| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - HOLT & HAYNES CONSTRUCTION LLC |
- 2 - FORBY CONTRACTING, INC. |
- 3 - RMK CONSTRUCTION CO. LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
19,935   |
LNFT |
1.10 |
21,928.50 |
1.00 |
19,935.00 |
1.40 |
27,909.00 |
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
29,238   |
LNFT |
1.30 |
38,009.40 |
1.25 |
36,547.50 |
1.42 |
41,517.96 |
|
|
| 602-05-G-01 |
full depth patching of jointed conc pvmt (8" thick)
(16.0 sq yds & under) |
82.9 |
SQYD |
110.00 |
9,119.00 |
150.00 |
12,435.00 |
65.00 |
5,388.50 |
|
|
| 602-05-G-02 |
full depth patching of jointed conc pvmt (8" thick)
(16.1-48.0 sq yds) |
81.9 |
SQYD |
110.00 |
9,009.00 |
140.00 |
11,466.00 |
75.00 |
6,142.50 |
|
|
| 602-10 |
longitudinal shoulder joints
|
39,870   |
LNFT |
0.80 |
31,896.00 |
0.90 |
35,883.00 |
1.40 |
55,818.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
6,000.00 |
6,000.00 |
15,000.00 |
15,000.00 |
16,000.00 |
16,000.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
6,000.00 |
6,000.00 |
10,000.00 |
10,000.00 |
17,224.04 |
17,224.04 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
121,961.90 |
|
141,266.50 |
|
170,000.00 |
|
|
|