Bid Tabs Error processing SSI file
Bid Tabulations Error processing SSI file
February 06, 2014 Error processing SSI file

Letting of 4/28/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 827-03-0023
Parish: JEFF DAVIS
Routes: LA 102
Description: LA 102 WIDENING (LA 97 TO I-10)
Type Const: clearing and grubbing, grading, drainage structures, pavement patching, and related
work
 
RankLicenseBidderAmount
138299 K.A.S. CONSTRUCTION LLC $1,507,087.90
227634 PHYLWAY CONSTRUCTION LLC $1,582,463.50
314096 BESSETTE DEVELOPMENT CORP. $1,703,918.00
400568 MERRICK CONSTRUCTION CO. $1,794,479.40
508815 W. E. MCDONALD & SON, LLC. $1,848,208.80
 
Item Number Item Description Quantity Unit of Measure - 1 -
K.A.S. CONSTRUCTION LLC
- 2 -
PHYLWAY CONSTRUCTION LLC
- 3 -
BESSETTE DEVELOPMENT CORP.
- 4 -
MERRICK CONSTRUCTION CO.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 55,000.00 55,000.00 25,000.00 25,000.00 60,000.00 60,000.00 200,000.00 200,000.00
202-01 removal of structures & obstructions lump      LUMP 25,000.00 25,000.00 25,000.00 25,000.00 15,000.00 15,000.00 6,000.00 6,000.00
202-02-D removal of concrete walks & drives 488      SQYD 12.00 5,856.00 8.00 3,904.00 10.00 4,880.00 3.00 1,464.00
203-01 general excavation 188      CUYD 10.00 1,880.00 40.00 7,520.00 10.00 1,880.00 4.00 752.00
203-03 muck excavation 300      CUYD 13.00 3,900.00 42.00 12,600.00 10.00 3,000.00 4.00 1,200.00
203-08 borrow (vehicular measurement) 1,251      CUYD 11.00 13,761.00 17.00 21,267.00 20.00 25,020.00 10.00 12,510.00
204-02 temporary hay or straw bales 1,100      EACH 6.00 6,600.00 5.50 6,050.00 10.00 11,000.00 2.00 2,200.00
204-04 temporary sediment basins 6      EACH 550.00 3,300.00 120.00 720.00 400.00 2,400.00 5.00 30.00
204-05-A temporary sediment check dams (hay) 10      EACH 275.00 2,750.00 110.00 1,100.00 150.00 1,500.00 10.00 100.00
204-06 temporary silt fencing 3,000      LNFT 1.75 5,250.00 1.50 4,500.00 1.60 4,800.00 0.50 1,500.00
402-01 traffic maintenance aggregate (vehicular measurement) 162.2    CUYD 42.00 6,812.40 35.00 5,677.00 55.00 8,921.00 100.00 16,220.00
701-04-A storm drain pipe arch (15" equiv. rcpa) 1,206      LNFT 47.00 56,682.00 53.00 63,918.00 40.00 48,240.00 60.00 72,360.00
701-04-B storm drain pipe arch (18" equiv. rcpa) 1,234      LNFT 55.00 67,870.00 55.00 67,870.00 40.00 49,360.00 65.00 80,210.00
701-04-D storm drain pipe arch (24" equiv. rcpa) 495      LNFT 65.00 32,175.00 75.00 37,125.00 50.00 24,750.00 70.00 34,650.00
701-04-E storm drain pipe arch (30" equiv. rcpa) 2,639      LNFT 82.00 216,398.00 92.00 242,788.00 60.00 158,340.00 80.00 211,120.00
701-04-F storm drain pipe arch (36" equiv. rcpa) 15      LNFT 90.00 1,350.00 170.00 2,550.00 70.00 1,050.00 100.00 1,500.00
701-04-H storm drain pipe arch (48" equiv. rcpa) 723      LNFT 165.00 119,295.00 180.00 130,140.00 130.00 93,990.00 150.00 108,450.00
701-07-C yard drain pipe (8") 30      LNFT 12.00 360.00 20.00 600.00 30.00 900.00 30.00 900.00
702-02-B manholes (r-cb-11) 22      EACH 2,650.00 58,300.00 2,000.00 44,000.00 2,500.00 55,000.00 3,000.00 66,000.00
702-02-C manholes (r-cb-11 mod) 2      EACH 2,875.00 5,750.00 2,500.00 5,000.00 3,500.00 7,000.00 4,000.00 8,000.00
702-02-D manholes (r-cb-12) 3      EACH 3,900.00 11,700.00 3,000.00 9,000.00 2,500.00 7,500.00 1,000.00 3,000.00
702-03-A catch basins (cb-01) 64      EACH 2,400.00 153,600.00 1,900.00 121,600.00 3,000.00 192,000.00 2,000.00 128,000.00
702-03-B catch basins (cb-02) 7      EACH 4,000.00 28,000.00 2,500.00 17,500.00 4,000.00 28,000.00 4,000.00 28,000.00
702-03-D-01 catch basins (cb-07)(special detail) 36      EACH 2,400.00 86,400.00 1,500.00 54,000.00 4,000.00 144,000.00 3,000.00 108,000.00
702-03-F-01 catch basins (cb-08)(special detail) 4      EACH 2,900.00 11,600.00 2,200.00 8,800.00 5,000.00 20,000.00 4,000.00 16,000.00
702-03-H catch basins (cb-05) 2      EACH 1,875.00 3,750.00 1,000.00 2,000.00 1,500.00 3,000.00 1,000.00 2,000.00
706-02-C concrete drive (6" thick) 248.7    SQYD 45.00 11,191.50 35.00 8,704.50 40.00 9,948.00 20.00 4,974.00
710-01 flowable fill 4,680      CUYD 15.00 70,200.00 54.00 252,720.00 50.00 234,000.00 20.00 93,600.00
711-01-D riprap (55 lb, 18" thick) 40      SQYD 45.00 1,800.00 55.00 2,200.00 200.00 8,000.00 50.00 2,000.00
712-04 flexible revetment 8      SQYD 38.00 304.00 200.00 1,600.00 100.00 800.00 100.00 800.00
713-01 temporary signs & barricades lump      LUMP 45,000.00 45,000.00 22,000.00 22,000.00 50,000.00 50,000.00 160,000.00 160,000.00
713-05-A-01 temporary pavement markings (solid line)(4" width)
(type 1 removable)
0.061  MILE 25,000.00 1,525.00 16,000.00 976.00 50,000.00 3,050.00 15,000.00 915.00
716-01-A mulch (vegetative) 4.00   ACRE 900.00 3,600.00 750.00 3,000.00 1,000.00 4,000.00 200.00 800.00
717-01 seeding 120      LB 15.00 1,800.00 10.00 1,200.00 15.00 1,800.00 5.00 600.00
718-01 fertilizer 4,000      LB 0.35 1,400.00 0.20 800.00 0.50 2,000.00 0.10 400.00
722-01 project site laboratory 1      EACH 5,000.00 5,000.00 6,000.00 6,000.00 8,000.00 8,000.00 1,000.00 1,000.00
724-01-A pavement patching (6" minimum thickness) 506      SQYD 50.00 25,300.00 60.00 30,360.00 55.00 27,830.00 50.00 25,300.00
726-01 bedding material 811.0    CUYD 52.00 42,172.00 45.00 36,495.00 70.00 56,770.00 15.00 12,165.00
727-01 mobilization lump      LUMP 120,000.00 120,000.00 110,000.00 110,000.00 50,000.00 50,000.00 170,000.00 170,000.00
735-02 mailbox supports (single) 10      EACH 175.00 1,750.00 145.00 1,450.00 200.00 2,000.00 100.00 1,000.00
740-01 construction layout lump      LUMP 25,000.00 25,000.00 20,000.00 20,000.00 15,000.00 15,000.00 100,000.00 100,000.00
742-01 sanitary sewer pipe (8") 240      LNFT 15.00 3,600.00 30.00 7,200.00 25.00 6,000.00 15.00 3,600.00
742-02 adjusting sanitary sewer house connections 27      EACH 300.00 8,100.00 400.00 10,800.00 600.00 16,200.00 150.00 4,050.00
742-03 adjusting sanitary sewer service lines 175      LNFT 15.00 2,625.00 20.00 3,500.00 500.00 87,500.00 FREE FREE
805-01-A class a concrete (pipe headwalls) 4.46   CUYD 700.00 3,122.00 1,000.00 4,460.00 500.00 2,230.00 1,000.00 4,460.00
806-01 deformed reinforcing steel 311      LB 1.00 311.00 4.00 1,244.00 1.00 311.00 0.40 124.40
S-001 cured-in-place-pipe (cipp) rehabilitation (8") 3,341      LNFT 28.00 93,548.00 25.00 83,525.00 28.00 93,548.00 25.00 83,525.00
S-002 service reconnection 27      EACH 200.00 5,400.00 150.00 4,050.00 200.00 5,400.00 150.00 4,050.00
S-003 service connection lining 30.0    LNFT 200.00 6,000.00 165.00 4,950.00 200.00 6,000.00 165.00 4,950.00
S-004 month of extended maintenance 6      EACH 7,500.00 45,000.00 7,500.00 45,000.00 7,000.00 42,000.00 1,000.00 6,000.00
                       
 CONTRACTOR TOTAL       1,507,087.90   1,582,463.50   1,703,918.00   1,794,479.40
 
Item Number Item Description Quantity Unit of Measure - 5 -
W. E. MCDONALD & SON, LLC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 120,000.00 120,000.00            
202-01 removal of structures & obstructions lump      LUMP 125,000.00 125,000.00            
202-02-D removal of concrete walks & drives 488      SQYD 15.00 7,320.00            
203-01 general excavation 188      CUYD 10.00 1,880.00            
203-03 muck excavation 300      CUYD 15.00 4,500.00            
203-08 borrow (vehicular measurement) 1,251      CUYD 1.00 1,251.00            
204-02 temporary hay or straw bales 1,100      EACH 7.50 8,250.00            
204-04 temporary sediment basins 6      EACH 500.00 3,000.00            
204-05-A temporary sediment check dams (hay) 10      EACH 500.00 5,000.00            
204-06 temporary silt fencing 3,000      LNFT 2.50 7,500.00            
402-01 traffic maintenance aggregate (vehicular measurement) 162.2    CUYD 100.00 16,220.00            
701-04-A storm drain pipe arch (15" equiv. rcpa) 1,206      LNFT 48.00 57,888.00            
701-04-B storm drain pipe arch (18" equiv. rcpa) 1,234      LNFT 55.00 67,870.00            
701-04-D storm drain pipe arch (24" equiv. rcpa) 495      LNFT 71.00 35,145.00            
701-04-E storm drain pipe arch (30" equiv. rcpa) 2,639      LNFT 90.00 237,510.00            
701-04-F storm drain pipe arch (36" equiv. rcpa) 15      LNFT 110.00 1,650.00            
701-04-H storm drain pipe arch (48" equiv. rcpa) 723      LNFT 135.00 97,605.00            
701-07-C yard drain pipe (8") 30      LNFT 25.00 750.00            
702-02-B manholes (r-cb-11) 22      EACH 4,000.00 88,000.00            
702-02-C manholes (r-cb-11 mod) 2      EACH 5,500.00 11,000.00            
702-02-D manholes (r-cb-12) 3      EACH 7,000.00 21,000.00            
702-03-A catch basins (cb-01) 64      EACH 2,500.00 160,000.00            
702-03-B catch basins (cb-02) 7      EACH 3,800.00 26,600.00            
702-03-D-01 catch basins (cb-07)(special detail) 36      EACH 4,500.00 162,000.00            
702-03-F-01 catch basins (cb-08)(special detail) 4      EACH 6,500.00 26,000.00            
702-03-H catch basins (cb-05) 2      EACH 3,000.00 6,000.00            
706-02-C concrete drive (6" thick) 248.7    SQYD 40.00 9,948.00            
710-01 flowable fill 4,680      CUYD 0.01 46.80            
711-01-D riprap (55 lb, 18" thick) 40      SQYD 100.00 4,000.00            
712-04 flexible revetment 8      SQYD 50.00 400.00            
713-01 temporary signs & barricades lump      LUMP 50,000.00 50,000.00            
713-05-A-01 temporary pavement markings (solid line)(4" width)
(type 1 removable)
0.061  MILE 40,000.00 2,440.00            
716-01-A mulch (vegetative) 4.00   ACRE 1,000.00 4,000.00            
717-01 seeding 120      LB 10.00 1,200.00            
718-01 fertilizer 4,000      LB 0.35 1,400.00            
722-01 project site laboratory 1      EACH 4,000.00 4,000.00            
724-01-A pavement patching (6" minimum thickness) 506      SQYD 65.00 32,890.00            
726-01 bedding material 811.0    CUYD 60.00 48,660.00            
727-01 mobilization lump      LUMP 158,000.00 158,000.00            
735-02 mailbox supports (single) 10      EACH 150.00 1,500.00            
740-01 construction layout lump      LUMP 21,000.00 21,000.00            
742-01 sanitary sewer pipe (8") 240      LNFT 30.00 7,200.00            
742-02 adjusting sanitary sewer house connections 27      EACH 500.00 13,500.00            
742-03 adjusting sanitary sewer service lines 175      LNFT 15.00 2,625.00            
805-01-A class a concrete (pipe headwalls) 4.46   CUYD 2,000.00 8,920.00            
806-01 deformed reinforcing steel 311      LB 3.00 933.00            
S-001 cured-in-place-pipe (cipp) rehabilitation (8") 3,341      LNFT 27.00 90,207.00            
S-002 service reconnection 27      EACH 200.00 5,400.00            
S-003 service connection lining 30.0    LNFT 200.00 6,000.00            
S-004 month of extended maintenance 6      EACH 12,500.00 75,000.00            
                       
 CONTRACTOR TOTAL       1,848,208.80            