Letting of 6/23/2004 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 036-04-0059
Parish: FRANKLIN
Routes: LA 4
Description: JCT. LA 578 - MIDDLE JCT. LA 128 (C.M)
Type Const: superpave nt, temporary pavement markings, reflectorized raised paveme nt markers,
plastic pavement striping and related work
 
RankLicenseBidderAmount
105789 D & J CONSTRUCTION CO., INC. $369,580.61
212487 DIAMOND B CONSTRUCTION CO., L.L.C. $398,014.71
 
Item Number Item Description Quantity Unit of Measure - 1 -
D & J CONSTRUCTION CO., INC.
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
401-02 aggregate surface course (adjusted vehicular
measurement)
845      CUYD 30.00 25,350.00 60.00 50,700.00        
502-01 superpave asphaltic concrete 3,746.7    TON 55.00 206,068.50 55.00 206,068.50        
502-01-A superpave asphaltic concrete, paved drives and
turnouts
26.3    TON 250.00 6,575.00 150.00 3,945.00        
509-01 cold planing asphaltic pavement 32,580      SQYD 1.50 48,870.00 1.64 53,431.20        
509-02 contractor retained reclaimed asphaltic pavement - 1,170      CUYD 0.01 - 11.70 0.15 - 175.50        
701-10-I reinforced concrete pipe (extension)(24") 8      LNFT 210.00 1,680.00 115.00 920.00        
701-15 concrete collar 1      EACH 700.00 700.00 350.00 350.00        
713-01 temporary signs & barricades lump      LUMP 19,000.00 19,000.00 8,000.00 8,000.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
5.048  MILE 175.00 883.40 337.00 1,701.17        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
3.723  MILE 180.00 670.14 337.00 1,254.65        
713-05-A temporary pavement markings (solid line)(4" width) 13.028  MILE 1.00 13.02 675.00 8,793.90        
726-01 bedding material 2.5    CUYD 100.00 250.00 67.00 167.50        
727-01 mobilization lump      LUMP 35,000.00 35,000.00 45,150.00 45,150.00        
731-02 reflectorized raised pavement markers 333      EACH 8.00 2,664.00 5.75 1,914.75        
732-02-A plastic pavement striping (solid line) (4" width) 6.514  MILE 3,000.00 19,542.00 2,200.00 14,330.80        
732-03-A plastic pavement striping (broken line)(4" width) 1.861  MILE 1,250.00 2,326.25 786.00 1,462.74        
                       
 CONTRACTOR TOTAL       369,580.61   398,014.71        