| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - D & J CONSTRUCTION CO., INC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - AMETHYST CONSTRUCTION, INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
10,000.00 |
10,000.00 |
7,350.00 |
7,350.00 |
35,000.00 |
35,000.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
484   |
SQYD |
10.00 |
4,840.00 |
15.75 |
7,623.00 |
9.00 |
4,356.00 |
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
75,000.00 |
75,000.00 |
36,250.00 |
36,250.00 |
55,000.00 |
55,000.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
147   |
CUYD |
65.00 |
9,555.00 |
132.21 |
19,434.87 |
50.00 |
7,350.00 |
|
|
| 502-01-B |
superpave asphaltic concrete (level 2)
|
950.8 |
TON |
62.00 |
58,949.60 |
58.00 |
55,146.40 |
75.00 |
71,310.00 |
|
|
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
42   |
LNFT |
52.00 |
2,184.00 |
84.00 |
3,528.00 |
125.00 |
5,250.00 |
|
|
| 701-05-F |
side drain pipe (15")
|
42   |
LNFT |
42.00 |
1,764.00 |
52.50 |
2,205.00 |
100.00 |
4,200.00 |
|
|
| 701-05-G |
side drain pipe (18")
|
226   |
LNFT |
48.00 |
10,848.00 |
63.00 |
14,238.00 |
110.00 |
24,860.00 |
|
|
| 701-05-I |
side drain pipe (24")
|
102   |
LNFT |
52.00 |
5,304.00 |
73.50 |
7,497.00 |
125.00 |
12,750.00 |
|
|
| 701-06-D |
side drain pipe arch (24" equiv.)
|
10   |
LNFT |
62.00 |
620.00 |
115.50 |
1,155.00 |
145.00 |
1,450.00 |
|
|
| 701-06-F |
side drain pipe arch (36" equiv.)
|
40   |
LNFT |
72.00 |
2,880.00 |
147.00 |
5,880.00 |
175.00 |
7,000.00 |
|
|
| 701-06-G |
side drain pipe arch (42" equiv.)
|
100   |
LNFT |
125.00 |
12,500.00 |
168.00 |
16,800.00 |
185.00 |
18,500.00 |
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
8   |
LNFT |
62.00 |
496.00 |
126.00 |
1,008.00 |
250.00 |
2,000.00 |
|
|
| 702-02-B |
manholes (r-cb-11)
|
2   |
EACH |
2,600.00 |
5,200.00 |
2,310.00 |
4,620.00 |
4,500.00 |
9,000.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
1   |
EACH |
3,300.00 |
3,300.00 |
2,625.00 |
2,625.00 |
4,500.00 |
4,500.00 |
|
|
| 702-03-B |
catch basins (cb-02)
|
1   |
EACH |
3,200.00 |
3,200.00 |
3,675.00 |
3,675.00 |
4,800.00 |
4,800.00 |
|
|
| 702-04-A |
adjusting manholes
|
4   |
EACH |
1,000.00 |
4,000.00 |
840.00 |
3,360.00 |
2,500.00 |
10,000.00 |
|
|
| 702-08-A |
side drain safety end (type 1)
|
1   |
EACH |
1,000.00 |
1,000.00 |
1,155.00 |
1,155.00 |
3,500.00 |
3,500.00 |
|
|
| 706-02-C |
concrete drive (6" thick)
|
234.1 |
SQYD |
47.00 |
11,002.70 |
63.00 |
14,748.30 |
92.00 |
21,537.20 |
|
|
| 712-01-A |
concrete cast-in-place revetment (4" thick)
|
208   |
SQYD |
47.00 |
9,776.00 |
63.00 |
13,104.00 |
75.00 |
15,600.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
53,000.00 |
53,000.00 |
17,875.00 |
17,875.00 |
25,000.00 |
25,000.00 |
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
180   |
LNFT |
1.00 |
180.00 |
0.32 |
57.60 |
0.30 |
54.00 |
|
|
| 713-03-D |
temporary pavement markings (12" width)
|
1,320   |
LNFT |
0.75 |
990.00 |
0.47 |
620.40 |
0.50 |
660.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
0.365 |
MILE |
300.00 |
109.50 |
310.00 |
113.15 |
3,000.00 |
1,095.00 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
1.279 |
MILE |
800.00 |
1,023.20 |
630.00 |
805.77 |
650.00 |
831.35 |
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
2   |
EACH |
250.00 |
500.00 |
52.50 |
105.00 |
100.00 |
200.00 |
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
2   |
EACH |
250.00 |
500.00 |
52.50 |
105.00 |
100.00 |
200.00 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
168   |
SQYD |
150.00 |
25,200.00 |
215.03 |
36,125.04 |
180.00 |
30,240.00 |
|
|
| 724-02 |
pavement widening
|
2,073.7 |
SQYD |
50.00 |
103,685.00 |
68.59 |
142,235.08 |
52.00 |
107,832.40 |
|
|
| 726-01 |
bedding material
|
229.4 |
CUYD |
50.00 |
11,470.00 |
10.50 |
2,408.70 |
35.00 |
8,029.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
53,000.00 |
53,000.00 |
55,800.00 |
55,800.00 |
25,000.00 |
25,000.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,171   |
EACH |
5.50 |
6,440.50 |
4.94 |
5,784.74 |
5.00 |
5,855.00 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
180   |
LNFT |
1.25 |
225.00 |
0.84 |
151.20 |
1.00 |
180.00 |
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
1,320   |
LNFT |
2.50 |
3,300.00 |
1.26 |
1,663.20 |
1.30 |
1,716.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
130   |
LNFT |
3.50 |
455.00 |
2.52 |
327.60 |
2.50 |
325.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
1.279 |
MILE |
3,800.00 |
4,860.20 |
3,675.00 |
4,700.32 |
3,600.00 |
4,604.40 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
2   |
EACH |
500.00 |
1,000.00 |
157.50 |
315.00 |
150.00 |
300.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
2   |
EACH |
500.00 |
1,000.00 |
157.50 |
315.00 |
300.00 |
600.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
49,400.00 |
49,400.00 |
12,000.00 |
12,000.00 |
|
|
| S-001 |
trench drain
|
1   |
EACH |
5,000.00 |
5,000.00 |
8,925.00 |
8,925.00 |
12,000.00 |
12,000.00 |
|
|
| S-002 |
tree trimming
|
lump |
LUMP |
15,000.00 |
15,000.00 |
5,250.00 |
5,250.00 |
5,000.00 |
5,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
534,357.70 |
|
554,485.37 |
|
559,685.35 |
|
|
|