Letting of 5/26/2004 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 840-22-0023
Parish: RAPIDES
Routes: LA 498
Description: LA 498 MINOR OVERLAY (CM)
Type Const: aggregate surface course,superpave asphaltic concrete, pavement patching,raised
pavement markers,plastic pavement striping and related work
 
RankLicenseBidderAmount
112312 GILCHRIST CONSTRUCTION CO. LLC $261,586.48
205789 D & J CONSTRUCTION CO., INC. $411,859.90
312487 DIAMOND B CONSTRUCTION CO., L.L.C. $455,303.22
 
Item Number Item Description Quantity Unit of Measure - 1 -
GILCHRIST CONSTRUCTION CO. LLC
- 2 -
D & J CONSTRUCTION CO., INC.
- 3 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
401-02 aggregate surface course (adjusted vehicular
measurement)
467      CUYD 30.00 14,010.00 52.00 24,284.00 88.00 41,096.00    
502-01 superpave asphaltic concrete 2,992.2    TON 41.65 124,625.13 55.00 164,571.00 57.15 171,004.23    
502-01-D superpave asphaltic concrete, incidental paving (level
a)
671.3    TON 48.00 32,222.40 85.00 57,060.50 77.00 51,690.10    
713-01 temporary signs & barricades lump      LUMP 6,000.00 6,000.00 30,000.00 30,000.00 35,000.00 35,000.00    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
1.847  MILE 450.00 831.15 250.00 461.75 368.00 679.69    
713-05-A temporary pavement markings (solid line)(4" width) 3.694  MILE 550.00 2,031.70 450.00 1,662.30 525.00 1,939.35    
724-01-B pavement patching (12" minimum thickness) 500      SQYD 68.00 34,000.00 85.00 42,500.00 143.00 71,500.00    
727-01 mobilization lump      LUMP 26,000.00 26,000.00 40,000.00 40,000.00 42,000.00 42,000.00    
731-02 reflectorized raised pavement markers 245      EACH 5.50 1,347.50 6.25 1,531.25 5.25 1,286.25    
732-02-A plastic pavement striping (solid line) (4" width) 3.694  MILE 1,900.00 7,018.60 2,650.00 9,789.10 1,900.00 7,018.60    
S-001 surface preparation lump      LUMP 13,500.00 13,500.00 40,000.00 40,000.00 32,089.00 32,089.00    
                       
 CONTRACTOR TOTAL       261,586.48   411,859.90   455,303.22    