| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MASSMAN CONSTRUCTION CO. |
- 2 - BOH BROS. CONSTRUCTION CO., LLC. |
- 3 - L & A CONTRACTING CO. |
- 4 - TRAYLOR BROTHERS, INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
35,000.00 |
35,000.00 |
500,000.00 |
500,000.00 |
3,000,000.00 |
3,000,000.00 |
66,000.00 |
66,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
15,000.00 |
15,000.00 |
10,000.00 |
10,000.00 |
550,000.00 |
550,000.00 |
14,500.00 |
14,500.00 |
| 202-02-A |
removal of bridges (sta. 14+756.514, 6.10m x 1188.568m
steel high truss swing span & concrete span) |
1   |
ea |
1,096,000.00 |
1,096,000.00 |
600,000.00 |
600,000.00 |
3,500,000.00 |
3,500,000.00 |
1,200,000.00 |
1,200,000.00 |
| 202-02-C |
removal of portland cement concrete pavement
|
6,325   |
sq m |
9.00 |
56,925.00 |
5.00 |
31,625.00 |
9.90 |
62,617.50 |
9.00 |
56,925.00 |
| 202-02-C-01 |
removal of portland cement concrete pavement with
overlay |
6,214   |
sq m |
9.00 |
55,926.00 |
7.00 |
43,498.00 |
9.90 |
61,518.60 |
10.00 |
62,140.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
39,493.2 |
sq m |
3.00 |
118,479.60 |
5.00 |
197,466.00 |
3.30 |
130,327.56 |
3.50 |
138,226.20 |
| 202-02-H |
removal of guard rail
|
58   |
ln m |
11.00 |
638.00 |
20.00 |
1,160.00 |
14.30 |
829.40 |
18.00 |
1,044.00 |
| 202-02-I |
removal of wood framed shed
|
lump |
lump |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
1,025.00 |
1,025.00 |
5,100.00 |
5,100.00 |
| 202-02-J |
removal of metal framed boat hoist and slab
|
lump |
lump |
5,000.00 |
5,000.00 |
20,000.00 |
20,000.00 |
2,550.00 |
2,550.00 |
5,100.00 |
5,100.00 |
| 202-02-K |
removal of water well and slab
|
lump |
lump |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
1,025.00 |
1,025.00 |
5,100.00 |
5,100.00 |
| 202-02-L |
removal of wood framed handicapped ramp
|
lump |
lump |
1,000.00 |
1,000.00 |
5,000.00 |
5,000.00 |
1,244.00 |
1,244.00 |
1,100.00 |
1,100.00 |
| 202-02-M |
removal of metal pole with signs
|
lump |
lump |
2,500.00 |
2,500.00 |
5,000.00 |
5,000.00 |
1,025.00 |
1,025.00 |
2,600.00 |
2,600.00 |
| 202-02-N |
removal of metal pole with signs and light
|
lump |
lump |
4,000.00 |
4,000.00 |
5,000.00 |
5,000.00 |
1,025.00 |
1,025.00 |
4,100.00 |
4,100.00 |
| 202-02-O |
removal of metal poles
|
lump |
lump |
2,000.00 |
2,000.00 |
2,500.00 |
2,500.00 |
1,025.00 |
1,025.00 |
2,100.00 |
2,100.00 |
| 202-02-P |
removal of fence (4' height)
|
6.1 |
l m |
82.00 |
500.20 |
100.00 |
610.00 |
210.00 |
1,281.00 |
85.00 |
518.50 |
| 202-02-Q |
removal of fence (6' height)
|
144.2 |
l m |
7.00 |
1,009.40 |
30.00 |
4,326.00 |
9.00 |
1,297.80 |
8.00 |
1,153.60 |
| 202-02-R |
removal of utility pole
|
8   |
each |
500.00 |
4,000.00 |
500.00 |
4,000.00 |
320.00 |
2,560.00 |
510.00 |
4,080.00 |
| 202-03-A |
relocation of existing split rail fence
|
lump |
lump |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
14,084.00 |
14,084.00 |
9,000.00 |
9,000.00 |
| 203-01 |
general excavation
|
24,276   |
cu m |
9.00 |
218,484.00 |
12.00 |
291,312.00 |
9.90 |
240,332.40 |
9.50 |
230,622.00 |
| 203-02 |
drainage excavation
|
777   |
cu m |
9.00 |
6,993.00 |
18.00 |
13,986.00 |
9.90 |
7,692.30 |
9.00 |
6,993.00 |
| 203-04 |
embankment
|
8,723   |
cu m |
20.00 |
174,460.00 |
6.50 |
56,699.50 |
28.50 |
248,605.50 |
21.00 |
183,183.00 |
| 203-05 |
nonplastic embankment
|
19,270   |
cu m |
20.00 |
385,400.00 |
21.00 |
404,670.00 |
22.00 |
423,940.00 |
21.00 |
404,670.00 |
| 203-09 |
geotextile fabric
|
2,093   |
sq m |
1.00 |
2,093.00 |
1.25 |
2,616.25 |
1.10 |
2,302.30 |
2.00 |
4,186.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
6   |
ea |
75.00 |
450.00 |
125.00 |
750.00 |
126.50 |
759.00 |
78.00 |
468.00 |
| 204-06 |
temporary silt fencing
|
5,398   |
ln m |
2.65 |
14,304.70 |
4.00 |
21,592.00 |
4.30 |
23,211.40 |
3.00 |
16,194.00 |
| 302-02-A |
class ii base course (150 mm thick)
|
2,118.9 |
sq m |
18.00 |
38,140.20 |
11.00 |
23,307.90 |
19.80 |
41,954.22 |
19.00 |
40,259.10 |
| 302-02-B |
class ii base course (220 mm thick)
|
8,681.2 |
sq m |
15.00 |
130,218.00 |
14.00 |
121,536.80 |
16.50 |
143,239.80 |
16.00 |
138,899.20 |
| 302-02-D |
class ii base course (300 mm thick)
|
25,471.6 |
sq m |
18.00 |
458,488.80 |
20.00 |
509,432.00 |
19.80 |
504,337.68 |
19.00 |
483,960.40 |
| 304-01 |
lime
|
90.60 |
Mg |
100.00 |
9,060.00 |
100.00 |
9,060.00 |
110.00 |
9,966.00 |
105.00 |
9,513.00 |
| 304-04-D |
lime treatment (type d) (300 mm thick)
|
5,985   |
sq m |
1.00 |
5,985.00 |
4.00 |
23,940.00 |
1.10 |
6,583.50 |
1.20 |
7,182.00 |
| 401-01 |
aggregate surface course (net section)
|
14.4 |
cu m |
100.00 |
1,440.00 |
70.00 |
1,008.00 |
110.00 |
1,584.00 |
102.00 |
1,468.80 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
710.0 |
cu m |
45.00 |
31,950.00 |
35.00 |
24,850.00 |
49.50 |
35,145.00 |
48.00 |
34,080.00 |
| 502-01 |
superpave asphaltic concrete
|
11,488.7 |
Mg |
67.00 |
769,742.90 |
73.00 |
838,675.10 |
73.70 |
846,717.19 |
70.00 |
804,209.00 |
| 509-01 |
cold planing asphaltic pavement
|
1,918   |
sq m |
5.00 |
9,590.00 |
4.00 |
7,672.00 |
5.50 |
10,549.00 |
5.50 |
10,549.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 48   |
cu m |
10.00 |
- 480.00 |
4.00 |
- 192.00 |
11.00 |
- 528.00 |
10.50 |
- 504.00 |
| 703-03 |
perforated pipe underdrains
|
60   |
ln m |
45.00 |
2,700.00 |
80.00 |
4,800.00 |
49.50 |
2,970.00 |
50.00 |
3,000.00 |
| 703-04 |
nonperforated pipe underdrains
|
20   |
ln m |
45.00 |
900.00 |
100.00 |
2,000.00 |
49.50 |
990.00 |
50.00 |
1,000.00 |
| 704-03 |
blocked out guard rail
|
114.30 |
ln m |
55.00 |
6,286.50 |
60.00 |
6,858.00 |
60.50 |
6,915.15 |
60.00 |
6,858.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
30.48 |
ln m |
135.00 |
4,114.80 |
140.00 |
4,267.20 |
148.50 |
4,526.28 |
140.00 |
4,267.20 |
| 704-11-A |
guard rail end treatment (flared)
|
4   |
ea |
1,750.00 |
7,000.00 |
1,700.00 |
6,800.00 |
1,925.00 |
7,700.00 |
1,800.00 |
7,200.00 |
| 708-01 |
right-of-way monument
|
54   |
ea |
50.00 |
2,700.00 |
500.00 |
27,000.00 |
73.65 |
3,977.10 |
240.00 |
12,960.00 |
| 708-02 |
right-of-way monument witness post
|
54   |
ea |
75.00 |
4,050.00 |
500.00 |
27,000.00 |
57.15 |
3,086.10 |
860.00 |
46,440.00 |
| 711-04 |
geotextile fabric
|
7,840   |
sq m |
3.00 |
23,520.00 |
2.00 |
15,680.00 |
1.30 |
10,192.00 |
3.00 |
23,520.00 |
| 712-04 |
flexible revetment
|
75   |
sq m |
50.00 |
3,750.00 |
100.00 |
7,500.00 |
63.58 |
4,768.50 |
30.00 |
2,250.00 |
| 713-01 |
temporary signs & barricades
|
lump |
lump |
70,000.00 |
70,000.00 |
200,000.00 |
200,000.00 |
120,000.00 |
120,000.00 |
180,000.00 |
180,000.00 |
| 713-05-A |
temporary pavement markings (solid line)(100 mm width)
|
1.534 |
km |
800.00 |
1,227.20 |
1,000.00 |
1,534.00 |
1,700.00 |
2,607.80 |
1,000.00 |
1,534.00 |
| 716-01-A |
mulch (vegetative)
|
9.1 |
hctr |
1,000.00 |
9,100.00 |
1,500.00 |
13,650.00 |
1,600.00 |
14,560.00 |
1,050.00 |
9,555.00 |
| 717-01 |
seeding
|
608   |
kg |
16.00 |
9,728.00 |
12.00 |
7,296.00 |
14.00 |
8,512.00 |
18.00 |
10,944.00 |
| 718-01 |
fertilizer
|
10,092   |
kg |
0.50 |
5,046.00 |
0.40 |
4,036.80 |
0.50 |
5,046.00 |
0.60 |
6,055.20 |
| 718-02 |
agricultural lime
|
40.4 |
Mg |
51.00 |
2,060.40 |
60.00 |
2,424.00 |
66.00 |
2,666.40 |
65.00 |
2,626.00 |
| 720-01-A |
erosion control system, slope protection (type a)
|
256   |
sq m |
1.60 |
409.60 |
10.00 |
2,560.00 |
2.00 |
512.00 |
2.00 |
512.00 |
| 722-01 |
project site laboratory
|
1   |
ea |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
55,000.00 |
55,000.00 |
3,000.00 |
3,000.00 |
| 725-01 |
temporary detour roads
|
1,430.0 |
ln m |
480.00 |
686,400.00 |
380.00 |
543,400.00 |
528.00 |
755,040.00 |
500.00 |
715,000.00 |
| 727-01 |
mobilization
|
lump |
lump |
4,700,000.00 |
4,700,000.00 |
5,200,000.00 |
5,200,000.00 |
5,000,000.00 |
5,000,000.00 |
5,520,000.00 |
5,520,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
ea |
65.00 |
260.00 |
70.00 |
280.00 |
71.50 |
286.00 |
70.00 |
280.00 |
| 729-19-B |
dead end road installations (type b)
|
1   |
ea |
950.00 |
950.00 |
1,000.00 |
1,000.00 |
1,045.00 |
1,045.00 |
1,000.00 |
1,000.00 |
| 730-09 |
electrical system
|
lump |
lump |
150,000.00 |
150,000.00 |
150,000.00 |
150,000.00 |
151,600.00 |
151,600.00 |
142,000.00 |
142,000.00 |
| 731-02 |
reflectorized raised pavement markers
|
2,656   |
ea |
5.25 |
13,944.00 |
5.00 |
13,280.00 |
6.05 |
16,068.80 |
7.00 |
18,592.00 |
| 732-01-A |
plastic pavement striping (100 mm width)
|
384   |
ln m |
1.15 |
441.60 |
1.25 |
480.00 |
2.20 |
844.80 |
1.50 |
576.00 |
| 732-01-C |
plastic pavement striping (200 mm width)
|
342   |
ln m |
2.30 |
786.60 |
2.25 |
769.50 |
3.85 |
1,316.70 |
3.00 |
1,026.00 |
| 732-01-E |
plastic pavement striping (600 mm width)
|
336   |
ln m |
6.75 |
2,268.00 |
7.00 |
2,352.00 |
10.45 |
3,511.20 |
9.00 |
3,024.00 |
| 732-02-A |
plastic pavement striping (solid line)(100 mm width)
|
17.197 |
km |
1,200.00 |
20,636.40 |
1,200.00 |
20,636.40 |
1,430.00 |
24,591.71 |
1,500.00 |
25,795.50 |
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
0.626 |
km |
600.00 |
375.60 |
600.00 |
375.60 |
495.00 |
309.87 |
760.00 |
475.76 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
13   |
ea |
135.00 |
1,755.00 |
140.00 |
1,820.00 |
154.00 |
2,002.00 |
170.00 |
2,210.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
12   |
ea |
155.00 |
1,860.00 |
160.00 |
1,920.00 |
176.00 |
2,112.00 |
200.00 |
2,400.00 |
| 735-01 |
mailboxes
|
77   |
ea |
5.10 |
392.70 |
1.00 |
77.00 |
1.10 |
84.70 |
1.10 |
84.70 |
| 735-02 |
mailbox supports (single)
|
2   |
ea |
125.00 |
250.00 |
100.00 |
200.00 |
121.00 |
242.00 |
110.00 |
220.00 |
| 735-03 |
mailbox supports (double)
|
1   |
ea |
200.00 |
200.00 |
150.00 |
150.00 |
176.00 |
176.00 |
135.00 |
135.00 |
| 735-04 |
mailbox supports (multiple)
|
12   |
ea |
280.00 |
3,360.00 |
300.00 |
3,600.00 |
330.00 |
3,960.00 |
280.00 |
3,360.00 |
| 740-01 |
construction layout
|
lump |
lump |
100,000.00 |
100,000.00 |
600,000.00 |
600,000.00 |
950,000.00 |
950,000.00 |
950,000.00 |
950,000.00 |
| 804-01-C |
precast concrete piles (400 mm)
|
1,387.0 |
ln m |
190.00 |
263,530.00 |
108.00 |
149,796.00 |
144.00 |
199,728.00 |
250.00 |
346,750.00 |
| 804-01-G |
precast concrete piles (750 mm)
|
1,245.5 |
ln m |
380.00 |
473,290.00 |
346.00 |
430,943.00 |
311.00 |
387,350.50 |
540.00 |
672,570.00 |
| 804-01-J |
precast concrete piles (1675 mm)
|
5,530.00 |
ln m |
1,000.00 |
5,530,000.00 |
2,266.00 |
12,530,980.00 |
1,075.00 |
5,944,750.00 |
1,250.00 |
6,912,500.00 |
| 804-05-G |
precast concrete test piles (750 mm)
|
2   |
ea |
30,000.00 |
60,000.00 |
11,600.00 |
23,200.00 |
1,150.00 |
2,300.00 |
15,600.00 |
31,200.00 |
| 804-05-J |
precast concrete test piles (1675 mm)
|
2   |
ea |
100,000.00 |
200,000.00 |
133,000.00 |
266,000.00 |
97,433.00 |
194,866.00 |
110,000.00 |
220,000.00 |
| 804-09-G |
loading test piles (750 mm)
|
2   |
ea |
170,000.00 |
340,000.00 |
60,800.00 |
121,600.00 |
22,690.00 |
45,380.00 |
55,000.00 |
110,000.00 |
| 804-10-G |
reloading test piles (750 mm)
|
2   |
ea |
23,000.00 |
46,000.00 |
500.00 |
1,000.00 |
7,750.00 |
15,500.00 |
17,000.00 |
34,000.00 |
| 804-11-G |
redriving test piles (750 mm)
|
2   |
ea |
5,000.00 |
10,000.00 |
750.00 |
1,500.00 |
3,180.00 |
6,360.00 |
2,500.00 |
5,000.00 |
| 804-11-J |
redriving test piles (1675 mm)
|
2   |
ea |
10,000.00 |
20,000.00 |
5,000.00 |
10,000.00 |
9,983.00 |
19,966.00 |
5,500.00 |
11,000.00 |
| 804-12-C |
loading permanent piles (400 mm)
|
1   |
ea |
45,000.00 |
45,000.00 |
15,000.00 |
15,000.00 |
20,405.00 |
20,405.00 |
22,500.00 |
22,500.00 |
| 804-12-G |
loading permanent piles (750 mm)
|
1   |
ea |
85,000.00 |
85,000.00 |
20,000.00 |
20,000.00 |
19,771.00 |
19,771.00 |
26,000.00 |
26,000.00 |
| 804-17 |
dynamic monitoring
|
20   |
ea |
200.00 |
4,000.00 |
1,900.00 |
38,000.00 |
468.00 |
9,360.00 |
2,200.00 |
44,000.00 |
| 805-01-D |
class a concrete (footings)
|
6,213.84 |
cu m |
600.00 |
3,728,304.00 |
600.00 |
3,728,304.00 |
431.00 |
2,678,165.04 |
580.00 |
3,604,027.20 |
| 805-01-F |
class a concrete (bents)
|
2,982.30 |
cu m |
700.00 |
2,087,610.00 |
650.00 |
1,938,495.00 |
813.00 |
2,424,609.90 |
780.00 |
2,326,194.00 |
| 805-03 |
class aa concrete
|
6,489.71 |
cu m |
750.00 |
4,867,282.50 |
500.00 |
3,244,855.00 |
1,009.00 |
6,548,117.39 |
900.00 |
5,840,739.00 |
| 805-08-B |
precast-prestressed concrete girder (type ii)
|
1,055.63 |
ln m |
280.00 |
295,576.40 |
180.00 |
190,013.40 |
175.00 |
184,735.25 |
200.00 |
211,126.00 |
| 805-08-I |
precast-prestressed concrete girder (type bt-78)
|
5,743.91 |
ln m |
550.00 |
3,159,150.50 |
500.00 |
2,871,955.00 |
489.00 |
2,808,771.99 |
480.00 |
2,757,076.80 |
| 805-11 |
strip seal joints
|
278.00 |
ln m |
320.00 |
88,960.00 |
300.00 |
83,400.00 |
403.36 |
112,134.08 |
700.00 |
194,600.00 |
| 806-01 |
deformed reinforcing steel
|
1,948,168   |
kg |
1.85 |
3,604,110.80 |
1.60 |
3,117,068.80 |
1.62 |
3,156,032.16 |
2.20 |
4,285,969.60 |
| 807-06 |
structural metalwork
|
lump |
lump |
150,000.00 |
150,000.00 |
100,000.00 |
100,000.00 |
34,300.00 |
34,300.00 |
156,000.00 |
156,000.00 |
| 810-04 |
steel & concrete railing
|
3,343.89 |
ln m |
430.00 |
1,437,872.70 |
450.00 |
1,504,750.50 |
506.00 |
1,692,008.34 |
520.00 |
1,738,822.80 |
| 813-02 |
concrete approach slabs (pile supported)
|
940.52 |
sq m |
250.00 |
235,130.00 |
250.00 |
235,130.00 |
353.00 |
332,003.56 |
380.00 |
357,397.60 |
| S-001 |
radar traffic sensor and recorder system
|
1   |
each |
19,500.00 |
19,500.00 |
20,000.00 |
20,000.00 |
36,500.00 |
36,500.00 |
22,000.00 |
22,000.00 |
| S-002 |
rumble strips (ground-in)
|
3.152 |
km |
950.00 |
2,994.40 |
1,000.00 |
3,152.00 |
5,500.00 |
17,336.00 |
1,000.00 |
3,152.00 |
| S-004 |
plugging existing water wells
|
lump |
lump |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
2,200.00 |
2,200.00 |
600.00 |
600.00 |
| S-101 |
settlement plate installation and monitoring
|
2   |
each |
750.00 |
1,500.00 |
2,500.00 |
5,000.00 |
27,500.00 |
55,000.00 |
350.00 |
700.00 |
| S-102 |
wick drains
|
19,464   |
ln m |
2.00 |
38,928.00 |
1.50 |
29,196.00 |
2.00 |
38,928.00 |
3.00 |
58,392.00 |
| S-103 |
dynamic analysis
|
20   |
each |
5,000.00 |
100,000.00 |
3,000.00 |
60,000.00 |
660.00 |
13,200.00 |
1,400.00 |
28,000.00 |
| S-104 |
clearance gauge
|
2   |
each |
18,000.00 |
36,000.00 |
5,000.00 |
10,000.00 |
8,800.00 |
17,600.00 |
3,600.00 |
7,200.00 |
| S-105 |
spliced precast-prestressed concrete girder, type bt
|
993.30 |
ln m |
2,000.00 |
1,986,600.00 |
1,200.00 |
1,191,960.00 |
910.00 |
903,903.00 |
1,760.00 |
1,748,208.00 |
| S-106 |
precast-prestressed high performance concrete (hpc)
girders (type bt-78) |
318.99 |
ln m |
750.00 |
239,242.50 |
750.00 |
239,242.50 |
672.30 |
214,456.97 |
550.00 |
175,444.50 |
| S-107 |
post-tensioning of tendons and bars
|
lump |
lump |
300,000.00 |
300,000.00 |
250,000.00 |
250,000.00 |
257,400.00 |
257,400.00 |
420,000.00 |
420,000.00 |
| S-108 |
elastomeric bearings (expansion)
|
10   |
each |
1,800.00 |
18,000.00 |
1,500.00 |
15,000.00 |
1,800.00 |
18,000.00 |
4,600.00 |
46,000.00 |
| S-109 |
elastomeric bearings (fixed)
|
10   |
each |
2,000.00 |
20,000.00 |
2,000.00 |
20,000.00 |
2,500.00 |
25,000.00 |
6,000.00 |
60,000.00 |
| S-110 |
solar generator platform
|
lump |
lump |
145,000.00 |
145,000.00 |
75,000.00 |
75,000.00 |
43,630.00 |
43,630.00 |
28,000.00 |
28,000.00 |
| S-111 |
construction site survey
|
lump |
lump |
25,000.00 |
25,000.00 |
75,000.00 |
75,000.00 |
110,000.00 |
110,000.00 |
22,000.00 |
22,000.00 |
| S-112 |
vibration monitoring
|
lump |
lump |
50,000.00 |
50,000.00 |
173,000.00 |
173,000.00 |
55,000.00 |
55,000.00 |
180,000.00 |
180,000.00 |
| S-113 |
riprap placement
|
lump |
lump |
230,000.00 |
230,000.00 |
80,000.00 |
80,000.00 |
764,500.00 |
764,500.00 |
48,000.00 |
48,000.00 |
| S-114 |
construction camera system, internet broadcasting
services, and video image archives |
lump |
lump |
165,000.00 |
165,000.00 |
150,000.00 |
150,000.00 |
300,000.00 |
300,000.00 |
175,000.00 |
175,000.00 |
| S-115 |
temporary haul road
|
lump |
lump |
3,000,000.00 |
3,000,000.00 |
1,000,000.00 |
1,000,000.00 |
466,000.00 |
466,000.00 |
280,000.00 |
280,000.00 |
| S-116 |
modular expansion joint (160 mm)
|
27.20 |
ln m |
2,300.00 |
62,560.00 |
2,000.00 |
54,400.00 |
1,740.00 |
47,328.00 |
2,500.00 |
68,000.00 |
| S-117 |
pile dynamic analyzer equipment & training
|
lump |
lump |
64,000.00 |
64,000.00 |
70,000.00 |
70,000.00 |
70,000.00 |
70,000.00 |
75,000.00 |
75,000.00 |
| S-118 |
class p(m) concrete (diaphragm)
|
75.54 |
cu m |
1,500.00 |
113,310.00 |
1,000.00 |
75,540.00 |
2,237.00 |
168,982.98 |
2,200.00 |
166,188.00 |
| S-119 |
loading test piles (statnamic)(750 mm)
|
1   |
ea |
100,000.00 |
100,000.00 |
94,000.00 |
94,000.00 |
59,000.00 |
59,000.00 |
85,000.00 |
85,000.00 |
| S-120 |
loading test piles (statnamic)(1675 mm)
|
2   |
ea |
120,000.00 |
240,000.00 |
255,000.00 |
510,000.00 |
73,000.00 |
146,000.00 |
260,000.00 |
520,000.00 |
| S-122 |
hpc bridge instrumentation (spans 42 & 43)
|
lump |
lump |
60,000.00 |
60,000.00 |
60,000.00 |
60,000.00 |
49,300.00 |
49,300.00 |
59,000.00 |
59,000.00 |
| S-123 |
reloading test piles (statnamic) (1675 mm)
|
2   |
ea |
60,000.00 |
120,000.00 |
85,000.00 |
170,000.00 |
73,000.00 |
146,000.00 |
120,000.00 |
240,000.00 |
| S-124 |
loading permanent piles (statnamic) (1675 mm)
|
1   |
ea |
90,000.00 |
90,000.00 |
255,000.00 |
255,000.00 |
92,000.00 |
92,000.00 |
235,000.00 |
235,000.00 |
| | SUBTOTAL GENERAL |
|
|
|
43,479,222.00 |
|
46,007,328.25 |
|
48,000,925.42 |
|
46,320,977.66 |
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
main span substructure
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
mudline footing with steel pipe piles
|
|
|
|
|
|
|
|
|
|
|
| 802-04 |
structural excavation for piers (wet)
|
4,863.0 |
cu m |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 802-05 |
cofferdams
|
lump |
lump |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 804-03-K |
steel piles (pipe piles 1220 mm x 19.1 mm wall
thickness) |
2,647.8 |
ln m |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 804-07-K |
steel test piles (1220 mm)
|
1   |
ea |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 804-09-K |
loading test piles (1220 mm)
|
1   |
ea |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 804-10-K |
reloading test piles (1220 mm)
|
1   |
ea |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 804-11-K |
redriving test piles (1220 mm)
|
1   |
ea |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 804-12-K |
loading permanent piles (1220 mm)
|
1   |
ea |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 804-15-K |
steel indicator piles (1220 mm)
|
1   |
ea |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 805-01-D-01 |
class a concrete (footings)
|
3,008.22 |
cu m |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 805-01-E |
class a concrete (piers)
|
3,322.67 |
cu m |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 805-07 |
class s concrete
|
3,035.36 |
cu m |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 806-01-01 |
deformed reinforcing steel
|
493,078   |
kg |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A2 |
waterline footing with precast concrete piles
|
|
|
|
|
|
|
|
|
|
|
| 804-01-J-01 |
precast concrete piles (1675 mm)
|
2,788.70 |
ln m |
1,000.00 |
2,788,700.00 |
0.00 |
0.00 |
1,063.00 |
2,964,388.10 |
1,425.00 |
3,973,897.50 |
| 804-05-J-01 |
precast concrete test piles (1675 mm)
|
1   |
ea |
100,000.00 |
100,000.00 |
0.00 |
0.00 |
109,800.00 |
109,800.00 |
130,000.00 |
130,000.00 |
| 804-11-J-01 |
redriving test piles (1675 mm)
|
1   |
ea |
10,000.00 |
10,000.00 |
0.00 |
0.00 |
11,700.00 |
11,700.00 |
6,500.00 |
6,500.00 |
| 804-13-J |
precast concrete indicator piles (1675 mm)
|
1   |
ea |
90,000.00 |
90,000.00 |
0.00 |
0.00 |
72,325.00 |
72,325.00 |
78,000.00 |
78,000.00 |
| 805-01-D-01 |
class a concrete (footings)
|
3,935.60 |
cu m |
600.00 |
2,361,360.00 |
0.00 |
0.00 |
431.00 |
1,696,243.60 |
580.00 |
2,282,648.00 |
| 805-01-E |
class a concrete (piers)
|
723.46 |
cu m |
700.00 |
506,422.00 |
0.00 |
0.00 |
1,157.00 |
837,043.22 |
780.00 |
564,298.80 |
| 806-01-01 |
deformed reinforcing steel
|
520,786   |
kg |
1.85 |
963,454.10 |
0.00 |
0.00 |
1.62 |
843,673.32 |
2.40 |
1,249,886.40 |
| S-120-01 |
loading test piles (statnamic) (1675 mm)
|
1   |
ea |
120,000.00 |
120,000.00 |
0.00 |
0.00 |
88,830.00 |
88,830.00 |
280,000.00 |
280,000.00 |
| S-123-01 |
reloading test piles (statnamic) (1675 mm)
|
1   |
ea |
60,000.00 |
60,000.00 |
0.00 |
0.00 |
89,160.00 |
89,160.00 |
120,000.00 |
120,000.00 |
| S-124-01 |
loading permanent piles (statnamic) (1675 mm)
|
1   |
ea |
90,000.00 |
90,000.00 |
0.00 |
0.00 |
89,160.00 |
89,160.00 |
232,000.00 |
232,000.00 |
| | SUBTOTAL ALT A2 |
|
|
|
7,089,936.10 |
|
|
|
6,802,323.24 |
|
8,917,230.70 |
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A3 |
waterline footing with steel pipe piles
|
|
|
|
|
|
|
|
|
|
|
| 804-03-L |
steel piles (pipe piles 1675 mm x 19.1 mm wall
thickness) |
2,103.0 |
ln m |
0.00 |
0.00 |
1,935.00 |
4,069,305.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 804-07-L |
steel test piles (1675 mm)
|
1   |
ea |
0.00 |
0.00 |
128,000.00 |
128,000.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 804-11-L |
redriving test piles (1675 mm)
|
1   |
ea |
0.00 |
0.00 |
16,000.00 |
16,000.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 804-15-L |
steel indicator piles (1675 mm)
|
1   |
ea |
0.00 |
0.00 |
149,000.00 |
149,000.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 805-01-D-01 |
class a concrete (footings)
|
3,219.16 |
cu m |
0.00 |
0.00 |
500.00 |
1,609,580.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 805-01-E |
class a concrete (piers)
|
723.46 |
cu m |
0.00 |
0.00 |
700.00 |
506,422.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 806-01-01 |
deformed reinforcing steel
|
450,324   |
kg |
0.00 |
0.00 |
1.60 |
720,518.40 |
0.00 |
0.00 |
0.00 |
0.00 |
| S-121 |
loading test piles (statnamic) (1675 mm)
|
1   |
ea |
0.00 |
0.00 |
255,000.00 |
255,000.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| S-123-02 |
reloading test piles (statnamic) (1675 mm)
|
1   |
ea |
0.00 |
0.00 |
85,000.00 |
85,000.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| S-124-02 |
loading permanent piles (statnamic) (1675 mm)
|
1   |
ea |
0.00 |
0.00 |
200,000.00 |
200,000.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| | SUBTOTAL ALT A3 |
|
|
|
|
|
7,738,825.40 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
50,569,158.10 |
|
53,746,153.65 |
|
54,803,248.66 |
|
55,238,208.36 |
|