| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BEST-YET BUILDERS, LLC |
- 2 - BENTON & BROWN, LLC. |
- 3 - JAMES CONSTRUCTION GROUP LLC |
- 4 - GILCHRIST CONSTRUCTION CO. LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
10,000.00 |
10,000.00 |
750,000.00 |
750,000.00 |
350,000.00 |
350,000.00 |
300,000.00 |
300,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
30,000.00 |
30,000.00 |
50,000.00 |
50,000.00 |
40,000.00 |
40,000.00 |
50,000.00 |
50,000.00 |
| 202-02-A-01 |
removal of bridges (sta 111+62.77, 35' x 95' precast
concrete) |
1   |
EACH |
15,000.00 |
15,000.00 |
60,000.00 |
60,000.00 |
51,000.00 |
51,000.00 |
10,000.00 |
10,000.00 |
| 202-02-A-02 |
removal of bridges (sta 157+14.84, 35' x 57' precast
concrete) |
1   |
EACH |
10,000.00 |
10,000.00 |
90,000.00 |
90,000.00 |
52,000.00 |
52,000.00 |
10,000.00 |
10,000.00 |
| 202-02-C |
removal of portland cement concrete pavement
|
2,489   |
SQYD |
6.00 |
14,934.00 |
5.00 |
12,445.00 |
8.00 |
19,912.00 |
6.00 |
14,934.00 |
| 202-02-D |
removal of concrete walks & drives
|
3,183   |
SQYD |
5.00 |
15,915.00 |
5.00 |
15,915.00 |
5.00 |
15,915.00 |
8.00 |
25,464.00 |
| 202-02-E |
removal of concrete curbs
|
3,055.7 |
LNFT |
4.00 |
12,222.80 |
2.00 |
6,111.40 |
3.00 |
9,167.10 |
5.00 |
15,278.50 |
| 202-02-G |
removal of surfacing & stabilized base
|
41,604.3 |
SQYD |
3.00 |
124,812.90 |
4.00 |
166,417.20 |
2.00 |
83,208.60 |
5.00 |
208,021.50 |
| 202-02-H |
removal of guard rail
|
626   |
LNFT |
4.40 |
2,754.40 |
3.50 |
2,191.00 |
3.50 |
2,191.00 |
5.00 |
3,130.00 |
| 202-02-I |
removal of existing traffic signal equipment
|
lump |
lump |
6,500.00 |
6,500.00 |
5,800.00 |
5,800.00 |
8,000.00 |
8,000.00 |
7,500.00 |
7,500.00 |
| 202-02-J |
removal of abandoned gas line (10" steel, sta.
100+34 to sta. 158+60, rt) |
5,900   |
LNFT |
10.00 |
59,000.00 |
10.00 |
59,000.00 |
8.50 |
50,150.00 |
5.00 |
29,500.00 |
| 203-01 |
general excavation
|
28,457   |
CUYD |
4.00 |
113,828.00 |
7.00 |
199,199.00 |
8.00 |
227,656.00 |
8.00 |
227,656.00 |
| 203-02 |
drainage excavation
|
1,851   |
CUYD |
5.00 |
9,255.00 |
6.00 |
11,106.00 |
5.00 |
9,255.00 |
10.00 |
18,510.00 |
| 203-04 |
embankment
|
27,631   |
CUYD |
7.00 |
193,417.00 |
9.50 |
262,494.50 |
20.00 |
552,620.00 |
14.00 |
386,834.00 |
| 203-05 |
nonplastic embankment
|
184   |
CUYD |
15.00 |
2,760.00 |
35.00 |
6,440.00 |
65.00 |
11,960.00 |
70.00 |
12,880.00 |
| 204-02 |
temporary hay or straw bales
|
132   |
EACH |
10.00 |
1,320.00 |
5.00 |
660.00 |
7.00 |
924.00 |
20.00 |
2,640.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
34   |
EACH |
50.00 |
1,700.00 |
75.00 |
2,550.00 |
90.00 |
3,060.00 |
300.00 |
10,200.00 |
| 204-06 |
temporary silt fencing
|
5,455   |
LNFT |
2.00 |
10,910.00 |
2.50 |
13,637.50 |
1.35 |
7,364.25 |
2.50 |
13,637.50 |
| 302-01 |
class ii base course
|
17,152.8 |
CUYD |
40.00 |
686,112.00 |
45.00 |
771,876.00 |
50.00 |
857,640.00 |
65.00 |
1,114,932.00 |
| 304-01 |
lime
|
1,072.34 |
TON |
100.00 |
107,234.00 |
100.00 |
107,234.00 |
100.00 |
107,234.00 |
125.00 |
134,042.50 |
| 304-04-D |
lime treatment (type d) (12" thick)
|
75,625   |
SQYD |
1.50 |
113,437.50 |
2.00 |
151,250.00 |
2.00 |
151,250.00 |
2.00 |
151,250.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
3,000.0 |
CUYD |
0.10 |
300.00 |
20.00 |
60,000.00 |
35.00 |
105,000.00 |
45.00 |
135,000.00 |
| 502-01 |
superpave asphaltic concrete
|
3,435.4 |
TON |
50.00 |
171,770.00 |
60.00 |
206,124.00 |
60.00 |
206,124.00 |
100.00 |
343,540.00 |
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
327.1 |
TON |
50.00 |
16,355.00 |
135.00 |
44,158.50 |
135.00 |
44,158.50 |
200.00 |
65,420.00 |
| 601-01-K |
portland cement concrete pavement (10" thick)
|
67,633.9 |
SQYD |
48.00 |
3,246,427.20 |
30.00 |
2,029,017.00 |
38.00 |
2,570,088.20 |
50.00 |
3,381,695.00 |
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
3,913   |
LNFT |
35.00 |
136,955.00 |
35.00 |
136,955.00 |
50.00 |
195,650.00 |
47.00 |
183,911.00 |
| 701-03-G/I-01 |
storm drain pipe (18" pcp or 24" cmp)(outfall)
|
40   |
LNFT |
30.00 |
1,200.00 |
35.00 |
1,400.00 |
85.00 |
3,400.00 |
67.00 |
2,680.00 |
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
2,495   |
LNFT |
45.00 |
112,275.00 |
50.00 |
124,750.00 |
65.00 |
162,175.00 |
60.00 |
149,700.00 |
| 701-03-I/K-01 |
storm drain pipe (24" pcp or 30" cmp)(outfall)
|
100   |
LNFT |
45.00 |
4,500.00 |
50.00 |
5,000.00 |
100.00 |
10,000.00 |
85.00 |
8,500.00 |
| 701-03-K |
storm drain pipe (30" rcp/pcp)
|
248   |
LNFT |
65.00 |
16,120.00 |
65.00 |
16,120.00 |
90.00 |
22,320.00 |
90.00 |
22,320.00 |
| 701-03-M |
storm drain pipe (36" rcp/pcp)
|
662   |
LNFT |
85.00 |
56,270.00 |
85.00 |
56,270.00 |
100.00 |
66,200.00 |
105.00 |
69,510.00 |
| 701-03-M/N-01 |
storm drain pipe (36" pcp or 42" cmp)(outfall)
|
20   |
LNFT |
85.00 |
1,700.00 |
85.00 |
1,700.00 |
135.00 |
2,700.00 |
112.00 |
2,240.00 |
| 701-03-O |
storm drain pipe (48" rcp/pcp)
|
494   |
LNFT |
130.00 |
64,220.00 |
150.00 |
74,100.00 |
190.00 |
93,860.00 |
150.00 |
74,100.00 |
| 701-05-F |
side drain pipe (15")
|
76   |
LNFT |
30.00 |
2,280.00 |
30.00 |
2,280.00 |
50.00 |
3,800.00 |
40.00 |
3,040.00 |
| 701-07-C |
yard drain pipe (8")
|
4   |
LNFT |
50.00 |
200.00 |
6.00 |
24.00 |
80.00 |
320.00 |
60.00 |
240.00 |
| 701-09 |
fabricating pipe fittings
|
4   |
EACH |
1,500.00 |
6,000.00 |
4,000.00 |
16,000.00 |
1,500.00 |
6,000.00 |
1,500.00 |
6,000.00 |
| 702-02-B |
manholes (r-cb-11)
|
1   |
EACH |
2,500.00 |
2,500.00 |
4,000.00 |
4,000.00 |
2,000.00 |
2,000.00 |
3,800.00 |
3,800.00 |
| 702-02-C |
manholes (r-cb-11 mod)
|
4   |
EACH |
5,000.00 |
20,000.00 |
9,000.00 |
36,000.00 |
4,500.00 |
18,000.00 |
4,400.00 |
17,600.00 |
| 702-03-A |
catch basins (cb-01)
|
61   |
EACH |
3,300.00 |
201,300.00 |
3,000.00 |
183,000.00 |
2,800.00 |
170,800.00 |
4,400.00 |
268,400.00 |
| 702-03-B |
catch basins (cb-02)
|
27   |
EACH |
3,900.00 |
105,300.00 |
4,000.00 |
108,000.00 |
3,300.00 |
89,100.00 |
4,400.00 |
118,800.00 |
| 702-03-C |
catch basins (cb-06)
|
13   |
EACH |
3,600.00 |
46,800.00 |
5,000.00 |
65,000.00 |
3,400.00 |
44,200.00 |
4,000.00 |
52,000.00 |
| 702-03-F |
catch basins (cb-08)
|
29   |
EACH |
6,600.00 |
191,400.00 |
6,500.00 |
188,500.00 |
4,700.00 |
136,300.00 |
8,000.00 |
232,000.00 |
| 702-04-A |
adjusting manholes
|
13   |
EACH |
1,000.00 |
13,000.00 |
1,000.00 |
13,000.00 |
200.00 |
2,600.00 |
1,000.00 |
13,000.00 |
| 702-04-B |
adjusting catch basins
|
2   |
EACH |
1,800.00 |
3,600.00 |
1,800.00 |
3,600.00 |
2,000.00 |
4,000.00 |
4,000.00 |
8,000.00 |
| 702-08-A |
side drain safety end (type 1)
|
4   |
EACH |
850.00 |
3,400.00 |
900.00 |
3,600.00 |
1,000.00 |
4,000.00 |
1,500.00 |
6,000.00 |
| 703-01 |
shoulder underdrain systems
|
3,728   |
LNFT |
8.00 |
29,824.00 |
5.00 |
18,640.00 |
10.00 |
37,280.00 |
10.00 |
37,280.00 |
| 703-02 |
shoulder outlet underdrains
|
2   |
EACH |
500.00 |
1,000.00 |
200.00 |
400.00 |
800.00 |
1,600.00 |
600.00 |
1,200.00 |
| 705-01 |
barbed wire fence
|
4,058   |
LNFT |
4.15 |
16,840.70 |
3.75 |
15,217.50 |
3.50 |
14,203.00 |
4.00 |
16,232.00 |
| 705-05 |
double swinging driveway gates
|
4   |
DBGT |
530.00 |
2,120.00 |
475.00 |
1,900.00 |
550.00 |
2,200.00 |
450.00 |
1,800.00 |
| 705-06-B |
chain link fence (5-foot height)
|
128   |
LNFT |
16.50 |
2,112.00 |
15.00 |
1,920.00 |
10.00 |
1,280.00 |
18.00 |
2,304.00 |
| 705-06-D |
chain link fence (7-foot height)
|
170   |
LNFT |
22.00 |
3,740.00 |
20.00 |
3,400.00 |
15.00 |
2,550.00 |
30.00 |
5,100.00 |
| 705-08-D |
24-foot double gates for chain link fence (7-foot
height) |
1   |
DBGT |
1,100.00 |
1,100.00 |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
800.00 |
800.00 |
| 706-01-A |
concrete walk (4" thick)
|
47.2 |
SQYD |
40.00 |
1,888.00 |
40.00 |
1,888.00 |
50.00 |
2,360.00 |
85.00 |
4,012.00 |
| 706-02-C |
concrete drive (6" thick)
|
1,910.4 |
SQYD |
33.00 |
63,043.20 |
33.00 |
63,043.20 |
38.00 |
72,595.20 |
45.00 |
85,968.00 |
| 706-03-A |
incidental concrete paving (4" thick)
|
1,157.9 |
SQYD |
28.00 |
32,421.20 |
28.00 |
32,421.20 |
35.00 |
40,526.50 |
45.00 |
52,105.50 |
| 707-01 |
concrete curb
|
18,627.5 |
LNFT |
4.00 |
74,510.00 |
4.50 |
83,823.75 |
8.00 |
149,020.00 |
10.00 |
186,275.00 |
| 712-01-A |
concrete cast-in-place revetment (4" thick)
|
358   |
SQYD |
40.00 |
14,320.00 |
40.00 |
14,320.00 |
55.00 |
19,690.00 |
55.00 |
19,690.00 |
| 712-02 |
sacked concrete revetment
|
99   |
SQYD |
80.00 |
7,920.00 |
80.00 |
7,920.00 |
150.00 |
14,850.00 |
100.00 |
9,900.00 |
| 712-04 |
flexible revetment
|
1,110   |
SQYD |
40.00 |
44,400.00 |
40.00 |
44,400.00 |
42.00 |
46,620.00 |
50.00 |
55,500.00 |
| 713-01 |
temporary signs and barricades
|
lump |
LUMP |
250,000.00 |
250,000.00 |
500,000.00 |
500,000.00 |
75,000.00 |
75,000.00 |
200,000.00 |
200,000.00 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
20.000 |
MILE |
580.00 |
11,600.00 |
525.00 |
10,500.00 |
500.00 |
10,000.00 |
700.00 |
14,000.00 |
| 713-09 |
temporary precast concrete barrier (department
furnished) |
33   |
EACH |
300.00 |
9,900.00 |
200.00 |
6,600.00 |
250.00 |
8,250.00 |
350.00 |
11,550.00 |
| 716-01-A |
mulch (vegetative)
|
27.82 |
ACRE |
400.00 |
11,128.00 |
595.00 |
16,552.90 |
400.00 |
11,128.00 |
600.00 |
16,692.00 |
| 717-01 |
seeding
|
1,269   |
LB |
7.00 |
8,883.00 |
6.00 |
7,614.00 |
5.00 |
6,345.00 |
8.00 |
10,152.00 |
| 718-01 |
fertilizer
|
9,279   |
LB |
0.22 |
2,041.38 |
0.25 |
2,319.75 |
0.50 |
4,639.50 |
0.25 |
2,319.75 |
| 722-01 |
project site laboratory
|
1   |
EACH |
6,000.00 |
6,000.00 |
7,500.00 |
7,500.00 |
6,000.00 |
6,000.00 |
25,000.00 |
25,000.00 |
| 724-01-A |
pavement patching
|
300   |
SQYD |
40.00 |
12,000.00 |
75.00 |
22,500.00 |
35.00 |
10,500.00 |
80.00 |
24,000.00 |
| 725-02 |
temporary detour roads
|
4,349.1 |
SQYD |
36.00 |
156,567.60 |
50.00 |
217,455.00 |
50.00 |
217,455.00 |
100.00 |
434,910.00 |
| 726-01 |
bedding material
|
3,500.0 |
CUYD |
44.00 |
154,000.00 |
35.00 |
122,500.00 |
65.00 |
227,500.00 |
44.00 |
154,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
700,000.00 |
700,000.00 |
1,000,000.00 |
1,000,000.00 |
1,100,000.00 |
1,100,000.00 |
1,200,000.00 |
1,200,000.00 |
| 729-01 |
sign (type a)
|
110.0 |
SQFT |
50.00 |
5,500.00 |
50.00 |
5,500.00 |
50.00 |
5,500.00 |
50.00 |
5,500.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
85.00 |
340.00 |
75.00 |
300.00 |
70.00 |
280.00 |
80.00 |
320.00 |
| 731-02 |
reflectorized raised pavement markers
|
922   |
EACH |
5.70 |
5,255.40 |
5.20 |
4,794.40 |
5.00 |
4,610.00 |
6.00 |
5,532.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
6.652 |
MILE |
2,100.00 |
13,969.20 |
1,910.00 |
12,705.32 |
2,000.00 |
13,304.00 |
2,000.00 |
13,304.00 |
| 732-02-C |
plastic pavement striping (solid line) (8" width)
|
0.027 |
MILE |
4,200.00 |
113.40 |
3,820.00 |
103.14 |
5,000.00 |
135.00 |
4,000.00 |
108.00 |
| 732-02-E |
plastic pavement striping (solid line) (24" width)
|
0.082 |
MILE |
14,000.00 |
1,148.00 |
11,460.00 |
939.72 |
12,000.00 |
984.00 |
12,000.00 |
984.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
6.605 |
MILE |
900.00 |
5,944.50 |
800.00 |
5,284.00 |
800.00 |
5,284.00 |
1,000.00 |
6,605.00 |
| 732-03-C |
plastic pavement striping (broken line)(8" width)
|
0.273 |
MILE |
2,000.00 |
546.00 |
1,600.00 |
436.80 |
1,600.00 |
436.80 |
1,800.00 |
491.40 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
51   |
EACH |
200.00 |
10,200.00 |
175.00 |
8,925.00 |
175.00 |
8,925.00 |
200.00 |
10,200.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
46   |
EACH |
220.00 |
10,120.00 |
195.00 |
8,970.00 |
200.00 |
9,200.00 |
200.00 |
9,200.00 |
| 735-01 |
mailboxes
|
1   |
EACH |
50.00 |
50.00 |
150.00 |
150.00 |
10.00 |
10.00 |
25.00 |
25.00 |
| 735-02 |
mailbox supports (single)
|
1   |
EACH |
120.00 |
120.00 |
125.00 |
125.00 |
150.00 |
150.00 |
200.00 |
200.00 |
| 736-01 |
trenching and backfilling
|
1,170   |
LNFT |
3.30 |
3,861.00 |
3.00 |
3,510.00 |
4.00 |
4,680.00 |
4.00 |
4,680.00 |
| 736-04-A |
signal support (20' mast arm pole)
|
1   |
EACH |
6,600.00 |
6,600.00 |
6,000.00 |
6,000.00 |
5,800.00 |
5,800.00 |
7,000.00 |
7,000.00 |
| 736-04-B |
signal support (35' mast arm pole)
|
1   |
EACH |
8,800.00 |
8,800.00 |
8,000.00 |
8,000.00 |
8,300.00 |
8,300.00 |
9,000.00 |
9,000.00 |
| 736-04-C |
signal support (40' mast arm pole)
|
2   |
EACH |
10,000.00 |
20,000.00 |
9,000.00 |
18,000.00 |
9,000.00 |
18,000.00 |
10,000.00 |
20,000.00 |
| 736-04-D |
signal support (45' mast arm pole)
|
4   |
EACH |
11,000.00 |
44,000.00 |
10,000.00 |
40,000.00 |
9,700.00 |
38,800.00 |
12,000.00 |
48,000.00 |
| 736-04-E |
signal support (50' mast arm pole)
|
2   |
EACH |
12,000.00 |
24,000.00 |
11,000.00 |
22,000.00 |
11,000.00 |
22,000.00 |
12,000.00 |
24,000.00 |
| 736-05-A |
signal head (3 section, 12" leds)(r,y,g)
|
23   |
EACH |
1,100.00 |
25,300.00 |
1,000.00 |
23,000.00 |
1,000.00 |
23,000.00 |
1,200.00 |
27,600.00 |
| 736-05-B |
signal head (5 section, 12" leds)(r,lt y,y,lt g,g)
|
3   |
EACH |
1,800.00 |
5,400.00 |
1,600.00 |
4,800.00 |
1,500.00 |
4,500.00 |
1,800.00 |
5,400.00 |
| 736-05-C |
signal head (5 section, 12" leds)(r,y,rt y,g, rt g)
|
1   |
EACH |
1,800.00 |
1,800.00 |
1,600.00 |
1,600.00 |
1,500.00 |
1,500.00 |
1,800.00 |
1,800.00 |
| 736-06 |
signal service
|
2   |
EACH |
2,200.00 |
4,400.00 |
2,000.00 |
4,000.00 |
1,000.00 |
2,000.00 |
2,200.00 |
4,400.00 |
| 736-08 |
signal controller (8 phase fully actuated)
|
2   |
EACH |
17,000.00 |
34,000.00 |
15,000.00 |
30,000.00 |
12,000.00 |
24,000.00 |
18,000.00 |
36,000.00 |
| 736-10-A |
underground junction box (type f)
|
8   |
EACH |
410.00 |
3,280.00 |
370.00 |
2,960.00 |
550.00 |
4,400.00 |
400.00 |
3,200.00 |
| 736-10-B |
underground junction box (type h)
|
3   |
EACH |
1,100.00 |
3,300.00 |
1,000.00 |
3,000.00 |
1,100.00 |
3,300.00 |
1,200.00 |
3,600.00 |
| 736-11-A |
conduit (2" hdpe)
|
1,105   |
LNFT |
5.50 |
6,077.50 |
5.00 |
5,525.00 |
3.00 |
3,315.00 |
6.00 |
6,630.00 |
| 736-11-B |
conduit (3" hdpe)
|
65   |
LNFT |
22.00 |
1,430.00 |
20.00 |
1,300.00 |
6.00 |
390.00 |
22.00 |
1,430.00 |
| 736-12-A |
conductor (6c) signal
|
1,910   |
LNFT |
1.65 |
3,151.50 |
1.50 |
2,865.00 |
1.00 |
1,910.00 |
1.75 |
3,342.50 |
| 736-12-B |
conductor (10c) signal
|
1,825   |
LNFT |
2.20 |
4,015.00 |
2.00 |
3,650.00 |
2.00 |
3,650.00 |
2.25 |
4,106.25 |
| 736-13 |
interconnect (6 pair)
|
7,000   |
LNFT |
4.40 |
30,800.00 |
4.00 |
28,000.00 |
4.00 |
28,000.00 |
4.50 |
31,500.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
170,000.00 |
170,000.00 |
550,000.00 |
550,000.00 |
175,000.00 |
175,000.00 |
160,000.00 |
160,000.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
80,000.00 |
80,000.00 |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
40,000.00 |
40,000.00 |
| 804-01-C |
precast concrete piles (16")
|
3,891   |
LNFT |
32.00 |
124,512.00 |
41.00 |
159,531.00 |
33.00 |
128,403.00 |
43.00 |
167,313.00 |
| 804-12 |
loading permanent piles
|
2   |
EACH |
7,500.00 |
15,000.00 |
500.00 |
1,000.00 |
1,000.00 |
2,000.00 |
100.00 |
200.00 |
| 805-01-A |
class a concrete (pipe headwalls)
|
36.76 |
CUYD |
880.00 |
32,348.80 |
400.00 |
14,704.00 |
750.00 |
27,570.00 |
1,500.00 |
55,140.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
12.75 |
CUYD |
1,100.00 |
14,025.00 |
750.00 |
9,562.50 |
600.00 |
7,650.00 |
1,200.00 |
15,300.00 |
| 805-01-F |
class a concrete (bents)
|
140.19 |
CUYD |
500.00 |
70,095.00 |
600.00 |
84,114.00 |
500.00 |
70,095.00 |
1,000.00 |
140,190.00 |
| 805-03 |
class aa concrete
|
618.93 |
CUYD |
400.00 |
247,572.00 |
500.00 |
309,465.00 |
400.00 |
247,572.00 |
700.00 |
433,251.00 |
| 805-12-G |
reinforced concrete box culverts (6'x 4')(precast)
|
640.0 |
LNFT |
330.00 |
211,200.00 |
275.00 |
176,000.00 |
310.00 |
198,400.00 |
440.00 |
281,600.00 |
| 806-01 |
deformed reinforcing steel
|
124,036   |
LB |
0.70 |
86,825.20 |
0.73 |
90,546.28 |
0.60 |
74,421.60 |
1.10 |
136,439.60 |
| 806-02 |
deformed reinforcing steel (epoxy coated)
|
25,031   |
LB |
0.84 |
21,026.04 |
0.87 |
21,776.97 |
0.90 |
22,527.90 |
1.50 |
37,546.50 |
| 810-04 |
steel & concrete railing
|
360.00 |
LNFT |
87.00 |
31,320.00 |
100.00 |
36,000.00 |
135.00 |
48,600.00 |
200.00 |
72,000.00 |
| 813-01 |
concrete approach slabs
|
1,386.68 |
SQYD |
130.00 |
180,268.40 |
135.00 |
187,201.80 |
150.00 |
208,002.00 |
160.00 |
221,868.80 |
| S-001 |
temporary traffic signal system
|
lump |
LUMP |
57,000.00 |
57,000.00 |
52,000.00 |
52,000.00 |
50,000.00 |
50,000.00 |
60,000.00 |
60,000.00 |
| S-002 |
video detector device and connection
|
8   |
EACH |
9,000.00 |
72,000.00 |
8,000.00 |
64,000.00 |
5,000.00 |
40,000.00 |
8,500.00 |
68,000.00 |
| S-003 |
video detection system
|
3   |
EACH |
5,000.00 |
15,000.00 |
4,500.00 |
13,500.00 |
3,500.00 |
10,500.00 |
5,000.00 |
15,000.00 |
| S-004 |
paved gutter drain (pg-01)
|
64   |
EACH |
2,400.00 |
153,600.00 |
2,500.00 |
160,000.00 |
3,000.00 |
192,000.00 |
4,000.00 |
256,000.00 |
| S-005 |
reinforced concrete box culvert (3' x 1.5')(precast)
|
246.0 |
LNFT |
160.00 |
39,360.00 |
120.00 |
29,520.00 |
170.00 |
41,820.00 |
220.00 |
54,120.00 |
| S-006 |
reinforced concrete box culvert (3' x 2')(precast)
|
1,526.0 |
LNFT |
160.00 |
244,160.00 |
120.00 |
183,120.00 |
170.00 |
259,420.00 |
220.00 |
335,720.00 |
| S-007 |
reinforced concrete box culvert (4' x 2')(precast)
|
1,204.0 |
LNFT |
200.00 |
240,800.00 |
200.00 |
240,800.00 |
205.00 |
246,820.00 |
280.00 |
337,120.00 |
| S-008 |
reinforced concrete box culvert (5' x 2')(precast)
|
456.0 |
LNFT |
250.00 |
114,000.00 |
210.00 |
95,760.00 |
260.00 |
118,560.00 |
350.00 |
159,600.00 |
| S-009 |
reinforced concrete box culvert (5' x 4')(precast)
|
910.0 |
LNFT |
270.00 |
245,700.00 |
230.00 |
209,300.00 |
290.00 |
263,900.00 |
360.00 |
327,600.00 |
| S-010 |
reinforced concrete box culvert (7' x 4')(precast)
|
1,260.0 |
LNFT |
400.00 |
504,000.00 |
360.00 |
453,600.00 |
360.00 |
453,600.00 |
525.00 |
661,500.00 |
| S-011 |
rebuild cattle guard (sta 149+81, rt)
|
1   |
EACH |
6,000.00 |
6,000.00 |
2,000.00 |
2,000.00 |
4,000.00 |
4,000.00 |
8,000.00 |
8,000.00 |
| S-012 |
cap existing catch basin (sta 105+63, rt)
|
1   |
EACH |
2,000.00 |
2,000.00 |
1,500.00 |
1,500.00 |
2,000.00 |
2,000.00 |
2,500.00 |
2,500.00 |
| S-101 |
impact attenuators (construction zone)
|
2   |
EACH |
23,000.00 |
46,000.00 |
16,500.00 |
33,000.00 |
18,000.00 |
36,000.00 |
25,000.00 |
50,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
10,889,677.82 |
|
11,781,205.33 |
|
11,856,120.15 |
|
14,874,863.30 |
|