Letting of 4/28/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 031-09-0041
Parish: BEAUREGARD
Routes: LA 27
Description: LM 4.65 - LM 7.87
Type Const: grading, cold planing asphaltic concrete pavement, subgrade layer, lime treatment,
class ii base course, superpave asphaltic concrete pavement and related work
 
RankLicenseBidderAmount
108815 W. E. MCDONALD & SON, LLC. $1,789,922.79
234356 PRAIRIE CONTRACTORS INC. $1,884,743.12
300183 R. E. HEIDT CONSTRUCTION CO., INC. $1,947,994.45
 
Item Number Item Description Quantity Unit of Measure - 1 -
W. E. MCDONALD & SON, LLC.
- 2 -
PRAIRIE CONTRACTORS INC.
- 3 -
R. E. HEIDT CONSTRUCTION CO., INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 962      LNFT 3.00 2,886.00 3.00 2,886.00 10.00 9,620.00    
203-01 general excavation 6,232      CUYD 8.00 49,856.00 6.50 40,508.00 6.36 39,635.52    
203-08 borrow (vehicular measurement) 2,395      CUYD 3.00 7,185.00 12.00 28,740.00 10.60 25,387.00    
302-02-B class ii base course (8 1/2" thick) 26,387.9    SQYD 15.25 402,415.47 15.10 398,457.29 15.90 419,567.61    
302-02-E class ii base course (4" thick) 47,591.8    SQYD 8.75 416,428.25 9.05 430,705.79 9.55 454,501.69    
304-01 lime 137.30   TON 110.00 15,103.00 115.00 15,789.50 117.00 16,064.10    
304-04-D lime treatment (type d) (12" thick) 9,686      SQYD 3.00 29,058.00 3.20 30,995.20 3.20 30,995.20    
305-01-D subgrade layer (12" thick) 17,165      SQYD 5.00 85,825.00 5.10 87,541.50 5.30 90,974.50    
401-02 aggregate surface course (adjusted vehicular
measurement)
578      CUYD 25.00 14,450.00 26.00 15,028.00 36.80 21,270.40    
502-01 superpave asphaltic concrete 11,824.8    TON 44.00 520,291.20 43.50 514,378.80 51.50 608,977.20    
502-01-A superpave asphaltic concrete (paved drives and
turnouts)
124.4    TON 75.00 9,330.00 70.00 8,708.00 70.00 8,708.00    
509-01 cold planing asphaltic pavement 46,880      SQYD 1.25 58,600.00 1.35 63,288.00 1.30 60,944.00    
509-02 contractor retained reclaimed asphaltic pavement - 2,604      CUYD 0.01 - 26.04 0.01 - 26.04 1.00 - 2,604.00    
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 200.0    LNFT 49.00 9,800.00 74.00 14,800.00 52.00 10,400.00    
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 146.0    LNFT 0.01 1.46 15.00 2,190.00 0.01 1.46    
704-03 blocked out guard rail 1,531.3    LNFT 13.50 20,672.55 14.00 21,438.20 14.35 21,974.15    
704-07-A guard rail bridge attachments (single thrie beam) 100.0    LNFT 31.50 3,150.00 32.00 3,200.00 33.40 3,340.00    
704-08-B guard rail transitions (double thrie beam) 200.0    LNFT 35.50 7,100.00 37.00 7,400.00 37.65 7,530.00    
704-11-A guard rail end treatment (flared) 14      EACH 1,500.00 21,000.00 1,600.00 22,400.00 1,600.00 22,400.00    
704-11-B guard rail end treatment (tangent) 2      EACH 1,750.00 3,500.00 2,000.00 4,000.00 1,850.00 3,700.00    
713-01 temporary signs & barricades lump      LUMP 15,000.00 15,000.00 11,000.00 11,000.00 12,000.00 12,000.00    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
4.982  MILE 250.00 1,245.50 2,040.00 10,163.28 250.00 1,245.50    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
4.982  MILE 240.00 1,195.68 1.00 4.98 215.00 1,071.13    
713-05-A temporary pavement markings (solid line)(4" width) 19.824  MILE 480.00 9,515.52 1.00 19.82 100.00 1,982.40    
727-01 mobilization lump      LUMP 52,000.00 52,000.00 117,000.00 117,000.00 41,000.00 41,000.00    
729-16-C object marker assembly (type 3) 16      EACH 65.00 1,040.00 70.00 1,120.00 69.00 1,104.00    
731-02 reflectorized raised pavement markers 426      EACH 4.90 2,087.40 4.00 1,704.00 4.25 1,810.50    
732-02-A plastic pavement striping (solid line) (4" width) 9.912  MILE 1,600.00 15,859.20 1,600.00 15,859.20 1,700.00 16,850.40    
732-03-A plastic pavement striping (broken line)(4" width) 2.491  MILE 600.00 1,494.60 600.00 1,494.60 640.00 1,594.24    
735-01 mailboxes 9      EACH 1.00 9.00 1.00 9.00 1.05 9.45    
735-02 mailbox supports (single) 9      EACH 150.00 1,350.00 160.00 1,440.00 160.00 1,440.00    
740-01 construction layout lump      LUMP 12,500.00 12,500.00 12,500.00 12,500.00 14,500.00 14,500.00    
                       
 CONTRACTOR TOTAL       1,789,922.79   1,884,743.12   1,947,994.45    