| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - JAMES CONSTRUCTION GROUP LLC |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
- 4 - DENTON-JAMES LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
245,000.00 |
245,000.00 |
10,500.00 |
10,500.00 |
50,000.00 |
50,000.00 |
720,000.00 |
720,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
60,000.00 |
60,000.00 |
63,000.00 |
63,000.00 |
20,000.00 |
20,000.00 |
50,000.00 |
50,000.00 |
| 202-02-B-01 |
removal of concrete box culverts (sta. 44+692; 914mm x
610mm x 18.37 m) |
1   |
ea |
1,000.00 |
1,000.00 |
2,100.00 |
2,100.00 |
2,000.00 |
2,000.00 |
2,000.00 |
2,000.00 |
| 202-02-B-02 |
removal of concrete box culverts (sta. 45+033; 610mm x
610mm x 17.10 m) |
1   |
ea |
1,000.00 |
1,000.00 |
2,100.00 |
2,100.00 |
2,000.00 |
2,000.00 |
2,000.00 |
2,000.00 |
| 202-02-B-03 |
removal of concrete box culverts (sta. 45+843; 457mm x
910mm x 18.38 m) |
1   |
ea |
1,000.00 |
1,000.00 |
2,100.00 |
2,100.00 |
2,000.00 |
2,000.00 |
2,000.00 |
2,000.00 |
| 202-02-B-04 |
removal of concrete box culverts (sta. 46+561; 610mm x
910mm x 20.94 m) |
1   |
ea |
1,000.00 |
1,000.00 |
2,100.00 |
2,100.00 |
2,000.00 |
2,000.00 |
2,000.00 |
2,000.00 |
| 202-02-B-05 |
removal of concrete box culverts (sta. 47+126; 610mm x
910mm x 23.50 m) |
1   |
ea |
1,000.00 |
1,000.00 |
2,100.00 |
2,100.00 |
2,000.00 |
2,000.00 |
3,000.00 |
3,000.00 |
| 202-02-B-06 |
removal of concrete box culverts (sta. 47+522; 610mm x
610mm x 16.15 m) |
1   |
ea |
1,000.00 |
1,000.00 |
2,100.00 |
2,100.00 |
2,000.00 |
2,000.00 |
2,000.00 |
2,000.00 |
| 202-02-B-07 |
removal of concrete box culverts (sta. 48+220; 610mm x
610mm x 7.87 m) |
1   |
ea |
500.00 |
500.00 |
2,100.00 |
2,100.00 |
2,000.00 |
2,000.00 |
2,000.00 |
2,000.00 |
| 202-02-B-08 |
removal of concrete box culverts (sta. 48+232; 610mm x
610mm x 18.29 m) |
1   |
ea |
500.00 |
500.00 |
2,100.00 |
2,100.00 |
2,000.00 |
2,000.00 |
2,000.00 |
2,000.00 |
| 202-02-B-09 |
removal of concrete box culverts (sta. 48+512; 610mm x
914mm x 21.64 m) |
1   |
ea |
500.00 |
500.00 |
2,100.00 |
2,100.00 |
2,000.00 |
2,000.00 |
2,000.00 |
2,000.00 |
| 202-02-B-10 |
removal of concrete box culverts (sta. 49+464; 610mm x
914mm x 28.35 m) |
1   |
ea |
1,000.00 |
1,000.00 |
2,100.00 |
2,100.00 |
2,000.00 |
2,000.00 |
3,000.00 |
3,000.00 |
| 202-02-C |
removal of portland cement concrete pavement
|
55,996   |
sq m |
2.50 |
139,990.00 |
4.62 |
258,701.52 |
3.35 |
187,586.60 |
4.20 |
235,183.20 |
| 202-02-D |
removal of concrete walks & drives
|
717   |
sq m |
6.00 |
4,302.00 |
11.55 |
8,281.35 |
7.00 |
5,019.00 |
10.00 |
7,170.00 |
| 202-02-E |
removal of concrete curbs
|
235.0 |
ln m |
15.00 |
3,525.00 |
9.45 |
2,220.75 |
10.00 |
2,350.00 |
9.00 |
2,115.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
38,984.4 |
sq m |
2.00 |
77,968.80 |
2.07 |
80,697.70 |
2.75 |
107,207.10 |
2.40 |
93,562.56 |
| 202-02-H |
removal of guard rail
|
693   |
ln m |
10.00 |
6,930.00 |
3.15 |
2,182.95 |
12.00 |
8,316.00 |
6.00 |
4,158.00 |
| 202-02-I |
removal of asphaltic concrete pavement (thickness
varies 50mm-220mm) |
55,855   |
sq m |
2.00 |
111,710.00 |
1.53 |
85,458.15 |
1.30 |
72,611.50 |
1.50 |
83,782.50 |
| 202-02-J |
removal of 8m x 16m brick house on slab (sta.
47+632 lt.) |
1   |
each |
4,000.00 |
4,000.00 |
3,570.00 |
3,570.00 |
3,500.00 |
3,500.00 |
4,000.00 |
4,000.00 |
| 202-02-K |
removal of 8m x 11m wood house on piers (sta.
45+911 lt.) |
1   |
each |
1,000.00 |
1,000.00 |
6,300.00 |
6,300.00 |
2,000.00 |
2,000.00 |
6,000.00 |
6,000.00 |
| 203-01 |
general excavation
|
496,518   |
cu m |
3.30 |
1,638,509.40 |
4.20 |
2,085,375.60 |
3.24 |
1,608,718.32 |
3.30 |
1,638,509.40 |
| 203-04 |
embankment
|
357,398   |
cu m |
2.90 |
1,036,454.20 |
3.89 |
1,390,278.22 |
4.00 |
1,429,592.00 |
3.00 |
1,072,194.00 |
| 203-05-A |
nonplastic embankment (stone)
|
2,353   |
cu m |
75.00 |
176,475.00 |
68.25 |
160,592.25 |
80.00 |
188,240.00 |
80.00 |
188,240.00 |
| 204-02 |
temporary hay or straw bales
|
100   |
ea |
6.00 |
600.00 |
5.25 |
525.00 |
15.00 |
1,500.00 |
5.00 |
500.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
15   |
ea |
110.00 |
1,650.00 |
105.00 |
1,575.00 |
225.00 |
3,375.00 |
100.00 |
1,500.00 |
| 204-05-B |
temporary sediment check dams (stone)
|
10   |
ea |
350.00 |
3,500.00 |
315.00 |
3,150.00 |
350.00 |
3,500.00 |
600.00 |
6,000.00 |
| 204-06 |
temporary silt fencing
|
4,300   |
ln m |
4.00 |
17,200.00 |
3.15 |
13,545.00 |
7.00 |
30,100.00 |
3.00 |
12,900.00 |
| 204-07 |
temporary stone construction entrance
|
2   |
ea |
1,000.00 |
2,000.00 |
1,575.00 |
3,150.00 |
2,000.00 |
4,000.00 |
1,500.00 |
3,000.00 |
| 302-01 |
class ii base course (stone or recycled pccp)
|
29,576.5 |
cu m |
55.00 |
1,626,707.50 |
70.87 |
2,096,086.55 |
80.00 |
2,366,120.00 |
62.00 |
1,833,743.00 |
| 304-01 |
lime
|
1,134.00 |
Mg |
110.00 |
124,740.00 |
1.00 |
1,134.00 |
115.00 |
130,410.00 |
100.00 |
113,400.00 |
| 304-04 |
lime treatment (type d) (300 mm thick)
|
75,000   |
sq m |
1.20 |
90,000.00 |
1.05 |
78,750.00 |
1.00 |
75,000.00 |
1.60 |
120,000.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
313   |
cu m |
100.00 |
31,300.00 |
23.96 |
7,499.48 |
60.00 |
18,780.00 |
65.00 |
20,345.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
3,000.0 |
cu m |
45.00 |
135,000.00 |
5.97 |
17,910.00 |
35.00 |
105,000.00 |
55.00 |
165,000.00 |
| 509-01 |
cold planing asphaltic concrete pavement (50mm) thick
|
1,949   |
sq m |
3.50 |
6,821.50 |
4.49 |
8,751.01 |
3.00 |
5,847.00 |
2.50 |
4,872.50 |
| 701-01-G |
cross drain pipe (450 mm rcp/pcp)
|
156.0 |
ln m |
300.00 |
46,800.00 |
157.50 |
24,570.00 |
100.00 |
15,600.00 |
150.00 |
23,400.00 |
| 701-01-I |
cross drain pipe (600 mm rcp/pcp)
|
47.5 |
ln m |
400.00 |
19,000.00 |
199.50 |
9,476.25 |
135.00 |
6,412.50 |
190.00 |
9,025.00 |
| 701-01-K |
cross drain pipe (750 mm rcp/pcp)
|
124.0 |
ln m |
430.00 |
53,320.00 |
241.50 |
29,946.00 |
200.00 |
24,800.00 |
230.00 |
28,520.00 |
| 701-01-M |
cross drain pipe (900 mm rcp/pcp)
|
284.0 |
ln m |
450.00 |
127,800.00 |
273.00 |
77,532.00 |
225.00 |
63,900.00 |
260.00 |
73,840.00 |
| 701-01-N |
cross drain pipe (1050 mm rcp/pcp)
|
49.0 |
ln m |
500.00 |
24,500.00 |
399.00 |
19,551.00 |
330.00 |
16,170.00 |
380.00 |
18,620.00 |
| 701-01-Q |
cross drain pipe (1500 mm rcp/pcp)
|
72.5 |
ln m |
550.00 |
39,875.00 |
745.50 |
54,048.75 |
565.00 |
40,962.50 |
700.00 |
50,750.00 |
| 701-03-F |
storm drain pipe (375 mm rcp/pcp)
|
5,374.5 |
ln m |
100.00 |
537,450.00 |
126.00 |
677,187.00 |
80.00 |
429,960.00 |
120.00 |
644,940.00 |
| 701-03-G |
storm drain pipe (450 mm rcp/pcp)
|
1,091.0 |
ln m |
115.00 |
125,465.00 |
147.00 |
160,377.00 |
95.00 |
103,645.00 |
140.00 |
152,740.00 |
| 701-03-G-01 |
storm drain pipe (450mm rpvccp or rpecp)(outfall)
|
10.0 |
ln m |
170.00 |
1,700.00 |
189.00 |
1,890.00 |
115.00 |
1,150.00 |
170.00 |
1,700.00 |
| 701-03-I |
storm drain pipe (600 mm rcp/pcp)
|
699.5 |
ln m |
140.00 |
97,930.00 |
194.25 |
135,877.87 |
130.00 |
90,935.00 |
180.00 |
125,910.00 |
| 701-03-K |
storm drain pipe (750 mm rcp/pcp)
|
202.5 |
ln m |
200.00 |
40,500.00 |
241.50 |
48,903.75 |
180.00 |
36,450.00 |
220.00 |
44,550.00 |
| 701-05-G |
side drain pipe (450 mm)
|
109.0 |
ln m |
110.00 |
11,990.00 |
178.50 |
19,456.50 |
100.00 |
10,900.00 |
160.00 |
17,440.00 |
| 701-05-I |
side drain pipe (600 mm)
|
191.5 |
ln m |
120.00 |
22,980.00 |
199.50 |
38,204.25 |
135.00 |
25,852.50 |
180.00 |
34,470.00 |
| 701-05-K |
side drain pipe (750 mm)
|
90.5 |
ln m |
160.00 |
14,480.00 |
252.00 |
22,806.00 |
175.00 |
15,837.50 |
240.00 |
21,720.00 |
| 701-09-A |
fabricating pipe fittings (375 x 375 x 375 mm)
|
1   |
ea |
750.00 |
750.00 |
1,155.00 |
1,155.00 |
1,200.00 |
1,200.00 |
1,000.00 |
1,000.00 |
| 701-09-B |
fabricating pipe fittings (450 x 375 x 450 mm)
|
3   |
ea |
800.00 |
2,400.00 |
1,155.00 |
3,465.00 |
1,250.00 |
3,750.00 |
1,000.00 |
3,000.00 |
| 701-09-C |
fabricating pipe fittings (600 x 375 x 600 mm)
|
4   |
ea |
1,000.00 |
4,000.00 |
1,575.00 |
6,300.00 |
1,500.00 |
6,000.00 |
1,500.00 |
6,000.00 |
| 701-09-D |
fabricating pipe fittings (450mm-30 degree elbow)
|
2   |
ea |
800.00 |
1,600.00 |
1,050.00 |
2,100.00 |
1,200.00 |
2,400.00 |
1,000.00 |
2,000.00 |
| 702-02-F |
manholes (mh-01)
|
2   |
ea |
2,100.00 |
4,200.00 |
5,250.00 |
10,500.00 |
3,000.00 |
6,000.00 |
2,500.00 |
5,000.00 |
| 702-03-A |
catch basins (cb-01)
|
62   |
ea |
2,500.00 |
155,000.00 |
2,835.00 |
175,770.00 |
2,200.00 |
136,400.00 |
2,400.00 |
148,800.00 |
| 702-03-C |
catch basins (cb-06)
|
122   |
ea |
2,300.00 |
280,600.00 |
2,100.00 |
256,200.00 |
3,000.00 |
366,000.00 |
2,800.00 |
341,600.00 |
| 702-03-D |
catch basins (cb-07)
|
87   |
ea |
2,800.00 |
243,600.00 |
1,575.00 |
137,025.00 |
4,000.00 |
348,000.00 |
3,700.00 |
321,900.00 |
| 702-03-F |
catch basins (cb-08)
|
27   |
ea |
5,000.00 |
135,000.00 |
5,250.00 |
141,750.00 |
7,500.00 |
202,500.00 |
5,800.00 |
156,600.00 |
| 703-03 |
perforated pipe underdrains
|
8,375   |
ln m |
20.00 |
167,500.00 |
14.10 |
118,087.50 |
16.50 |
138,187.50 |
18.00 |
150,750.00 |
| 703-04 |
nonperforated pipe underdrains
|
177   |
ln m |
160.00 |
28,320.00 |
32.71 |
5,789.67 |
30.00 |
5,310.00 |
110.00 |
19,470.00 |
| 706-02-C |
concrete drive (150 mm thick)
|
4,686.2 |
sq m |
40.00 |
187,448.00 |
57.75 |
270,628.05 |
37.00 |
173,389.40 |
52.00 |
243,682.40 |
| 708-01 |
right-of-way monument
|
252   |
ea |
200.00 |
50,400.00 |
157.50 |
39,690.00 |
250.00 |
63,000.00 |
100.00 |
25,200.00 |
| 708-02 |
right-of-way monument witness post
|
252   |
ea |
200.00 |
50,400.00 |
157.50 |
39,690.00 |
250.00 |
63,000.00 |
100.00 |
25,200.00 |
| 711-02-C |
riprap (15 kg)
|
17   |
cu m |
150.00 |
2,550.00 |
126.00 |
2,142.00 |
85.00 |
1,445.00 |
100.00 |
1,700.00 |
| 711-04 |
geotextile fabric
|
50   |
sq m |
3.00 |
150.00 |
3.15 |
157.50 |
5.50 |
275.00 |
2.50 |
125.00 |
| 713-01 |
temporary signs & barricades
|
lump |
lump |
50,000.00 |
50,000.00 |
110,538.75 |
110,538.75 |
125,000.00 |
125,000.00 |
110,000.00 |
110,000.00 |
| 713-03-E |
temporary pavement markings (600 mm width)
|
70   |
ln m |
2.00 |
140.00 |
4.15 |
290.50 |
18.00 |
1,260.00 |
2.00 |
140.00 |
| 713-05-A |
temporary pavement markings (solid line)(100 mm width)
|
20.000 |
km |
250.00 |
5,000.00 |
624.75 |
12,495.00 |
550.00 |
11,000.00 |
250.00 |
5,000.00 |
| 713-05-A-01 |
temporary pavement markings (solid line)(100 mm width)
(type 1 removable) |
50.000 |
km |
8,000.00 |
400,000.00 |
3,000.00 |
150,000.00 |
1.00 |
50.00 |
8,000.00 |
400,000.00 |
| 713-07 |
temporary reflectorized raised pavement markers
|
1,568   |
ea |
0.35 |
548.80 |
1.58 |
2,477.44 |
6.00 |
9,408.00 |
2.00 |
3,136.00 |
| 715-01 |
topsoil
|
1,161   |
cu m |
90.00 |
104,490.00 |
23.10 |
26,819.10 |
30.00 |
34,830.00 |
20.00 |
23,220.00 |
| 716-01-A |
mulch (vegetative)
|
30.0 |
hctr |
900.00 |
27,000.00 |
945.00 |
28,350.00 |
950.00 |
28,500.00 |
900.00 |
27,000.00 |
| 717-01 |
seeding
|
1,488   |
kg |
12.00 |
17,856.00 |
12.08 |
17,975.04 |
12.50 |
18,600.00 |
11.50 |
17,112.00 |
| 718-01 |
fertilizer
|
26,454   |
kg |
0.40 |
10,581.60 |
0.41 |
10,846.14 |
0.45 |
11,904.30 |
0.40 |
10,581.60 |
| 720-01-A |
erosion control system, slope protection (type a)
|
24,375   |
sq m |
1.00 |
24,375.00 |
1.05 |
25,593.75 |
1.10 |
26,812.50 |
1.00 |
24,375.00 |
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
1,561   |
sq m |
1.00 |
1,561.00 |
1.05 |
1,639.05 |
1.10 |
1,717.10 |
1.00 |
1,561.00 |
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
12,326   |
sq m |
1.00 |
12,326.00 |
1.05 |
12,942.30 |
1.10 |
13,558.60 |
1.00 |
12,326.00 |
| 722-02 |
project site laboratory (equipped)
|
1   |
ea |
30,000.00 |
30,000.00 |
20,420.59 |
20,420.59 |
24,000.00 |
24,000.00 |
30,000.00 |
30,000.00 |
| 724-02 |
pavement widening (temporary)(310mm thickness)
|
7,665.0 |
sq m |
45.00 |
344,925.00 |
63.14 |
483,968.10 |
42.00 |
321,930.00 |
42.00 |
321,930.00 |
| 725-02 |
temporary detour roads
|
11,585.6 |
sq m |
60.00 |
695,136.00 |
65.60 |
760,015.36 |
56.00 |
648,793.60 |
42.00 |
486,595.20 |
| 726-01 |
bedding material
|
4,032.8 |
cu m |
70.00 |
282,296.00 |
52.50 |
211,722.00 |
50.00 |
201,640.00 |
44.00 |
177,443.20 |
| 727-01 |
mobilization
|
lump |
lump |
1,600,000.00 |
1,600,000.00 |
1,400,000.00 |
1,400,000.00 |
1,600,000.00 |
1,600,000.00 |
1,500,000.00 |
1,500,000.00 |
| 729-19-A |
dead end road installation (type a)
|
1   |
ea |
4,000.00 |
4,000.00 |
6,300.00 |
6,300.00 |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
| 731-02 |
reflectorized raised pavement markers
|
4,032   |
ea |
4.50 |
18,144.00 |
5.46 |
22,014.72 |
8.00 |
32,256.00 |
4.50 |
18,144.00 |
| 732-01-C |
plastic pavement striping (200 mm width)
|
208   |
ln m |
3.00 |
624.00 |
3.10 |
644.80 |
28.00 |
5,824.00 |
2.70 |
561.60 |
| 732-01-E |
plastic pavement striping (600 mm width)
|
485   |
ln m |
8.00 |
3,880.00 |
9.40 |
4,559.00 |
23.00 |
11,155.00 |
8.00 |
3,880.00 |
| 732-02-A |
plastic pavement striping (solid line)(100 mm width)
|
29.425 |
km |
1,000.00 |
29,425.00 |
1,369.20 |
40,288.71 |
3,500.00 |
102,987.50 |
1,200.00 |
35,310.00 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
100   |
ea |
125.00 |
12,500.00 |
162.75 |
16,275.00 |
350.00 |
35,000.00 |
130.00 |
13,000.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
5   |
ea |
150.00 |
750.00 |
183.75 |
918.75 |
300.00 |
1,500.00 |
150.00 |
750.00 |
| 735-01 |
mailboxes
|
75   |
ea |
5.00 |
375.00 |
15.75 |
1,181.25 |
60.00 |
4,500.00 |
1.00 |
75.00 |
| 735-02 |
mailbox supports (single)
|
75   |
ea |
130.00 |
9,750.00 |
157.50 |
11,812.50 |
180.00 |
13,500.00 |
110.00 |
8,250.00 |
| 740-01 |
construction layout
|
lump |
lump |
180,000.00 |
180,000.00 |
157,500.00 |
157,500.00 |
220,000.00 |
220,000.00 |
200,000.00 |
200,000.00 |
| 741-09 |
adjusting water house connections
|
20   |
ea |
150.00 |
3,000.00 |
210.00 |
4,200.00 |
350.00 |
7,000.00 |
500.00 |
10,000.00 |
| 741-10 |
adjusting water service lines
|
400   |
ln m |
50.00 |
20,000.00 |
31.50 |
12,600.00 |
40.00 |
16,000.00 |
70.00 |
28,000.00 |
| 742-02 |
adjusting sanitary sewer house connections
|
20   |
ea |
300.00 |
6,000.00 |
525.00 |
10,500.00 |
500.00 |
10,000.00 |
600.00 |
12,000.00 |
| 742-03 |
adjusting sanitary sewer service lines
|
400   |
ln m |
50.00 |
20,000.00 |
42.00 |
16,800.00 |
45.00 |
18,000.00 |
80.00 |
32,000.00 |
| S-001 |
plugging existing waterwells
|
2   |
ea |
1,500.00 |
3,000.00 |
5,250.00 |
10,500.00 |
6,000.00 |
12,000.00 |
500.00 |
1,000.00 |
| | SUBTOTAL GENERAL |
|
|
|
11,949,274.80 |
|
12,532,698.47 |
|
12,421,931.02 |
|
12,626,218.16 |
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
alternate typical sections
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
portland cement concrete pavement
|
|
|
|
|
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
1,765.2 |
Mg |
87.00 |
153,572.40 |
0.00 |
0.00 |
0.00 |
0.00 |
95.00 |
167,694.00 |
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
1,525.6 |
Mg |
87.00 |
132,727.20 |
0.00 |
0.00 |
0.00 |
0.00 |
95.00 |
144,932.00 |
| 601-01-G |
portland cement concrete pavement (200 mm thick)
|
128,419.3 |
sq m |
34.00 |
4,366,256.20 |
0.00 |
0.00 |
0.00 |
0.00 |
33.00 |
4,237,836.90 |
| 601-02-G |
portland cement concrete pavement (200 mm thick)
(crossovers & turnouts) |
4,065.4 |
sq m |
48.00 |
195,139.20 |
0.00 |
0.00 |
0.00 |
0.00 |
45.00 |
182,943.00 |
| 601-04 |
portland cement concrete pavement coring
|
265   |
ea |
150.00 |
39,750.00 |
0.00 |
0.00 |
0.00 |
0.00 |
100.00 |
26,500.00 |
| 707-01 |
concrete curb
|
9,225.8 |
ln m |
8.00 |
73,806.40 |
0.00 |
0.00 |
0.00 |
0.00 |
13.00 |
119,935.40 |
| 732-03-A-01 |
plastic pvmt striping(broken line)(100mmwidth)
preformed marking tape(type v |
21.508 |
km |
2,850.00 |
61,297.80 |
0.00 |
0.00 |
0.00 |
0.00 |
2,900.00 |
62,373.20 |
| | SUBTOTAL ALT A1 |
|
|
|
5,022,549.20 |
|
|
|
|
|
4,942,214.50 |
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A2 |
superpave asphaltic concrete pavement
|
|
|
|
|
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
61,872.8 |
Mg |
0.00 |
0.00 |
53.56 |
3,313,907.16 |
60.00 |
3,712,368.00 |
0.00 |
0.00 |
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
3,307.0 |
Mg |
0.00 |
0.00 |
69.83 |
230,927.81 |
60.00 |
198,420.00 |
0.00 |
0.00 |
| 707-03 |
combination concrete curb & gutter
|
9,225.8 |
ln m |
0.00 |
0.00 |
68.25 |
629,660.85 |
42.00 |
387,483.60 |
0.00 |
0.00 |
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
21.508 |
km |
0.00 |
0.00 |
472.50 |
10,162.53 |
65.00 |
1,398.02 |
0.00 |
0.00 |
| | SUBTOTAL ALT A2 |
|
|
|
|
|
4,184,658.35 |
|
4,299,669.62 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
16,971,824.00 |
|
16,717,356.82 |
|
16,721,600.64 |
|
17,568,432.66 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - HIGHWAY SPECIALISTS INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
500,000.00 |
500,000.00 |
|
|
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
100,000.00 |
100,000.00 |
|
|
|
|
|
|
| 202-02-B-01 |
removal of concrete box culverts (sta. 44+692; 914mm x
610mm x 18.37 m) |
1   |
ea |
2,500.00 |
2,500.00 |
|
|
|
|
|
|
| 202-02-B-02 |
removal of concrete box culverts (sta. 45+033; 610mm x
610mm x 17.10 m) |
1   |
ea |
2,500.00 |
2,500.00 |
|
|
|
|
|
|
| 202-02-B-03 |
removal of concrete box culverts (sta. 45+843; 457mm x
910mm x 18.38 m) |
1   |
ea |
2,500.00 |
2,500.00 |
|
|
|
|
|
|
| 202-02-B-04 |
removal of concrete box culverts (sta. 46+561; 610mm x
910mm x 20.94 m) |
1   |
ea |
2,500.00 |
2,500.00 |
|
|
|
|
|
|
| 202-02-B-05 |
removal of concrete box culverts (sta. 47+126; 610mm x
910mm x 23.50 m) |
1   |
ea |
2,500.00 |
2,500.00 |
|
|
|
|
|
|
| 202-02-B-06 |
removal of concrete box culverts (sta. 47+522; 610mm x
610mm x 16.15 m) |
1   |
ea |
2,500.00 |
2,500.00 |
|
|
|
|
|
|
| 202-02-B-07 |
removal of concrete box culverts (sta. 48+220; 610mm x
610mm x 7.87 m) |
1   |
ea |
2,500.00 |
2,500.00 |
|
|
|
|
|
|
| 202-02-B-08 |
removal of concrete box culverts (sta. 48+232; 610mm x
610mm x 18.29 m) |
1   |
ea |
2,500.00 |
2,500.00 |
|
|
|
|
|
|
| 202-02-B-09 |
removal of concrete box culverts (sta. 48+512; 610mm x
914mm x 21.64 m) |
1   |
ea |
2,500.00 |
2,500.00 |
|
|
|
|
|
|
| 202-02-B-10 |
removal of concrete box culverts (sta. 49+464; 610mm x
914mm x 28.35 m) |
1   |
ea |
2,500.00 |
2,500.00 |
|
|
|
|
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
55,996   |
sq m |
1.50 |
83,994.00 |
|
|
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
717   |
sq m |
6.00 |
4,302.00 |
|
|
|
|
|
|
| 202-02-E |
removal of concrete curbs
|
235.0 |
ln m |
18.00 |
4,230.00 |
|
|
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
38,984.4 |
sq m |
0.50 |
19,492.20 |
|
|
|
|
|
|
| 202-02-H |
removal of guard rail
|
693   |
ln m |
9.00 |
6,237.00 |
|
|
|
|
|
|
| 202-02-I |
removal of asphaltic concrete pavement (thickness
varies 50mm-220mm) |
55,855   |
sq m |
0.50 |
27,927.50 |
|
|
|
|
|
|
| 202-02-J |
removal of 8m x 16m brick house on slab (sta.
47+632 lt.) |
1   |
each |
3,500.00 |
3,500.00 |
|
|
|
|
|
|
| 202-02-K |
removal of 8m x 11m wood house on piers (sta.
45+911 lt.) |
1   |
each |
3,500.00 |
3,500.00 |
|
|
|
|
|
|
| 203-01 |
general excavation
|
496,518   |
cu m |
5.05 |
2,507,415.90 |
|
|
|
|
|
|
| 203-04 |
embankment
|
357,398   |
cu m |
5.60 |
2,001,428.80 |
|
|
|
|
|
|
| 203-05-A |
nonplastic embankment (stone)
|
2,353   |
cu m |
90.00 |
211,770.00 |
|
|
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
100   |
ea |
5.00 |
500.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
15   |
ea |
100.00 |
1,500.00 |
|
|
|
|
|
|
| 204-05-B |
temporary sediment check dams (stone)
|
10   |
ea |
350.00 |
3,500.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
4,300   |
ln m |
3.00 |
12,900.00 |
|
|
|
|
|
|
| 204-07 |
temporary stone construction entrance
|
2   |
ea |
3,000.00 |
6,000.00 |
|
|
|
|
|
|
| 302-01 |
class ii base course (stone or recycled pccp)
|
29,576.5 |
cu m |
70.00 |
2,070,355.00 |
|
|
|
|
|
|
| 304-01 |
lime
|
1,134.00 |
Mg |
115.00 |
130,410.00 |
|
|
|
|
|
|
| 304-04 |
lime treatment (type d) (300 mm thick)
|
75,000   |
sq m |
1.50 |
112,500.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
313   |
cu m |
20.00 |
6,260.00 |
|
|
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
3,000.0 |
cu m |
60.00 |
180,000.00 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic concrete pavement (50mm) thick
|
1,949   |
sq m |
15.00 |
29,235.00 |
|
|
|
|
|
|
| 701-01-G |
cross drain pipe (450 mm rcp/pcp)
|
156.0 |
ln m |
140.00 |
21,840.00 |
|
|
|
|
|
|
| 701-01-I |
cross drain pipe (600 mm rcp/pcp)
|
47.5 |
ln m |
230.00 |
10,925.00 |
|
|
|
|
|
|
| 701-01-K |
cross drain pipe (750 mm rcp/pcp)
|
124.0 |
ln m |
240.00 |
29,760.00 |
|
|
|
|
|
|
| 701-01-M |
cross drain pipe (900 mm rcp/pcp)
|
284.0 |
ln m |
260.00 |
73,840.00 |
|
|
|
|
|
|
| 701-01-N |
cross drain pipe (1050 mm rcp/pcp)
|
49.0 |
ln m |
350.00 |
17,150.00 |
|
|
|
|
|
|
| 701-01-Q |
cross drain pipe (1500 mm rcp/pcp)
|
72.5 |
ln m |
550.00 |
39,875.00 |
|
|
|
|
|
|
| 701-03-F |
storm drain pipe (375 mm rcp/pcp)
|
5,374.5 |
ln m |
100.00 |
537,450.00 |
|
|
|
|
|
|
| 701-03-G |
storm drain pipe (450 mm rcp/pcp)
|
1,091.0 |
ln m |
110.00 |
120,010.00 |
|
|
|
|
|
|
| 701-03-G-01 |
storm drain pipe (450mm rpvccp or rpecp)(outfall)
|
10.0 |
ln m |
195.00 |
1,950.00 |
|
|
|
|
|
|
| 701-03-I |
storm drain pipe (600 mm rcp/pcp)
|
699.5 |
ln m |
130.00 |
90,935.00 |
|
|
|
|
|
|
| 701-03-K |
storm drain pipe (750 mm rcp/pcp)
|
202.5 |
ln m |
175.00 |
35,437.50 |
|
|
|
|
|
|
| 701-05-G |
side drain pipe (450 mm)
|
109.0 |
ln m |
85.00 |
9,265.00 |
|
|
|
|
|
|
| 701-05-I |
side drain pipe (600 mm)
|
191.5 |
ln m |
105.00 |
20,107.50 |
|
|
|
|
|
|
| 701-05-K |
side drain pipe (750 mm)
|
90.5 |
ln m |
150.00 |
13,575.00 |
|
|
|
|
|
|
| 701-09-A |
fabricating pipe fittings (375 x 375 x 375 mm)
|
1   |
ea |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 701-09-B |
fabricating pipe fittings (450 x 375 x 450 mm)
|
3   |
ea |
900.00 |
2,700.00 |
|
|
|
|
|
|
| 701-09-C |
fabricating pipe fittings (600 x 375 x 600 mm)
|
4   |
ea |
1,200.00 |
4,800.00 |
|
|
|
|
|
|
| 701-09-D |
fabricating pipe fittings (450mm-30 degree elbow)
|
2   |
ea |
900.00 |
1,800.00 |
|
|
|
|
|
|
| 702-02-F |
manholes (mh-01)
|
2   |
ea |
2,800.00 |
5,600.00 |
|
|
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
62   |
ea |
2,200.00 |
136,400.00 |
|
|
|
|
|
|
| 702-03-C |
catch basins (cb-06)
|
122   |
ea |
2,500.00 |
305,000.00 |
|
|
|
|
|
|
| 702-03-D |
catch basins (cb-07)
|
87   |
ea |
3,300.00 |
287,100.00 |
|
|
|
|
|
|
| 702-03-F |
catch basins (cb-08)
|
27   |
ea |
6,200.00 |
167,400.00 |
|
|
|
|
|
|
| 703-03 |
perforated pipe underdrains
|
8,375   |
ln m |
12.00 |
100,500.00 |
|
|
|
|
|
|
| 703-04 |
nonperforated pipe underdrains
|
177   |
ln m |
30.00 |
5,310.00 |
|
|
|
|
|
|
| 706-02-C |
concrete drive (150 mm thick)
|
4,686.2 |
sq m |
40.00 |
187,448.00 |
|
|
|
|
|
|
| 708-01 |
right-of-way monument
|
252   |
ea |
100.00 |
25,200.00 |
|
|
|
|
|
|
| 708-02 |
right-of-way monument witness post
|
252   |
ea |
85.00 |
21,420.00 |
|
|
|
|
|
|
| 711-02-C |
riprap (15 kg)
|
17   |
cu m |
250.00 |
4,250.00 |
|
|
|
|
|
|
| 711-04 |
geotextile fabric
|
50   |
sq m |
1.00 |
50.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
800,000.00 |
800,000.00 |
|
|
|
|
|
|
| 713-03-E |
temporary pavement markings (600 mm width)
|
70   |
ln m |
15.00 |
1,050.00 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(100 mm width)
|
20.000 |
km |
1,500.00 |
30,000.00 |
|
|
|
|
|
|
| 713-05-A-01 |
temporary pavement markings (solid line)(100 mm width)
(type 1 removable) |
50.000 |
km |
1,450.00 |
72,500.00 |
|
|
|
|
|
|
| 713-07 |
temporary reflectorized raised pavement markers
|
1,568   |
ea |
5.50 |
8,624.00 |
|
|
|
|
|
|
| 715-01 |
topsoil
|
1,161   |
cu m |
20.00 |
23,220.00 |
|
|
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
30.0 |
hctr |
900.00 |
27,000.00 |
|
|
|
|
|
|
| 717-01 |
seeding
|
1,488   |
kg |
11.50 |
17,112.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
26,454   |
kg |
0.39 |
10,317.06 |
|
|
|
|
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
24,375   |
sq m |
1.00 |
24,375.00 |
|
|
|
|
|
|
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
1,561   |
sq m |
1.00 |
1,561.00 |
|
|
|
|
|
|
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
12,326   |
sq m |
1.00 |
12,326.00 |
|
|
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
ea |
17,500.00 |
17,500.00 |
|
|
|
|
|
|
| 724-02 |
pavement widening (temporary)(310mm thickness)
|
7,665.0 |
sq m |
36.00 |
275,940.00 |
|
|
|
|
|
|
| 725-02 |
temporary detour roads
|
11,585.6 |
sq m |
36.00 |
417,081.60 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
4,032.8 |
cu m |
70.00 |
282,296.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
lump |
1,800,000.00 |
1,800,000.00 |
|
|
|
|
|
|
| 729-19-A |
dead end road installation (type a)
|
1   |
ea |
4,250.00 |
4,250.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
4,032   |
ea |
6.75 |
27,216.00 |
|
|
|
|
|
|
| 732-01-C |
plastic pavement striping (200 mm width)
|
208   |
ln m |
25.00 |
5,200.00 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (600 mm width)
|
485   |
ln m |
20.00 |
9,700.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line)(100 mm width)
|
29.425 |
km |
3,475.00 |
102,251.87 |
|
|
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
100   |
ea |
350.00 |
35,000.00 |
|
|
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
5   |
ea |
350.00 |
1,750.00 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
75   |
ea |
5.00 |
375.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
75   |
ea |
130.00 |
9,750.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
lump |
300,000.00 |
300,000.00 |
|
|
|
|
|
|
| 741-09 |
adjusting water house connections
|
20   |
ea |
1,150.00 |
23,000.00 |
|
|
|
|
|
|
| 741-10 |
adjusting water service lines
|
400   |
ln m |
75.00 |
30,000.00 |
|
|
|
|
|
|
| 742-02 |
adjusting sanitary sewer house connections
|
20   |
ea |
500.00 |
10,000.00 |
|
|
|
|
|
|
| 742-03 |
adjusting sanitary sewer service lines
|
400   |
ln m |
55.00 |
22,000.00 |
|
|
|
|
|
|
| S-001 |
plugging existing waterwells
|
2   |
ea |
3,500.00 |
7,000.00 |
|
|
|
|
|
|
| | SUBTOTAL GENERAL |
|
|
|
14,738,450.93 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
alternate typical sections
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
portland cement concrete pavement
|
|
|
|
|
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
1,765.2 |
Mg |
0.00 |
0.00 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
1,525.6 |
Mg |
0.00 |
0.00 |
|
|
|
|
|
|
| 601-01-G |
portland cement concrete pavement (200 mm thick)
|
128,419.3 |
sq m |
0.00 |
0.00 |
|
|
|
|
|
|
| 601-02-G |
portland cement concrete pavement (200 mm thick)
(crossovers & turnouts) |
4,065.4 |
sq m |
0.00 |
0.00 |
|
|
|
|
|
|
| 601-04 |
portland cement concrete pavement coring
|
265   |
ea |
0.00 |
0.00 |
|
|
|
|
|
|
| 707-01 |
concrete curb
|
9,225.8 |
ln m |
0.00 |
0.00 |
|
|
|
|
|
|
| 732-03-A-01 |
plastic pvmt striping(broken line)(100mmwidth)
preformed marking tape(type v |
21.508 |
km |
0.00 |
0.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A2 |
superpave asphaltic concrete pavement
|
|
|
|
|
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
61,872.8 |
Mg |
54.85 |
3,393,723.08 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
3,307.0 |
Mg |
54.85 |
181,388.95 |
|
|
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
9,225.8 |
ln m |
42.65 |
393,480.37 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
21.508 |
km |
1,350.00 |
29,035.80 |
|
|
|
|
|
|
| | SUBTOTAL ALT A2 |
|
|
|
3,997,628.20 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
18,736,079.13 |
|
|
|
|
|
|
|