| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GILCHRIST CONSTRUCTION CO. LLC |
- 2 - D & J CONSTRUCTION CO., INC. |
- 3 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks and drives
|
156   |
SQYD |
15.00 |
2,340.00 |
7.00 |
1,092.00 |
7.62 |
1,188.72 |
|
|
| 202-02-F |
removal of concrete combination curb and gutter
|
35.0 |
LNFT |
15.00 |
525.00 |
12.50 |
437.50 |
5.45 |
190.75 |
|
|
| 202-02-H |
removal of guard rail
|
770   |
LNFT |
3.50 |
2,695.00 |
10.00 |
7,700.00 |
3.27 |
2,517.90 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
100   |
CUYD |
18.00 |
1,800.00 |
30.00 |
3,000.00 |
16.34 |
1,634.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
7,130.0 |
TON |
48.64 |
346,803.20 |
52.00 |
370,760.00 |
56.00 |
399,280.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
470.0 |
TON |
55.00 |
25,850.00 |
96.00 |
45,120.00 |
74.00 |
34,780.00 |
|
|
| 507-01-B |
asphaltic surface treatment (2 applications)
|
59,110   |
SQYD |
1.30 |
76,843.00 |
2.05 |
121,175.50 |
2.72 |
160,779.20 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
61,999   |
SQYD |
1.15 |
71,298.85 |
0.98 |
60,759.02 |
1.53 |
94,858.47 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,779   |
CUYD |
1.00 |
- 1,779.00 |
0.01 |
- 17.79 |
0.10 |
- 177.90 |
|
|
| 702-04-A |
adjusting manholes
|
3   |
EACH |
500.00 |
1,500.00 |
900.00 |
2,700.00 |
875.00 |
2,625.00 |
|
|
| 704-03 |
blocked out guard rail
|
624.8 |
LNFT |
16.00 |
9,996.80 |
16.00 |
9,996.80 |
16.34 |
10,209.23 |
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
100.0 |
LNFT |
55.00 |
5,500.00 |
30.00 |
3,000.00 |
54.45 |
5,445.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
55.00 |
11,000.00 |
40.00 |
8,000.00 |
54.45 |
10,890.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
8   |
EACH |
2,200.00 |
17,600.00 |
1,750.00 |
14,000.00 |
2,200.00 |
17,600.00 |
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
156   |
SQYD |
35.00 |
5,460.00 |
40.00 |
6,240.00 |
56.00 |
8,736.00 |
|
|
| 707-03 |
combination concrete curb and gutter
|
35.0 |
LNFT |
30.00 |
1,050.00 |
25.00 |
875.00 |
27.23 |
953.05 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
4,500.00 |
4,500.00 |
10,000.00 |
10,000.00 |
6,350.00 |
6,350.00 |
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
2,752   |
LNFT |
0.35 |
963.20 |
0.70 |
1,926.40 |
0.33 |
908.16 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
7.348 |
MILE |
450.00 |
3,306.60 |
165.00 |
1,212.42 |
327.00 |
2,402.79 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
3.674 |
MILE |
230.00 |
845.02 |
225.00 |
826.65 |
380.00 |
1,396.12 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
13.625 |
MILE |
450.00 |
6,131.25 |
265.00 |
3,610.62 |
742.00 |
10,109.75 |
|
|
| 713-07 |
temporary reflectorized raised pavement markers
|
486   |
EACH |
1.40 |
680.40 |
1.00 |
486.00 |
1.63 |
792.18 |
|
|
| 724-01-C |
pavement patching(9" minimum thickness)
|
150   |
SQYD |
55.00 |
8,250.00 |
60.00 |
9,000.00 |
96.64 |
14,496.00 |
|
|
| 724-01-D |
pavement patching (15"minimum thickness)
|
428   |
SQYD |
70.00 |
29,960.00 |
82.50 |
35,310.00 |
88.75 |
37,985.00 |
|
|
| 724-01-E |
pavement patching (19" minimum thickness)
|
200   |
SQYD |
95.00 |
19,000.00 |
125.00 |
25,000.00 |
102.24 |
20,448.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
36,000.00 |
36,000.00 |
46,000.00 |
46,000.00 |
32,608.00 |
32,608.00 |
|
|
| 729-01 |
sign (type a)
|
11.6 |
SQFT |
28.00 |
324.80 |
25.00 |
290.00 |
28.00 |
324.80 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
90.00 |
720.00 |
65.00 |
520.00 |
92.57 |
740.56 |
|
|
| 729-21 |
u-channel post
|
4   |
EACH |
20.00 |
80.00 |
75.00 |
300.00 |
82.00 |
328.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,534   |
EACH |
4.50 |
6,903.00 |
4.25 |
6,519.50 |
5.23 |
8,022.82 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
1,376   |
LNFT |
0.90 |
1,238.40 |
2.20 |
3,027.20 |
0.87 |
1,197.12 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
478   |
LNFT |
2.80 |
1,338.40 |
4.65 |
2,222.70 |
2.61 |
1,247.58 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
6.813 |
MILE |
1,800.00 |
12,263.40 |
1,800.00 |
12,263.40 |
2,152.00 |
14,661.57 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.674 |
MILE |
700.00 |
2,571.80 |
750.00 |
2,755.50 |
762.00 |
2,799.58 |
|
|
| 735-01 |
mailboxes
|
8   |
EACH |
7.00 |
56.00 |
5.00 |
40.00 |
13.00 |
104.00 |
|
|
| 735-02 |
mailbox supports (single)
|
8   |
EACH |
165.00 |
1,320.00 |
130.00 |
1,040.00 |
400.00 |
3,200.00 |
|
|
| 736-09 |
loop detector
|
286   |
LNFT |
25.00 |
7,150.00 |
25.00 |
7,150.00 |
23.96 |
6,852.56 |
|
|
| 739-01 |
hydro-seeding
|
1.00 |
ACRE |
1,100.00 |
1,100.00 |
1,000.00 |
1,000.00 |
2,725.00 |
2,725.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
7,500.00 |
7,500.00 |
2,500.00 |
2,500.00 |
9,300.00 |
9,300.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
730,685.12 |
|
827,838.42 |
|
930,509.01 |
|
|
|