| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - PHYLWAY CONSTRUCTION LLC |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - JAMES CONSTRUCTION GROUP LLC |
- 4 - M. MATT DURAND, LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
10,000.00 |
10,000.00 |
25,000.00 |
25,000.00 |
25,000.00 |
25,000.00 |
42,000.00 |
42,000.00 |
| 202-02-C-01 |
removal of portland cement concrete
pavement(crossovers) |
1,925   |
SQYD |
6.00 |
11,550.00 |
5.00 |
9,625.00 |
5.00 |
9,625.00 |
9.10 |
17,517.50 |
| 202-02-G |
removal of surfacing & stabilized base
|
2,391.8 |
SQYD |
3.00 |
7,175.40 |
4.00 |
9,567.20 |
3.00 |
7,175.40 |
5.80 |
13,872.44 |
| 203-01 |
general excavation
|
2,699   |
CUYD |
5.00 |
13,495.00 |
3.50 |
9,446.50 |
4.00 |
10,796.00 |
6.60 |
17,813.40 |
| 203-02 |
drainage excavation
|
1,545   |
CUYD |
6.50 |
10,042.50 |
5.00 |
7,725.00 |
6.00 |
9,270.00 |
16.00 |
24,720.00 |
| 203-04 |
embankment
|
19,765   |
CUYD |
13.75 |
271,768.75 |
12.00 |
237,180.00 |
14.00 |
276,710.00 |
11.40 |
225,321.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
72   |
EACH |
160.00 |
11,520.00 |
100.00 |
7,200.00 |
80.00 |
5,760.00 |
135.00 |
9,720.00 |
| 204-06 |
temporary silt fencing
|
11,409   |
LNFT |
1.15 |
13,120.35 |
1.25 |
14,261.25 |
1.30 |
14,831.70 |
1.80 |
20,536.20 |
| 302-01 |
class ii base course
|
3,211.3 |
CUYD |
48.00 |
154,142.40 |
55.00 |
176,621.50 |
47.00 |
150,931.10 |
42.60 |
136,801.38 |
| 302-02-D |
class ii base course (12" thick)
|
27,888.6 |
SQYD |
16.00 |
446,217.60 |
16.00 |
446,217.60 |
18.00 |
501,994.80 |
14.15 |
394,623.69 |
| 304-01 |
lime
|
109.00 |
TON |
125.00 |
13,625.00 |
110.00 |
11,990.00 |
120.00 |
13,080.00 |
108.30 |
11,804.70 |
| 304-04-D |
lime treatment (type d) (12" thick)
|
7,700   |
SQYD |
1.25 |
9,625.00 |
1.25 |
9,625.00 |
1.50 |
11,550.00 |
2.15 |
16,555.00 |
| 305-01-A |
subgrade layer (12" thick)
|
38,030   |
SQYD |
4.00 |
152,120.00 |
4.75 |
180,642.50 |
6.00 |
228,180.00 |
5.00 |
190,150.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
55   |
CUYD |
50.00 |
2,750.00 |
60.00 |
3,300.00 |
60.00 |
3,300.00 |
66.70 |
3,668.50 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
500.0 |
CUYD |
30.00 |
15,000.00 |
30.00 |
15,000.00 |
45.00 |
22,500.00 |
51.30 |
25,650.00 |
| 502-01 |
superpave asphaltic concrete
|
7,730.2 |
TON |
56.00 |
432,891.20 |
50.00 |
386,510.00 |
53.00 |
409,700.60 |
52.50 |
405,835.50 |
| 502-01-D |
superpave asphaltic concrete, incidental paving (level
a) |
506.2 |
TON |
56.00 |
28,347.20 |
75.00 |
37,965.00 |
55.00 |
27,841.00 |
54.60 |
27,638.52 |
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
145   |
LNFT |
50.00 |
7,250.00 |
80.00 |
11,600.00 |
55.00 |
7,975.00 |
50.00 |
7,250.00 |
| 701-05-G |
side drain pipe (18")
|
683   |
LNFT |
25.00 |
17,075.00 |
35.00 |
23,905.00 |
35.00 |
23,905.00 |
29.00 |
19,807.00 |
| 701-05-I-01 |
side drain pipe (24")(erosion)
|
2,098   |
LNFT |
33.00 |
69,234.00 |
45.00 |
94,410.00 |
45.00 |
94,410.00 |
31.00 |
65,038.00 |
| 701-10-N |
reinforced concrete pipe (extension)(42")
|
285   |
LNFT |
110.00 |
31,350.00 |
140.00 |
39,900.00 |
110.00 |
31,350.00 |
102.50 |
29,212.50 |
| 702-03-B |
catch basins (cb-02)
|
4   |
EACH |
2,300.00 |
9,200.00 |
3,000.00 |
12,000.00 |
3,000.00 |
12,000.00 |
3,600.00 |
14,400.00 |
| 702-07-A |
cross drain safety end (type 1)
|
4   |
EACH |
1,600.00 |
6,400.00 |
1,300.00 |
5,200.00 |
1,500.00 |
6,000.00 |
1,400.00 |
5,600.00 |
| 702-07-B |
cross drain safety end (type 2)
|
3   |
EACH |
2,200.00 |
6,600.00 |
4,200.00 |
12,600.00 |
2,100.00 |
6,300.00 |
4,700.00 |
14,100.00 |
| 702-08-A |
side drain safety end (type 1)
|
20   |
EACH |
1,400.00 |
28,000.00 |
1,100.00 |
22,000.00 |
1,300.00 |
26,000.00 |
1,100.00 |
22,000.00 |
| 704-03 |
blocked out guard rail
|
975.0 |
LNFT |
14.00 |
13,650.00 |
15.00 |
14,625.00 |
16.00 |
15,600.00 |
18.00 |
17,550.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
39.00 |
7,800.00 |
40.00 |
8,000.00 |
40.00 |
8,000.00 |
48.00 |
9,600.00 |
| 704-11-B |
guard rail end treatment (tangent)
|
8   |
EACH |
1,800.00 |
14,400.00 |
1,800.00 |
14,400.00 |
1,775.00 |
14,200.00 |
2,200.00 |
17,600.00 |
| 706-02-C |
concrete drive (6" thick)
|
134.8 |
SQYD |
60.00 |
8,088.00 |
45.00 |
6,066.00 |
32.00 |
4,313.60 |
41.50 |
5,594.20 |
| 712-04 |
flexible revetment
|
1,399   |
SQYD |
33.00 |
46,167.00 |
50.00 |
69,950.00 |
46.00 |
64,354.00 |
76.40 |
106,883.60 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
40,000.00 |
40,000.00 |
30,000.00 |
30,000.00 |
20,000.00 |
20,000.00 |
74,200.00 |
74,200.00 |
| 717-01 |
seeding
|
204   |
LB |
11.00 |
2,244.00 |
8.00 |
1,632.00 |
7.00 |
1,428.00 |
16.00 |
3,264.00 |
| 718-01 |
fertilizer
|
6,800   |
LB |
0.22 |
1,496.00 |
0.30 |
2,040.00 |
0.20 |
1,360.00 |
1.00 |
6,800.00 |
| 726-01 |
bedding material
|
79.1 |
CUYD |
45.00 |
3,559.50 |
50.00 |
3,955.00 |
35.00 |
2,768.50 |
48.00 |
3,796.80 |
| 727-01 |
mobilization
|
lump |
LUMP |
198,000.00 |
198,000.00 |
200,000.00 |
200,000.00 |
293,000.00 |
293,000.00 |
129,000.00 |
129,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
525.00 |
4,200.00 |
65.00 |
520.00 |
65.00 |
520.00 |
69.00 |
552.00 |
| 731-02 |
reflectorized raised pavement markers
|
291   |
EACH |
5.50 |
1,600.50 |
5.50 |
1,600.50 |
5.00 |
1,455.00 |
7.00 |
2,037.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
4.412 |
MILE |
2,100.00 |
9,265.20 |
2,100.00 |
9,265.20 |
2,000.00 |
8,824.00 |
2,400.00 |
10,588.80 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.206 |
MILE |
850.00 |
1,875.10 |
900.00 |
1,985.40 |
800.00 |
1,764.80 |
820.00 |
1,808.92 |
| 740-01 |
construction layout
|
lump |
LUMP |
45,000.00 |
45,000.00 |
40,000.00 |
40,000.00 |
15,000.00 |
15,000.00 |
39,000.00 |
39,000.00 |
| 804-01-B |
precast concrete piles (14")
|
5,250   |
LNFT |
27.00 |
141,750.00 |
30.00 |
157,500.00 |
25.00 |
131,250.00 |
28.50 |
149,625.00 |
| 804-05 |
precast concrete test piles
|
1   |
EACH |
15,500.00 |
15,500.00 |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
12,600.00 |
12,600.00 |
| 804-09 |
loading test piles
|
1   |
EACH |
15,500.00 |
15,500.00 |
4,500.00 |
4,500.00 |
2,000.00 |
2,000.00 |
1,200.00 |
1,200.00 |
| 804-10 |
reloading test piles
|
1   |
EACH |
550.00 |
550.00 |
100.00 |
100.00 |
250.00 |
250.00 |
110.00 |
110.00 |
| 804-11 |
redriving test piles
|
1   |
EACH |
550.00 |
550.00 |
100.00 |
100.00 |
250.00 |
250.00 |
110.00 |
110.00 |
| 804-12 |
loading permanent piles
|
2   |
EACH |
1,000.00 |
2,000.00 |
100.00 |
200.00 |
250.00 |
500.00 |
110.00 |
220.00 |
| 804-17 |
dynamic monitoring
|
3   |
EACH |
1,600.00 |
4,800.00 |
1,200.00 |
3,600.00 |
1,000.00 |
3,000.00 |
342.00 |
1,026.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
18.96 |
CUYD |
900.00 |
17,064.00 |
750.00 |
14,220.00 |
900.00 |
17,064.00 |
725.00 |
13,746.00 |
| 805-01-F |
class a concrete (bents)
|
119.48 |
CUYD |
525.00 |
62,727.00 |
550.00 |
65,714.00 |
525.00 |
62,727.00 |
722.00 |
86,264.56 |
| 805-03 |
class aa concrete
|
432.72 |
CUYD |
475.00 |
205,542.00 |
400.00 |
173,088.00 |
300.00 |
129,816.00 |
427.00 |
184,771.44 |
| 805-12-I-01 |
reinforced concrete box culverts (5'x 5')(extension)
|
240.0 |
LNFT |
550.00 |
132,000.00 |
425.00 |
102,000.00 |
400.00 |
96,000.00 |
390.00 |
93,600.00 |
| 806-01 |
deformed reinforcing steel
|
99,182   |
LB |
0.65 |
64,468.30 |
0.60 |
59,509.20 |
0.60 |
59,509.20 |
0.91 |
90,255.62 |
| 810-01 |
concrete railing (barrier)
|
480.00 |
LNFT |
52.00 |
24,960.00 |
45.00 |
21,600.00 |
30.00 |
14,400.00 |
45.00 |
21,600.00 |
| 813-01 |
concrete approach slabs
|
728.88 |
SQYD |
150.00 |
109,332.00 |
150.00 |
109,332.00 |
120.00 |
87,465.60 |
171.00 |
124,638.48 |
| S-001 |
paved embankment widening (asphaltic or concrete)
|
889.2 |
SQYD |
18.00 |
16,005.60 |
35.00 |
31,122.00 |
37.00 |
32,900.40 |
46.00 |
40,903.20 |
| S-002 |
field office (equipped)
|
lump |
LUMP |
15,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
10,000.00 |
10,000.00 |
58,300.00 |
58,300.00 |
| S-101 |
dynamic analysis
|
3   |
EACH |
1,100.00 |
3,300.00 |
900.00 |
2,700.00 |
750.00 |
2,250.00 |
1,400.00 |
4,200.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,006,893.60 |
|
2,983,815.85 |
|
3,058,155.70 |
|
3,073,080.95 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
DIAMOND B CONSTRUCTION CO., L.L.C. |
H & S CONSTRUCTION CO., INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
50,000.00 |
50,000.00 |
30,000.00 |
30,000.00 |
|
|
|
|
| 202-02-C-01 |
removal of portland cement concrete
pavement(crossovers) |
1,925   |
SQYD |
8.00 |
15,400.00 |
10.00 |
19,250.00 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
2,391.8 |
SQYD |
8.00 |
19,134.40 |
5.00 |
11,959.00 |
|
|
|
|
| 203-01 |
general excavation
|
2,699   |
CUYD |
10.00 |
26,990.00 |
4.35 |
11,740.65 |
|
|
|
|
| 203-02 |
drainage excavation
|
1,545   |
CUYD |
10.00 |
15,450.00 |
6.00 |
9,270.00 |
|
|
|
|
| 203-04 |
embankment
|
19,765   |
CUYD |
15.00 |
296,475.00 |
15.00 |
296,475.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
72   |
EACH |
110.00 |
7,920.00 |
100.00 |
7,200.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
11,409   |
LNFT |
3.00 |
34,227.00 |
1.25 |
14,261.25 |
|
|
|
|
| 302-01 |
class ii base course
|
3,211.3 |
CUYD |
45.00 |
144,508.50 |
40.00 |
128,452.00 |
|
|
|
|
| 302-02-D |
class ii base course (12" thick)
|
27,888.6 |
SQYD |
21.00 |
585,660.60 |
17.00 |
474,106.20 |
|
|
|
|
| 304-01 |
lime
|
109.00 |
TON |
111.00 |
12,099.00 |
118.00 |
12,862.00 |
|
|
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
7,700   |
SQYD |
2.50 |
19,250.00 |
1.50 |
11,550.00 |
|
|
|
|
| 305-01-A |
subgrade layer (12" thick)
|
38,030   |
SQYD |
4.00 |
152,120.00 |
440.00 |
16,733,200.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
55   |
CUYD |
51.00 |
2,805.00 |
50.00 |
2,750.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
500.0 |
CUYD |
36.00 |
18,000.00 |
27.00 |
13,500.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
7,730.2 |
TON |
56.45 |
436,369.79 |
44.00 |
340,128.80 |
|
|
|
|
| 502-01-D |
superpave asphaltic concrete, incidental paving (level
a) |
506.2 |
TON |
85.00 |
43,027.00 |
46.00 |
23,285.20 |
|
|
|
|
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
145   |
LNFT |
145.00 |
21,025.00 |
63.30 |
9,178.50 |
|
|
|
|
| 701-05-G |
side drain pipe (18")
|
683   |
LNFT |
38.00 |
25,954.00 |
40.00 |
27,320.00 |
|
|
|
|
| 701-05-I-01 |
side drain pipe (24")(erosion)
|
2,098   |
LNFT |
36.00 |
75,528.00 |
51.80 |
108,676.40 |
|
|
|
|
| 701-10-N |
reinforced concrete pipe (extension)(42")
|
285   |
LNFT |
200.00 |
57,000.00 |
126.00 |
35,910.00 |
|
|
|
|
| 702-03-B |
catch basins (cb-02)
|
4   |
EACH |
3,500.00 |
14,000.00 |
3,450.00 |
13,800.00 |
|
|
|
|
| 702-07-A |
cross drain safety end (type 1)
|
4   |
EACH |
1,500.00 |
6,000.00 |
1,610.00 |
6,440.00 |
|
|
|
|
| 702-07-B |
cross drain safety end (type 2)
|
3   |
EACH |
3,500.00 |
10,500.00 |
2,300.00 |
6,900.00 |
|
|
|
|
| 702-08-A |
side drain safety end (type 1)
|
20   |
EACH |
1,500.00 |
30,000.00 |
1,380.00 |
27,600.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
975.0 |
LNFT |
19.00 |
18,525.00 |
15.40 |
15,015.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
49.00 |
9,800.00 |
41.40 |
8,280.00 |
|
|
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
8   |
EACH |
1,900.00 |
15,200.00 |
1,904.00 |
15,232.00 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
134.8 |
SQYD |
39.00 |
5,257.20 |
36.80 |
4,960.64 |
|
|
|
|
| 712-04 |
flexible revetment
|
1,399   |
SQYD |
51.00 |
71,349.00 |
52.90 |
74,007.10 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
30,000.00 |
30,000.00 |
100,000.00 |
100,000.00 |
|
|
|
|
| 717-01 |
seeding
|
204   |
LB |
8.00 |
1,632.00 |
10.00 |
2,040.00 |
|
|
|
|
| 718-01 |
fertilizer
|
6,800   |
LB |
1.00 |
6,800.00 |
0.50 |
3,400.00 |
|
|
|
|
| 726-01 |
bedding material
|
79.1 |
CUYD |
51.50 |
4,073.65 |
40.30 |
3,187.73 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
250,000.00 |
250,000.00 |
100,000.00 |
100,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
76.00 |
608.00 |
67.00 |
536.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
291   |
EACH |
5.50 |
1,600.50 |
6.70 |
1,949.70 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
4.412 |
MILE |
2,000.00 |
8,824.00 |
2,320.00 |
10,235.84 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.206 |
MILE |
731.00 |
1,612.58 |
792.00 |
1,747.15 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
80,000.00 |
80,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| 804-01-B |
precast concrete piles (14")
|
5,250   |
LNFT |
62.50 |
328,125.00 |
31.40 |
164,850.00 |
|
|
|
|
| 804-05 |
precast concrete test piles
|
1   |
EACH |
19,000.00 |
19,000.00 |
7,840.00 |
7,840.00 |
|
|
|
|
| 804-09 |
loading test piles
|
1   |
EACH |
5,000.00 |
5,000.00 |
5,712.00 |
5,712.00 |
|
|
|
|
| 804-10 |
reloading test piles
|
1   |
EACH |
250.00 |
250.00 |
2.00 |
2.00 |
|
|
|
|
| 804-11 |
redriving test piles
|
1   |
EACH |
650.00 |
650.00 |
2.00 |
2.00 |
|
|
|
|
| 804-12 |
loading permanent piles
|
2   |
EACH |
1,400.00 |
2,800.00 |
2.00 |
4.00 |
|
|
|
|
| 804-17 |
dynamic monitoring
|
3   |
EACH |
3,500.00 |
10,500.00 |
2,240.00 |
6,720.00 |
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
18.96 |
CUYD |
816.00 |
15,471.36 |
1,035.00 |
19,623.60 |
|
|
|
|
| 805-01-F |
class a concrete (bents)
|
119.48 |
CUYD |
750.00 |
89,610.00 |
728.00 |
86,981.44 |
|
|
|
|
| 805-03 |
class aa concrete
|
432.72 |
CUYD |
550.00 |
237,996.00 |
481.00 |
208,138.32 |
|
|
|
|
| 805-12-I-01 |
reinforced concrete box culverts (5'x 5')(extension)
|
240.0 |
LNFT |
750.00 |
180,000.00 |
460.00 |
110,400.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
99,182   |
LB |
0.60 |
59,509.20 |
0.94 |
93,231.08 |
|
|
|
|
| 810-01 |
concrete railing (barrier)
|
480.00 |
LNFT |
60.00 |
28,800.00 |
40.00 |
19,200.00 |
|
|
|
|
| 813-01 |
concrete approach slabs
|
728.88 |
SQYD |
160.00 |
116,620.80 |
168.00 |
122,451.84 |
|
|
|
|
| S-001 |
paved embankment widening (asphaltic or concrete)
|
889.2 |
SQYD |
35.00 |
31,122.00 |
44.00 |
39,124.80 |
|
|
|
|
| S-002 |
field office (equipped)
|
lump |
LUMP |
NO BID |
NO BID |
7,500.00 |
7,500.00 |
|
|
|
|
| S-101 |
dynamic analysis
|
3   |
EACH |
4,000.00 |
12,000.00 |
2,240.00 |
6,720.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
IRREGULAR |
|
IRREGULAR |
|
|
|
|
|