| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - W. E. MCDONALD & SON, LLC. |
- 2 - PRAIRIE CONTRACTORS INC. |
- 3 - R. E. HEIDT CONSTRUCTION CO., INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
962   |
LNFT |
3.00 |
2,886.00 |
3.00 |
2,886.00 |
10.00 |
9,620.00 |
|
|
| 203-01 |
general excavation
|
6,232   |
CUYD |
8.00 |
49,856.00 |
6.50 |
40,508.00 |
6.36 |
39,635.52 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
2,395   |
CUYD |
3.00 |
7,185.00 |
12.00 |
28,740.00 |
10.60 |
25,387.00 |
|
|
| 302-02-B |
class ii base course (8 1/2" thick)
|
26,387.9 |
SQYD |
15.25 |
402,415.47 |
15.10 |
398,457.29 |
15.90 |
419,567.61 |
|
|
| 302-02-E |
class ii base course (4" thick)
|
47,591.8 |
SQYD |
8.75 |
416,428.25 |
9.05 |
430,705.79 |
9.55 |
454,501.69 |
|
|
| 304-01 |
lime
|
137.30 |
TON |
110.00 |
15,103.00 |
115.00 |
15,789.50 |
117.00 |
16,064.10 |
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
9,686   |
SQYD |
3.00 |
29,058.00 |
3.20 |
30,995.20 |
3.20 |
30,995.20 |
|
|
| 305-01-D |
subgrade layer (12" thick)
|
17,165   |
SQYD |
5.00 |
85,825.00 |
5.10 |
87,541.50 |
5.30 |
90,974.50 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
578   |
CUYD |
25.00 |
14,450.00 |
26.00 |
15,028.00 |
36.80 |
21,270.40 |
|
|
| 502-01 |
superpave asphaltic concrete
|
11,824.8 |
TON |
44.00 |
520,291.20 |
43.50 |
514,378.80 |
51.50 |
608,977.20 |
|
|
| 502-01-A |
superpave asphaltic concrete (paved drives and
turnouts) |
124.4 |
TON |
75.00 |
9,330.00 |
70.00 |
8,708.00 |
70.00 |
8,708.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
46,880   |
SQYD |
1.25 |
58,600.00 |
1.35 |
63,288.00 |
1.30 |
60,944.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,604   |
CUYD |
0.01 |
- 26.04 |
0.01 |
- 26.04 |
1.00 |
- 2,604.00 |
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
200.0 |
LNFT |
49.00 |
9,800.00 |
74.00 |
14,800.00 |
52.00 |
10,400.00 |
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
146.0 |
LNFT |
0.01 |
1.46 |
15.00 |
2,190.00 |
0.01 |
1.46 |
|
|
| 704-03 |
blocked out guard rail
|
1,531.3 |
LNFT |
13.50 |
20,672.55 |
14.00 |
21,438.20 |
14.35 |
21,974.15 |
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
100.0 |
LNFT |
31.50 |
3,150.00 |
32.00 |
3,200.00 |
33.40 |
3,340.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
35.50 |
7,100.00 |
37.00 |
7,400.00 |
37.65 |
7,530.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
14   |
EACH |
1,500.00 |
21,000.00 |
1,600.00 |
22,400.00 |
1,600.00 |
22,400.00 |
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
2   |
EACH |
1,750.00 |
3,500.00 |
2,000.00 |
4,000.00 |
1,850.00 |
3,700.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
15,000.00 |
15,000.00 |
11,000.00 |
11,000.00 |
12,000.00 |
12,000.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
4.982 |
MILE |
250.00 |
1,245.50 |
2,040.00 |
10,163.28 |
250.00 |
1,245.50 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
4.982 |
MILE |
240.00 |
1,195.68 |
1.00 |
4.98 |
215.00 |
1,071.13 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
19.824 |
MILE |
480.00 |
9,515.52 |
1.00 |
19.82 |
100.00 |
1,982.40 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
52,000.00 |
52,000.00 |
117,000.00 |
117,000.00 |
41,000.00 |
41,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
16   |
EACH |
65.00 |
1,040.00 |
70.00 |
1,120.00 |
69.00 |
1,104.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
426   |
EACH |
4.90 |
2,087.40 |
4.00 |
1,704.00 |
4.25 |
1,810.50 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
9.912 |
MILE |
1,600.00 |
15,859.20 |
1,600.00 |
15,859.20 |
1,700.00 |
16,850.40 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.491 |
MILE |
600.00 |
1,494.60 |
600.00 |
1,494.60 |
640.00 |
1,594.24 |
|
|
| 735-01 |
mailboxes
|
9   |
EACH |
1.00 |
9.00 |
1.00 |
9.00 |
1.05 |
9.45 |
|
|
| 735-02 |
mailbox supports (single)
|
9   |
EACH |
150.00 |
1,350.00 |
160.00 |
1,440.00 |
160.00 |
1,440.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
12,500.00 |
12,500.00 |
12,500.00 |
12,500.00 |
14,500.00 |
14,500.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,789,922.79 |
|
1,884,743.12 |
|
1,947,994.45 |
|
|
|