DBE GOAL FED
Lead Project: 001-09-0076
Parish: OUACHITA
Routes: US 80
Description: DESIARD STREET (MONROE) (LOUISVILLE AVENUE - GILBERT STREET)
Type Const: grading, drain struct, class ii base course, subgrade layer, water and sanitary
sewer installations, superpave acp, pccp, landscaping, traffic signalization and related work
 
RankLicenseBidderAmount
112312 GILCHRIST CONSTRUCTION CO. LLC $13,880,648.49
239462 DENTON-JAMES LLC $14,955,634.20
321810 HIGHWAY SPECIALISTS INC. $15,638,991.67
 
Item Number Item Description Quantity Unit of Measure - 1 -
GILCHRIST CONSTRUCTION CO. LLC
- 2 -
DENTON-JAMES LLC
- 3 -
HIGHWAY SPECIALISTS INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 1,360,000.00 1,360,000.00 900,000.00 900,000.00 250,000.00 250,000.00    
202-01 removal of structures & obstructions lump      LUMP 40,000.00 40,000.00 340,000.00 340,000.00 450,000.00 450,000.00    
202-02-B-01 removal of concrete box culverts (sta. 120+40; 3' x 3'
x 48')
1      EACH 4,000.00 4,000.00 2,000.00 2,000.00 3,500.00 3,500.00    
202-02-B-02 removal of concrete box culverts (lt. of sta. 129+42;
4' x 4' x 73')
1      EACH 7,500.00 7,500.00 5,000.00 5,000.00 6,500.00 6,500.00    
202-02-B-03 removal of concrete box culverts (sta. 129+79; 4' x 4'
x 47')
1      EACH 4,000.00 4,000.00 4,000.00 4,000.00 3,500.00 3,500.00    
202-02-C removal of portland cement concrete pavement 43,405      SQYD 4.00 173,620.00 11.00 477,455.00 9.00 390,645.00    
202-02-D removal of concrete walks & drives 9,067      SQYD 4.00 36,268.00 9.00 81,603.00 9.00 81,603.00    
202-02-E removal of concrete curbs 3,349.1    LNFT 4.00 13,396.40 2.50 8,372.75 6.00 20,094.60    
202-02-G removal of surfacing & stabilized base 7,024.9    SQYD 4.00 28,099.60 5.00 35,124.50 7.00 49,174.30    
202-02-I removal of existing signal equipment lump      LUMP 8,000.00 8,000.00 10,000.00 10,000.00 9,000.00 9,000.00    
202-02-J-01 removal of sign (sta. 109+036 rt., 5'x9', "b & v auto
sales")
1      EACH 100.00 100.00 1.00 1.00 750.00 750.00    
202-02-J-02 removal of sign (sta. 110+000 lt., 10'x30', shell gas
price)
1      EACH 100.00 100.00 1.00 1.00 2,500.00 2,500.00    
202-02-J-03 removal of sign (sta. 117+088 rt., 4'x8') 1      EACH 100.00 100.00 1.00 1.00 750.00 750.00    
202-02-J-04 removal of sign (sta. 118+038 rt., 3'x8', "smoker's
paradise")
1      EACH 100.00 100.00 1.00 1.00 750.00 750.00    
202-02-J-05 removal of sign (sta. 118+038 rt., 4'x5', box sign) 1      EACH 100.00 100.00 1.00 1.00 750.00 750.00    
202-02-J-06 removal of sign (sta. 120+074 lt., 5'x10') 1      EACH 100.00 100.00 1.00 1.00 750.00 750.00    
202-02-J-07 removal of sign (sta. 121+062 rt., 4'x8', changeable
message)
1      EACH 100.00 100.00 1.00 1.00 750.00 750.00    
202-02-J-08 removal of sign (sta. 121+083 rt., 2'x9', "cv joint
plus")
1      EACH 100.00 100.00 1.00 1.00 750.00 750.00    
202-02-J-09 removal of sign (sta. 123+053 lt., 4'x9', "aventis") 1      EACH 100.00 100.00 1.00 1.00 750.00 750.00    
202-02-J-10 removal of sign (sta. 124+012 rt., 4'x8') 1      EACH 100.00 100.00 1.00 1.00 750.00 750.00    
202-02-J-11 removal of sign (sta. 124+017 lt., 2'x4', "a & b
properties")
1      EACH 100.00 100.00 1.00 1.00 750.00 750.00    
202-02-J-12 removal of sign (sta. 125+000 rt., 2'x3', metal) 1      EACH 100.00 100.00 1.00 1.00 750.00 750.00    
202-02-J-13 removal of sign (sta. 125+005 lt., 2'x8', "ulm
vistor's center")
1      EACH 100.00 100.00 1.00 1.00 750.00 750.00    
202-02-J-14 removal of sign (sta. 125+058 rt., 4'x8', metal) 1      EACH 100.00 100.00 1.00 1.00 750.00 750.00    
202-02-J-15 removal of sign (sta. 126+054 rt., 4'x8') 1      EACH 100.00 100.00 1.00 1.00 750.00 750.00    
202-02-J-16 removal of sign (sta. 127+010 lt., 4'x8', "church of
christ")
1      EACH 100.00 100.00 1.00 1.00 750.00 750.00    
202-02-J-17 removal of sign (sta. 128+084 rt., 4'x8', "boudreaux
motors - 342-9136")
1      EACH 100.00 100.00 1.00 1.00 750.00 750.00    
202-02-J-18 removal of sign (sta. 132+015 rt., 20'x10') 1      EACH 100.00 100.00 1.00 1.00 1,500.00 1,500.00    
202-02-J-19 removal of sign (sta. 132+064 rt., 4'x8') 1      EACH 100.00 100.00 1.00 1.00 750.00 750.00    
202-02-J-20 removal of sign (sta. 133+033 rt., 4'x8') 1      EACH 100.00 100.00 1.00 1.00 750.00 750.00    
202-02-J-21 removal of sign (sta. 134+045 rt., 4'x8', "northeast
textbooks")
1      EACH 100.00 100.00 1.00 1.00 750.00 750.00    
202-02-J-22 removal of sign (sta. 138+025 rt., 2'x4', "subway") 1      EACH 100.00 100.00 1.00 1.00 750.00 750.00    
202-02-J-23 removal of sign (sta. 139+015 rt., 4'x8', metal) 1      EACH 100.00 100.00 1.00 1.00 750.00 750.00    
202-02-J-24 removal of sign (sta. 140+015 rt., 5'x10', old
"peking")
1      EACH 100.00 100.00 1.00 1.00 750.00 750.00    
202-02-J-25 removal of sign (sta. 141+009 rt., 5'x10', "oriental
market")
1      EACH 100.00 100.00 1.00 1.00 750.00 750.00    
202-02-J-26 removal of sign (sta. 142+020 rt., 3.5'x4', brick
address)
1      EACH 100.00 100.00 1.00 1.00 1,500.00 1,500.00    
202-02-J-27 removal of sign (sta. 146+053 rt., 6'x10', "kfc &
changeable messageboard")
1      EACH 100.00 100.00 1.00 1.00 1,500.00 1,500.00    
202-02-J-28 removal of sign (sta. 154+088 rt., 4'x8', "dirty dan's
carwash"
1      EACH 100.00 100.00 1.00 1.00 750.00 750.00    
202-02-K-01 removal of fence (sta. 109+050 rt., metal) 112      LNFT 6.00 672.00 3.00 336.00 12.00 1,344.00    
202-02-K-02 removal of fence (sta. 124+060 rt., metal) 100      LNFT 6.00 600.00 3.00 300.00 12.00 1,200.00    
202-02-L-01 removal of sign post (sta. 112+016 rt., metal) 1      EACH 100.00 100.00 1.00 1.00 750.00 750.00    
202-02-L-02 removal of sign post (sta. 122+070 lt., metal) 1      EACH 100.00 100.00 1.00 1.00 750.00 750.00    
202-02-M removal of concrete sign base (sta. 121+046 rt.) 1      EACH 1,200.00 1,200.00 1.00 1.00 2,000.00 2,000.00    
202-02-N removal of canopy (sta. 123+087 rt., 29'x32', wood
frame)
1      EACH 1,200.00 1,200.00 1.00 1.00 2,500.00 2,500.00    
202-02-O removal of flower bed (sta. 149+026 lt., 60'x38', ulm
flower bed on hill)
1      EACH 2,000.00 2,000.00 1.00 1.00 6,000.00 6,000.00    
202-02-P-01 removal of light pole (sta. 110+055 rt.) 1      EACH 500.00 500.00 400.00 400.00 450.00 450.00    
202-02-P-02 removal of light pole (sta. 111+046 rt.) 1      EACH 500.00 500.00 400.00 400.00 450.00 450.00    
202-02-P-03 removal of light pole (sta. 112+070 lt.) 1      EACH 500.00 500.00 400.00 400.00 450.00 450.00    
202-02-P-04 removal of light pole (sta. 126+058 lt.) 1      EACH 500.00 500.00 400.00 400.00 450.00 450.00    
202-02-P-05 removal of light pole (sta. 131+033 rt.) 1      EACH 500.00 500.00 400.00 400.00 450.00 450.00    
203-01 general excavation 36,919      CUYD 9.00 332,271.00 13.00 479,947.00 10.00 369,190.00    
203-04 embankment 1,763      CUYD 15.00 26,445.00 25.00 44,075.00 25.00 44,075.00    
204-02 temporary hay or straw bales 1,060      EACH 12.00 12,720.00 6.00 6,360.00 5.00 5,300.00    
204-06 temporary silt fencing 5,320      LNFT 2.00 10,640.00 1.40 7,448.00 1.50 7,980.00    
204-07 temporary stone construction entrance 2      EACH 1,000.00 2,000.00 1,500.00 3,000.00 3,000.00 6,000.00    
302-02-D class ii base course (12" thick)(stone or recycled
pccp)
55,376.9    SQYD 22.50 1,245,980.25 22.00 1,218,291.80 21.00 1,162,914.90    
305-01-A subgrade layer ( 6" thick)(stone or recycled pccp) 55,377      SQYD 12.50 692,212.50 13.00 719,901.00 14.00 775,278.00    
402-01 traffic maintenance aggregate (vehicular measurement) 3,000.0    CUYD 45.00 135,000.00 55.00 165,000.00 40.00 120,000.00    
502-01 superpave asphaltic concrete 277.3    TON 175.00 48,527.50 250.00 69,325.00 250.00 69,325.00    
601-01-I portland cement concrete pavement (9" thick) 43,800.1    SQYD 50.00 2,190,005.00 58.00 2,540,405.80 51.00 2,233,805.10    
601-02-I portland cement concrete pavement (9" thick)
(crossovers & turnouts)
9,870.2    SQYD 58.00 572,471.60 65.00 641,563.00 58.00 572,471.60    
601-04 portland cement concrete pavement coring 115      EACH 125.00 14,375.00 100.00 11,500.00 125.00 14,375.00    
701-03-F storm drain pipe (15" rcp/pcp) 1,674      LNFT 33.00 55,242.00 60.00 100,440.00 70.00 117,180.00    
701-03-G storm drain pipe (18" rcp/pcp) 1,122      LNFT 38.00 42,636.00 65.00 72,930.00 75.00 84,150.00    
701-03-G/I-01 storm drain pipe (18" pcp or 24" cmp)(outfall) 26      LNFT 65.00 1,690.00 55.00 1,430.00 205.00 5,330.00    
701-03-I storm drain pipe (24" rcp/pcp) 753      LNFT 55.00 41,415.00 80.00 60,240.00 95.00 71,535.00    
701-03-K storm drain pipe (30" rcp/pcp) 300      LNFT 66.00 19,800.00 85.00 25,500.00 115.00 34,500.00    
701-03-M storm drain pipe (36" rcp/pcp) 591      LNFT 88.00 52,008.00 100.00 59,100.00 135.00 79,785.00    
701-03-N storm drain pipe (42" rcp/pcp) 946      LNFT 105.00 99,330.00 140.00 132,440.00 160.00 151,360.00    
701-03-P storm drain pipe (54" rcp/pcp) 136      LNFT 160.00 21,760.00 180.00 24,480.00 360.00 48,960.00    
701-03-P/Q-01 storm drain pipe (54" pcp or 60" cmp)(outfall) 37      LNFT 180.00 6,660.00 160.00 5,920.00 305.00 11,285.00    
701-04-A storm drain pipe arch (15" equiv. rcpa) 603      LNFT 40.00 24,120.00 65.00 39,195.00 90.00 54,270.00    
701-04-B storm drain pipe arch (18" equiv. rcpa) 896      LNFT 48.00 43,008.00 68.00 60,928.00 95.00 85,120.00    
701-04-D storm drain pipe arch (24" equiv. rcpa) 1,487      LNFT 65.00 96,655.00 80.00 118,960.00 105.00 156,135.00    
701-04-E storm drain pipe arch (30" equiv. rcpa) 3,133      LNFT 77.00 241,241.00 85.00 266,305.00 125.00 391,625.00    
701-04-F storm drain pipe arch (36" equiv. rcpa) 2,524      LNFT 100.00 252,400.00 110.00 277,640.00 145.00 365,980.00    
701-04-F-01 storm drain pipe arch (36" equiv. cmpa)(outfall) 240      LNFT 86.00 20,640.00 130.00 31,200.00 255.00 61,200.00    
701-04-I storm drain pipe arch (54" equiv. rcpa) 12      LNFT 265.00 3,180.00 230.00 2,760.00 425.00 5,100.00    
701-04-J storm drain pipe arch (60" equiv. rcpa) 313      LNFT 220.00 68,860.00 250.00 78,250.00 340.00 106,420.00    
701-04-J-01 storm drain pipe arch (60" equiv. cmpa)(outfall) 92      LNFT 235.00 21,620.00 180.00 16,560.00 290.00 26,680.00    
701-09-A fabricating pipe fittings (18" x 15" x 18" tee) 1      EACH 950.00 950.00 1,400.00 1,400.00 2,600.00 2,600.00    
701-09-B fabricating pipe fittings (36" x 15" x 36" tee) 1      EACH 1,300.00 1,300.00 3,000.00 3,000.00 4,100.00 4,100.00    
702-02-B manholes (r-cb-11) 12      EACH 2,700.00 32,400.00 2,800.00 33,600.00 4,500.00 54,000.00    
702-02-G manholes (mh-12.5 x 9) 8      EACH 3,300.00 26,400.00 10,000.00 80,000.00 5,400.00 43,200.00    
702-02-H manholes (r-cb-36) 39      EACH 3,600.00 140,400.00 3,100.00 120,900.00 5,000.00 195,000.00    
702-03-A catch basins (cb-01) 38      EACH 2,500.00 95,000.00 2,000.00 76,000.00 2,900.00 110,200.00    
702-03-C catch basins (cb-06) 110      EACH 3,600.00 396,000.00 2,800.00 308,000.00 3,500.00 385,000.00    
702-03-D catch basins (cb-07) 2      EACH 4,200.00 8,400.00 3,400.00 6,800.00 6,200.00 12,400.00    
702-03-F catch basins (cb-08) 12      EACH 8,000.00 96,000.00 5,800.00 69,600.00 7,800.00 93,600.00    
702-03-G catch basins (cb-09) 4      EACH 5,500.00 22,000.00 3,200.00 12,800.00 7,500.00 30,000.00    
702-03-H catch basins (cb-opntop) 14      EACH 3,500.00 49,000.00 2,500.00 35,000.00 3,800.00 53,200.00    
702-03-I catch basins (cb-sd08) 12      EACH 8,500.00 102,000.00 12,000.00 144,000.00 8,800.00 105,600.00    
702-03-J catch basins (r-cb-43x) 10      EACH 6,000.00 60,000.00 3,800.00 38,000.00 7,200.00 72,000.00    
702-04-A adjusting manholes 10      EACH 1,000.00 10,000.00 800.00 8,000.00 1,750.00 17,500.00    
702-04-B adjusting catch basins 4      EACH 2,500.00 10,000.00 1,500.00 6,000.00 2,100.00 8,400.00    
702-08-A side drain safety end (type 1) 5      EACH 1,200.00 6,000.00 1,100.00 5,500.00 1,500.00 7,500.00    
702-08-B side drain safety end (type 2) 1      EACH 2,500.00 2,500.00 3,500.00 3,500.00 3,000.00 3,000.00    
703-03 perforated pipe underdrains 11,180      LNFT 7.00 78,260.00 8.00 89,440.00 6.00 67,080.00    
703-04 nonperforated pipe underdrains 460      LNFT 12.00 5,520.00 40.00 18,400.00 25.00 11,500.00    
705-06-C chain link fence (6-foot height) 65      LNFT 12.00 780.00 25.00 1,625.00 40.00 2,600.00    
706-01-A concrete walk (4" thick) 2,555.0    SQYD 35.00 89,425.00 37.00 94,535.00 38.50 98,367.50    
706-02-C concrete drive (6" thick) 4,606.2    SQYD 38.00 175,035.60 44.00 202,672.80 43.00 198,066.60    
706-03-A incidental concrete paving (4" thick) 1,157.1    SQYD 30.00 34,713.00 37.00 42,812.70 38.00 43,969.80    
707-01-A concrete curb (4" mountable) 8,142.5    LNFT 7.00 56,997.50 8.50 69,211.25 7.00 56,997.50    
707-01-B concrete curb (6" barrier) 10,593.1    LNFT 8.00 84,744.80 14.50 153,599.95 14.50 153,599.95    
708-01 right-of-way monument 73      EACH 300.00 21,900.00 120.00 8,760.00 130.00 9,490.00    
711-02-C riprap (30 lb) 15      CUYD 100.00 1,500.00 120.00 1,800.00 125.00 1,875.00    
711-04 geotextile fabric 40      SQYD 5.00 200.00 3.00 120.00 5.00 200.00    
712-01-A concrete cast-in-place revetment (4" thick) 117      SQYD 35.00 4,095.00 70.00 8,190.00 100.00 11,700.00    
713-01 temporary signs & barricades lump      LUMP 120,000.00 120,000.00 200,000.00 200,000.00 700,000.00 700,000.00    
713-03-C temporary pavement markings (8" width) 2,327      LNFT 0.50 1,163.50 0.30 698.10 1.10 2,559.70    
713-03-D temporary pavement markings (12" width) 722      LNFT 0.70 505.40 0.45 324.90 1.65 1,191.30    
713-03-E temporary pavement markings (24" width) 1,154      LNFT 1.40 1,615.60 0.90 1,038.60 2.00 2,308.00    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
2.923  MILE 380.00 1,110.74 250.00 730.75 775.00 2,265.32    
713-05-A temporary pavement markings (solid line)(4" width) 7.150  MILE 1,100.00 7,865.00 500.00 3,575.00 600.00 4,290.00    
713-05-A-01 temporary pavement markings (solid line)(4" width)
(type 1 removable)
3.000  MILE 18,000.00 54,000.00 9,500.00 28,500.00 25,000.00 75,000.00    
713-06-A temporary pavement legends and symbols (arrow) 53      EACH 90.00 4,770.00 75.00 3,975.00 75.00 3,975.00    
713-06-B temporary pavement legends and symbols (double arrow) 4      EACH 150.00 600.00 100.00 400.00 135.00 540.00    
713-06-C temporary pavement legends and symbols (only) 28      EACH 150.00 4,200.00 100.00 2,800.00 85.00 2,380.00    
714-01 slab sodding 28,075      SQYD 4.50 126,337.50 3.40 95,455.00 4.00 112,300.00    
718-01 fertilizer 5,800      LB 0.20 1,160.00 0.20 1,160.00 0.18 1,044.00    
719-01-A plants (quercus virginiana/live oak 5" cal.,
200 gallon container, 18' min. ht.)
24      EACH 1,700.00 40,800.00 2,000.00 48,000.00 1,500.00 36,000.00    
719-01-B plants (lagerstroemia indica "natchez"/natchez crape
myrtle, 65 gallon cont ainer, 14' min. ht.,
3 canes min.)
19      EACH 450.00 8,550.00 400.00 7,600.00 385.00 7,315.00    
719-02-A top dressing mulch (3" depth) 33      SQYD 75.00 2,475.00 15.00 495.00 65.00 2,145.00    
722-02 project site laboratory (equipped) 1      EACH 25,000.00 25,000.00 40,000.00 40,000.00 15,000.00 15,000.00    
724-01-B pavement patching (12" minimum thickness) 872      SQYD 100.00 87,200.00 70.00 61,040.00 90.00 78,480.00    
725-02 temporary detour roads 100.0    SQYD 120.00 12,000.00 100.00 10,000.00 70.00 7,000.00    
726-01 bedding material 1,891.7    CUYD 42.00 79,451.40 60.00 113,502.00 65.00 122,960.50    
727-01 mobilization lump      LUMP 1,200,000.00 1,200,000.00 1,400,000.00 1,400,000.00 1,420,000.00 1,420,000.00    
729-01 sign (type a) 157.5    SQFT 35.00 5,512.50 38.00 5,985.00 38.00 5,985.00    
731-02 reflectorized raised pavement markers 1,480      EACH 6.00 8,880.00 5.00 7,400.00 7.50 11,100.00    
732-01-C plastic pavement striping (8" width) 2,327      LNFT 1.00 2,327.00 0.80 1,861.60 7.50 17,452.50    
732-01-D plastic pavement striping (12" width) 722      LNFT 1.50 1,083.00 1.20 866.40 10.50 7,581.00    
732-01-E plastic pavement striping (24" width) 1,154      LNFT 3.50 4,039.00 2.40 2,769.60 10.00 11,540.00    
732-02-A plastic pavement striping (solid line) (4" width) 4.949  MILE 2,400.00 11,877.60 1,800.00 8,908.20 5,000.00 24,745.00    
732-03-A-01 plastic pvmt striping (broken line)(4"width)preformed
marking tape (type v)
2.923  MILE 4,500.00 13,153.50 4,900.00 14,322.70 10,000.00 29,230.00    
732-04-A plastic pavement legends & symbols (arrow) 53      EACH 200.00 10,600.00 150.00 7,950.00 400.00 21,200.00    
732-04-B plastic pavement legends & symbols (double arrow) 4      EACH 250.00 1,000.00 200.00 800.00 800.00 3,200.00    
732-04-C plastic pavement legends & symbols (only) 28      EACH 250.00 7,000.00 150.00 4,200.00 500.00 14,000.00    
732-05 removal of existing markings 0.825  MILE 5,000.00 4,125.00 5,000.00 4,125.00 35,000.00 28,875.00    
736-01 trenching and backfilling 7,479      LNFT 4.50 33,655.50 4.00 29,916.00 4.00 29,916.00    
736-04-A signal support (mast arm pole, twin arms, 45' & 48') 1      EACH 15,000.00 15,000.00 16,000.00 16,000.00 16,000.00 16,000.00    
736-04-B signal support (mast arm pole, twin arms, 35' & 46') 1      EACH 14,500.00 14,500.00 15,000.00 15,000.00 15,000.00 15,000.00    
736-04-C signal support (mast arm pole, twin arms, 45' & 46') 1      EACH 15,000.00 15,000.00 16,000.00 16,000.00 16,000.00 16,000.00    
736-04-D signal support (mast arm pole, 30' arm) 1      EACH 7,000.00 7,000.00 7,000.00 7,000.00 7,200.00 7,200.00    
736-04-E signal support (mast arm pole, 32' arm) 1      EACH 8,000.00 8,000.00 8,000.00 8,000.00 8,200.00 8,200.00    
736-04-F signal support (mast arm pole, 36' arm) 2      EACH 8,500.00 17,000.00 8,600.00 17,200.00 8,600.00 17,200.00    
736-04-G signal support (mast arm pole, 42' arm) 1      EACH 9,000.00 9,000.00 9,000.00 9,000.00 9,100.00 9,100.00    
736-04-H signal support (mast arm pole, 44' arm) 2      EACH 10,000.00 20,000.00 9,200.00 18,400.00 9,200.00 18,400.00    
736-04-I signal support (mast arm pole, 45' arm) 3      EACH 1,000.00 3,000.00 9,600.00 28,800.00 9,600.00 28,800.00    
736-04-J signal support (mast arm pole, 47' arm) 1      EACH 11,000.00 11,000.00 11,000.00 11,000.00 11,000.00 11,000.00    
736-04-K signal support (mast arm pole, 49' arm) 1      EACH 11,000.00 11,000.00 11,000.00 11,000.00 11,000.00 11,000.00    
736-04-L signal support (mast arm pole, 50' arm) 3      EACH 11,000.00 33,000.00 11,000.00 33,000.00 11,000.00 33,000.00    
736-04-M signal support (10' pedestal pole) 5      EACH 1,000.00 5,000.00 920.00 4,600.00 1,000.00 5,000.00    
736-05-A signal heads (12" 3 face) 39      EACH 500.00 19,500.00 480.00 18,720.00 500.00 19,500.00    
736-05-B signal heads (12" 4 face) 2      EACH 700.00 1,400.00 720.00 1,440.00 800.00 1,600.00    
736-05-C signal heads (12" 5 face) 10      EACH 900.00 9,000.00 870.00 8,700.00 900.00 9,000.00    
736-05-D signal heads (pedestrian face) 10      EACH 700.00 7,000.00 650.00 6,500.00 700.00 7,000.00    
736-06 signal service 6      EACH 1,500.00 9,000.00 1,500.00 9,000.00 1,500.00 9,000.00    
736-08-A signal controller (nema type ts-1 controller in pole
mounted cabinet)
4      EACH 11,000.00 44,000.00 10,300.00 41,200.00 11,000.00 44,000.00    
736-08-B signal controller (nema type ts-1 controller in ground
mounted cabinet with foundation)
2      EACH 14,000.00 28,000.00 13,400.00 26,800.00 14,000.00 28,000.00    
736-09 loop detector 3,708      LNFT 13.00 48,204.00 15.00 55,620.00 15.00 55,620.00    
736-10-A underground junction box (type d) 9      EACH 250.00 2,250.00 250.00 2,250.00 250.00 2,250.00    
736-10-B underground junction box (type e) 23      EACH 400.00 9,200.00 430.00 9,890.00 425.00 9,775.00    
736-10-C underground junction box (type f) 18      EACH 450.00 8,100.00 480.00 8,640.00 475.00 8,550.00    
736-10-D underground junction box (type h) 2      EACH 1,200.00 2,400.00 1,100.00 2,200.00 1,200.00 2,400.00    
736-11-A conduit (1" pec) 246      LNFT 2.00 492.00 1.70 418.20 1.65 405.90    
736-11-B conduit (2" pec) 6,862      LNFT 3.00 20,586.00 2.70 18,527.40 2.70 18,527.40    
736-11-C conduit (3" pec) 537      LNFT 6.00 3,222.00 5.40 2,899.80 5.40 2,899.80    
736-12-A conductor 3c (power, 6 gauge/#6 awg) 64      LNFT 2.00 128.00 1.80 115.20 1.80 115.20    
736-13-A cable (6c #14 awg, 600v.) 5,701      LNFT 1.20 6,841.20 1.10 6,271.10 1.10 6,271.10    
736-13-B cable (10c #14 awg, 600v.) 1,655      LNFT 2.00 3,310.00 1.70 2,813.50 1.70 2,813.50    
736-13-C cable (2c #14 awg, 600v. with outer shield) 4,032      LNFT 0.60 2,419.20 0.55 2,217.60 0.55 2,217.60    
736-13-D cable (7c #12 awg, 600v. interconnect cable) 5,626      LNFT 1.60 9,001.60 1.50 8,439.00 1.50 8,439.00    
740-01 construction layout lump      LUMP 275,000.00 275,000.00 240,000.00 240,000.00 230,000.00 230,000.00    
741-01-A water main (4" c-900 pvc) 300      LNFT 32.00 9,600.00 28.00 8,400.00 37.00 11,100.00    
741-01-B water main (6" c-900 pvc) 400      LNFT 42.00 16,800.00 39.00 15,600.00 45.00 18,000.00    
741-01-C water main (8" c-900 pvc) 2,320      LNFT 30.00 69,600.00 27.00 62,640.00 45.00 104,400.00    
741-01-D water main (10" c-900 pvc) 70      LNFT 60.00 4,200.00 55.00 3,850.00 90.00 6,300.00    
741-01-E water main (12" c-900 pvc) 5,230      LNFT 45.00 235,350.00 40.00 209,200.00 55.00 287,650.00    
741-01-F water main (16" c-905 pvc) 950      LNFT 85.00 80,750.00 74.00 70,300.00 95.00 90,250.00    
741-02-A gate valve (4") 8      EACH 600.00 4,800.00 550.00 4,400.00 700.00 5,600.00    
741-02-B gate valve (6") 11      EACH 750.00 8,250.00 640.00 7,040.00 850.00 9,350.00    
741-02-C gate valve (8") 16      EACH 950.00 15,200.00 850.00 13,600.00 1,100.00 17,600.00    
741-02-D gate valve (10") 2      EACH 1,500.00 3,000.00 1,300.00 2,600.00 1,600.00 3,200.00    
741-02-E gate valve (12") 39      EACH 1,600.00 62,400.00 1,500.00 58,500.00 2,000.00 78,000.00    
741-02-F gate valve (16") 7      EACH 5,000.00 35,000.00 4,700.00 32,900.00 6,000.00 42,000.00    
741-03-A tapping sleeve and valve assembly (6") 3      EACH 2,400.00 7,200.00 2,100.00 6,300.00 3,000.00 9,000.00    
741-03-B tapping sleeve and valve assembly (8") 3      EACH 3,200.00 9,600.00 2,700.00 8,100.00 3,500.00 10,500.00    
741-03-C tapping sleeve and valve assembly (10") 1      EACH 4,500.00 4,500.00 4,200.00 4,200.00 5,000.00 5,000.00    
741-03-D tapping sleeve and valve assembly (12") 2      EACH 5,500.00 11,000.00 5,200.00 10,400.00 6,800.00 13,600.00    
741-04-A fire hydrant (3-way) 2      EACH 3,500.00 7,000.00 3,300.00 6,600.00 3,000.00 6,000.00    
741-04-B fire hydrant (2-way) 11      EACH 3,500.00 38,500.00 3,300.00 36,300.00 3,300.00 36,300.00    
741-05-A water service line (3/4" pe tubing 200 p.s.i.)(cts
copper tubing size)
1,000      LNFT 8.00 8,000.00 6.80 6,800.00 20.00 20,000.00    
741-05-B water service line (1" pe tubing 200 p.s.i.)(cts
copper tubing size)
600      LNFT 8.00 4,800.00 6.90 4,140.00 22.00 13,200.00    
741-05-C water service line (1 1/2" pe tubing 200 p.s.i.)(cts
copper tubing size)
300      LNFT 8.50 2,550.00 7.40 2,220.00 25.00 7,500.00    
741-05-D water service line (2" pe tubing 200 p.s.i.)(cts
copper tubing size)
100      LNFT 9.00 900.00 7.60 760.00 27.00 2,700.00    
741-08 relocating water meter 45      EACH 400.00 18,000.00 370.00 16,650.00 600.00 27,000.00    
741-11 adjusting water valve and meter box 6      EACH 800.00 4,800.00 500.00 3,000.00 1,000.00 6,000.00    
741-12 removing water valve including box 32      EACH 300.00 9,600.00 300.00 9,600.00 550.00 17,600.00    
741-13 removing fire hydrant 8      EACH 400.00 3,200.00 600.00 4,800.00 600.00 4,800.00    
741-14 concrete blocking 130.0    CUYD 450.00 58,500.00 400.00 52,000.00 150.00 19,500.00    
742-02 adjusting sanitary sewer house connections 55      EACH 1,500.00 82,500.00 1,300.00 71,500.00 1,500.00 82,500.00    
742-03 adjusting sanitary sewer service lines 1,100      LNFT 35.00 38,500.00 30.00 33,000.00 35.00 38,500.00    
805-01-A class a concrete (pipe headwalls) 13.68   CUYD 1,200.00 16,416.00 850.00 11,628.00 1,100.00 15,048.00    
806-01 deformed reinforcing steel 717      LB 2.50 1,792.50 1.00 717.00 4.00 2,868.00    
S-001 adjusting monitoring wells 1      EACH 1,000.00 1,000.00 1,500.00 1,500.00 1,000.00 1,000.00    
S-002 cleaning existing ditches 380      LNFT 12.00 4,560.00 14.00 5,320.00 8.00 3,040.00    
S-004 unit pavers 406.3    SQYD 50.00 20,315.00 60.00 24,378.00 120.00 48,756.00    
S-005 sanitary sewer pipe (8")(pe)(install by pipe bursting) 3,365      LNFT 80.00 269,200.00 70.00 235,550.00 60.00 201,900.00    
S-006 sanitary sewer pipe (12")(pe)(install by pipe bursting) 1,455      LNFT 60.00 87,300.00 56.00 81,480.00 72.00 104,760.00    
S-007 sanitary sewer pipe (15")(pe)(install by pipe bursting) 1,511.0    LNFT 65.00 98,215.00 60.00 90,660.00 110.00 166,210.00    
S-008 sanitary sewer pipe (21")(pe)(install by pipe bursting) 587      LNFT 190.00 111,530.00 165.00 96,855.00 230.00 135,010.00    
S-009 sanitary sewer force main (10")(class 150 c-900 pvc) 1,000      LNFT 30.00 30,000.00 26.00 26,000.00 30.00 30,000.00    
S-010 sanitary sewer point repair 3      EACH 3,000.00 9,000.00 2,600.00 7,800.00 3,200.00 9,600.00    
S-011 plastic pavement markings (yield lines) 34      LNFT 3.50 119.00 50.00 1,700.00 100.00 3,400.00    
S-012 traffic maintenance superpave asphaltic concrete 500.0    TON 250.00 125,000.00 80.00 40,000.00 125.00 62,500.00    
                       
 CONTRACTOR TOTAL       13,880,648.49   14,955,634.20   15,638,991.67    