| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GILCHRIST CONSTRUCTION CO. LLC |
- 2 - DENTON-JAMES LLC |
- 3 - HIGHWAY SPECIALISTS INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
1,360,000.00 |
1,360,000.00 |
900,000.00 |
900,000.00 |
250,000.00 |
250,000.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
40,000.00 |
40,000.00 |
340,000.00 |
340,000.00 |
450,000.00 |
450,000.00 |
|
|
| 202-02-B-01 |
removal of concrete box culverts (sta. 120+40; 3' x 3'
x 48') |
1   |
EACH |
4,000.00 |
4,000.00 |
2,000.00 |
2,000.00 |
3,500.00 |
3,500.00 |
|
|
| 202-02-B-02 |
removal of concrete box culverts (lt. of sta. 129+42;
4' x 4' x 73') |
1   |
EACH |
7,500.00 |
7,500.00 |
5,000.00 |
5,000.00 |
6,500.00 |
6,500.00 |
|
|
| 202-02-B-03 |
removal of concrete box culverts (sta. 129+79; 4' x 4'
x 47') |
1   |
EACH |
4,000.00 |
4,000.00 |
4,000.00 |
4,000.00 |
3,500.00 |
3,500.00 |
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
43,405   |
SQYD |
4.00 |
173,620.00 |
11.00 |
477,455.00 |
9.00 |
390,645.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
9,067   |
SQYD |
4.00 |
36,268.00 |
9.00 |
81,603.00 |
9.00 |
81,603.00 |
|
|
| 202-02-E |
removal of concrete curbs
|
3,349.1 |
LNFT |
4.00 |
13,396.40 |
2.50 |
8,372.75 |
6.00 |
20,094.60 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
7,024.9 |
SQYD |
4.00 |
28,099.60 |
5.00 |
35,124.50 |
7.00 |
49,174.30 |
|
|
| 202-02-I |
removal of existing signal equipment
|
lump |
LUMP |
8,000.00 |
8,000.00 |
10,000.00 |
10,000.00 |
9,000.00 |
9,000.00 |
|
|
| 202-02-J-01 |
removal of sign (sta. 109+036 rt., 5'x9', "b & v auto
sales") |
1   |
EACH |
100.00 |
100.00 |
1.00 |
1.00 |
750.00 |
750.00 |
|
|
| 202-02-J-02 |
removal of sign (sta. 110+000 lt., 10'x30', shell gas
price) |
1   |
EACH |
100.00 |
100.00 |
1.00 |
1.00 |
2,500.00 |
2,500.00 |
|
|
| 202-02-J-03 |
removal of sign (sta. 117+088 rt., 4'x8')
|
1   |
EACH |
100.00 |
100.00 |
1.00 |
1.00 |
750.00 |
750.00 |
|
|
| 202-02-J-04 |
removal of sign (sta. 118+038 rt., 3'x8', "smoker's
paradise") |
1   |
EACH |
100.00 |
100.00 |
1.00 |
1.00 |
750.00 |
750.00 |
|
|
| 202-02-J-05 |
removal of sign (sta. 118+038 rt., 4'x5', box sign)
|
1   |
EACH |
100.00 |
100.00 |
1.00 |
1.00 |
750.00 |
750.00 |
|
|
| 202-02-J-06 |
removal of sign (sta. 120+074 lt., 5'x10')
|
1   |
EACH |
100.00 |
100.00 |
1.00 |
1.00 |
750.00 |
750.00 |
|
|
| 202-02-J-07 |
removal of sign (sta. 121+062 rt., 4'x8', changeable
message) |
1   |
EACH |
100.00 |
100.00 |
1.00 |
1.00 |
750.00 |
750.00 |
|
|
| 202-02-J-08 |
removal of sign (sta. 121+083 rt., 2'x9', "cv joint
plus") |
1   |
EACH |
100.00 |
100.00 |
1.00 |
1.00 |
750.00 |
750.00 |
|
|
| 202-02-J-09 |
removal of sign (sta. 123+053 lt., 4'x9', "aventis")
|
1   |
EACH |
100.00 |
100.00 |
1.00 |
1.00 |
750.00 |
750.00 |
|
|
| 202-02-J-10 |
removal of sign (sta. 124+012 rt., 4'x8')
|
1   |
EACH |
100.00 |
100.00 |
1.00 |
1.00 |
750.00 |
750.00 |
|
|
| 202-02-J-11 |
removal of sign (sta. 124+017 lt., 2'x4', "a & b
properties") |
1   |
EACH |
100.00 |
100.00 |
1.00 |
1.00 |
750.00 |
750.00 |
|
|
| 202-02-J-12 |
removal of sign (sta. 125+000 rt., 2'x3', metal)
|
1   |
EACH |
100.00 |
100.00 |
1.00 |
1.00 |
750.00 |
750.00 |
|
|
| 202-02-J-13 |
removal of sign (sta. 125+005 lt., 2'x8', "ulm
vistor's center") |
1   |
EACH |
100.00 |
100.00 |
1.00 |
1.00 |
750.00 |
750.00 |
|
|
| 202-02-J-14 |
removal of sign (sta. 125+058 rt., 4'x8', metal)
|
1   |
EACH |
100.00 |
100.00 |
1.00 |
1.00 |
750.00 |
750.00 |
|
|
| 202-02-J-15 |
removal of sign (sta. 126+054 rt., 4'x8')
|
1   |
EACH |
100.00 |
100.00 |
1.00 |
1.00 |
750.00 |
750.00 |
|
|
| 202-02-J-16 |
removal of sign (sta. 127+010 lt., 4'x8', "church of
christ") |
1   |
EACH |
100.00 |
100.00 |
1.00 |
1.00 |
750.00 |
750.00 |
|
|
| 202-02-J-17 |
removal of sign (sta. 128+084 rt., 4'x8', "boudreaux
motors - 342-9136") |
1   |
EACH |
100.00 |
100.00 |
1.00 |
1.00 |
750.00 |
750.00 |
|
|
| 202-02-J-18 |
removal of sign (sta. 132+015 rt., 20'x10')
|
1   |
EACH |
100.00 |
100.00 |
1.00 |
1.00 |
1,500.00 |
1,500.00 |
|
|
| 202-02-J-19 |
removal of sign (sta. 132+064 rt., 4'x8')
|
1   |
EACH |
100.00 |
100.00 |
1.00 |
1.00 |
750.00 |
750.00 |
|
|
| 202-02-J-20 |
removal of sign (sta. 133+033 rt., 4'x8')
|
1   |
EACH |
100.00 |
100.00 |
1.00 |
1.00 |
750.00 |
750.00 |
|
|
| 202-02-J-21 |
removal of sign (sta. 134+045 rt., 4'x8', "northeast
textbooks") |
1   |
EACH |
100.00 |
100.00 |
1.00 |
1.00 |
750.00 |
750.00 |
|
|
| 202-02-J-22 |
removal of sign (sta. 138+025 rt., 2'x4', "subway")
|
1   |
EACH |
100.00 |
100.00 |
1.00 |
1.00 |
750.00 |
750.00 |
|
|
| 202-02-J-23 |
removal of sign (sta. 139+015 rt., 4'x8', metal)
|
1   |
EACH |
100.00 |
100.00 |
1.00 |
1.00 |
750.00 |
750.00 |
|
|
| 202-02-J-24 |
removal of sign (sta. 140+015 rt., 5'x10', old
"peking") |
1   |
EACH |
100.00 |
100.00 |
1.00 |
1.00 |
750.00 |
750.00 |
|
|
| 202-02-J-25 |
removal of sign (sta. 141+009 rt., 5'x10', "oriental
market") |
1   |
EACH |
100.00 |
100.00 |
1.00 |
1.00 |
750.00 |
750.00 |
|
|
| 202-02-J-26 |
removal of sign (sta. 142+020 rt., 3.5'x4', brick
address) |
1   |
EACH |
100.00 |
100.00 |
1.00 |
1.00 |
1,500.00 |
1,500.00 |
|
|
| 202-02-J-27 |
removal of sign (sta. 146+053 rt., 6'x10', "kfc &
changeable messageboard") |
1   |
EACH |
100.00 |
100.00 |
1.00 |
1.00 |
1,500.00 |
1,500.00 |
|
|
| 202-02-J-28 |
removal of sign (sta. 154+088 rt., 4'x8', "dirty dan's
carwash" |
1   |
EACH |
100.00 |
100.00 |
1.00 |
1.00 |
750.00 |
750.00 |
|
|
| 202-02-K-01 |
removal of fence (sta. 109+050 rt., metal)
|
112   |
LNFT |
6.00 |
672.00 |
3.00 |
336.00 |
12.00 |
1,344.00 |
|
|
| 202-02-K-02 |
removal of fence (sta. 124+060 rt., metal)
|
100   |
LNFT |
6.00 |
600.00 |
3.00 |
300.00 |
12.00 |
1,200.00 |
|
|
| 202-02-L-01 |
removal of sign post (sta. 112+016 rt., metal)
|
1   |
EACH |
100.00 |
100.00 |
1.00 |
1.00 |
750.00 |
750.00 |
|
|
| 202-02-L-02 |
removal of sign post (sta. 122+070 lt., metal)
|
1   |
EACH |
100.00 |
100.00 |
1.00 |
1.00 |
750.00 |
750.00 |
|
|
| 202-02-M |
removal of concrete sign base (sta. 121+046 rt.)
|
1   |
EACH |
1,200.00 |
1,200.00 |
1.00 |
1.00 |
2,000.00 |
2,000.00 |
|
|
| 202-02-N |
removal of canopy (sta. 123+087 rt., 29'x32', wood
frame) |
1   |
EACH |
1,200.00 |
1,200.00 |
1.00 |
1.00 |
2,500.00 |
2,500.00 |
|
|
| 202-02-O |
removal of flower bed (sta. 149+026 lt., 60'x38', ulm
flower bed on hill) |
1   |
EACH |
2,000.00 |
2,000.00 |
1.00 |
1.00 |
6,000.00 |
6,000.00 |
|
|
| 202-02-P-01 |
removal of light pole (sta. 110+055 rt.)
|
1   |
EACH |
500.00 |
500.00 |
400.00 |
400.00 |
450.00 |
450.00 |
|
|
| 202-02-P-02 |
removal of light pole (sta. 111+046 rt.)
|
1   |
EACH |
500.00 |
500.00 |
400.00 |
400.00 |
450.00 |
450.00 |
|
|
| 202-02-P-03 |
removal of light pole (sta. 112+070 lt.)
|
1   |
EACH |
500.00 |
500.00 |
400.00 |
400.00 |
450.00 |
450.00 |
|
|
| 202-02-P-04 |
removal of light pole (sta. 126+058 lt.)
|
1   |
EACH |
500.00 |
500.00 |
400.00 |
400.00 |
450.00 |
450.00 |
|
|
| 202-02-P-05 |
removal of light pole (sta. 131+033 rt.)
|
1   |
EACH |
500.00 |
500.00 |
400.00 |
400.00 |
450.00 |
450.00 |
|
|
| 203-01 |
general excavation
|
36,919   |
CUYD |
9.00 |
332,271.00 |
13.00 |
479,947.00 |
10.00 |
369,190.00 |
|
|
| 203-04 |
embankment
|
1,763   |
CUYD |
15.00 |
26,445.00 |
25.00 |
44,075.00 |
25.00 |
44,075.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
1,060   |
EACH |
12.00 |
12,720.00 |
6.00 |
6,360.00 |
5.00 |
5,300.00 |
|
|
| 204-06 |
temporary silt fencing
|
5,320   |
LNFT |
2.00 |
10,640.00 |
1.40 |
7,448.00 |
1.50 |
7,980.00 |
|
|
| 204-07 |
temporary stone construction entrance
|
2   |
EACH |
1,000.00 |
2,000.00 |
1,500.00 |
3,000.00 |
3,000.00 |
6,000.00 |
|
|
| 302-02-D |
class ii base course (12" thick)(stone or recycled
pccp) |
55,376.9 |
SQYD |
22.50 |
1,245,980.25 |
22.00 |
1,218,291.80 |
21.00 |
1,162,914.90 |
|
|
| 305-01-A |
subgrade layer ( 6" thick)(stone or recycled pccp)
|
55,377   |
SQYD |
12.50 |
692,212.50 |
13.00 |
719,901.00 |
14.00 |
775,278.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
3,000.0 |
CUYD |
45.00 |
135,000.00 |
55.00 |
165,000.00 |
40.00 |
120,000.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
277.3 |
TON |
175.00 |
48,527.50 |
250.00 |
69,325.00 |
250.00 |
69,325.00 |
|
|
| 601-01-I |
portland cement concrete pavement (9" thick)
|
43,800.1 |
SQYD |
50.00 |
2,190,005.00 |
58.00 |
2,540,405.80 |
51.00 |
2,233,805.10 |
|
|
| 601-02-I |
portland cement concrete pavement (9" thick)
(crossovers & turnouts) |
9,870.2 |
SQYD |
58.00 |
572,471.60 |
65.00 |
641,563.00 |
58.00 |
572,471.60 |
|
|
| 601-04 |
portland cement concrete pavement coring
|
115   |
EACH |
125.00 |
14,375.00 |
100.00 |
11,500.00 |
125.00 |
14,375.00 |
|
|
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
1,674   |
LNFT |
33.00 |
55,242.00 |
60.00 |
100,440.00 |
70.00 |
117,180.00 |
|
|
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
1,122   |
LNFT |
38.00 |
42,636.00 |
65.00 |
72,930.00 |
75.00 |
84,150.00 |
|
|
| 701-03-G/I-01 |
storm drain pipe (18" pcp or 24" cmp)(outfall)
|
26   |
LNFT |
65.00 |
1,690.00 |
55.00 |
1,430.00 |
205.00 |
5,330.00 |
|
|
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
753   |
LNFT |
55.00 |
41,415.00 |
80.00 |
60,240.00 |
95.00 |
71,535.00 |
|
|
| 701-03-K |
storm drain pipe (30" rcp/pcp)
|
300   |
LNFT |
66.00 |
19,800.00 |
85.00 |
25,500.00 |
115.00 |
34,500.00 |
|
|
| 701-03-M |
storm drain pipe (36" rcp/pcp)
|
591   |
LNFT |
88.00 |
52,008.00 |
100.00 |
59,100.00 |
135.00 |
79,785.00 |
|
|
| 701-03-N |
storm drain pipe (42" rcp/pcp)
|
946   |
LNFT |
105.00 |
99,330.00 |
140.00 |
132,440.00 |
160.00 |
151,360.00 |
|
|
| 701-03-P |
storm drain pipe (54" rcp/pcp)
|
136   |
LNFT |
160.00 |
21,760.00 |
180.00 |
24,480.00 |
360.00 |
48,960.00 |
|
|
| 701-03-P/Q-01 |
storm drain pipe (54" pcp or 60" cmp)(outfall)
|
37   |
LNFT |
180.00 |
6,660.00 |
160.00 |
5,920.00 |
305.00 |
11,285.00 |
|
|
| 701-04-A |
storm drain pipe arch (15" equiv. rcpa)
|
603   |
LNFT |
40.00 |
24,120.00 |
65.00 |
39,195.00 |
90.00 |
54,270.00 |
|
|
| 701-04-B |
storm drain pipe arch (18" equiv. rcpa)
|
896   |
LNFT |
48.00 |
43,008.00 |
68.00 |
60,928.00 |
95.00 |
85,120.00 |
|
|
| 701-04-D |
storm drain pipe arch (24" equiv. rcpa)
|
1,487   |
LNFT |
65.00 |
96,655.00 |
80.00 |
118,960.00 |
105.00 |
156,135.00 |
|
|
| 701-04-E |
storm drain pipe arch (30" equiv. rcpa)
|
3,133   |
LNFT |
77.00 |
241,241.00 |
85.00 |
266,305.00 |
125.00 |
391,625.00 |
|
|
| 701-04-F |
storm drain pipe arch (36" equiv. rcpa)
|
2,524   |
LNFT |
100.00 |
252,400.00 |
110.00 |
277,640.00 |
145.00 |
365,980.00 |
|
|
| 701-04-F-01 |
storm drain pipe arch (36" equiv. cmpa)(outfall)
|
240   |
LNFT |
86.00 |
20,640.00 |
130.00 |
31,200.00 |
255.00 |
61,200.00 |
|
|
| 701-04-I |
storm drain pipe arch (54" equiv. rcpa)
|
12   |
LNFT |
265.00 |
3,180.00 |
230.00 |
2,760.00 |
425.00 |
5,100.00 |
|
|
| 701-04-J |
storm drain pipe arch (60" equiv. rcpa)
|
313   |
LNFT |
220.00 |
68,860.00 |
250.00 |
78,250.00 |
340.00 |
106,420.00 |
|
|
| 701-04-J-01 |
storm drain pipe arch (60" equiv. cmpa)(outfall)
|
92   |
LNFT |
235.00 |
21,620.00 |
180.00 |
16,560.00 |
290.00 |
26,680.00 |
|
|
| 701-09-A |
fabricating pipe fittings (18" x 15" x 18" tee)
|
1   |
EACH |
950.00 |
950.00 |
1,400.00 |
1,400.00 |
2,600.00 |
2,600.00 |
|
|
| 701-09-B |
fabricating pipe fittings (36" x 15" x 36" tee)
|
1   |
EACH |
1,300.00 |
1,300.00 |
3,000.00 |
3,000.00 |
4,100.00 |
4,100.00 |
|
|
| 702-02-B |
manholes (r-cb-11)
|
12   |
EACH |
2,700.00 |
32,400.00 |
2,800.00 |
33,600.00 |
4,500.00 |
54,000.00 |
|
|
| 702-02-G |
manholes (mh-12.5 x 9)
|
8   |
EACH |
3,300.00 |
26,400.00 |
10,000.00 |
80,000.00 |
5,400.00 |
43,200.00 |
|
|
| 702-02-H |
manholes (r-cb-36)
|
39   |
EACH |
3,600.00 |
140,400.00 |
3,100.00 |
120,900.00 |
5,000.00 |
195,000.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
38   |
EACH |
2,500.00 |
95,000.00 |
2,000.00 |
76,000.00 |
2,900.00 |
110,200.00 |
|
|
| 702-03-C |
catch basins (cb-06)
|
110   |
EACH |
3,600.00 |
396,000.00 |
2,800.00 |
308,000.00 |
3,500.00 |
385,000.00 |
|
|
| 702-03-D |
catch basins (cb-07)
|
2   |
EACH |
4,200.00 |
8,400.00 |
3,400.00 |
6,800.00 |
6,200.00 |
12,400.00 |
|
|
| 702-03-F |
catch basins (cb-08)
|
12   |
EACH |
8,000.00 |
96,000.00 |
5,800.00 |
69,600.00 |
7,800.00 |
93,600.00 |
|
|
| 702-03-G |
catch basins (cb-09)
|
4   |
EACH |
5,500.00 |
22,000.00 |
3,200.00 |
12,800.00 |
7,500.00 |
30,000.00 |
|
|
| 702-03-H |
catch basins (cb-opntop)
|
14   |
EACH |
3,500.00 |
49,000.00 |
2,500.00 |
35,000.00 |
3,800.00 |
53,200.00 |
|
|
| 702-03-I |
catch basins (cb-sd08)
|
12   |
EACH |
8,500.00 |
102,000.00 |
12,000.00 |
144,000.00 |
8,800.00 |
105,600.00 |
|
|
| 702-03-J |
catch basins (r-cb-43x)
|
10   |
EACH |
6,000.00 |
60,000.00 |
3,800.00 |
38,000.00 |
7,200.00 |
72,000.00 |
|
|
| 702-04-A |
adjusting manholes
|
10   |
EACH |
1,000.00 |
10,000.00 |
800.00 |
8,000.00 |
1,750.00 |
17,500.00 |
|
|
| 702-04-B |
adjusting catch basins
|
4   |
EACH |
2,500.00 |
10,000.00 |
1,500.00 |
6,000.00 |
2,100.00 |
8,400.00 |
|
|
| 702-08-A |
side drain safety end (type 1)
|
5   |
EACH |
1,200.00 |
6,000.00 |
1,100.00 |
5,500.00 |
1,500.00 |
7,500.00 |
|
|
| 702-08-B |
side drain safety end (type 2)
|
1   |
EACH |
2,500.00 |
2,500.00 |
3,500.00 |
3,500.00 |
3,000.00 |
3,000.00 |
|
|
| 703-03 |
perforated pipe underdrains
|
11,180   |
LNFT |
7.00 |
78,260.00 |
8.00 |
89,440.00 |
6.00 |
67,080.00 |
|
|
| 703-04 |
nonperforated pipe underdrains
|
460   |
LNFT |
12.00 |
5,520.00 |
40.00 |
18,400.00 |
25.00 |
11,500.00 |
|
|
| 705-06-C |
chain link fence (6-foot height)
|
65   |
LNFT |
12.00 |
780.00 |
25.00 |
1,625.00 |
40.00 |
2,600.00 |
|
|
| 706-01-A |
concrete walk (4" thick)
|
2,555.0 |
SQYD |
35.00 |
89,425.00 |
37.00 |
94,535.00 |
38.50 |
98,367.50 |
|
|
| 706-02-C |
concrete drive (6" thick)
|
4,606.2 |
SQYD |
38.00 |
175,035.60 |
44.00 |
202,672.80 |
43.00 |
198,066.60 |
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
1,157.1 |
SQYD |
30.00 |
34,713.00 |
37.00 |
42,812.70 |
38.00 |
43,969.80 |
|
|
| 707-01-A |
concrete curb (4" mountable)
|
8,142.5 |
LNFT |
7.00 |
56,997.50 |
8.50 |
69,211.25 |
7.00 |
56,997.50 |
|
|
| 707-01-B |
concrete curb (6" barrier)
|
10,593.1 |
LNFT |
8.00 |
84,744.80 |
14.50 |
153,599.95 |
14.50 |
153,599.95 |
|
|
| 708-01 |
right-of-way monument
|
73   |
EACH |
300.00 |
21,900.00 |
120.00 |
8,760.00 |
130.00 |
9,490.00 |
|
|
| 711-02-C |
riprap (30 lb)
|
15   |
CUYD |
100.00 |
1,500.00 |
120.00 |
1,800.00 |
125.00 |
1,875.00 |
|
|
| 711-04 |
geotextile fabric
|
40   |
SQYD |
5.00 |
200.00 |
3.00 |
120.00 |
5.00 |
200.00 |
|
|
| 712-01-A |
concrete cast-in-place revetment (4" thick)
|
117   |
SQYD |
35.00 |
4,095.00 |
70.00 |
8,190.00 |
100.00 |
11,700.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
120,000.00 |
120,000.00 |
200,000.00 |
200,000.00 |
700,000.00 |
700,000.00 |
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
2,327   |
LNFT |
0.50 |
1,163.50 |
0.30 |
698.10 |
1.10 |
2,559.70 |
|
|
| 713-03-D |
temporary pavement markings (12" width)
|
722   |
LNFT |
0.70 |
505.40 |
0.45 |
324.90 |
1.65 |
1,191.30 |
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
1,154   |
LNFT |
1.40 |
1,615.60 |
0.90 |
1,038.60 |
2.00 |
2,308.00 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
2.923 |
MILE |
380.00 |
1,110.74 |
250.00 |
730.75 |
775.00 |
2,265.32 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
7.150 |
MILE |
1,100.00 |
7,865.00 |
500.00 |
3,575.00 |
600.00 |
4,290.00 |
|
|
| 713-05-A-01 |
temporary pavement markings (solid line)(4" width)
(type 1 removable) |
3.000 |
MILE |
18,000.00 |
54,000.00 |
9,500.00 |
28,500.00 |
25,000.00 |
75,000.00 |
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
53   |
EACH |
90.00 |
4,770.00 |
75.00 |
3,975.00 |
75.00 |
3,975.00 |
|
|
| 713-06-B |
temporary pavement legends and symbols (double arrow)
|
4   |
EACH |
150.00 |
600.00 |
100.00 |
400.00 |
135.00 |
540.00 |
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
28   |
EACH |
150.00 |
4,200.00 |
100.00 |
2,800.00 |
85.00 |
2,380.00 |
|
|
| 714-01 |
slab sodding
|
28,075   |
SQYD |
4.50 |
126,337.50 |
3.40 |
95,455.00 |
4.00 |
112,300.00 |
|
|
| 718-01 |
fertilizer
|
5,800   |
LB |
0.20 |
1,160.00 |
0.20 |
1,160.00 |
0.18 |
1,044.00 |
|
|
| 719-01-A |
plants (quercus virginiana/live oak 5" cal.,
200 gallon container, 18' min. ht.) |
24   |
EACH |
1,700.00 |
40,800.00 |
2,000.00 |
48,000.00 |
1,500.00 |
36,000.00 |
|
|
| 719-01-B |
plants (lagerstroemia indica "natchez"/natchez crape
myrtle, 65 gallon cont ainer, 14' min. ht., 3 canes min.) |
19   |
EACH |
450.00 |
8,550.00 |
400.00 |
7,600.00 |
385.00 |
7,315.00 |
|
|
| 719-02-A |
top dressing mulch (3" depth)
|
33   |
SQYD |
75.00 |
2,475.00 |
15.00 |
495.00 |
65.00 |
2,145.00 |
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
25,000.00 |
25,000.00 |
40,000.00 |
40,000.00 |
15,000.00 |
15,000.00 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
872   |
SQYD |
100.00 |
87,200.00 |
70.00 |
61,040.00 |
90.00 |
78,480.00 |
|
|
| 725-02 |
temporary detour roads
|
100.0 |
SQYD |
120.00 |
12,000.00 |
100.00 |
10,000.00 |
70.00 |
7,000.00 |
|
|
| 726-01 |
bedding material
|
1,891.7 |
CUYD |
42.00 |
79,451.40 |
60.00 |
113,502.00 |
65.00 |
122,960.50 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
1,200,000.00 |
1,200,000.00 |
1,400,000.00 |
1,400,000.00 |
1,420,000.00 |
1,420,000.00 |
|
|
| 729-01 |
sign (type a)
|
157.5 |
SQFT |
35.00 |
5,512.50 |
38.00 |
5,985.00 |
38.00 |
5,985.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,480   |
EACH |
6.00 |
8,880.00 |
5.00 |
7,400.00 |
7.50 |
11,100.00 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
2,327   |
LNFT |
1.00 |
2,327.00 |
0.80 |
1,861.60 |
7.50 |
17,452.50 |
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
722   |
LNFT |
1.50 |
1,083.00 |
1.20 |
866.40 |
10.50 |
7,581.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
1,154   |
LNFT |
3.50 |
4,039.00 |
2.40 |
2,769.60 |
10.00 |
11,540.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
4.949 |
MILE |
2,400.00 |
11,877.60 |
1,800.00 |
8,908.20 |
5,000.00 |
24,745.00 |
|
|
| 732-03-A-01 |
plastic pvmt striping (broken line)(4"width)preformed
marking tape (type v) |
2.923 |
MILE |
4,500.00 |
13,153.50 |
4,900.00 |
14,322.70 |
10,000.00 |
29,230.00 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
53   |
EACH |
200.00 |
10,600.00 |
150.00 |
7,950.00 |
400.00 |
21,200.00 |
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
4   |
EACH |
250.00 |
1,000.00 |
200.00 |
800.00 |
800.00 |
3,200.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
28   |
EACH |
250.00 |
7,000.00 |
150.00 |
4,200.00 |
500.00 |
14,000.00 |
|
|
| 732-05 |
removal of existing markings
|
0.825 |
MILE |
5,000.00 |
4,125.00 |
5,000.00 |
4,125.00 |
35,000.00 |
28,875.00 |
|
|
| 736-01 |
trenching and backfilling
|
7,479   |
LNFT |
4.50 |
33,655.50 |
4.00 |
29,916.00 |
4.00 |
29,916.00 |
|
|
| 736-04-A |
signal support (mast arm pole, twin arms, 45' & 48')
|
1   |
EACH |
15,000.00 |
15,000.00 |
16,000.00 |
16,000.00 |
16,000.00 |
16,000.00 |
|
|
| 736-04-B |
signal support (mast arm pole, twin arms, 35' & 46')
|
1   |
EACH |
14,500.00 |
14,500.00 |
15,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
|
|
| 736-04-C |
signal support (mast arm pole, twin arms, 45' & 46')
|
1   |
EACH |
15,000.00 |
15,000.00 |
16,000.00 |
16,000.00 |
16,000.00 |
16,000.00 |
|
|
| 736-04-D |
signal support (mast arm pole, 30' arm)
|
1   |
EACH |
7,000.00 |
7,000.00 |
7,000.00 |
7,000.00 |
7,200.00 |
7,200.00 |
|
|
| 736-04-E |
signal support (mast arm pole, 32' arm)
|
1   |
EACH |
8,000.00 |
8,000.00 |
8,000.00 |
8,000.00 |
8,200.00 |
8,200.00 |
|
|
| 736-04-F |
signal support (mast arm pole, 36' arm)
|
2   |
EACH |
8,500.00 |
17,000.00 |
8,600.00 |
17,200.00 |
8,600.00 |
17,200.00 |
|
|
| 736-04-G |
signal support (mast arm pole, 42' arm)
|
1   |
EACH |
9,000.00 |
9,000.00 |
9,000.00 |
9,000.00 |
9,100.00 |
9,100.00 |
|
|
| 736-04-H |
signal support (mast arm pole, 44' arm)
|
2   |
EACH |
10,000.00 |
20,000.00 |
9,200.00 |
18,400.00 |
9,200.00 |
18,400.00 |
|
|
| 736-04-I |
signal support (mast arm pole, 45' arm)
|
3   |
EACH |
1,000.00 |
3,000.00 |
9,600.00 |
28,800.00 |
9,600.00 |
28,800.00 |
|
|
| 736-04-J |
signal support (mast arm pole, 47' arm)
|
1   |
EACH |
11,000.00 |
11,000.00 |
11,000.00 |
11,000.00 |
11,000.00 |
11,000.00 |
|
|
| 736-04-K |
signal support (mast arm pole, 49' arm)
|
1   |
EACH |
11,000.00 |
11,000.00 |
11,000.00 |
11,000.00 |
11,000.00 |
11,000.00 |
|
|
| 736-04-L |
signal support (mast arm pole, 50' arm)
|
3   |
EACH |
11,000.00 |
33,000.00 |
11,000.00 |
33,000.00 |
11,000.00 |
33,000.00 |
|
|
| 736-04-M |
signal support (10' pedestal pole)
|
5   |
EACH |
1,000.00 |
5,000.00 |
920.00 |
4,600.00 |
1,000.00 |
5,000.00 |
|
|
| 736-05-A |
signal heads (12" 3 face)
|
39   |
EACH |
500.00 |
19,500.00 |
480.00 |
18,720.00 |
500.00 |
19,500.00 |
|
|
| 736-05-B |
signal heads (12" 4 face)
|
2   |
EACH |
700.00 |
1,400.00 |
720.00 |
1,440.00 |
800.00 |
1,600.00 |
|
|
| 736-05-C |
signal heads (12" 5 face)
|
10   |
EACH |
900.00 |
9,000.00 |
870.00 |
8,700.00 |
900.00 |
9,000.00 |
|
|
| 736-05-D |
signal heads (pedestrian face)
|
10   |
EACH |
700.00 |
7,000.00 |
650.00 |
6,500.00 |
700.00 |
7,000.00 |
|
|
| 736-06 |
signal service
|
6   |
EACH |
1,500.00 |
9,000.00 |
1,500.00 |
9,000.00 |
1,500.00 |
9,000.00 |
|
|
| 736-08-A |
signal controller (nema type ts-1 controller in pole
mounted cabinet) |
4   |
EACH |
11,000.00 |
44,000.00 |
10,300.00 |
41,200.00 |
11,000.00 |
44,000.00 |
|
|
| 736-08-B |
signal controller (nema type ts-1 controller in ground
mounted cabinet with foundation) |
2   |
EACH |
14,000.00 |
28,000.00 |
13,400.00 |
26,800.00 |
14,000.00 |
28,000.00 |
|
|
| 736-09 |
loop detector
|
3,708   |
LNFT |
13.00 |
48,204.00 |
15.00 |
55,620.00 |
15.00 |
55,620.00 |
|
|
| 736-10-A |
underground junction box (type d)
|
9   |
EACH |
250.00 |
2,250.00 |
250.00 |
2,250.00 |
250.00 |
2,250.00 |
|
|
| 736-10-B |
underground junction box (type e)
|
23   |
EACH |
400.00 |
9,200.00 |
430.00 |
9,890.00 |
425.00 |
9,775.00 |
|
|
| 736-10-C |
underground junction box (type f)
|
18   |
EACH |
450.00 |
8,100.00 |
480.00 |
8,640.00 |
475.00 |
8,550.00 |
|
|
| 736-10-D |
underground junction box (type h)
|
2   |
EACH |
1,200.00 |
2,400.00 |
1,100.00 |
2,200.00 |
1,200.00 |
2,400.00 |
|
|
| 736-11-A |
conduit (1" pec)
|
246   |
LNFT |
2.00 |
492.00 |
1.70 |
418.20 |
1.65 |
405.90 |
|
|
| 736-11-B |
conduit (2" pec)
|
6,862   |
LNFT |
3.00 |
20,586.00 |
2.70 |
18,527.40 |
2.70 |
18,527.40 |
|
|
| 736-11-C |
conduit (3" pec)
|
537   |
LNFT |
6.00 |
3,222.00 |
5.40 |
2,899.80 |
5.40 |
2,899.80 |
|
|
| 736-12-A |
conductor 3c (power, 6 gauge/#6 awg)
|
64   |
LNFT |
2.00 |
128.00 |
1.80 |
115.20 |
1.80 |
115.20 |
|
|
| 736-13-A |
cable (6c #14 awg, 600v.)
|
5,701   |
LNFT |
1.20 |
6,841.20 |
1.10 |
6,271.10 |
1.10 |
6,271.10 |
|
|
| 736-13-B |
cable (10c #14 awg, 600v.)
|
1,655   |
LNFT |
2.00 |
3,310.00 |
1.70 |
2,813.50 |
1.70 |
2,813.50 |
|
|
| 736-13-C |
cable (2c #14 awg, 600v. with outer shield)
|
4,032   |
LNFT |
0.60 |
2,419.20 |
0.55 |
2,217.60 |
0.55 |
2,217.60 |
|
|
| 736-13-D |
cable (7c #12 awg, 600v. interconnect cable)
|
5,626   |
LNFT |
1.60 |
9,001.60 |
1.50 |
8,439.00 |
1.50 |
8,439.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
275,000.00 |
275,000.00 |
240,000.00 |
240,000.00 |
230,000.00 |
230,000.00 |
|
|
| 741-01-A |
water main (4" c-900 pvc)
|
300   |
LNFT |
32.00 |
9,600.00 |
28.00 |
8,400.00 |
37.00 |
11,100.00 |
|
|
| 741-01-B |
water main (6" c-900 pvc)
|
400   |
LNFT |
42.00 |
16,800.00 |
39.00 |
15,600.00 |
45.00 |
18,000.00 |
|
|
| 741-01-C |
water main (8" c-900 pvc)
|
2,320   |
LNFT |
30.00 |
69,600.00 |
27.00 |
62,640.00 |
45.00 |
104,400.00 |
|
|
| 741-01-D |
water main (10" c-900 pvc)
|
70   |
LNFT |
60.00 |
4,200.00 |
55.00 |
3,850.00 |
90.00 |
6,300.00 |
|
|
| 741-01-E |
water main (12" c-900 pvc)
|
5,230   |
LNFT |
45.00 |
235,350.00 |
40.00 |
209,200.00 |
55.00 |
287,650.00 |
|
|
| 741-01-F |
water main (16" c-905 pvc)
|
950   |
LNFT |
85.00 |
80,750.00 |
74.00 |
70,300.00 |
95.00 |
90,250.00 |
|
|
| 741-02-A |
gate valve (4")
|
8   |
EACH |
600.00 |
4,800.00 |
550.00 |
4,400.00 |
700.00 |
5,600.00 |
|
|
| 741-02-B |
gate valve (6")
|
11   |
EACH |
750.00 |
8,250.00 |
640.00 |
7,040.00 |
850.00 |
9,350.00 |
|
|
| 741-02-C |
gate valve (8")
|
16   |
EACH |
950.00 |
15,200.00 |
850.00 |
13,600.00 |
1,100.00 |
17,600.00 |
|
|
| 741-02-D |
gate valve (10")
|
2   |
EACH |
1,500.00 |
3,000.00 |
1,300.00 |
2,600.00 |
1,600.00 |
3,200.00 |
|
|
| 741-02-E |
gate valve (12")
|
39   |
EACH |
1,600.00 |
62,400.00 |
1,500.00 |
58,500.00 |
2,000.00 |
78,000.00 |
|
|
| 741-02-F |
gate valve (16")
|
7   |
EACH |
5,000.00 |
35,000.00 |
4,700.00 |
32,900.00 |
6,000.00 |
42,000.00 |
|
|
| 741-03-A |
tapping sleeve and valve assembly (6")
|
3   |
EACH |
2,400.00 |
7,200.00 |
2,100.00 |
6,300.00 |
3,000.00 |
9,000.00 |
|
|
| 741-03-B |
tapping sleeve and valve assembly (8")
|
3   |
EACH |
3,200.00 |
9,600.00 |
2,700.00 |
8,100.00 |
3,500.00 |
10,500.00 |
|
|
| 741-03-C |
tapping sleeve and valve assembly (10")
|
1   |
EACH |
4,500.00 |
4,500.00 |
4,200.00 |
4,200.00 |
5,000.00 |
5,000.00 |
|
|
| 741-03-D |
tapping sleeve and valve assembly (12")
|
2   |
EACH |
5,500.00 |
11,000.00 |
5,200.00 |
10,400.00 |
6,800.00 |
13,600.00 |
|
|
| 741-04-A |
fire hydrant (3-way)
|
2   |
EACH |
3,500.00 |
7,000.00 |
3,300.00 |
6,600.00 |
3,000.00 |
6,000.00 |
|
|
| 741-04-B |
fire hydrant (2-way)
|
11   |
EACH |
3,500.00 |
38,500.00 |
3,300.00 |
36,300.00 |
3,300.00 |
36,300.00 |
|
|
| 741-05-A |
water service line (3/4" pe tubing 200 p.s.i.)(cts
copper tubing size) |
1,000   |
LNFT |
8.00 |
8,000.00 |
6.80 |
6,800.00 |
20.00 |
20,000.00 |
|
|
| 741-05-B |
water service line (1" pe tubing 200 p.s.i.)(cts
copper tubing size) |
600   |
LNFT |
8.00 |
4,800.00 |
6.90 |
4,140.00 |
22.00 |
13,200.00 |
|
|
| 741-05-C |
water service line (1 1/2" pe tubing 200 p.s.i.)(cts
copper tubing size) |
300   |
LNFT |
8.50 |
2,550.00 |
7.40 |
2,220.00 |
25.00 |
7,500.00 |
|
|
| 741-05-D |
water service line (2" pe tubing 200 p.s.i.)(cts
copper tubing size) |
100   |
LNFT |
9.00 |
900.00 |
7.60 |
760.00 |
27.00 |
2,700.00 |
|
|
| 741-08 |
relocating water meter
|
45   |
EACH |
400.00 |
18,000.00 |
370.00 |
16,650.00 |
600.00 |
27,000.00 |
|
|
| 741-11 |
adjusting water valve and meter box
|
6   |
EACH |
800.00 |
4,800.00 |
500.00 |
3,000.00 |
1,000.00 |
6,000.00 |
|
|
| 741-12 |
removing water valve including box
|
32   |
EACH |
300.00 |
9,600.00 |
300.00 |
9,600.00 |
550.00 |
17,600.00 |
|
|
| 741-13 |
removing fire hydrant
|
8   |
EACH |
400.00 |
3,200.00 |
600.00 |
4,800.00 |
600.00 |
4,800.00 |
|
|
| 741-14 |
concrete blocking
|
130.0 |
CUYD |
450.00 |
58,500.00 |
400.00 |
52,000.00 |
150.00 |
19,500.00 |
|
|
| 742-02 |
adjusting sanitary sewer house connections
|
55   |
EACH |
1,500.00 |
82,500.00 |
1,300.00 |
71,500.00 |
1,500.00 |
82,500.00 |
|
|
| 742-03 |
adjusting sanitary sewer service lines
|
1,100   |
LNFT |
35.00 |
38,500.00 |
30.00 |
33,000.00 |
35.00 |
38,500.00 |
|
|
| 805-01-A |
class a concrete (pipe headwalls)
|
13.68 |
CUYD |
1,200.00 |
16,416.00 |
850.00 |
11,628.00 |
1,100.00 |
15,048.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
717   |
LB |
2.50 |
1,792.50 |
1.00 |
717.00 |
4.00 |
2,868.00 |
|
|
| S-001 |
adjusting monitoring wells
|
1   |
EACH |
1,000.00 |
1,000.00 |
1,500.00 |
1,500.00 |
1,000.00 |
1,000.00 |
|
|
| S-002 |
cleaning existing ditches
|
380   |
LNFT |
12.00 |
4,560.00 |
14.00 |
5,320.00 |
8.00 |
3,040.00 |
|
|
| S-004 |
unit pavers
|
406.3 |
SQYD |
50.00 |
20,315.00 |
60.00 |
24,378.00 |
120.00 |
48,756.00 |
|
|
| S-005 |
sanitary sewer pipe (8")(pe)(install by pipe bursting)
|
3,365   |
LNFT |
80.00 |
269,200.00 |
70.00 |
235,550.00 |
60.00 |
201,900.00 |
|
|
| S-006 |
sanitary sewer pipe (12")(pe)(install by pipe bursting)
|
1,455   |
LNFT |
60.00 |
87,300.00 |
56.00 |
81,480.00 |
72.00 |
104,760.00 |
|
|
| S-007 |
sanitary sewer pipe (15")(pe)(install by pipe bursting)
|
1,511.0 |
LNFT |
65.00 |
98,215.00 |
60.00 |
90,660.00 |
110.00 |
166,210.00 |
|
|
| S-008 |
sanitary sewer pipe (21")(pe)(install by pipe bursting)
|
587   |
LNFT |
190.00 |
111,530.00 |
165.00 |
96,855.00 |
230.00 |
135,010.00 |
|
|
| S-009 |
sanitary sewer force main (10")(class 150 c-900 pvc)
|
1,000   |
LNFT |
30.00 |
30,000.00 |
26.00 |
26,000.00 |
30.00 |
30,000.00 |
|
|
| S-010 |
sanitary sewer point repair
|
3   |
EACH |
3,000.00 |
9,000.00 |
2,600.00 |
7,800.00 |
3,200.00 |
9,600.00 |
|
|
| S-011 |
plastic pavement markings (yield lines)
|
34   |
LNFT |
3.50 |
119.00 |
50.00 |
1,700.00 |
100.00 |
3,400.00 |
|
|
| S-012 |
traffic maintenance superpave asphaltic concrete
|
500.0 |
TON |
250.00 |
125,000.00 |
80.00 |
40,000.00 |
125.00 |
62,500.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
13,880,648.49 |
|
14,955,634.20 |
|
15,638,991.67 |
|
|
|