| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
H & S CONSTRUCTION CO., INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-08 |
borrow (vehicular measurement)
|
5,100   |
CUYD |
17.80 |
90,780.00 |
10.25 |
52,275.00 |
|
|
|
|
| 307-01-A |
permeable base (3" thick)
|
19,696.7 |
SQYD |
9.18 |
180,815.70 |
10.40 |
204,845.68 |
|
|
|
|
| 307-01-B |
permeable base (4" thick)
|
39,882.2 |
SQYD |
10.32 |
411,584.30 |
14.20 |
566,327.24 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
49,342.9 |
TON |
50.76 |
2,504,645.60 |
46.00 |
2,269,773.40 |
|
|
|
|
| 509-01-A |
cold planing asphaltic pavement (2" deep)
|
407   |
SQYD |
2.65 |
1,078.55 |
3.27 |
1,330.89 |
|
|
|
|
| 509-01-B |
cold planing asphaltic pavement (6" deep)
|
39,881   |
SQYD |
3.95 |
157,529.95 |
9.64 |
384,452.84 |
|
|
|
|
| 509-01-C |
cold planing asphaltic pavement (6 3/4" avg depth)
|
95,718   |
SQYD |
4.14 |
396,272.52 |
3.94 |
377,128.92 |
|
|
|
|
| 509-01-D |
cold planing asphaltic pavement (7 1/2" deep)
|
15,953   |
SQYD |
4.83 |
77,052.99 |
4.92 |
78,488.76 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 13,483   |
CUYD |
0.10 |
- 1,348.30 |
0.01 |
- 134.83 |
|
|
|
|
| 602-07-G-01 |
patching continuously reinforced concrete pavement (8"
thick)(16.0 sq. yd and under) |
40.0 |
SQYD |
195.00 |
7,800.00 |
650.00 |
26,000.00 |
|
|
|
|
| 602-07-G-02 |
patching continuously reinforced concrete pavement (8"
thick)(16.1 sq. yd to 48.0 sq. yd) |
26.7 |
SQYD |
200.00 |
5,340.00 |
650.00 |
17,355.00 |
|
|
|
|
| 602-07-G-03 |
patching continuously reinforced concrete pavement (8"
thick)(48.1 sq. yd and over) |
200.0 |
SQYD |
210.00 |
42,000.00 |
625.00 |
125,000.00 |
|
|
|
|
| 711-04 |
geotextile fabric (class b, c, or d)
|
21,010   |
SQYD |
2.71 |
56,937.10 |
1.75 |
36,767.50 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
172,250.00 |
172,250.00 |
265,500.00 |
265,500.00 |
|
|
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
2,400   |
LNFT |
0.33 |
792.00 |
0.35 |
840.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
27.480 |
MILE |
335.00 |
9,205.80 |
520.00 |
14,289.60 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
27.480 |
MILE |
285.00 |
7,831.80 |
297.00 |
8,161.56 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
54.961 |
MILE |
500.00 |
27,480.50 |
520.00 |
28,579.72 |
|
|
|
|
| 713-09 |
temporary precast concrete barrier (department
furnished) |
45   |
EACH |
735.00 |
33,075.00 |
549.00 |
24,705.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
4.42 |
ACRE |
667.00 |
2,948.14 |
693.00 |
3,063.06 |
|
|
|
|
| 717-01 |
seeding
|
88   |
LB |
11.11 |
977.68 |
11.50 |
1,012.00 |
|
|
|
|
| 718-01 |
fertilizer
|
2,206   |
LB |
0.28 |
617.68 |
0.30 |
661.80 |
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
60,000.00 |
60,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 724-01-A |
pavement patching (6" minimum thickness)
|
227   |
SQYD |
79.21 |
17,980.67 |
100.00 |
22,700.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
580,375.00 |
580,375.00 |
380,000.00 |
380,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
20   |
EACH |
72.22 |
1,444.40 |
70.00 |
1,400.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
20   |
EACH |
72.22 |
1,444.40 |
79.00 |
1,580.00 |
|
|
|
|
| 731-01 |
nonreflectorized raised pavement markers
|
500   |
EACH |
8.89 |
4,445.00 |
9.25 |
4,625.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
3,049   |
EACH |
5.50 |
16,769.50 |
5.72 |
17,440.28 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
600   |
LNFT |
0.98 |
588.00 |
1.02 |
612.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
13.816 |
MILE |
1,935.00 |
26,733.96 |
2,012.00 |
27,797.79 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
6.908 |
MILE |
656.00 |
4,531.64 |
717.00 |
4,953.03 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
38,110.00 |
38,110.00 |
70,000.00 |
70,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
422,915.00 |
422,915.00 |
60,000.00 |
60,000.00 |
|
|
|
|
| 805-03-A |
class aa concrete (high early strength)
|
28.95 |
CUYD |
6,115.00 |
177,029.25 |
6,000.00 |
173,700.00 |
|
|
|
|
| 805-11 |
strip seal joints
|
197.50 |
LNFT |
245.00 |
48,387.50 |
253.00 |
49,967.50 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
4,446   |
LB |
2.78 |
12,359.88 |
2.88 |
12,804.48 |
|
|
|
|
| 813-01 |
concrete approach slabs
|
90.00 |
SQYD |
367.00 |
33,030.00 |
690.00 |
62,100.00 |
|
|
|
|
| S-001 |
rumble strips (ground-in)
|
13.9 |
MILE |
1,056.00 |
14,678.40 |
520.00 |
7,228.00 |
|
|
|
|
| S-002 |
variable message sign unit
|
10   |
EACH |
22,700.00 |
227,000.00 |
8,600.00 |
86,000.00 |
|
|
|
|
| S-003 |
removal of bridge joint
|
5   |
EACH |
17,225.00 |
86,125.00 |
18,825.00 |
94,125.00 |
|
|
|
|
| S-004 |
tree removal
|
150   |
EACH |
280.00 |
42,000.00 |
400.00 |
60,000.00 |
|
|
|
|
| S-005 |
raising and/or undersealing concrete approach slabs
(polyeurethane) |
2,000   |
LB |
7.50 |
15,000.00 |
7.00 |
14,000.00 |
|
|
|
|
| S-006 |
permeable drain outlet (15 feet wide)
|
512   |
EACH |
438.00 |
224,256.00 |
NO BID |
NO BID |
|
|
|
|
| S-007 |
permeable drain outlet (9 feet wide)
|
22   |
EACH |
280.00 |
6,160.00 |
NO BID |
NO BID |
|
|
|
|
| S-101 |
removal of approach slabs
|
lump |
LUMP |
11,111.00 |
11,111.00 |
16,000.00 |
16,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
6,258,141.61 |
|
IRREGULAR |
|
|
|
|
|