| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
- 3 - COASTAL BRIDGE CO., L.L.C. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
1,000.00 |
1,000.00 |
31,000.00 |
31,000.00 |
40,000.00 |
40,000.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
5,000.00 |
5,000.00 |
1,000.00 |
1,000.00 |
5,000.00 |
5,000.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
315   |
SQYD |
10.00 |
3,150.00 |
11.00 |
3,465.00 |
15.00 |
4,725.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
4,170.2 |
SQYD |
3.00 |
12,510.60 |
6.00 |
25,021.20 |
10.00 |
41,702.00 |
|
|
| 202-02-J |
removal of existing traffic signal equipment & related
equipment |
lump |
LUMP |
4,000.00 |
4,000.00 |
4,000.00 |
4,000.00 |
5,000.00 |
5,000.00 |
|
|
| 202-02-01 |
removal of metal building (rt. of sta. 121+56.74; 120'
x 51') |
1   |
EACH |
20,000.00 |
20,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
|
|
| 202-02-02 |
removal of metal sign and conc. slab (rt. of sta.
119+06.10) |
1   |
EACH |
1,500.00 |
1,500.00 |
1,000.00 |
1,000.00 |
2,000.00 |
2,000.00 |
|
|
| 202-02-03 |
removal of septic tank (rt. of sta. 122+87.86)
|
1   |
EACH |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
3,000.00 |
3,000.00 |
|
|
| 202-02-04 |
removal of wood frame house (lt. of sta. 125+29.89;
50' x 35') |
1   |
EACH |
10,000.00 |
10,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
|
|
| 202-02-05 |
removal of wood frame shed (lt. of sta. 126+06.34; 20'
x 30') |
1   |
EACH |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
500.00 |
500.00 |
|
|
| 203-01 |
general excavation
|
5,397   |
CUYD |
10.00 |
53,970.00 |
12.00 |
64,764.00 |
6.00 |
32,382.00 |
|
|
| 203-03 |
muck excavation
|
1,000   |
CUYD |
10.00 |
10,000.00 |
12.00 |
12,000.00 |
3.00 |
3,000.00 |
|
|
| 203-04 |
embankment
|
2,502   |
CUYD |
15.00 |
37,530.00 |
12.00 |
30,024.00 |
18.00 |
45,036.00 |
|
|
| 304-01 |
lime
|
20.15 |
TON |
90.00 |
1,813.50 |
110.00 |
2,216.50 |
10.00 |
201.50 |
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
1,421   |
SQYD |
2.00 |
2,842.00 |
3.00 |
4,263.00 |
1.00 |
1,421.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
284   |
CUYD |
55.00 |
15,620.00 |
35.00 |
9,940.00 |
50.00 |
14,200.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
300.0 |
CUYD |
20.00 |
6,000.00 |
35.00 |
10,500.00 |
1.00 |
300.00 |
|
|
| 502-01 |
superpave asphaltic concrete (level 1)
|
3,666.1 |
TON |
65.00 |
238,296.50 |
60.00 |
219,966.00 |
80.00 |
293,288.00 |
|
|
| 502-01-A |
superpave asphaltic concrete (paved drives and
turnouts) |
112.0 |
TON |
100.00 |
11,200.00 |
120.00 |
13,440.00 |
120.00 |
13,440.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
991   |
SQYD |
6.00 |
5,946.00 |
10.00 |
9,910.00 |
10.00 |
9,910.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 27   |
CUYD |
1.00 |
- 27.00 |
0.10 |
- 2.70 |
10.00 |
- 270.00 |
|
|
| 701-02-D/E |
cross drain pipe arch (24" equiv. rcpa or 30" equiv.
cmpa) |
168   |
LNFT |
60.00 |
10,080.00 |
100.00 |
16,800.00 |
80.00 |
13,440.00 |
|
|
| 701-05-G |
side drain pipe (18")
|
24   |
LNFT |
60.00 |
1,440.00 |
50.00 |
1,200.00 |
40.00 |
960.00 |
|
|
| 701-05-I |
side drain pipe (24")
|
148   |
LNFT |
60.00 |
8,880.00 |
60.00 |
8,880.00 |
50.00 |
7,400.00 |
|
|
| 701-05-K |
side drain pipe (30")
|
68   |
LNFT |
75.00 |
5,100.00 |
70.00 |
4,760.00 |
60.00 |
4,080.00 |
|
|
| 706-02-C |
concrete drive (6" thick)
|
897.9 |
SQYD |
28.00 |
25,141.20 |
35.00 |
31,426.50 |
65.00 |
58,363.50 |
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
256.4 |
SQYD |
28.00 |
7,179.20 |
35.00 |
8,974.00 |
40.00 |
10,256.00 |
|
|
| 707-03 |
combination concrete curb & gutter
|
250.5 |
LNFT |
30.00 |
7,515.00 |
25.00 |
6,262.50 |
25.00 |
6,262.50 |
|
|
| 708-01 |
right-of-way monument
|
11   |
EACH |
30.00 |
330.00 |
175.00 |
1,925.00 |
125.00 |
1,375.00 |
|
|
| 708-02 |
right-of-way monument witness post
|
11   |
EACH |
210.00 |
2,310.00 |
175.00 |
1,925.00 |
125.00 |
1,375.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
40,000.00 |
40,000.00 |
75,000.00 |
75,000.00 |
50,000.00 |
50,000.00 |
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
1,668   |
LNFT |
0.03 |
50.04 |
0.15 |
250.20 |
0.40 |
667.20 |
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
728   |
LNFT |
0.10 |
72.80 |
0.60 |
436.80 |
1.50 |
1,092.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
0.868 |
MILE |
200.00 |
173.60 |
1,000.00 |
868.00 |
1,500.00 |
1,302.00 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
0.868 |
MILE |
10.00 |
8.68 |
100.00 |
86.80 |
270.00 |
234.36 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
3.866 |
MILE |
15.00 |
57.99 |
100.00 |
386.60 |
1.00 |
3.86 |
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
12   |
EACH |
5.00 |
60.00 |
25.00 |
300.00 |
100.00 |
1,200.00 |
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
12   |
EACH |
5.00 |
60.00 |
25.00 |
300.00 |
75.00 |
900.00 |
|
|
| 713-07 |
temporary reflectorized raised pavement markers
|
1,954   |
EACH |
0.50 |
977.00 |
0.75 |
1,465.50 |
1.00 |
1,954.00 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
100   |
SQYD |
60.00 |
6,000.00 |
100.00 |
10,000.00 |
60.00 |
6,000.00 |
|
|
| 726-01 |
bedding material
|
38.0 |
CUYD |
50.00 |
1,900.00 |
60.00 |
2,280.00 |
60.00 |
2,280.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
70,000.00 |
70,000.00 |
75,000.00 |
75,000.00 |
85,000.00 |
85,000.00 |
|
|
| 729-01-A |
sign (type a)(r10-12)(24" x 30") "lt. turn yield on
green" |
10.0 |
SQFT |
35.00 |
350.00 |
30.00 |
300.00 |
40.00 |
400.00 |
|
|
| 729-01-B |
sign (type a)(r3-1)(12" x 24") "no right turn"
|
4.0 |
SQFT |
35.00 |
140.00 |
30.00 |
120.00 |
40.00 |
160.00 |
|
|
| 729-01-C |
sign (type a)(r1-2)(36" x 36") "yield"
|
6.0 |
SQFT |
35.00 |
210.00 |
30.00 |
180.00 |
40.00 |
240.00 |
|
|
| 729-01-D |
sign (type a)(r5-1)(36" x 36") "do not enter"
|
9.0 |
SQFT |
35.00 |
315.00 |
30.00 |
270.00 |
40.00 |
360.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,310   |
EACH |
5.00 |
6,550.00 |
6.00 |
7,860.00 |
6.00 |
7,860.00 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
1,206   |
LNFT |
0.75 |
904.50 |
1.00 |
1,206.00 |
0.80 |
964.80 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
364   |
LNFT |
2.50 |
910.00 |
3.00 |
1,092.00 |
3.00 |
1,092.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
2.122 |
MILE |
2,000.00 |
4,244.00 |
2,000.00 |
4,244.00 |
2,200.00 |
4,668.40 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.387 |
MILE |
900.00 |
348.30 |
1,000.00 |
387.00 |
1,000.00 |
387.00 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
6   |
EACH |
150.00 |
900.00 |
150.00 |
900.00 |
150.00 |
900.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
6   |
EACH |
150.00 |
900.00 |
150.00 |
900.00 |
160.00 |
960.00 |
|
|
| 735-01 |
mailboxes
|
15   |
EACH |
1.00 |
15.00 |
1.00 |
15.00 |
1.00 |
15.00 |
|
|
| 735-02 |
mailbox supports (single)
|
15   |
EACH |
110.00 |
1,650.00 |
125.00 |
1,875.00 |
100.00 |
1,500.00 |
|
|
| 736-01 |
trenching and backfilling
|
380   |
LNFT |
3.50 |
1,330.00 |
3.00 |
1,140.00 |
3.00 |
1,140.00 |
|
|
| 736-04 |
signal support (30' steel strain pole)
|
4   |
EACH |
6,500.00 |
26,000.00 |
6,000.00 |
24,000.00 |
6,000.00 |
24,000.00 |
|
|
| 736-05-A |
signal heads (3-section, r,y,g)(l.e.d.)
|
8   |
EACH |
1,100.00 |
8,800.00 |
1,000.00 |
8,000.00 |
1,000.00 |
8,000.00 |
|
|
| 736-05-B |
signal heads (5-section, r,y,lt. y,lt. g,g)(l.e.d.)
|
2   |
EACH |
1,600.00 |
3,200.00 |
1,500.00 |
3,000.00 |
1,500.00 |
3,000.00 |
|
|
| 736-06 |
signal service (pole mounted)
|
1   |
EACH |
1,200.00 |
1,200.00 |
1,100.00 |
1,100.00 |
1,200.00 |
1,200.00 |
|
|
| 736-08 |
signal controller (nema 8-phase,ts-2,type 2; type
6 base mounted cabinet) |
1   |
EACH |
16,000.00 |
16,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
|
|
| 736-09 |
loop detector (sawcut, loop wire, sealant)
|
955   |
LNFT |
11.00 |
10,505.00 |
10.00 |
9,550.00 |
10.00 |
9,550.00 |
|
|
| 736-10-A |
underground junction box (type "e")
|
7   |
EACH |
450.00 |
3,150.00 |
400.00 |
2,800.00 |
400.00 |
2,800.00 |
|
|
| 736-10-B |
underground junction box (type "h")
|
1   |
EACH |
1,300.00 |
1,300.00 |
1,500.00 |
1,500.00 |
1,200.00 |
1,200.00 |
|
|
| 736-11-A |
conduit (1/2" pec, schedule 80)
|
125   |
LNFT |
3.50 |
437.50 |
3.00 |
375.00 |
3.00 |
375.00 |
|
|
| 736-11-B |
conduit (1" pec, schedule 80)
|
305   |
LNFT |
3.50 |
1,067.50 |
4.00 |
1,220.00 |
3.25 |
991.25 |
|
|
| 736-11-C |
conduit (2" pec, schedule 80)
|
50   |
LNFT |
4.50 |
225.00 |
5.00 |
250.00 |
5.00 |
250.00 |
|
|
| 736-11-D |
conduit (3" pec, schedule 80)
|
20   |
LNFT |
7.00 |
140.00 |
7.00 |
140.00 |
8.00 |
160.00 |
|
|
| 736-12-A |
conductor, 2c (loop lead-in/#16 awg)
|
1,110   |
LNFT |
2.00 |
2,220.00 |
1.00 |
1,110.00 |
1.25 |
1,387.50 |
|
|
| 736-12-B |
conductor, 3c (power, 6 gauge/#6 awg)
|
310   |
LNFT |
5.00 |
1,550.00 |
6.00 |
1,860.00 |
5.00 |
1,550.00 |
|
|
| 736-12-C |
conductor, 6c (signal /#14 awg)
|
45   |
LNFT |
2.00 |
90.00 |
2.00 |
90.00 |
1.50 |
67.50 |
|
|
| 736-12-D |
conductor, 10c (signal /#14 awg)
|
730   |
LNFT |
2.00 |
1,460.00 |
2.00 |
1,460.00 |
1.70 |
1,241.00 |
|
|
| 739-01 |
hydro-seeding
|
3.50 |
ACRE |
900.00 |
3,150.00 |
1,000.00 |
3,500.00 |
1,500.00 |
5,250.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
25,000.00 |
25,000.00 |
35,000.00 |
35,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
738,948.91 |
|
824,477.90 |
|
911,650.37 |
|
|
|