Letting of 6/23/2004 LA DOTD Headquarters


READV
go back
Go Back
DBE GOAL FED
Lead Project: 006-05-0076
Parish: ORLEANS, ST TAMMANY
Routes: US 90, LA 433
Description: RIGOLETS PASS BRIDGE AND APPROACHES
Type Const: rem. of br., superpave asph. conc. pav., temp. detour roads, conc. girder span br.
, conc. slab span br., three pile supported footing alternates and related work.
 
RankLicenseBidderAmount
100271 MASSMAN CONSTRUCTION CO. $50,569,158.10
202179 BOH BROS. CONSTRUCTION CO., LLC. $53,746,153.65
300755 L & A CONTRACTING CO. $54,803,248.66
401029 TRAYLOR BROTHERS, INC. $55,238,208.36
 
Item Number Item Description Quantity Unit of Measure - 1 -
MASSMAN CONSTRUCTION CO.
- 2 -
BOH BROS. CONSTRUCTION CO., LLC.
- 3 -
L & A CONTRACTING CO.
- 4 -
TRAYLOR BROTHERS, INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 35,000.00 35,000.00 500,000.00 500,000.00 3,000,000.00 3,000,000.00 66,000.00 66,000.00
202-01 removal of structures & obstructions lump      lump 15,000.00 15,000.00 10,000.00 10,000.00 550,000.00 550,000.00 14,500.00 14,500.00
202-02-A removal of bridges (sta. 14+756.514, 6.10m x 1188.568m
steel high truss swing span & concrete span)
1      ea 1,096,000.00 1,096,000.00 600,000.00 600,000.00 3,500,000.00 3,500,000.00 1,200,000.00 1,200,000.00
202-02-C removal of portland cement concrete pavement 6,325      sq m 9.00 56,925.00 5.00 31,625.00 9.90 62,617.50 9.00 56,925.00
202-02-C-01 removal of portland cement concrete pavement with
overlay
6,214      sq m 9.00 55,926.00 7.00 43,498.00 9.90 61,518.60 10.00 62,140.00
202-02-G removal of surfacing & stabilized base 39,493.2    sq m 3.00 118,479.60 5.00 197,466.00 3.30 130,327.56 3.50 138,226.20
202-02-H removal of guard rail 58      ln m 11.00 638.00 20.00 1,160.00 14.30 829.40 18.00 1,044.00
202-02-I removal of wood framed shed lump      lump 5,000.00 5,000.00 10,000.00 10,000.00 1,025.00 1,025.00 5,100.00 5,100.00
202-02-J removal of metal framed boat hoist and slab lump      lump 5,000.00 5,000.00 20,000.00 20,000.00 2,550.00 2,550.00 5,100.00 5,100.00
202-02-K removal of water well and slab lump      lump 5,000.00 5,000.00 10,000.00 10,000.00 1,025.00 1,025.00 5,100.00 5,100.00
202-02-L removal of wood framed handicapped ramp lump      lump 1,000.00 1,000.00 5,000.00 5,000.00 1,244.00 1,244.00 1,100.00 1,100.00
202-02-M removal of metal pole with signs lump      lump 2,500.00 2,500.00 5,000.00 5,000.00 1,025.00 1,025.00 2,600.00 2,600.00
202-02-N removal of metal pole with signs and light lump      lump 4,000.00 4,000.00 5,000.00 5,000.00 1,025.00 1,025.00 4,100.00 4,100.00
202-02-O removal of metal poles lump      lump 2,000.00 2,000.00 2,500.00 2,500.00 1,025.00 1,025.00 2,100.00 2,100.00
202-02-P removal of fence (4' height) 6.1    l m 82.00 500.20 100.00 610.00 210.00 1,281.00 85.00 518.50
202-02-Q removal of fence (6' height) 144.2    l m 7.00 1,009.40 30.00 4,326.00 9.00 1,297.80 8.00 1,153.60
202-02-R removal of utility pole 8      each 500.00 4,000.00 500.00 4,000.00 320.00 2,560.00 510.00 4,080.00
202-03-A relocation of existing split rail fence lump      lump 5,000.00 5,000.00 10,000.00 10,000.00 14,084.00 14,084.00 9,000.00 9,000.00
203-01 general excavation 24,276      cu m 9.00 218,484.00 12.00 291,312.00 9.90 240,332.40 9.50 230,622.00
203-02 drainage excavation 777      cu m 9.00 6,993.00 18.00 13,986.00 9.90 7,692.30 9.00 6,993.00
203-04 embankment 8,723      cu m 20.00 174,460.00 6.50 56,699.50 28.50 248,605.50 21.00 183,183.00
203-05 nonplastic embankment 19,270      cu m 20.00 385,400.00 21.00 404,670.00 22.00 423,940.00 21.00 404,670.00
203-09 geotextile fabric 2,093      sq m 1.00 2,093.00 1.25 2,616.25 1.10 2,302.30 2.00 4,186.00
204-05-A temporary sediment check dams (hay) 6      ea 75.00 450.00 125.00 750.00 126.50 759.00 78.00 468.00
204-06 temporary silt fencing 5,398      ln m 2.65 14,304.70 4.00 21,592.00 4.30 23,211.40 3.00 16,194.00
302-02-A class ii base course (150 mm thick) 2,118.9    sq m 18.00 38,140.20 11.00 23,307.90 19.80 41,954.22 19.00 40,259.10
302-02-B class ii base course (220 mm thick) 8,681.2    sq m 15.00 130,218.00 14.00 121,536.80 16.50 143,239.80 16.00 138,899.20
302-02-D class ii base course (300 mm thick) 25,471.6    sq m 18.00 458,488.80 20.00 509,432.00 19.80 504,337.68 19.00 483,960.40
304-01 lime 90.60   Mg 100.00 9,060.00 100.00 9,060.00 110.00 9,966.00 105.00 9,513.00
304-04-D lime treatment (type d) (300 mm thick) 5,985      sq m 1.00 5,985.00 4.00 23,940.00 1.10 6,583.50 1.20 7,182.00
401-01 aggregate surface course (net section) 14.4    cu m 100.00 1,440.00 70.00 1,008.00 110.00 1,584.00 102.00 1,468.80
402-01 traffic maintenance aggregate (vehicular measurement) 710.0    cu m 45.00 31,950.00 35.00 24,850.00 49.50 35,145.00 48.00 34,080.00
502-01 superpave asphaltic concrete 11,488.7    Mg 67.00 769,742.90 73.00 838,675.10 73.70 846,717.19 70.00 804,209.00
509-01 cold planing asphaltic pavement 1,918      sq m 5.00 9,590.00 4.00 7,672.00 5.50 10,549.00 5.50 10,549.00
509-02 contractor retained reclaimed asphaltic pavement - 48      cu m 10.00 - 480.00 4.00 - 192.00 11.00 - 528.00 10.50 - 504.00
703-03 perforated pipe underdrains 60      ln m 45.00 2,700.00 80.00 4,800.00 49.50 2,970.00 50.00 3,000.00
703-04 nonperforated pipe underdrains 20      ln m 45.00 900.00 100.00 2,000.00 49.50 990.00 50.00 1,000.00
704-03 blocked out guard rail 114.30   ln m 55.00 6,286.50 60.00 6,858.00 60.50 6,915.15 60.00 6,858.00
704-08-B guard rail transitions (double thrie beam) 30.48   ln m 135.00 4,114.80 140.00 4,267.20 148.50 4,526.28 140.00 4,267.20
704-11-A guard rail end treatment (flared) 4      ea 1,750.00 7,000.00 1,700.00 6,800.00 1,925.00 7,700.00 1,800.00 7,200.00
708-01 right-of-way monument 54      ea 50.00 2,700.00 500.00 27,000.00 73.65 3,977.10 240.00 12,960.00
708-02 right-of-way monument witness post 54      ea 75.00 4,050.00 500.00 27,000.00 57.15 3,086.10 860.00 46,440.00
711-04 geotextile fabric 7,840      sq m 3.00 23,520.00 2.00 15,680.00 1.30 10,192.00 3.00 23,520.00
712-04 flexible revetment 75      sq m 50.00 3,750.00 100.00 7,500.00 63.58 4,768.50 30.00 2,250.00
713-01 temporary signs & barricades lump      lump 70,000.00 70,000.00 200,000.00 200,000.00 120,000.00 120,000.00 180,000.00 180,000.00
713-05-A temporary pavement markings (solid line)(100 mm width) 1.534  km 800.00 1,227.20 1,000.00 1,534.00 1,700.00 2,607.80 1,000.00 1,534.00
716-01-A mulch (vegetative) 9.1    hctr 1,000.00 9,100.00 1,500.00 13,650.00 1,600.00 14,560.00 1,050.00 9,555.00
717-01 seeding 608      kg 16.00 9,728.00 12.00 7,296.00 14.00 8,512.00 18.00 10,944.00
718-01 fertilizer 10,092      kg 0.50 5,046.00 0.40 4,036.80 0.50 5,046.00 0.60 6,055.20
718-02 agricultural lime 40.4    Mg 51.00 2,060.40 60.00 2,424.00 66.00 2,666.40 65.00 2,626.00
720-01-A erosion control system, slope protection (type a) 256      sq m 1.60 409.60 10.00 2,560.00 2.00 512.00 2.00 512.00
722-01 project site laboratory 1      ea 5,000.00 5,000.00 10,000.00 10,000.00 55,000.00 55,000.00 3,000.00 3,000.00
725-01 temporary detour roads 1,430.0    ln m 480.00 686,400.00 380.00 543,400.00 528.00 755,040.00 500.00 715,000.00
727-01 mobilization lump      lump 4,700,000.00 4,700,000.00 5,200,000.00 5,200,000.00 5,000,000.00 5,000,000.00 5,520,000.00 5,520,000.00
729-16-C object marker assembly (type 3) 4      ea 65.00 260.00 70.00 280.00 71.50 286.00 70.00 280.00
729-19-B dead end road installations (type b) 1      ea 950.00 950.00 1,000.00 1,000.00 1,045.00 1,045.00 1,000.00 1,000.00
730-09 electrical system lump      lump 150,000.00 150,000.00 150,000.00 150,000.00 151,600.00 151,600.00 142,000.00 142,000.00
731-02 reflectorized raised pavement markers 2,656      ea 5.25 13,944.00 5.00 13,280.00 6.05 16,068.80 7.00 18,592.00
732-01-A plastic pavement striping (100 mm width) 384      ln m 1.15 441.60 1.25 480.00 2.20 844.80 1.50 576.00
732-01-C plastic pavement striping (200 mm width) 342      ln m 2.30 786.60 2.25 769.50 3.85 1,316.70 3.00 1,026.00
732-01-E plastic pavement striping (600 mm width) 336      ln m 6.75 2,268.00 7.00 2,352.00 10.45 3,511.20 9.00 3,024.00
732-02-A plastic pavement striping (solid line)(100 mm width) 17.197  km 1,200.00 20,636.40 1,200.00 20,636.40 1,430.00 24,591.71 1,500.00 25,795.50
732-03-A plastic pavement striping (broken line)(100 mm width) 0.626  km 600.00 375.60 600.00 375.60 495.00 309.87 760.00 475.76
732-04-A plastic pavement legends & symbols (arrow) 13      ea 135.00 1,755.00 140.00 1,820.00 154.00 2,002.00 170.00 2,210.00
732-04-C plastic pavement legends & symbols (only) 12      ea 155.00 1,860.00 160.00 1,920.00 176.00 2,112.00 200.00 2,400.00
735-01 mailboxes 77      ea 5.10 392.70 1.00 77.00 1.10 84.70 1.10 84.70
735-02 mailbox supports (single) 2      ea 125.00 250.00 100.00 200.00 121.00 242.00 110.00 220.00
735-03 mailbox supports (double) 1      ea 200.00 200.00 150.00 150.00 176.00 176.00 135.00 135.00
735-04 mailbox supports (multiple) 12      ea 280.00 3,360.00 300.00 3,600.00 330.00 3,960.00 280.00 3,360.00
740-01 construction layout lump      lump 100,000.00 100,000.00 600,000.00 600,000.00 950,000.00 950,000.00 950,000.00 950,000.00
804-01-C precast concrete piles (400 mm) 1,387.0    ln m 190.00 263,530.00 108.00 149,796.00 144.00 199,728.00 250.00 346,750.00
804-01-G precast concrete piles (750 mm) 1,245.5    ln m 380.00 473,290.00 346.00 430,943.00 311.00 387,350.50 540.00 672,570.00
804-01-J precast concrete piles (1675 mm) 5,530.00   ln m 1,000.00 5,530,000.00 2,266.00 12,530,980.00 1,075.00 5,944,750.00 1,250.00 6,912,500.00
804-05-G precast concrete test piles (750 mm) 2      ea 30,000.00 60,000.00 11,600.00 23,200.00 1,150.00 2,300.00 15,600.00 31,200.00
804-05-J precast concrete test piles (1675 mm) 2      ea 100,000.00 200,000.00 133,000.00 266,000.00 97,433.00 194,866.00 110,000.00 220,000.00
804-09-G loading test piles (750 mm) 2      ea 170,000.00 340,000.00 60,800.00 121,600.00 22,690.00 45,380.00 55,000.00 110,000.00
804-10-G reloading test piles (750 mm) 2      ea 23,000.00 46,000.00 500.00 1,000.00 7,750.00 15,500.00 17,000.00 34,000.00
804-11-G redriving test piles (750 mm) 2      ea 5,000.00 10,000.00 750.00 1,500.00 3,180.00 6,360.00 2,500.00 5,000.00
804-11-J redriving test piles (1675 mm) 2      ea 10,000.00 20,000.00 5,000.00 10,000.00 9,983.00 19,966.00 5,500.00 11,000.00
804-12-C loading permanent piles (400 mm) 1      ea 45,000.00 45,000.00 15,000.00 15,000.00 20,405.00 20,405.00 22,500.00 22,500.00
804-12-G loading permanent piles (750 mm) 1      ea 85,000.00 85,000.00 20,000.00 20,000.00 19,771.00 19,771.00 26,000.00 26,000.00
804-17 dynamic monitoring 20      ea 200.00 4,000.00 1,900.00 38,000.00 468.00 9,360.00 2,200.00 44,000.00
805-01-D class a concrete (footings) 6,213.84   cu m 600.00 3,728,304.00 600.00 3,728,304.00 431.00 2,678,165.04 580.00 3,604,027.20
805-01-F class a concrete (bents) 2,982.30   cu m 700.00 2,087,610.00 650.00 1,938,495.00 813.00 2,424,609.90 780.00 2,326,194.00
805-03 class aa concrete 6,489.71   cu m 750.00 4,867,282.50 500.00 3,244,855.00 1,009.00 6,548,117.39 900.00 5,840,739.00
805-08-B precast-prestressed concrete girder (type ii) 1,055.63   ln m 280.00 295,576.40 180.00 190,013.40 175.00 184,735.25 200.00 211,126.00
805-08-I precast-prestressed concrete girder (type bt-78) 5,743.91   ln m 550.00 3,159,150.50 500.00 2,871,955.00 489.00 2,808,771.99 480.00 2,757,076.80
805-11 strip seal joints 278.00   ln m 320.00 88,960.00 300.00 83,400.00 403.36 112,134.08 700.00 194,600.00
806-01 deformed reinforcing steel 1,948,168      kg 1.85 3,604,110.80 1.60 3,117,068.80 1.62 3,156,032.16 2.20 4,285,969.60
807-06 structural metalwork lump      lump 150,000.00 150,000.00 100,000.00 100,000.00 34,300.00 34,300.00 156,000.00 156,000.00
810-04 steel & concrete railing 3,343.89   ln m 430.00 1,437,872.70 450.00 1,504,750.50 506.00 1,692,008.34 520.00 1,738,822.80
813-02 concrete approach slabs (pile supported) 940.52   sq m 250.00 235,130.00 250.00 235,130.00 353.00 332,003.56 380.00 357,397.60
S-001 radar traffic sensor and recorder system 1      each 19,500.00 19,500.00 20,000.00 20,000.00 36,500.00 36,500.00 22,000.00 22,000.00
S-002 rumble strips (ground-in) 3.152  km 950.00 2,994.40 1,000.00 3,152.00 5,500.00 17,336.00 1,000.00 3,152.00
S-004 plugging existing water wells lump      lump 10,000.00 10,000.00 5,000.00 5,000.00 2,200.00 2,200.00 600.00 600.00
S-101 settlement plate installation and monitoring 2      each 750.00 1,500.00 2,500.00 5,000.00 27,500.00 55,000.00 350.00 700.00
S-102 wick drains 19,464      ln m 2.00 38,928.00 1.50 29,196.00 2.00 38,928.00 3.00 58,392.00
S-103 dynamic analysis 20      each 5,000.00 100,000.00 3,000.00 60,000.00 660.00 13,200.00 1,400.00 28,000.00
S-104 clearance gauge 2      each 18,000.00 36,000.00 5,000.00 10,000.00 8,800.00 17,600.00 3,600.00 7,200.00
S-105 spliced precast-prestressed concrete girder, type bt 993.30   ln m 2,000.00 1,986,600.00 1,200.00 1,191,960.00 910.00 903,903.00 1,760.00 1,748,208.00
S-106 precast-prestressed high performance concrete (hpc)
girders (type bt-78)
318.99   ln m 750.00 239,242.50 750.00 239,242.50 672.30 214,456.97 550.00 175,444.50
S-107 post-tensioning of tendons and bars lump      lump 300,000.00 300,000.00 250,000.00 250,000.00 257,400.00 257,400.00 420,000.00 420,000.00
S-108 elastomeric bearings (expansion) 10      each 1,800.00 18,000.00 1,500.00 15,000.00 1,800.00 18,000.00 4,600.00 46,000.00
S-109 elastomeric bearings (fixed) 10      each 2,000.00 20,000.00 2,000.00 20,000.00 2,500.00 25,000.00 6,000.00 60,000.00
S-110 solar generator platform lump      lump 145,000.00 145,000.00 75,000.00 75,000.00 43,630.00 43,630.00 28,000.00 28,000.00
S-111 construction site survey lump      lump 25,000.00 25,000.00 75,000.00 75,000.00 110,000.00 110,000.00 22,000.00 22,000.00
S-112 vibration monitoring lump      lump 50,000.00 50,000.00 173,000.00 173,000.00 55,000.00 55,000.00 180,000.00 180,000.00
S-113 riprap placement lump      lump 230,000.00 230,000.00 80,000.00 80,000.00 764,500.00 764,500.00 48,000.00 48,000.00
S-114 construction camera system, internet broadcasting
services, and video image archives
lump      lump 165,000.00 165,000.00 150,000.00 150,000.00 300,000.00 300,000.00 175,000.00 175,000.00
S-115 temporary haul road lump      lump 3,000,000.00 3,000,000.00 1,000,000.00 1,000,000.00 466,000.00 466,000.00 280,000.00 280,000.00
S-116 modular expansion joint (160 mm) 27.20   ln m 2,300.00 62,560.00 2,000.00 54,400.00 1,740.00 47,328.00 2,500.00 68,000.00
S-117 pile dynamic analyzer equipment & training lump      lump 64,000.00 64,000.00 70,000.00 70,000.00 70,000.00 70,000.00 75,000.00 75,000.00
S-118 class p(m) concrete (diaphragm) 75.54   cu m 1,500.00 113,310.00 1,000.00 75,540.00 2,237.00 168,982.98 2,200.00 166,188.00
S-119 loading test piles (statnamic)(750 mm) 1      ea 100,000.00 100,000.00 94,000.00 94,000.00 59,000.00 59,000.00 85,000.00 85,000.00
S-120 loading test piles (statnamic)(1675 mm) 2      ea 120,000.00 240,000.00 255,000.00 510,000.00 73,000.00 146,000.00 260,000.00 520,000.00
S-122 hpc bridge instrumentation (spans 42 & 43) lump      lump 60,000.00 60,000.00 60,000.00 60,000.00 49,300.00 49,300.00 59,000.00 59,000.00
S-123 reloading test piles (statnamic) (1675 mm) 2      ea 60,000.00 120,000.00 85,000.00 170,000.00 73,000.00 146,000.00 120,000.00 240,000.00
S-124 loading permanent piles (statnamic) (1675 mm) 1      ea 90,000.00 90,000.00 255,000.00 255,000.00 92,000.00 92,000.00 235,000.00 235,000.00
 SUBTOTAL GENERAL       43,479,222.00   46,007,328.25   48,000,925.42   46,320,977.66
                       
ALTERNATE A main span substructure                    
                       
ALTERNATE A1 mudline footing with steel pipe piles                    
802-04 structural excavation for piers (wet) 4,863.0    cu m 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
802-05 cofferdams lump      lump 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
804-03-K steel piles (pipe piles 1220 mm x 19.1 mm wall
thickness)
2,647.8    ln m 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
804-07-K steel test piles (1220 mm) 1      ea 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
804-09-K loading test piles (1220 mm) 1      ea 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
804-10-K reloading test piles (1220 mm) 1      ea 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
804-11-K redriving test piles (1220 mm) 1      ea 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
804-12-K loading permanent piles (1220 mm) 1      ea 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
804-15-K steel indicator piles (1220 mm) 1      ea 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
805-01-D-01 class a concrete (footings) 3,008.22   cu m 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
805-01-E class a concrete (piers) 3,322.67   cu m 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
805-07 class s concrete 3,035.36   cu m 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
806-01-01 deformed reinforcing steel 493,078      kg 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
                       
ALTERNATE A2 waterline footing with precast concrete piles                    
804-01-J-01 precast concrete piles (1675 mm) 2,788.70   ln m 1,000.00 2,788,700.00 0.00 0.00 1,063.00 2,964,388.10 1,425.00 3,973,897.50
804-05-J-01 precast concrete test piles (1675 mm) 1      ea 100,000.00 100,000.00 0.00 0.00 109,800.00 109,800.00 130,000.00 130,000.00
804-11-J-01 redriving test piles (1675 mm) 1      ea 10,000.00 10,000.00 0.00 0.00 11,700.00 11,700.00 6,500.00 6,500.00
804-13-J precast concrete indicator piles (1675 mm) 1      ea 90,000.00 90,000.00 0.00 0.00 72,325.00 72,325.00 78,000.00 78,000.00
805-01-D-01 class a concrete (footings) 3,935.60   cu m 600.00 2,361,360.00 0.00 0.00 431.00 1,696,243.60 580.00 2,282,648.00
805-01-E class a concrete (piers) 723.46   cu m 700.00 506,422.00 0.00 0.00 1,157.00 837,043.22 780.00 564,298.80
806-01-01 deformed reinforcing steel 520,786      kg 1.85 963,454.10 0.00 0.00 1.62 843,673.32 2.40 1,249,886.40
S-120-01 loading test piles (statnamic) (1675 mm) 1      ea 120,000.00 120,000.00 0.00 0.00 88,830.00 88,830.00 280,000.00 280,000.00
S-123-01 reloading test piles (statnamic) (1675 mm) 1      ea 60,000.00 60,000.00 0.00 0.00 89,160.00 89,160.00 120,000.00 120,000.00
S-124-01 loading permanent piles (statnamic) (1675 mm) 1      ea 90,000.00 90,000.00 0.00 0.00 89,160.00 89,160.00 232,000.00 232,000.00
 SUBTOTAL ALT A2       7,089,936.10       6,802,323.24   8,917,230.70
                       
ALTERNATE A3 waterline footing with steel pipe piles                    
804-03-L steel piles (pipe piles 1675 mm x 19.1 mm wall
thickness)
2,103.0    ln m 0.00 0.00 1,935.00 4,069,305.00 0.00 0.00 0.00 0.00
804-07-L steel test piles (1675 mm) 1      ea 0.00 0.00 128,000.00 128,000.00 0.00 0.00 0.00 0.00
804-11-L redriving test piles (1675 mm) 1      ea 0.00 0.00 16,000.00 16,000.00 0.00 0.00 0.00 0.00
804-15-L steel indicator piles (1675 mm) 1      ea 0.00 0.00 149,000.00 149,000.00 0.00 0.00 0.00 0.00
805-01-D-01 class a concrete (footings) 3,219.16   cu m 0.00 0.00 500.00 1,609,580.00 0.00 0.00 0.00 0.00
805-01-E class a concrete (piers) 723.46   cu m 0.00 0.00 700.00 506,422.00 0.00 0.00 0.00 0.00
806-01-01 deformed reinforcing steel 450,324      kg 0.00 0.00 1.60 720,518.40 0.00 0.00 0.00 0.00
S-121 loading test piles (statnamic) (1675 mm) 1      ea 0.00 0.00 255,000.00 255,000.00 0.00 0.00 0.00 0.00
S-123-02 reloading test piles (statnamic) (1675 mm) 1      ea 0.00 0.00 85,000.00 85,000.00 0.00 0.00 0.00 0.00
S-124-02 loading permanent piles (statnamic) (1675 mm) 1      ea 0.00 0.00 200,000.00 200,000.00 0.00 0.00 0.00 0.00
 SUBTOTAL ALT A3           7,738,825.40        
                       
 CONTRACTOR TOTAL       50,569,158.10   53,746,153.65   54,803,248.66   55,238,208.36