| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - FORBY CONTRACTING, INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
101   |
SQYD |
15.00 |
1,515.00 |
|
|
|
|
|
|
| 202-02-E |
removal of concrete curbs
|
152.0 |
LNFT |
5.00 |
760.00 |
|
|
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
738.4 |
SQYD |
10.00 |
7,384.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
6,450.0 |
TON |
52.00 |
335,400.00 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete (paved drives and
turnouts) |
343.7 |
TON |
80.00 |
27,496.00 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
7,712   |
SQYD |
4.00 |
30,848.00 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 321   |
CUYD |
1.00 |
- 321.00 |
|
|
|
|
|
|
| 602-05-G-01 |
full depth patching of jointed conc pvmt (8" thick)
(16.0 sq yds & under) |
520.0 |
SQYD |
129.00 |
67,080.00 |
|
|
|
|
|
|
| 602-05-G-02 |
full depth patching of jointed conc pvmt (8" thick)
(16.1-48.0 sq yds) |
1,480.0 |
SQYD |
119.00 |
176,120.00 |
|
|
|
|
|
|
| 602-05-G-03 |
full depth patching of jointed conc pvmt (8" thick)
(48.1 sq yds & over) |
1,120.0 |
SQYD |
99.00 |
110,880.00 |
|
|
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
8   |
LNFT |
75.00 |
600.00 |
|
|
|
|
|
|
| 701-10-K |
reinforced concrete pipe (extension)(30")
|
8   |
LNFT |
100.00 |
800.00 |
|
|
|
|
|
|
| 701-10-S |
reinforced concrete pipe (extension)(72")
|
8   |
LNFT |
400.00 |
3,200.00 |
|
|
|
|
|
|
| 702-03-I |
catch basins (cb-sdo2)
|
1   |
EACH |
6,500.00 |
6,500.00 |
|
|
|
|
|
|
| 702-04-A |
adjusting manholes
|
58   |
EACH |
500.00 |
29,000.00 |
|
|
|
|
|
|
| 702-04-B |
adjusting catch basins
|
10   |
EACH |
1,500.00 |
15,000.00 |
|
|
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
101.4 |
SQYD |
65.00 |
6,591.00 |
|
|
|
|
|
|
| 707-01-A |
concrete curb (mountable)
|
2,152.0 |
LNFT |
10.00 |
21,520.00 |
|
|
|
|
|
|
| 707-01-B |
concrete curb (6" barrier)
|
2,000.0 |
LNFT |
12.00 |
24,000.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
50,000.00 |
50,000.00 |
|
|
|
|
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
100   |
LNFT |
0.30 |
30.00 |
|
|
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
1,016   |
LNFT |
0.90 |
914.40 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
5.149 |
MILE |
500.00 |
2,574.50 |
|
|
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
5.149 |
MILE |
290.00 |
1,493.21 |
|
|
|
|
|
|
| 713-04-C |
temporary pavement markings (broken line)(4" width)(3'
length) |
0.140 |
MILE |
500.00 |
70.00 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
9.285 |
MILE |
450.00 |
4,178.25 |
|
|
|
|
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
4   |
EACH |
50.00 |
200.00 |
|
|
|
|
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
2   |
EACH |
75.00 |
150.00 |
|
|
|
|
|
|
| 713-06-D |
temporary pavement legends and symbols (rr crossing)
|
12   |
EACH |
200.00 |
2,400.00 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
24.6 |
CUYD |
40.00 |
984.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
95,000.00 |
95,000.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
319   |
EACH |
5.40 |
1,722.60 |
|
|
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
50   |
LNFT |
0.90 |
45.00 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
690   |
LNFT |
2.70 |
1,863.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
4.136 |
MILE |
1,140.00 |
4,715.04 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.208 |
MILE |
810.00 |
1,788.48 |
|
|
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
2   |
EACH |
135.00 |
270.00 |
|
|
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
1   |
EACH |
145.00 |
145.00 |
|
|
|
|
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
4   |
EACH |
440.00 |
1,760.00 |
|
|
|
|
|
|
| 732-05 |
removal of existing markings
|
1.034 |
MILE |
3,500.00 |
3,619.00 |
|
|
|
|
|
|
| 736-09 |
loop detector
|
250   |
LNFT |
9.00 |
2,250.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
5,000.00 |
5,000.00 |
|
|
|
|
|
|
| | SUBTOTAL GENERAL |
|
|
|
1,045,545.48 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
reflective crack mitigation alternates
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
mesh
|
|
|
|
|
|
|
|
|
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
1,548   |
LNFT |
0.00 |
0.00 |
|
|
|
|
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
2,548   |
LNFT |
0.00 |
0.00 |
|
|
|
|
|
|
| 602-03 |
cleaning and sealing random cracks
|
100   |
LNFT |
0.00 |
0.00 |
|
|
|
|
|
|
| S-001 |
roadway reinforcing mesh (complete road system)
|
31,724   |
SQYD |
0.00 |
0.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A2 |
sawing and sealing
|
|
|
|
|
|
|
|
|
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
14,079   |
LNFT |
1.25 |
17,598.75 |
|
|
|
|
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
22,440   |
LNFT |
1.50 |
33,660.00 |
|
|
|
|
|
|
| 602-03 |
cleaning and sealing random cracks
|
700   |
LNFT |
3.00 |
2,100.00 |
|
|
|
|
|
|
| S-002 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
23,486   |
LNFT |
1.00 |
23,486.00 |
|
|
|
|
|
|
| S-003 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
19,892   |
LNFT |
1.10 |
21,881.20 |
|
|
|
|
|
|
| S-004 |
sawcuts in asphaltic concrete lifts
|
86,757   |
LNFT |
0.55 |
47,716.35 |
|
|
|
|
|
|
| | SUBTOTAL ALT A2 |
|
|
|
146,442.30 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,191,987.78 |
|
|
|
|
|
|
|