| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - D & J CONSTRUCTION CO., INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
10,700.00 |
10,700.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
164   |
SQYD |
11.00 |
1,804.00 |
15.00 |
2,460.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
374   |
SQYD |
11.00 |
4,114.00 |
6.00 |
2,244.00 |
|
|
|
|
| 202-02-E |
removal of concrete curbs
|
156.0 |
LNFT |
5.33 |
831.48 |
2.00 |
312.00 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
241.8 |
SQYD |
5.00 |
1,209.00 |
8.00 |
1,934.40 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
200   |
LNFT |
3.20 |
640.00 |
15.00 |
3,000.00 |
|
|
|
|
| 203-01 |
general excavation
|
1,425   |
CUYD |
13.00 |
18,525.00 |
9.00 |
12,825.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
2,625   |
CUYD |
26.50 |
69,562.50 |
20.00 |
52,500.00 |
|
|
|
|
| 302-02-C |
class ii base course (10" thick)
|
866.8 |
SQYD |
53.30 |
46,200.44 |
20.00 |
17,336.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
104   |
CUYD |
19.00 |
1,976.00 |
25.00 |
2,600.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
11,001.2 |
TON |
50.55 |
556,110.66 |
62.00 |
682,074.40 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
1,034.7 |
TON |
79.15 |
81,896.50 |
85.00 |
87,949.50 |
|
|
|
|
| 507-01-A |
asphaltic surface treatment (1 application)
|
10,722   |
SQYD |
2.13 |
22,837.86 |
1.80 |
19,299.60 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
76,309   |
SQYD |
1.68 |
128,199.12 |
2.00 |
152,618.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,904   |
CUYD |
0.10 |
- 290.40 |
0.01 |
- 29.04 |
|
|
|
|
| 601-01-I |
portland cement concrete pavement (9" thick)
|
847.1 |
SQYD |
85.33 |
72,283.04 |
85.00 |
72,003.50 |
|
|
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
3,348   |
LNFT |
5.33 |
17,844.84 |
1.50 |
5,022.00 |
|
|
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
2,679   |
LNFT |
5.33 |
14,279.07 |
1.75 |
4,688.25 |
|
|
|
|
| 602-05-I-01 |
full depth patching of jointed conc pvmt (9" thick)
(16.0 sq yds & under) |
16.0 |
SQYD |
195.00 |
3,120.00 |
200.00 |
3,200.00 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
9   |
EACH |
960.00 |
8,640.00 |
1,200.00 |
10,800.00 |
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
462.0 |
LNFT |
25.00 |
11,550.00 |
35.00 |
16,170.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
56.3 |
LNFT |
17.50 |
985.25 |
20.00 |
1,126.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
25.0 |
LNFT |
46.00 |
1,150.00 |
40.00 |
1,000.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
1   |
EACH |
1,950.00 |
1,950.00 |
2,000.00 |
2,000.00 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
374.9 |
SQYD |
55.00 |
20,619.50 |
60.00 |
22,494.00 |
|
|
|
|
| 707-01 |
concrete curb
|
65.0 |
LNFT |
16.00 |
1,040.00 |
17.00 |
1,105.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
7,095.05 |
7,095.05 |
95,000.00 |
95,000.00 |
|
|
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
6,102   |
LNFT |
0.32 |
1,952.64 |
0.50 |
3,051.00 |
|
|
|
|
| 713-03-D |
temporary pavement markings (12" width)
|
240   |
LNFT |
0.48 |
115.20 |
3.00 |
720.00 |
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
2,376   |
LNFT |
0.96 |
2,280.96 |
0.70 |
1,663.20 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
16.688 |
MILE |
320.00 |
5,340.16 |
160.00 |
2,670.08 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
12.724 |
MILE |
320.00 |
4,071.68 |
135.00 |
1,717.74 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
22.738 |
MILE |
640.00 |
14,552.32 |
285.00 |
6,480.33 |
|
|
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
42   |
EACH |
55.00 |
2,310.00 |
80.00 |
3,360.00 |
|
|
|
|
| 713-06-B |
temporary pavement legends and symbols (double arrow)
|
8   |
EACH |
55.00 |
440.00 |
100.00 |
800.00 |
|
|
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
34   |
EACH |
55.00 |
1,870.00 |
95.00 |
3,230.00 |
|
|
|
|
| 713-06-D |
temporary pavement legends and symbols (rr crossing)
|
6   |
EACH |
220.00 |
1,320.00 |
125.00 |
750.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
1.24 |
ACRE |
650.00 |
806.00 |
565.00 |
700.60 |
|
|
|
|
| 717-01 |
seeding
|
56   |
LB |
8.00 |
448.00 |
5.85 |
327.60 |
|
|
|
|
| 718-01 |
fertilizer
|
1,240   |
LB |
0.25 |
310.00 |
0.17 |
210.80 |
|
|
|
|
| 724-01-C |
pavement patching (8 1/2" minimum thickness)
|
53   |
SQYD |
110.00 |
5,830.00 |
105.00 |
5,565.00 |
|
|
|
|
| 724-01-D |
pavement patching (16" minimum thickness)
|
267   |
SQYD |
107.00 |
28,569.00 |
105.00 |
28,035.00 |
|
|
|
|
| 724-02 |
pavement widening
|
4,270.9 |
SQYD |
50.00 |
213,545.00 |
35.00 |
149,481.50 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
73,000.00 |
73,000.00 |
125,000.00 |
125,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
1   |
EACH |
80.00 |
80.00 |
70.00 |
70.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
2,051   |
EACH |
5.33 |
10,931.83 |
6.50 |
13,331.50 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
3,051   |
LNFT |
1.07 |
3,264.57 |
2.50 |
7,627.50 |
|
|
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
120   |
LNFT |
1.60 |
192.00 |
16.50 |
1,980.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
1,188   |
LNFT |
3.20 |
3,801.60 |
4.50 |
5,346.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
11.369 |
MILE |
2,069.00 |
23,522.46 |
2,950.00 |
33,538.55 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
6.362 |
MILE |
746.00 |
4,746.05 |
900.00 |
5,725.80 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
21   |
EACH |
160.00 |
3,360.00 |
350.00 |
7,350.00 |
|
|
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
4   |
EACH |
160.00 |
640.00 |
500.00 |
2,000.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
17   |
EACH |
160.00 |
2,720.00 |
350.00 |
5,950.00 |
|
|
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
3   |
EACH |
425.00 |
1,275.00 |
650.00 |
1,950.00 |
|
|
|
|
| 732-05 |
removal of existing markings
|
0.405 |
MILE |
4,440.00 |
1,798.20 |
22,000.00 |
8,910.00 |
|
|
|
|
| 735-01 |
mailboxes
|
33   |
EACH |
12.00 |
396.00 |
5.00 |
165.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
31   |
EACH |
150.00 |
4,650.00 |
130.00 |
4,030.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
1   |
EACH |
300.00 |
300.00 |
175.00 |
175.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,500.00 |
10,500.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 741-11 |
adjusting water valve and meter box
|
3   |
EACH |
745.00 |
2,235.00 |
700.00 |
2,100.00 |
|
|
|
|
| S-001 |
ultra thin asphaltic concrete wearing course
|
59,422   |
SQYD |
4.95 |
294,138.90 |
4.50 |
267,399.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,830,185.48 |
|
1,998,143.81 |
|
|
|
|
|