Letting of 4/28/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 424-04-0040
Parish: IBERIA
Routes: US 90
Description: US 90 FRONTAGE ROADS (LA 14 - LA 675)
Type Const: grading, drainage structures, class ii base course,lime treatment, superpave asphaltic
concrete pavement, concrete slab span bridge and related work.
 
RankLicenseBidderAmount
127634 PHYLWAY CONSTRUCTION LLC $3,006,893.60
212312 GILCHRIST CONSTRUCTION CO. LLC $2,983,815.85
334567 JAMES CONSTRUCTION GROUP LLC $3,058,155.70
413086 M. MATT DURAND, LLC $3,073,080.95
12487 DIAMOND B CONSTRUCTION CO., L.L.C. IRREGULAR
04089 H & S CONSTRUCTION CO., INC. IRREGULAR
 
Item Number Item Description Quantity Unit of Measure - 1 -
PHYLWAY CONSTRUCTION LLC
- 2 -
GILCHRIST CONSTRUCTION CO. LLC
- 3 -
JAMES CONSTRUCTION GROUP LLC
- 4 -
M. MATT DURAND, LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 10,000.00 10,000.00 25,000.00 25,000.00 25,000.00 25,000.00 42,000.00 42,000.00
202-02-C-01 removal of portland cement concrete
pavement(crossovers)
1,925      SQYD 6.00 11,550.00 5.00 9,625.00 5.00 9,625.00 9.10 17,517.50
202-02-G removal of surfacing & stabilized base 2,391.8    SQYD 3.00 7,175.40 4.00 9,567.20 3.00 7,175.40 5.80 13,872.44
203-01 general excavation 2,699      CUYD 5.00 13,495.00 3.50 9,446.50 4.00 10,796.00 6.60 17,813.40
203-02 drainage excavation 1,545      CUYD 6.50 10,042.50 5.00 7,725.00 6.00 9,270.00 16.00 24,720.00
203-04 embankment 19,765      CUYD 13.75 271,768.75 12.00 237,180.00 14.00 276,710.00 11.40 225,321.00
204-05-A temporary sediment check dams (hay) 72      EACH 160.00 11,520.00 100.00 7,200.00 80.00 5,760.00 135.00 9,720.00
204-06 temporary silt fencing 11,409      LNFT 1.15 13,120.35 1.25 14,261.25 1.30 14,831.70 1.80 20,536.20
302-01 class ii base course 3,211.3    CUYD 48.00 154,142.40 55.00 176,621.50 47.00 150,931.10 42.60 136,801.38
302-02-D class ii base course (12" thick) 27,888.6    SQYD 16.00 446,217.60 16.00 446,217.60 18.00 501,994.80 14.15 394,623.69
304-01 lime 109.00   TON 125.00 13,625.00 110.00 11,990.00 120.00 13,080.00 108.30 11,804.70
304-04-D lime treatment (type d) (12" thick) 7,700      SQYD 1.25 9,625.00 1.25 9,625.00 1.50 11,550.00 2.15 16,555.00
305-01-A subgrade layer (12" thick) 38,030      SQYD 4.00 152,120.00 4.75 180,642.50 6.00 228,180.00 5.00 190,150.00
401-02 aggregate surface course (adjusted vehicular
measurement)
55      CUYD 50.00 2,750.00 60.00 3,300.00 60.00 3,300.00 66.70 3,668.50
402-01 traffic maintenance aggregate (vehicular measurement) 500.0    CUYD 30.00 15,000.00 30.00 15,000.00 45.00 22,500.00 51.30 25,650.00
502-01 superpave asphaltic concrete 7,730.2    TON 56.00 432,891.20 50.00 386,510.00 53.00 409,700.60 52.50 405,835.50
502-01-D superpave asphaltic concrete, incidental paving (level
a)
506.2    TON 56.00 28,347.20 75.00 37,965.00 55.00 27,841.00 54.60 27,638.52
701-01-I cross drain pipe (24" rcp/pcp) 145      LNFT 50.00 7,250.00 80.00 11,600.00 55.00 7,975.00 50.00 7,250.00
701-05-G side drain pipe (18") 683      LNFT 25.00 17,075.00 35.00 23,905.00 35.00 23,905.00 29.00 19,807.00
701-05-I-01 side drain pipe (24")(erosion) 2,098      LNFT 33.00 69,234.00 45.00 94,410.00 45.00 94,410.00 31.00 65,038.00
701-10-N reinforced concrete pipe (extension)(42") 285      LNFT 110.00 31,350.00 140.00 39,900.00 110.00 31,350.00 102.50 29,212.50
702-03-B catch basins (cb-02) 4      EACH 2,300.00 9,200.00 3,000.00 12,000.00 3,000.00 12,000.00 3,600.00 14,400.00
702-07-A cross drain safety end (type 1) 4      EACH 1,600.00 6,400.00 1,300.00 5,200.00 1,500.00 6,000.00 1,400.00 5,600.00
702-07-B cross drain safety end (type 2) 3      EACH 2,200.00 6,600.00 4,200.00 12,600.00 2,100.00 6,300.00 4,700.00 14,100.00
702-08-A side drain safety end (type 1) 20      EACH 1,400.00 28,000.00 1,100.00 22,000.00 1,300.00 26,000.00 1,100.00 22,000.00
704-03 blocked out guard rail 975.0    LNFT 14.00 13,650.00 15.00 14,625.00 16.00 15,600.00 18.00 17,550.00
704-08-B guard rail transitions (double thrie beam) 200.0    LNFT 39.00 7,800.00 40.00 8,000.00 40.00 8,000.00 48.00 9,600.00
704-11-B guard rail end treatment (tangent) 8      EACH 1,800.00 14,400.00 1,800.00 14,400.00 1,775.00 14,200.00 2,200.00 17,600.00
706-02-C concrete drive (6" thick) 134.8    SQYD 60.00 8,088.00 45.00 6,066.00 32.00 4,313.60 41.50 5,594.20
712-04 flexible revetment 1,399      SQYD 33.00 46,167.00 50.00 69,950.00 46.00 64,354.00 76.40 106,883.60
713-01 temporary signs & barricades lump      LUMP 40,000.00 40,000.00 30,000.00 30,000.00 20,000.00 20,000.00 74,200.00 74,200.00
717-01 seeding 204      LB 11.00 2,244.00 8.00 1,632.00 7.00 1,428.00 16.00 3,264.00
718-01 fertilizer 6,800      LB 0.22 1,496.00 0.30 2,040.00 0.20 1,360.00 1.00 6,800.00
726-01 bedding material 79.1    CUYD 45.00 3,559.50 50.00 3,955.00 35.00 2,768.50 48.00 3,796.80
727-01 mobilization lump      LUMP 198,000.00 198,000.00 200,000.00 200,000.00 293,000.00 293,000.00 129,000.00 129,000.00
729-16-C object marker assembly (type 3) 8      EACH 525.00 4,200.00 65.00 520.00 65.00 520.00 69.00 552.00
731-02 reflectorized raised pavement markers 291      EACH 5.50 1,600.50 5.50 1,600.50 5.00 1,455.00 7.00 2,037.00
732-02-A plastic pavement striping (solid line) (4" width) 4.412  MILE 2,100.00 9,265.20 2,100.00 9,265.20 2,000.00 8,824.00 2,400.00 10,588.80
732-03-A plastic pavement striping (broken line)(4" width) 2.206  MILE 850.00 1,875.10 900.00 1,985.40 800.00 1,764.80 820.00 1,808.92
740-01 construction layout lump      LUMP 45,000.00 45,000.00 40,000.00 40,000.00 15,000.00 15,000.00 39,000.00 39,000.00
804-01-B precast concrete piles (14") 5,250      LNFT 27.00 141,750.00 30.00 157,500.00 25.00 131,250.00 28.50 149,625.00
804-05 precast concrete test piles 1      EACH 15,500.00 15,500.00 10,000.00 10,000.00 20,000.00 20,000.00 12,600.00 12,600.00
804-09 loading test piles 1      EACH 15,500.00 15,500.00 4,500.00 4,500.00 2,000.00 2,000.00 1,200.00 1,200.00
804-10 reloading test piles 1      EACH 550.00 550.00 100.00 100.00 250.00 250.00 110.00 110.00
804-11 redriving test piles 1      EACH 550.00 550.00 100.00 100.00 250.00 250.00 110.00 110.00
804-12 loading permanent piles 2      EACH 1,000.00 2,000.00 100.00 200.00 250.00 500.00 110.00 220.00
804-17 dynamic monitoring 3      EACH 1,600.00 4,800.00 1,200.00 3,600.00 1,000.00 3,000.00 342.00 1,026.00
805-01-B class a concrete (box culvert headwalls) 18.96   CUYD 900.00 17,064.00 750.00 14,220.00 900.00 17,064.00 725.00 13,746.00
805-01-F class a concrete (bents) 119.48   CUYD 525.00 62,727.00 550.00 65,714.00 525.00 62,727.00 722.00 86,264.56
805-03 class aa concrete 432.72   CUYD 475.00 205,542.00 400.00 173,088.00 300.00 129,816.00 427.00 184,771.44
805-12-I-01 reinforced concrete box culverts (5'x 5')(extension) 240.0    LNFT 550.00 132,000.00 425.00 102,000.00 400.00 96,000.00 390.00 93,600.00
806-01 deformed reinforcing steel 99,182      LB 0.65 64,468.30 0.60 59,509.20 0.60 59,509.20 0.91 90,255.62
810-01 concrete railing (barrier) 480.00   LNFT 52.00 24,960.00 45.00 21,600.00 30.00 14,400.00 45.00 21,600.00
813-01 concrete approach slabs 728.88   SQYD 150.00 109,332.00 150.00 109,332.00 120.00 87,465.60 171.00 124,638.48
S-001 paved embankment widening (asphaltic or concrete) 889.2    SQYD 18.00 16,005.60 35.00 31,122.00 37.00 32,900.40 46.00 40,903.20
S-002 field office (equipped) lump      LUMP 15,000.00 15,000.00 15,000.00 15,000.00 10,000.00 10,000.00 58,300.00 58,300.00
S-101 dynamic analysis 3      EACH 1,100.00 3,300.00 900.00 2,700.00 750.00 2,250.00 1,400.00 4,200.00
                       
 CONTRACTOR TOTAL       3,006,893.60   2,983,815.85   3,058,155.70   3,073,080.95
 
Item Number Item Description Quantity Unit of Measure
DIAMOND B CONSTRUCTION CO., L.L.C.

H & S CONSTRUCTION CO., INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 50,000.00 50,000.00 30,000.00 30,000.00        
202-02-C-01 removal of portland cement concrete
pavement(crossovers)
1,925      SQYD 8.00 15,400.00 10.00 19,250.00        
202-02-G removal of surfacing & stabilized base 2,391.8    SQYD 8.00 19,134.40 5.00 11,959.00        
203-01 general excavation 2,699      CUYD 10.00 26,990.00 4.35 11,740.65        
203-02 drainage excavation 1,545      CUYD 10.00 15,450.00 6.00 9,270.00        
203-04 embankment 19,765      CUYD 15.00 296,475.00 15.00 296,475.00        
204-05-A temporary sediment check dams (hay) 72      EACH 110.00 7,920.00 100.00 7,200.00        
204-06 temporary silt fencing 11,409      LNFT 3.00 34,227.00 1.25 14,261.25        
302-01 class ii base course 3,211.3    CUYD 45.00 144,508.50 40.00 128,452.00        
302-02-D class ii base course (12" thick) 27,888.6    SQYD 21.00 585,660.60 17.00 474,106.20        
304-01 lime 109.00   TON 111.00 12,099.00 118.00 12,862.00        
304-04-D lime treatment (type d) (12" thick) 7,700      SQYD 2.50 19,250.00 1.50 11,550.00        
305-01-A subgrade layer (12" thick) 38,030      SQYD 4.00 152,120.00 440.00 16,733,200.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
55      CUYD 51.00 2,805.00 50.00 2,750.00        
402-01 traffic maintenance aggregate (vehicular measurement) 500.0    CUYD 36.00 18,000.00 27.00 13,500.00        
502-01 superpave asphaltic concrete 7,730.2    TON 56.45 436,369.79 44.00 340,128.80        
502-01-D superpave asphaltic concrete, incidental paving (level
a)
506.2    TON 85.00 43,027.00 46.00 23,285.20        
701-01-I cross drain pipe (24" rcp/pcp) 145      LNFT 145.00 21,025.00 63.30 9,178.50        
701-05-G side drain pipe (18") 683      LNFT 38.00 25,954.00 40.00 27,320.00        
701-05-I-01 side drain pipe (24")(erosion) 2,098      LNFT 36.00 75,528.00 51.80 108,676.40        
701-10-N reinforced concrete pipe (extension)(42") 285      LNFT 200.00 57,000.00 126.00 35,910.00        
702-03-B catch basins (cb-02) 4      EACH 3,500.00 14,000.00 3,450.00 13,800.00        
702-07-A cross drain safety end (type 1) 4      EACH 1,500.00 6,000.00 1,610.00 6,440.00        
702-07-B cross drain safety end (type 2) 3      EACH 3,500.00 10,500.00 2,300.00 6,900.00        
702-08-A side drain safety end (type 1) 20      EACH 1,500.00 30,000.00 1,380.00 27,600.00        
704-03 blocked out guard rail 975.0    LNFT 19.00 18,525.00 15.40 15,015.00        
704-08-B guard rail transitions (double thrie beam) 200.0    LNFT 49.00 9,800.00 41.40 8,280.00        
704-11-B guard rail end treatment (tangent) 8      EACH 1,900.00 15,200.00 1,904.00 15,232.00        
706-02-C concrete drive (6" thick) 134.8    SQYD 39.00 5,257.20 36.80 4,960.64        
712-04 flexible revetment 1,399      SQYD 51.00 71,349.00 52.90 74,007.10        
713-01 temporary signs & barricades lump      LUMP 30,000.00 30,000.00 100,000.00 100,000.00        
717-01 seeding 204      LB 8.00 1,632.00 10.00 2,040.00        
718-01 fertilizer 6,800      LB 1.00 6,800.00 0.50 3,400.00        
726-01 bedding material 79.1    CUYD 51.50 4,073.65 40.30 3,187.73        
727-01 mobilization lump      LUMP 250,000.00 250,000.00 100,000.00 100,000.00        
729-16-C object marker assembly (type 3) 8      EACH 76.00 608.00 67.00 536.00        
731-02 reflectorized raised pavement markers 291      EACH 5.50 1,600.50 6.70 1,949.70        
732-02-A plastic pavement striping (solid line) (4" width) 4.412  MILE 2,000.00 8,824.00 2,320.00 10,235.84        
732-03-A plastic pavement striping (broken line)(4" width) 2.206  MILE 731.00 1,612.58 792.00 1,747.15        
740-01 construction layout lump      LUMP 80,000.00 80,000.00 20,000.00 20,000.00        
804-01-B precast concrete piles (14") 5,250      LNFT 62.50 328,125.00 31.40 164,850.00        
804-05 precast concrete test piles 1      EACH 19,000.00 19,000.00 7,840.00 7,840.00        
804-09 loading test piles 1      EACH 5,000.00 5,000.00 5,712.00 5,712.00        
804-10 reloading test piles 1      EACH 250.00 250.00 2.00 2.00        
804-11 redriving test piles 1      EACH 650.00 650.00 2.00 2.00        
804-12 loading permanent piles 2      EACH 1,400.00 2,800.00 2.00 4.00        
804-17 dynamic monitoring 3      EACH 3,500.00 10,500.00 2,240.00 6,720.00        
805-01-B class a concrete (box culvert headwalls) 18.96   CUYD 816.00 15,471.36 1,035.00 19,623.60        
805-01-F class a concrete (bents) 119.48   CUYD 750.00 89,610.00 728.00 86,981.44        
805-03 class aa concrete 432.72   CUYD 550.00 237,996.00 481.00 208,138.32        
805-12-I-01 reinforced concrete box culverts (5'x 5')(extension) 240.0    LNFT 750.00 180,000.00 460.00 110,400.00        
806-01 deformed reinforcing steel 99,182      LB 0.60 59,509.20 0.94 93,231.08        
810-01 concrete railing (barrier) 480.00   LNFT 60.00 28,800.00 40.00 19,200.00        
813-01 concrete approach slabs 728.88   SQYD 160.00 116,620.80 168.00 122,451.84        
S-001 paved embankment widening (asphaltic or concrete) 889.2    SQYD 35.00 31,122.00 44.00 39,124.80        
S-002 field office (equipped) lump      LUMP NO BID NO BID 7,500.00 7,500.00        
S-101 dynamic analysis 3      EACH 4,000.00 12,000.00 2,240.00 6,720.00        
                       
 CONTRACTOR TOTAL       IRREGULAR   IRREGULAR        