DBE GOAL FED
Lead Project: 080-02-0029
Parish: LAFAYETTE
Routes: US 167
Description: JCT LA 3073 - JCT US 90 (NB RDWY)
Type Const: grading, class ii base, drain struct, cold planing asph pvmt, pvmt patch, stress
absorbing membrane, superpave acp, camera detection system and related work
 
RankLicenseBidderAmount
104089 H & S CONSTRUCTION CO., INC. $4,489,561.17
212487 DIAMOND B CONSTRUCTION CO., L.L.C. $5,518,398.81
 
Item Number Item Description Quantity Unit of Measure - 1 -
H & S CONSTRUCTION CO., INC.
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      LUMP 3,000.00 3,000.00 20,000.00 20,000.00        
202-01 removal of structures and obstructions lump      LUMP 15,000.00 15,000.00 6,000.00 6,000.00        
202-02-C removal of portland cement concrete pavement 89      SQYD 15.50 1,379.50 9.60 854.40        
202-02-D removal of concrete walks & drives 1,716      SQYD 8.00 13,728.00 12.00 20,592.00        
202-02-E removal of concrete curbs 1,344.0    LNFT 3.00 4,032.00 9.60 12,902.40        
203-06 excavation and embankment lump      LUMP 13,000.00 13,000.00 15,900.00 15,900.00        
203-08 borrow(vehicular measuerment) 1,944      CUYD 14.00 27,216.00 19.76 38,413.44        
302-02-A class ii base course (6" thick) 4,876.7    SQYD 20.00 97,534.00 11.20 54,619.04        
401-02 aggregate surface course (adjusted vehicular
measurement)
2,631      CUYD 25.00 65,775.00 48.60 127,866.60        
402-01 traffic maintenance aggregate (vehicular measurement) 103.7    CUYD 52.00 5,392.40 39.65 4,111.70        
502-01 superpave asphaltic concrete 1,496.5    TON 50.00 74,825.00 65.00 97,272.50        
502-01-A superpave asphaltic concrete, paved drives and
turnouts
4,277.3    TON 80.00 342,184.00 85.00 363,570.50        
508-01 asphalt concrete (sma) wearing course 24,682.9    TON 58.00 1,431,608.20 85.00 2,098,046.50        
509-01 cold planing asphaltic pavement 209,751      SQYD 2.25 471,939.75 1.29 270,578.79        
509-02 contractor retained reclaimed asphaltic pavement - 6,307      CUYD 0.01 - 63.07 0.10 - 630.70        
602-01 cleaning and filling existing longitudinal pavement
joints
2,081      LNFT 18.00 37,458.00 4.00 8,324.00        
701-03-F storm drain pipe (15" rcp/pcp) 18      LNFT 48.00 864.00 72.00 1,296.00        
701-03-G storm drain pipe (18" rcp/pcp) 121      LNFT 60.00 7,260.00 84.00 10,164.00        
701-03-I storm drain pipe (24" rcp/pcp) 905      LNFT 72.00 65,160.00 96.00 86,880.00        
701-03-M storm drain pipe (36" rcp/pcp) 504      LNFT 90.00 45,360.00 132.00 66,528.00        
701-03-N storm drain pipe (42" rcp/pcp) 84      LNFT 120.00 10,080.00 168.00 14,112.00        
701-03-P storm drain pipe (54" rcp/pcp) 776      LNFT 170.00 131,920.00 228.00 176,928.00        
702-02-A manholes (mh-06) 2      EACH 2,998.00 5,996.00 3,480.00 6,960.00        
702-03-A catch basins (cb-01) 30      EACH 3,795.00 113,850.00 3,960.00 118,800.00        
702-03-C catch basins (cb-06) 2      EACH 3,910.00 7,820.00 4,080.00 8,160.00        
702-04-A adjusting manholes 11      EACH 300.00 3,300.00 1,200.00 13,200.00        
702-04-D adjusting valve boxes 1      EACH 175.00 175.00 780.00 780.00        
706-01-C concrete walk (6" thick) 672.0    SQYD 36.00 24,192.00 50.00 33,600.00        
707-01 concrete curb 1,008.0    LNFT 12.00 12,096.00 9.60 9,676.80        
707-03 combination concrete curb & gutter 1,010.4    LNFT 20.00 20,208.00 20.40 20,612.16        
713-01 temporary signs & barricades lump      LUMP 105,000.00 105,000.00 230,975.00 230,975.00        
713-03-B temporary pavement markings (6" width) 9,502      LNFT 0.30 2,850.60 0.30 2,850.60        
713-03-C temporary pavement markings (8" width) 7,938      LNFT 0.36 2,857.68 0.36 2,857.68        
713-03-D temporary pavement markings (12" width) 6,212      LNFT 0.60 3,727.20 0.60 3,727.20        
713-03-E temporary pavement markings (24" width) 4,406      LNFT 1.20 5,287.20 1.20 5,287.20        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
56.004  MILE 540.00 30,242.16 420.00 23,521.68        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
31.242  MILE 288.00 8,997.69 288.00 8,997.69        
713-05-A temporary pavement markings (solid line)(4" width) 32.036  MILE 576.00 18,452.73 576.00 18,452.73        
713-06-A temporary pavement legends and symbols (arrow) 292      EACH 60.00 17,520.00 60.00 17,520.00        
713-06-B temporary pavement legends and symbols (double arrow) 2      EACH 84.00 168.00 84.00 168.00        
713-06-C temporary pavement legends and symbols (only) 46      EACH 65.00 2,990.00 64.80 2,980.80        
713-06-D temporary pavement legends and symbols (rr crossing) 8      EACH 264.00 2,112.00 264.00 2,112.00        
724-01-A pavement patching (6" minimum thickness) 2,255      SQYD 60.00 135,300.00 55.00 124,025.00        
724-01-B pavement patching (12" minimum thickness) 877      SQYD 70.00 61,390.00 75.00 65,775.00        
724-02 pavement widening 2,160.0    SQYD 65.00 140,400.00 50.00 108,000.00        
726-01 bedding material 150.0    CUYD 35.00 5,250.00 65.00 9,750.00        
727-01 mobilization lump      LUMP 100,000.00 100,000.00 300,000.00 300,000.00        
731-02 reflectorized raised pavement markers 1,499      EACH 6.25 9,368.75 6.24 9,353.76        
732-02-A plastic pavement striping (solid line) (4" width) 16.018  MILE 2,667.00 42,720.00 2,629.00 42,111.32        
732-02-B plastic pavement striping (solid line) (6" width) 0.900  MILE 3,406.00 3,065.40 3,410.00 3,069.00        
732-02-C plastic pavement striping (solid line) (8" width) 0.752  MILE 4,521.00 3,399.79 4,525.00 3,402.80        
732-02-D plastic pavement striping (solid line) (12" width) 0.588  MILE 6,823.50 4,012.21 6,827.00 4,014.27        
732-02-E plastic pavement striping (solid line) (24" width) 0.213  MILE 13,409.00 2,856.11 13,417.00 2,857.82        
732-03-A plastic pavement striping (broken line)(4" width) 15.621  MILE 911.00 14,230.73 912.00 14,246.35        
732-03-E plastic pavement striping (broken line)(24" width) 0.204  MILE 5,362.00 1,093.84 5,365.00 1,094.46        
732-04-A plastic pavement legends & symbols (arrow) 146      EACH 162.00 23,652.00 162.00 23,652.00        
732-04-B plastic pavement legends & symbols (double arrow) 1      EACH 234.00 234.00 234.00 234.00        
732-04-C plastic pavement legends & symbols (only) 23      EACH 174.00 4,002.00 174.00 4,002.00        
732-04-D plastic pavement legends & symbols (rr crossing) 4      EACH 527.00 2,108.00 528.00 2,112.00        
732-05 removal of existing markings 0.129  MILE 5,076.00 654.80 5,080.00 655.32        
735-01 mailboxes 1      EACH 60.00 60.00 35.00 35.00        
735-02 mailbox supports (single) 1      EACH 240.00 240.00 244.00 244.00        
740-01 construction layout lump      LUMP 25,000.00 25,000.00 133,500.00 133,500.00        
S-001 paveprep standard stress absorbing membrane (18" width) 54,542      SQFT 4.25 231,803.50 4.00 218,168.00        
S-002 variable message sign unit 2      EACH 22,327.00 44,654.00 22,000.00 44,000.00        
S-005 autoscope solo pro 50      EACH 6,428.00 321,400.00 6,050.00 302,500.00        
S-006 4 channel communication interface panel 10      EACH 1,841.00 18,410.00 1,840.00 18,400.00        
S-007 autoscope cable 14,700      LNFT 1.98 29,106.00 3.04 44,688.00        
S-008 autoscope mini hub ii w/enclosure, power supply, &
harness
10      EACH 1,265.50 12,655.00 1,294.00 12,940.00        
                       
 CONTRACTOR TOTAL       4,489,561.17   5,518,398.81        