Letting of 4/28/2004 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 450-37-0020
Parish: ST CHARLES
Routes: I-310
Description: MISS. RIVER BRIDGE(LULING) DECK TEST SECTION & JOINT REPAIRS
Type Const: bridge roadway surface replacment, bridge roadway concrete test section installation,
expansion joint repairs, and replacement, and related work.
 
RankLicenseBidderAmount
102179 BOH BROS. CONSTRUCTION CO., LLC. $1,172,202.20
200481 COASTAL BRIDGE CO., L.L.C. $1,934,921.40
306276 BARRIERE CONSTRUCTION CO., LLC. $2,703,311.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
BOH BROS. CONSTRUCTION CO., LLC.
- 2 -
COASTAL BRIDGE CO., L.L.C.
- 3 -
BARRIERE CONSTRUCTION CO., LLC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
713-01 temporary signs & barricades lump      LUMP 131,000.00 131,000.00 154,000.00 154,000.00 200,000.00 200,000.00    
727-01 mobilization lump      LUMP 75,000.00 75,000.00 194,000.00 194,000.00 1,200,000.00 1,200,000.00    
731-02 reflectorized raised pavement markers 160      EACH 9.00 1,440.00 30.00 4,800.00 10.00 1,600.00    
732-02-A plastic pavement striping (solid line) (4" width) 1.110  MILE 2,450.00 2,719.50 5,000.00 5,550.00 3,000.00 3,330.00    
732-03-A plastic pavement striping (broken line)(4" width) 0.070  MILE 1,100.00 77.00 4,000.00 280.00 2,000.00 140.00    
S-101 construction layout lump      lump 9,000.00 9,000.00 30,000.00 30,000.00 25,000.00 25,000.00    
S-102 asphalt pavement removal(sta. 265+53 to sta.
269+25 southbound)
1,581      SQYD 55.00 86,955.00 190.00 300,390.00 30.00 47,430.00    
S-103 pmac dense graded hot mix asphalt(sta. 265+53 to
269+25 southbound)
131.8    TON 275.00 36,245.00 400.00 52,720.00 500.00 65,900.00    
S-104 epoxy underlayment system(type "a") 7,986      SQFT 19.30 154,129.80 12.00 95,832.00 20.00 159,720.00    
S-105 epoxy underlayment system(type "b") 4,330      SQFT 23.00 99,590.00 15.00 64,950.00 20.00 86,600.00    
S-106 steel fiber reinforced concrete 82.22   CUYD 1,550.00 127,441.00 2,370.00 194,861.40 1,500.00 123,330.00    
S-108 saw cut and seal pmac 4,846      LNFT 3.15 15,264.90 3.00 14,538.00 3.50 16,961.00    
S-109 asphalt pavement removal(general open roadways) 60      SQYD 214.00 12,840.00 200.00 12,000.00 30.00 1,800.00    
S-110 pmac dense graded hot mix asphalt(general open
roadways)
60      SQYD 200.00 12,000.00 300.00 18,000.00 125.00 7,500.00    
S-111 repair e2 expansion joints (sta. 269+25) lump      LUMP 38,500.00 38,500.00 160,000.00 160,000.00 64,000.00 64,000.00    
S-112 replace e1 southbound expansion joint (sta. 241+80) lump      LUMP 170,000.00 170,000.00 300,000.00 300,000.00 310,000.00 310,000.00    
S-113 replace e1 northbound expansion joint (sta. 241+80) lump      LUMP 200,000.00 200,000.00 333,000.00 333,000.00 390,000.00 390,000.00    
                       
 CONTRACTOR TOTAL       1,172,202.20   1,934,921.40   2,703,311.00    