1,500.00 |
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
56,778   |
sq m |
5.00 |
283,890.00 |
3.60 |
204,400.80 |
7.00 |
397,446.00 |
|
|
| 202-02-D |
removal of concrete walks
|
1,252   |
sq m |
7.00 |
8,764.00 |
3.00 |
3,756.00 |
7.00 |
8,764.00 |
|
|
| 202-02-E |
removal of concrete curbs
|
262.0 |
ln m |
5.00 |
1,310.00 |
5.00 |
1,310.00 |
7.00 |
1,834.00 |
|
|
| 202-02-F |
removal of concrete combination curb & gutter
|
2,020.0 |
ln m |
6.00 |
12,120.00 |
6.00 |
12,120.00 |
8.00 |
16,160.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
969.0 |
sq m |
4.00 |
3,876.00 |
3.50 |
3,391.50 |
7.00 |
6,783.00 |
|
|
| 202-02-I |
removal of existing traffic signal equipment
|
lump |
lump |
5,000.00 |
5,000.00 |
1,700.00 |
1,700.00 |
1,500.00 |
1,500.00 |
|
|
| 202-02-J |
removal of concrete structure slabs
|
1,130   |
sq m |
10.00 |
11,300.00 |
3.50 |
3,955.00 |
10.00 |
11,300.00 |
|
|
| 202-02-K |
removal of concrete parking lot & drives
|
9,634   |
sq m |
5.00 |
48,170.00 |
2.50 |
24,085.00 |
7.00 |
67,438.00 |
|
|
| 202-02-L |
removal of winn rock
|
4,300   |
cu m |
6.00 |
25,800.00 |
4.00 |
17,200.00 |
10.00 |
43,000.00 |
|
|
| 202-02-M |
removal of 2-connected commercial buildings (slab to
remain)(sta 5+734 lt) |
lump |
lump |
15,000.00 |
15,000.00 |
3,500.00 |
3,500.00 |
1.00 |
1.00 |
|
|
| 202-02-N |
removal of logstacking structures
|
8   |
each |
100.00 |
800.00 |
350.00 |
2,800.00 |
1.00 |
8.00 |
|
|
| 202-02-O |
removal of underground storage tanks (5+173 rt.)
|
3   |
each |
5,000.00 |
15,000.00 |
9,000.00 |
27,000.00 |
6,000.00 |
18,000.00 |
|
|
| 202-02-P |
removal of 6.1x 9.8m building w/canopy (sta 10+055 rt.
|
lump |
lump |
500.00 |
500.00 |
3,500.00 |
3,500.00 |
1.00 |
1.00 |
|
|
| 202-02-Q |
removal of building w/ canopy (sta 4+000)
|
lump |
lump |
500.00 |
500.00 |
4,000.00 |
4,000.00 |
1.00 |
1.00 |
|
|
| 202-02-R |
removal of fuel equip. w/storage supports (sta
4+000 lt) |
lump |
lump |
1,000.00 |
1,000.00 |
800.00 |
800.00 |
1.00 |
1.00 |
|
|
| 202-02-S |
removal of chain link fence (sta 4+000 lt)
|
95   |
ln m |
5.00 |
475.00 |
7.00 |
665.00 |
8.50 |
807.50 |
|
|
| 202-02-T |
removal of retaining walls
|
110   |
ln m |
10.00 |
1,100.00 |
32.00 |
3,520.00 |
40.00 |
4,400.00 |
|
|
| 202-02-U |
removal of cinder block bldg. (10+238 rt.)
|
1   |
ln m |
2,000.00 |
2,000.00 |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
|
|
| 202-02-V |
removal of 16.2 x 8m wood frame house w/ porch (sta
9+820 rt.) |
1   |
each |
1,000.00 |
1,000.00 |
3,500.00 |
3,500.00 |
1.00 |
1.00 |
|
|
| 202-02-W |
removal of 6.2x11.1m wood frame house (sta 9+835 rt.)
|
1   |
each |
1,000.00 |
1,000.00 |
3,500.00 |
3,500.00 |
1.00 |
1.00 |
|
|
| 202-02-X |
removal of pile of tires (sta 4+300 rt.)
|
1   |
each |
100.00 |
100.00 |
3,500.00 |
3,500.00 |
1.00 |
1.00 |
|
|
| 202-06 |
removal and disposal of contaminated fluid
|
37,854   |
l |
1.00 |
37,854.00 |
0.30 |
11,356.20 |
0.20 |
7,570.80 |
|
|
| 203-01 |
general excavation
|
128,197   |
cu m |
3.00 |
384,591.00 |
5.00 |
640,985.00 |
5.40 |
692,263.80 |
|
|
| 203-02 |
drainage excavation
|
1,880   |
cu m |
7.00 |
13,160.00 |
6.50 |
12,220.00 |
11.00 |
20,680.00 |
|
|
| 203-04 |
embankment
|
84,432   |
cu m |
5.00 |
422,160.00 |
10.00 |
844,320.00 |
6.00 |
506,592.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
500   |
ea |
6.00 |
3,000.00 |
25.00 |
12,500.00 |
6.00 |
3,000.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
80   |
ea |
125.00 |
10,000.00 |
200.00 |
16,000.00 |
100.00 |
8,000.00 |
|
|
| 204-06 |
temporary silt fencing
|
2,500   |
ln m |
4.00 |
10,000.00 |
6.00 |
15,000.00 |
3.50 |
8,750.00 |
|
|
| 302-02-E |
class ii base course (200 mm thick)
|
111,575.2 |
sq m |
13.40 |
1,495,107.68 |
18.00 |
2,008,353.60 |
13.00 |
1,450,477.60 |
|
|
| 304-01 |
lime
|
864.80 |
Mg |
115.00 |
99,452.00 |
100.00 |
86,480.00 |
120.00 |
103,776.00 |
|
|
| 304-04-C |
lime treatment (type d) (250 mm thick)
|
57,129   |
sq m |
1.00 |
57,129.00 |
0.50 |
28,564.50 |
2.00 |
114,258.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
492   |
cu m |
35.00 |
17,220.00 |
50.00 |
24,600.00 |
70.00 |
34,440.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
500.0 |
cu m |
40.00 |
20,000.00 |
60.00 |
30,000.00 |
75.00 |
37,500.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
525.8 |
Mg |
180.00 |
94,644.00 |
100.00 |
52,580.00 |
165.00 |
86,757.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
84.3 |
Mg |
240.00 |
20,232.00 |
150.00 |
12,645.00 |
220.00 |
18,546.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
5,119   |
sq m |
1.50 |
7,678.50 |
2.00 |
10,238.00 |
3.30 |
16,892.70 |
|
|
| 601-01-K |
portland cement concrete pavement (250 mm thick)
|
78,945.6 |
sq m |
47.00 |
3,710,443.20 |
44.00 |
3,473,606.40 |
45.00 |
3,552,552.00 |
|
|
| 601-02-K |
portland cement concrete pavement (250 mm thick)
(crossovers & turnouts) |
13,653.8 |
sq m |
50.00 |
682,690.00 |
52.00 |
709,997.60 |
55.00 |
750,959.00 |
|
|
| 601-03-H |
portland cement concrete shoulder (212.5 mm thick)
|
3,649.9 |
sq m |
42.00 |
153,295.80 |
49.00 |
178,845.10 |
40.00 |
145,996.00 |
|
|
| 601-03-I |
portland cement concrete shoulder (225 mm thick)
|
12,707.7 |
sq m |
42.00 |
533,723.40 |
46.00 |
584,554.20 |
43.00 |
546,431.10 |
|
|
| 601-04 |
portland cement concrete pavement coring
|
135   |
ea |
70.00 |
9,450.00 |
90.00 |
12,150.00 |
100.00 |
13,500.00 |
|
|
| 701-01-Q |
cross drain pipe (1500 mm rcp/pcp)
|
186.0 |
ln m |
500.00 |
93,000.00 |
625.00 |
116,250.00 |
600.00 |
111,600.00 |
|
|
| 701-02-D |
cross drain pipe arch (600 mm equiv. rcpa)
|
81.6 |
ln m |
250.00 |
20,400.00 |
200.00 |
16,320.00 |
200.00 |
16,320.00 |
|
|
| 701-02-F |
cross drain pipe arch (900 mm equiv. rcpa)
|
88.4 |
ln m |
400.00 |
35,360.00 |
300.00 |
26,520.00 |
300.00 |
26,520.00 |
|
|
| 701-03-F |
storm drain pipe (375 mm rcp/pcp)
|
1,974.4 |
ln m |
120.00 |
236,928.00 |
85.00 |
167,824.00 |
160.00 |
315,904.00 |
|
|
| 701-03-G |
storm drain pipe (450 mm rcp/pcp)
|
199.5 |
ln m |
130.00 |
25,935.00 |
110.00 |
21,945.00 |
180.00 |
35,910.00 |
|
|
| 701-03-I |
storm drain pipe (600 mm rcp/pcp)
|
588.7 |
ln m |
230.00 |
135,401.00 |
140.00 |
82,418.00 |
200.00 |
117,740.00 |
|
|
| 701-03-K |
storm drain pipe (750 mm rcp/pcp)
|
264.8 |
ln m |
230.00 |
60,904.00 |
190.00 |
50,312.00 |
220.00 |
58,256.00 |
|
|
| 701-03-M |
storm drain pipe (900 mm rcp/pcp)
|
468.5 |
ln m |
250.00 |
117,125.00 |
245.00 |
114,782.50 |
300.00 |
140,550.00 |
|
|
| 701-03-N |
storm drain pipe (1050 mm rcp/pcp)
|
119.2 |
ln m |
330.00 |
39,336.00 |
355.00 |
42,316.00 |
380.00 |
45,296.00 |
|
|
| 701-03-N-01 |
storm drain pipe (1050 mm rpvccp)(outfall)
|
6.0 |
ln m |
400.00 |
2,400.00 |
390.00 |
2,340.00 |
450.00 |
2,700.00 |
|
|
| 701-03-O |
storm drain pipe (1200 mm rcp/pcp)
|
165.5 |
ln m |
450.00 |
74,475.00 |
430.00 |
71,165.00 |
480.00 |
79,440.00 |
|
|
| 701-04-E |
storm drain pipe arch (750 mm equiv. rcpa)
|
48.6 |
ln m |
280.00 |
13,608.00 |
230.00 |
11,178.00 |
250.00 |
12,150.00 |
|
|
| 701-04-E-01 |
storm drain pipe arch (750 mm equiv. cmpa)(outfall)
|
6.0 |
ln m |
250.00 |
1,500.00 |
230.00 |
1,380.00 |
300.00 |
1,800.00 |
|
|
| 701-04-F |
storm drain pipe arch (900 mm equiv. rcpa)
|
81.7 |
ln m |
350.00 |
28,595.00 |
310.00 |
25,327.00 |
350.00 |
28,595.00 |
|
|
| 701-04-G |
storm drain pipe arch (1050 mm equiv. rcpa)
|
65.2 |
ln m |
450.00 |
29,340.00 |
390.00 |
25,428.00 |
400.00 |
26,080.00 |
|
|
| 701-04-G-01 |
storm drain pipe arch (1050 mm equiv. cmpa)(outfall)
|
3.0 |
ln m |
450.00 |
1,350.00 |
440.00 |
1,320.00 |
420.00 |
1,260.00 |
|
|
| 701-04-H |
storm drain pipe arch (1200 mm equiv. rcpa)
|
96.0 |
ln m |
500.00 |
48,000.00 |
500.00 |
48,000.00 |
480.00 |
46,080.00 |
|
|
| 701-04-H-01 |
storm drain pipe arch (1200 mm equiv. rcpcvvp)(outfall)
|
14.0 |
ln m |
500.00 |
7,000.00 |
525.00 |
7,350.00 |
550.00 |
7,700.00 |
|
|
| 701-04-L |
storm drain pipe arch (1800 mm equiv. rcpa)
|
55.0 |
ln m |
1,200.00 |
66,000.00 |
800.00 |
44,000.00 |
800.00 |
44,000.00 |
|
|
| 701-04-L-01 |
storm drain pipe arch (1800 mm equiv. cmpa)(outfall)
|
5.6 |
ln m |
600.00 |
3,360.00 |
500.00 |
2,800.00 |
880.00 |
4,928.00 |
|
|
| 701-05-G |
side drain pipe (450 mm)
|
357.1 |
ln m |
110.00 |
39,281.00 |
80.00 |
28,568.00 |
140.00 |
49,994.00 |
|
|
| 701-05-I |
side drain pipe (600 mm)
|
61.0 |
ln m |
120.00 |
7,320.00 |
120.00 |
7,320.00 |
160.00 |
9,760.00 |
|
|
| 701-05-M |
side drain pipe (900 mm)
|
49.0 |
ln m |
220.00 |
10,780.00 |
200.00 |
9,800.00 |
310.00 |
15,190.00 |
|
|
| 701-09-A |
fabricating conduit fittings (375mm x 375mm)
|
5   |
ea |
500.00 |
2,500.00 |
800.00 |
4,000.00 |
1,000.00 |
5,000.00 |
|
|
| 701-09-B |
fabricating conduit fittings (375mm x 600mm)
|
1   |
ea |
1,000.00 |
1,000.00 |
1,500.00 |
1,500.00 |
1,200.00 |
1,200.00 |
|
|
| 701-09-C |
fabricating conduit fittings (600mm x 600mm)
|
1   |
ea |
1,500.00 |
1,500.00 |
2,000.00 |
2,000.00 |
1,500.00 |
1,500.00 |
|
|
| 702-02-A |
manholes (mh-06)
|
3   |
ea |
3,700.00 |
11,100.00 |
2,800.00 |
8,400.00 |
3,000.00 |
9,000.00 |
|
|
| 702-02-F |
manholes (mh-01)
|
31   |
ea |
2,800.00 |
86,800.00 |
2,800.00 |
86,800.00 |
3,500.00 |
108,500.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
85   |
ea |
3,800.00 |
323,000.00 |
2,200.00 |
187,000.00 |
2,300.00 |
195,500.00 |
|
|
| 702-03-B |
catch basins (cb-02)
|
9   |
ea |
4,500.00 |
40,500.00 |
3,800.00 |
34,200.00 |
3,000.00 |
27,000.00 |
|
|
| 702-03-C |
catch basins (cb-06)
|
34   |
ea |
2,800.00 |
95,200.00 |
3,100.00 |
105,400.00 |
3,500.00 |
119,000.00 |
|
|
| 702-03-D |
catch basins (cb-07)
|
45   |
ea |
4,600.00 |
207,000.00 |
4,100.00 |
184,500.00 |
4,000.00 |
180,000.00 |
|
|
| 702-03-F |
catch basins (cb-08)
|
18   |
ea |
4,800.00 |
86,400.00 |
7,100.00 |
127,800.00 |
5,800.00 |
104,400.00 |
|
|
| 702-04-A |
adjusting manholes
|
2   |
ea |
1,000.00 |
2,000.00 |
2,100.00 |
4,200.00 |
800.00 |
1,600.00 |
|
|
| 704-03 |
blocked out guard rail
|
121.92 |
ln m |
55.00 |
6,705.60 |
55.00 |
6,705.60 |
52.00 |
6,339.84 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
15.24 |
ln m |
135.00 |
2,057.40 |
150.00 |
2,286.00 |
140.00 |
2,133.60 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
2   |
ea |
1,700.00 |
3,400.00 |
1,800.00 |
3,600.00 |
1,700.00 |
3,400.00 |
|
|
| 705-06-B |
chain link fence (1500 mm height)
|
295   |
ln m |
39.00 |
11,505.00 |
40.00 |
11,800.00 |
39.00 |
11,505.00 |
|
|
| 705-06-C |
chain link fence (1800 mm height)
|
593   |
ln m |
48.00 |
28,464.00 |
50.00 |
29,650.00 |
48.00 |
28,464.00 |
|
|
| 705-06-D |
chain link fence (2100 mm height)
|
46   |
ln m |
59.00 |
2,714.00 |
60.00 |
2,760.00 |
59.00 |
2,714.00 |
|
|
| 706-01-A |
concrete walk (100 mm thick)
|
4,396.0 |
sq m |
35.00 |
153,860.00 |
35.00 |
153,860.00 |
35.00 |
153,860.00 |
|
|
| 706-01-C |
concrete walk (150 mm thick)
|
146.5 |
sq m |
38.00 |
5,567.00 |
45.00 |
6,592.50 |
55.00 |
8,057.50 |
|
|
| 706-02-C |
concrete drive (150 mm thick)
|
3,862.4 |
sq m |
36.00 |
139,046.40 |
42.00 |
162,220.80 |
52.00 |
200,844.80 |
|
|
| 706-03-C |
incidental concrete paving (150 mm thick)
|
1,478.3 |
sq m |
45.00 |
66,523.50 |
45.00 |
66,523.50 |
55.00 |
81,306.50 |
|
|
| 707-01 |
concrete curb
|
3,513.2 |
ln m |
8.00 |
28,105.60 |
20.00 |
70,264.00 |
20.00 |
70,264.00 |
|
|
| 708-01 |
right-of-way monument
|
203   |
ea |
100.00 |
20,300.00 |
300.00 |
60,900.00 |
100.00 |
20,300.00 |
|
|
| 708-02 |
right-of-way monument witness post
|
66   |
ea |
100.00 |
6,600.00 |
300.00 |
19,800.00 |
100.00 |
6,600.00 |
|
|
| 711-01-D |
riprap (25 kg,300mm thick)
|
80   |
sq m |
40.00 |
3,200.00 |
55.00 |
4,400.00 |
80.00 |
6,400.00 |
|
|
| 711-03-B |
riprap (5 kg)
|
200.0 |
Mg |
70.00 |
14,000.00 |
52.00 |
10,400.00 |
50.00 |
10,000.00 |
|
|
| 711-04 |
geotextile fabric
|
385   |
sq m |
2.00 |
770.00 |
3.00 |
1,155.00 |
2.00 |
770.00 |
|
|
| 712-01-A |
concrete cast-in-place revetment (100 mm thick)
|
350.0 |
sq m |
60.00 |
21,000.00 |
40.00 |
14,000.00 |
58.00 |
20,300.00 |
|
|
| 712-02-B |
sacked concrete revetment (dry batched)
|
300   |
sq m |
60.00 |
18,000.00 |
70.00 |
21,000.00 |
70.00 |
21,000.00 |
|
|
| 712-04 |
flexible revetment
|
748   |
sq m |
45.00 |
33,660.00 |
52.00 |
38,896.00 |
50.00 |
37,400.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
140,000.00 |
140,000.00 |
180,000.00 |
180,000.00 |
250,000.00 |
250,000.00 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(100 mm width)
(3.0 m length) |
0.557 |
km |
500.00 |
278.50 |
525.00 |
292.42 |
500.00 |
278.50 |
|
|
| 713-04-B-01 |
temporary pvmt. markings (broken line)(100 mm w)(3.0 m
l)(type i removable) |
5.180 |
km |
1,500.00 |
7,770.00 |
1,500.00 |
7,770.00 |
1,500.00 |
7,770.00 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(100 mm width)
|
1.325 |
km |
300.00 |
397.50 |
350.00 |
463.75 |
300.00 |
397.50 |
|
|
| 713-05-A-01 |
temporary pavement markings (solid line)(100 mm width)
(type 1 removable) |
19.396 |
km |
5,800.00 |
112,496.80 |
6,200.00 |
120,255.20 |
5,800.00 |
112,496.80 |
|
|
| 713-07 |
temporary reflectorized raised pavement markers
|
481   |
ea |
5.00 |
2,405.00 |
2.50 |
1,202.50 |
10.00 |
4,810.00 |
|
|
| 713-09 |
temporary precast concrete barrier (department
furnished) |
90   |
ea |
270.00 |
24,300.00 |
250.00 |
22,500.00 |
200.00 |
18,000.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
22.3 |
hctr |
1,000.00 |
22,300.00 |
1,700.00 |
37,910.00 |
950.00 |
21,185.00 |
|
|
| 717-01 |
seeding
|
1,339   |
kg |
12.00 |
16,068.00 |
13.00 |
17,407.00 |
11.50 |
15,398.50 |
|
|
| 718-01 |
fertilizer
|
25,000   |
kg |
0.50 |
12,500.00 |
0.35 |
8,750.00 |
0.40 |
10,000.00 |
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
1,000   |
sq m |
1.00 |
1,000.00 |
1.25 |
1,250.00 |
1.00 |
1,000.00 |
|
|
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
500   |
sq m |
1.00 |
500.00 |
1.25 |
625.00 |
1.00 |
500.00 |
|
|
| 722-01 |
project site laboratory
|
1   |
ea |
12,000.00 |
12,000.00 |
20,000.00 |
20,000.00 |
35,000.00 |
35,000.00 |
|
|
| 724-01-B |
asphalt pavement patching (300 mm minimum thickness)
|
122   |
sq m |
100.00 |
12,200.00 |
90.00 |
10,980.00 |
85.00 |
10,370.00 |
|
|
| 724-01-C |
pavement patching (full depth concrete)
|
575   |
sq m |
120.00 |
69,000.00 |
110.00 |
63,250.00 |
110.00 |
63,250.00 |
|
|
| 725-02 |
temporary detour roads
|
2,465.8 |
sq m |
55.00 |
135,619.00 |
60.00 |
147,948.00 |
62.00 |
152,879.60 |
|
|
| 726-01 |
bedding material
|
1,582.0 |
cu m |
75.00 |
118,650.00 |
65.00 |
102,830.00 |
40.00 |
63,280.00 |
|
|
| 727-01 |
mobilization
|
lump |
lump |
1,700,000.00 |
1,700,000.00 |
1,600,000.00 |
1,600,000.00 |
1,900,000.00 |
1,900,000.00 |
|
|
| 728-01 |
jacked or bored pipe (1050mm sdp)
|
10.80 |
ln m |
2,000.00 |
21,600.00 |
2,000.00 |
21,600.00 |
1,700.00 |
18,360.00 |
|
|
| 729-01 |
sign (type a)
|
4.24 |
sq m |
300.00 |
1,272.00 |
325.00 |
1,378.00 |
300.00 |
1,272.00 |
|
|
| 729-16-A |
object marker assembly (type 1)
|
2   |
ea |
70.00 |
140.00 |
75.00 |
150.00 |
70.00 |
140.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
20   |
ea |
60.00 |
1,200.00 |
65.00 |
1,300.00 |
60.00 |
1,200.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
ea |
55.00 |
440.00 |
60.00 |
480.00 |
55.00 |
440.00 |
|
|
| 729-19-B |
dead end road installation (type b)
|
7   |
ea |
1,080.00 |
7,560.00 |
1,200.00 |
8,400.00 |
1,100.00 |
7,700.00 |
|
|
| 729-21 |
u-channel post
|
2   |
ea |
40.00 |
80.00 |
35.00 |
70.00 |
100.00 |
200.00 |
|
|
| 731-01 |
nonreflectorized raised pavement markers
|
60   |
ea |
10.00 |
600.00 |
12.00 |
720.00 |
10.00 |
600.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
2,392   |
ea |
6.00 |
14,352.00 |
5.50 |
13,156.00 |
5.00 |
11,960.00 |
|
|
| 732-01-C |
plastic pavement striping (200 mm width)
|
131   |
ln m |
3.00 |
393.00 |
3.00 |
393.00 |
2.70 |
353.70 |
|
|
| 732-01-E |
plastic pavement striping (600 mm width)
|
695   |
ln m |
8.00 |
5,560.00 |
8.00 |
5,560.00 |
8.00 |
5,560.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line)(100 mm width)
|
19.142 |
km |
1,300.00 |
24,884.60 |
1,200.00 |
22,970.40 |
1,100.00 |
21,056.20 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
12.879 |
km |
450.00 |
5,795.55 |
500.00 |
6,439.50 |
440.00 |
5,666.76 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
62   |
ea |
130.00 |
8,060.00 |
130.00 |
8,060.00 |
130.00 |
8,060.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
6   |
ea |
150.00 |
900.00 |
135.00 |
810.00 |
130.00 |
780.00 |
|
|
| 735-01 |
mailboxes
|
50   |
ea |
5.00 |
250.00 |
10.00 |
500.00 |
1.00 |
50.00 |
|
|
| 735-02 |
mailbox supports (single)
|
50   |
ea |
120.00 |
6,000.00 |
120.00 |
6,000.00 |
110.00 |
5,500.00 |
|
|
| 736-01 |
trenching and backfilling
|
115   |
ln m |
10.00 |
1,150.00 |
11.00 |
1,265.00 |
10.00 |
1,150.00 |
|
|
| 736-04-A |
signal support (7.62m galvenized steel strain pole)
|
2   |
ea |
5,200.00 |
10,400.00 |
5,400.00 |
10,800.00 |
5,400.00 |
10,800.00 |
|
|
| 736-04-B |
signal support (7.92m galvenized steel strain pole)
|
4   |
ea |
5,200.00 |
20,800.00 |
5,400.00 |
21,600.00 |
5,400.00 |
21,600.00 |
|
|
| 736-04-C |
signal support (8.84m galvenized steel strain pole)
|
1   |
ea |
5,600.00 |
5,600.00 |
5,800.00 |
5,800.00 |
5,800.00 |
5,800.00 |
|
|
| 736-05-A |
signal heads (3-section, 300mm l.e.d. lens)
|
14   |
ea |
1,000.00 |
14,000.00 |
1,100.00 |
15,400.00 |
1,100.00 |
15,400.00 |
|
|
| 736-05-B |
signal heads (5-section, 300mm l.e.d. lens)
|
3   |
ea |
2,100.00 |
6,300.00 |
2,200.00 |
6,600.00 |
2,100.00 |
6,300.00 |
|
|
| 736-06 |
signal service
|
1   |
ea |
2,000.00 |
2,000.00 |
2,100.00 |
2,100.00 |
2,000.00 |
2,000.00 |
|
|
| 736-08 |
signal controller (type 5, base mounted cabinet,
8-phase) |
2   |
ea |
13,000.00 |
26,000.00 |
14,000.00 |
28,000.00 |
14,000.00 |
28,000.00 |
|
|
| 736-09 |
loop detector
|
369   |
ln m |
40.00 |
14,760.00 |
45.00 |
16,605.00 |
40.00 |
14,760.00 |
|
|
| 736-10 |
underground junction box (type d)
|
10   |
ea |
250.00 |
2,500.00 |
250.00 |
2,500.00 |
230.00 |
2,300.00 |
|
|
| 736-11-A |
conduit (13mm diam. rigid)
|
27   |
ln m |
10.00 |
270.00 |
10.00 |
270.00 |
10.00 |
270.00 |
|
|
| 736-11-B |
conduit (25mm diam. rigid)
|
34   |
ln m |
20.00 |
680.00 |
20.00 |
680.00 |
20.00 |
680.00 |
|
|
| 736-11-C |
conduit (50mm diam. rigid)
|
100   |
ln m |
35.00 |
3,500.00 |
38.00 |
3,800.00 |
35.00 |
3,500.00 |
|
|
| 736-11-D |
conduit (75mm diam. rigid)
|
6   |
ln m |
70.00 |
420.00 |
70.00 |
420.00 |
68.00 |
408.00 |
|
|
| 736-12-A |
conductor (2c loop lead-in / #16 awg)
|
235   |
ln m |
3.00 |
705.00 |
3.50 |
822.50 |
3.00 |
705.00 |
|
|
| 736-12-B |
conductor (power)
|
14   |
ln m |
6.00 |
84.00 |
7.00 |
98.00 |
6.00 |
84.00 |
|
|
| 740-01 |
construction layout
|
lump |
lump |
150,000.00 |
150,000.00 |
200,000.00 |
200,000.00 |
250,000.00 |
250,000.00 |
|
|
| 742-01-A |
sanitary sewer pipe (200mm pvc, astm d3034, sdr 35)
|
1,131   |
ln m |
160.00 |
180,960.00 |
140.00 |
158,340.00 |
120.00 |
135,720.00 |
|
|
| 742-01-B |
sanitary sewer pipe (200mm hdpe,astm d3034, sdr 35)
|
35   |
ln m |
300.00 |
10,500.00 |
260.00 |
9,100.00 |
220.00 |
7,700.00 |
|
|
| 742-02 |
adjusting sanitary sewer house connections
|
30   |
ea |
800.00 |
24,000.00 |
500.00 |
15,000.00 |
600.00 |
18,000.00 |
|
|
| 742-03 |
adjusting sanitary sewer service lines
|
150   |
ln m |
200.00 |
30,000.00 |
50.00 |
7,500.00 |
120.00 |
18,000.00 |
|
|
| 802-02 |
structural excavation for intermediate bents
|
51.4 |
cu m |
35.00 |
1,799.00 |
25.00 |
1,285.00 |
30.00 |
1,542.00 |
|
|
| 803-03 |
steel sheet pile wall
|
1,271.3 |
sq m |
135.00 |
171,625.50 |
150.00 |
190,695.00 |
160.00 |
203,408.00 |
|
|
| 804-01-B |
precast concrete piles (350 mm)
|
34.0 |
ln m |
250.00 |
8,500.00 |
200.00 |
6,800.00 |
230.00 |
7,820.00 |
|
|
| 804-01-D |
precast concrete piles (450 mm)
|
774.0 |
ln m |
160.00 |
123,840.00 |
150.00 |
116,100.00 |
180.00 |
139,320.00 |
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
15.00 |
cu m |
1,000.00 |
15,000.00 |
1,300.00 |
19,500.00 |
1,000.00 |
15,000.00 |
|
|
| 805-01-F |
class a concrete (bents)
|
986.25 |
cu m |
500.00 |
493,125.00 |
600.00 |
591,750.00 |
650.00 |
641,062.50 |
|
|
| 805-03 |
class aa concrete
|
1,364.14 |
cu m |
450.00 |
613,863.00 |
700.00 |
954,898.00 |
550.00 |
750,277.00 |
|
|
| 805-08-B |
precast-prestressed concrete girders (type ii)
|
2,838.89 |
ln m |
165.00 |
468,416.85 |
150.00 |
425,833.50 |
170.00 |
482,611.30 |
|
|
| 805-11 |
strip seal joints (100mm)
|
172.90 |
ln m |
350.00 |
60,515.00 |
400.00 |
69,160.00 |
350.00 |
60,515.00 |
|
|
| 805-12-P |
reinforced concrete box culverts (2100 mm x 2100 mm)
|
107.85 |
ln m |
1,600.00 |
172,560.00 |
1,500.00 |
161,775.00 |
1,400.00 |
150,990.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
339,666   |
kg |
1.40 |
475,532.40 |
1.75 |
594,415.50 |
1.50 |
509,499.00 |
|
|
| 807-06 |
structural metalwork (462 kg)
|
lump |
lump |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
6,000.00 |
6,000.00 |
|
|
| 810-01 |
concrete railing (810mm barrier)
|
732.60 |
ln m |
112.00 |
82,051.20 |
150.00 |
109,890.00 |
140.00 |
102,564.00 |
|
|
| 813-01 |
concrete approach slabs
|
1,182.69 |
sq m |
150.00 |
177,403.50 |
155.00 |
183,316.95 |
150.00 |
177,403.50 |
|
|
| 814-01-B |
drilled shaft (600 mm)
|
325.87 |
ln m |
270.00 |
87,984.90 |
340.00 |
110,795.80 |
230.00 |
74,950.10 |
|
|
| 814-01-C |
drilled shaft (750 mm)
|
1,892.00 |
ln m |
430.00 |
813,560.00 |
430.00 |
813,560.00 |
300.00 |
567,600.00 |
|
|
| 814-02-C |
test hole (750 mm)
|
25.00 |
ln m |
1,200.00 |
30,000.00 |
700.00 |
17,500.00 |
600.00 |
15,000.00 |
|
|
| 814-03 |
permanent casing (600mm diam.)
|
22.00 |
ln m |
280.00 |
6,160.00 |
300.00 |
6,600.00 |
250.00 |
5,500.00 |
|
|
| 814-03-A |
permanent casing (750mm diam.)
|
452.00 |
ln m |
380.00 |
171,760.00 |
350.00 |
158,200.00 |
340.00 |
153,680.00 |
|
|
| 814-04-B |
crosshole sonic logging (600 mm)
|
22   |
ea |
1,500.00 |
33,000.00 |
550.00 |
12,100.00 |
1,200.00 |
26,400.00 |
|
|
| 814-04-C |
crosshole sonic logging (750 mm)
|
78   |
ea |
2,000.00 |
156,000.00 |
550.00 |
42,900.00 |
1,200.00 |
93,600.00 |
|
|
| S-001 |
traffic maintanence asphaltic concrete
|
218.8 |
Mg |
100.00 |
21,880.00 |
75.00 |
16,410.00 |
120.00 |
26,256.00 |
|
|
| S-003 |
portable impact attenuator
|
2   |
each |
22,000.00 |
44,000.00 |
20,000.00 |
40,000.00 |
20,000.00 |
40,000.00 |
|
|
| S-005 |
interconnect cable
|
lump |
lump |
5,000.00 |
5,000.00 |
5,200.00 |
5,200.00 |
5,000.00 |
5,000.00 |
|
|
| S-006 |
full depth concrete saw cutting (avg. 25.4cm per meter)
|
700   |
ln m |
28.00 |
19,600.00 |
20.00 |
14,000.00 |
27.00 |
18,900.00 |
|
|
| S-101 |
mechanically stabilized earth wall
|
346.94 |
sq m |
770.00 |
267,143.80 |
575.00 |
199,490.50 |
600.00 |
208,164.00 |
|
|
| S-103 |
test drilled shaft
|
2   |
each |
42,000.00 |
84,000.00 |
18,000.00 |
36,000.00 |
30,000.00 |
60,000.00 |
|
|
| S-104 |
loading test drilled shaft
|
2   |
each |
60,000.00 |
120,000.00 |
40,000.00 |
80,000.00 |
38,000.00 |
76,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
18,599,933.18 |
|
19,468,772.32 |
|
19,556,776.70 |
|
|
|