Letting of 4/28/2004 LA DOTD Headquarters


REBID
go back
Go Back
 
Lead Project: 023-10-0034
Parish: LINCOLN
Routes: US 167
Description: RUSTON - VIENNA
Type Const: grading, drainage structures, class ii base course, lime treatment, pvmt widening,
superpave acp (alternate a1 & a2), portland cement conc. pvmt. (alternate a1) and related work.
 
RankLicenseBidderAmount
134567 JAMES CONSTRUCTION GROUP LLC $16,971,824.00
212487 DIAMOND B CONSTRUCTION CO., L.L.C. $16,717,356.82
312312 GILCHRIST CONSTRUCTION CO. LLC $16,721,600.64
439462 DENTON-JAMES LLC $17,568,432.66
521810 HIGHWAY SPECIALISTS INC. $18,736,079.13
 
Item Number Item Description Quantity Unit of Measure - 1 -
JAMES CONSTRUCTION GROUP LLC
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 3 -
GILCHRIST CONSTRUCTION CO. LLC
- 4 -
DENTON-JAMES LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 245,000.00 245,000.00 10,500.00 10,500.00 50,000.00 50,000.00 720,000.00 720,000.00
202-01 removal of structures & obstructions lump      lump 60,000.00 60,000.00 63,000.00 63,000.00 20,000.00 20,000.00 50,000.00 50,000.00
202-02-B-01 removal of concrete box culverts (sta. 44+692; 914mm x
610mm x 18.37 m)
1      ea 1,000.00 1,000.00 2,100.00 2,100.00 2,000.00 2,000.00 2,000.00 2,000.00
202-02-B-02 removal of concrete box culverts (sta. 45+033; 610mm x
610mm x 17.10 m)
1      ea 1,000.00 1,000.00 2,100.00 2,100.00 2,000.00 2,000.00 2,000.00 2,000.00
202-02-B-03 removal of concrete box culverts (sta. 45+843; 457mm x
910mm x 18.38 m)
1      ea 1,000.00 1,000.00 2,100.00 2,100.00 2,000.00 2,000.00 2,000.00 2,000.00
202-02-B-04 removal of concrete box culverts (sta. 46+561; 610mm x
910mm x 20.94 m)
1      ea 1,000.00 1,000.00 2,100.00 2,100.00 2,000.00 2,000.00 2,000.00 2,000.00
202-02-B-05 removal of concrete box culverts (sta. 47+126; 610mm x
910mm x 23.50 m)
1      ea 1,000.00 1,000.00 2,100.00 2,100.00 2,000.00 2,000.00 3,000.00 3,000.00
202-02-B-06 removal of concrete box culverts (sta. 47+522; 610mm x
610mm x 16.15 m)
1      ea 1,000.00 1,000.00 2,100.00 2,100.00 2,000.00 2,000.00 2,000.00 2,000.00
202-02-B-07 removal of concrete box culverts (sta. 48+220; 610mm x
610mm x 7.87 m)
1      ea 500.00 500.00 2,100.00 2,100.00 2,000.00 2,000.00 2,000.00 2,000.00
202-02-B-08 removal of concrete box culverts (sta. 48+232; 610mm x
610mm x 18.29 m)
1      ea 500.00 500.00 2,100.00 2,100.00 2,000.00 2,000.00 2,000.00 2,000.00
202-02-B-09 removal of concrete box culverts (sta. 48+512; 610mm x
914mm x 21.64 m)
1      ea 500.00 500.00 2,100.00 2,100.00 2,000.00 2,000.00 2,000.00 2,000.00
202-02-B-10 removal of concrete box culverts (sta. 49+464; 610mm x
914mm x 28.35 m)
1      ea 1,000.00 1,000.00 2,100.00 2,100.00 2,000.00 2,000.00 3,000.00 3,000.00
202-02-C removal of portland cement concrete pavement 55,996      sq m 2.50 139,990.00 4.62 258,701.52 3.35 187,586.60 4.20 235,183.20
202-02-D removal of concrete walks & drives 717      sq m 6.00 4,302.00 11.55 8,281.35 7.00 5,019.00 10.00 7,170.00
202-02-E removal of concrete curbs 235.0    ln m 15.00 3,525.00 9.45 2,220.75 10.00 2,350.00 9.00 2,115.00
202-02-G removal of surfacing & stabilized base 38,984.4    sq m 2.00 77,968.80 2.07 80,697.70 2.75 107,207.10 2.40 93,562.56
202-02-H removal of guard rail 693      ln m 10.00 6,930.00 3.15 2,182.95 12.00 8,316.00 6.00 4,158.00
202-02-I removal of asphaltic concrete pavement (thickness
varies 50mm-220mm)
55,855      sq m 2.00 111,710.00 1.53 85,458.15 1.30 72,611.50 1.50 83,782.50
202-02-J removal of 8m x 16m brick house on slab (sta.
47+632 lt.)
1      each 4,000.00 4,000.00 3,570.00 3,570.00 3,500.00 3,500.00 4,000.00 4,000.00
202-02-K removal of 8m x 11m wood house on piers (sta.
45+911 lt.)
1      each 1,000.00 1,000.00 6,300.00 6,300.00 2,000.00 2,000.00 6,000.00 6,000.00
203-01 general excavation 496,518      cu m 3.30 1,638,509.40 4.20 2,085,375.60 3.24 1,608,718.32 3.30 1,638,509.40
203-04 embankment 357,398      cu m 2.90 1,036,454.20 3.89 1,390,278.22 4.00 1,429,592.00 3.00 1,072,194.00
203-05-A nonplastic embankment (stone) 2,353      cu m 75.00 176,475.00 68.25 160,592.25 80.00 188,240.00 80.00 188,240.00
204-02 temporary hay or straw bales 100      ea 6.00 600.00 5.25 525.00 15.00 1,500.00 5.00 500.00
204-05-A temporary sediment check dams (hay) 15      ea 110.00 1,650.00 105.00 1,575.00 225.00 3,375.00 100.00 1,500.00
204-05-B temporary sediment check dams (stone) 10      ea 350.00 3,500.00 315.00 3,150.00 350.00 3,500.00 600.00 6,000.00
204-06 temporary silt fencing 4,300      ln m 4.00 17,200.00 3.15 13,545.00 7.00 30,100.00 3.00 12,900.00
204-07 temporary stone construction entrance 2      ea 1,000.00 2,000.00 1,575.00 3,150.00 2,000.00 4,000.00 1,500.00 3,000.00
302-01 class ii base course (stone or recycled pccp) 29,576.5    cu m 55.00 1,626,707.50 70.87 2,096,086.55 80.00 2,366,120.00 62.00 1,833,743.00
304-01 lime 1,134.00   Mg 110.00 124,740.00 1.00 1,134.00 115.00 130,410.00 100.00 113,400.00
304-04 lime treatment (type d) (300 mm thick) 75,000      sq m 1.20 90,000.00 1.05 78,750.00 1.00 75,000.00 1.60 120,000.00
401-02 aggregate surface course (adjusted vehicular
measurement)
313      cu m 100.00 31,300.00 23.96 7,499.48 60.00 18,780.00 65.00 20,345.00
402-01 traffic maintenance aggregate (vehicular measurement) 3,000.0    cu m 45.00 135,000.00 5.97 17,910.00 35.00 105,000.00 55.00 165,000.00
509-01 cold planing asphaltic concrete pavement (50mm) thick 1,949      sq m 3.50 6,821.50 4.49 8,751.01 3.00 5,847.00 2.50 4,872.50
701-01-G cross drain pipe (450 mm rcp/pcp) 156.0    ln m 300.00 46,800.00 157.50 24,570.00 100.00 15,600.00 150.00 23,400.00
701-01-I cross drain pipe (600 mm rcp/pcp) 47.5    ln m 400.00 19,000.00 199.50 9,476.25 135.00 6,412.50 190.00 9,025.00
701-01-K cross drain pipe (750 mm rcp/pcp) 124.0    ln m 430.00 53,320.00 241.50 29,946.00 200.00 24,800.00 230.00 28,520.00
701-01-M cross drain pipe (900 mm rcp/pcp) 284.0    ln m 450.00 127,800.00 273.00 77,532.00 225.00 63,900.00 260.00 73,840.00
701-01-N cross drain pipe (1050 mm rcp/pcp) 49.0    ln m 500.00 24,500.00 399.00 19,551.00 330.00 16,170.00 380.00 18,620.00
701-01-Q cross drain pipe (1500 mm rcp/pcp) 72.5    ln m 550.00 39,875.00 745.50 54,048.75 565.00 40,962.50 700.00 50,750.00
701-03-F storm drain pipe (375 mm rcp/pcp) 5,374.5    ln m 100.00 537,450.00 126.00 677,187.00 80.00 429,960.00 120.00 644,940.00
701-03-G storm drain pipe (450 mm rcp/pcp) 1,091.0    ln m 115.00 125,465.00 147.00 160,377.00 95.00 103,645.00 140.00 152,740.00
701-03-G-01 storm drain pipe (450mm rpvccp or rpecp)(outfall) 10.0    ln m 170.00 1,700.00 189.00 1,890.00 115.00 1,150.00 170.00 1,700.00
701-03-I storm drain pipe (600 mm rcp/pcp) 699.5    ln m 140.00 97,930.00 194.25 135,877.87 130.00 90,935.00 180.00 125,910.00
701-03-K storm drain pipe (750 mm rcp/pcp) 202.5    ln m 200.00 40,500.00 241.50 48,903.75 180.00 36,450.00 220.00 44,550.00
701-05-G side drain pipe (450 mm) 109.0    ln m 110.00 11,990.00 178.50 19,456.50 100.00 10,900.00 160.00 17,440.00
701-05-I side drain pipe (600 mm) 191.5    ln m 120.00 22,980.00 199.50 38,204.25 135.00 25,852.50 180.00 34,470.00
701-05-K side drain pipe (750 mm) 90.5    ln m 160.00 14,480.00 252.00 22,806.00 175.00 15,837.50 240.00 21,720.00
701-09-A fabricating pipe fittings (375 x 375 x 375 mm) 1      ea 750.00 750.00 1,155.00 1,155.00 1,200.00 1,200.00 1,000.00 1,000.00
701-09-B fabricating pipe fittings (450 x 375 x 450 mm) 3      ea 800.00 2,400.00 1,155.00 3,465.00 1,250.00 3,750.00 1,000.00 3,000.00
701-09-C fabricating pipe fittings (600 x 375 x 600 mm) 4      ea 1,000.00 4,000.00 1,575.00 6,300.00 1,500.00 6,000.00 1,500.00 6,000.00
701-09-D fabricating pipe fittings (450mm-30 degree elbow) 2      ea 800.00 1,600.00 1,050.00 2,100.00 1,200.00 2,400.00 1,000.00 2,000.00
702-02-F manholes (mh-01) 2      ea 2,100.00 4,200.00 5,250.00 10,500.00 3,000.00 6,000.00 2,500.00 5,000.00
702-03-A catch basins (cb-01) 62      ea 2,500.00 155,000.00 2,835.00 175,770.00 2,200.00 136,400.00 2,400.00 148,800.00
702-03-C catch basins (cb-06) 122      ea 2,300.00 280,600.00 2,100.00 256,200.00 3,000.00 366,000.00 2,800.00 341,600.00
702-03-D catch basins (cb-07) 87      ea 2,800.00 243,600.00 1,575.00 137,025.00 4,000.00 348,000.00 3,700.00 321,900.00
702-03-F catch basins (cb-08) 27      ea 5,000.00 135,000.00 5,250.00 141,750.00 7,500.00 202,500.00 5,800.00 156,600.00
703-03 perforated pipe underdrains 8,375      ln m 20.00 167,500.00 14.10 118,087.50 16.50 138,187.50 18.00 150,750.00
703-04 nonperforated pipe underdrains 177      ln m 160.00 28,320.00 32.71 5,789.67 30.00 5,310.00 110.00 19,470.00
706-02-C concrete drive (150 mm thick) 4,686.2    sq m 40.00 187,448.00 57.75 270,628.05 37.00 173,389.40 52.00 243,682.40
708-01 right-of-way monument 252      ea 200.00 50,400.00 157.50 39,690.00 250.00 63,000.00 100.00 25,200.00
708-02 right-of-way monument witness post 252      ea 200.00 50,400.00 157.50 39,690.00 250.00 63,000.00 100.00 25,200.00
711-02-C riprap (15 kg) 17      cu m 150.00 2,550.00 126.00 2,142.00 85.00 1,445.00 100.00 1,700.00
711-04 geotextile fabric 50      sq m 3.00 150.00 3.15 157.50 5.50 275.00 2.50 125.00
713-01 temporary signs & barricades lump      lump 50,000.00 50,000.00 110,538.75 110,538.75 125,000.00 125,000.00 110,000.00 110,000.00
713-03-E temporary pavement markings (600 mm width) 70      ln m 2.00 140.00 4.15 290.50 18.00 1,260.00 2.00 140.00
713-05-A temporary pavement markings (solid line)(100 mm width) 20.000  km 250.00 5,000.00 624.75 12,495.00 550.00 11,000.00 250.00 5,000.00
713-05-A-01 temporary pavement markings (solid line)(100 mm width)
(type 1 removable)
50.000  km 8,000.00 400,000.00 3,000.00 150,000.00 1.00 50.00 8,000.00 400,000.00
713-07 temporary reflectorized raised pavement markers 1,568      ea 0.35 548.80 1.58 2,477.44 6.00 9,408.00 2.00 3,136.00
715-01 topsoil 1,161      cu m 90.00 104,490.00 23.10 26,819.10 30.00 34,830.00 20.00 23,220.00
716-01-A mulch (vegetative) 30.0    hctr 900.00 27,000.00 945.00 28,350.00 950.00 28,500.00 900.00 27,000.00
717-01 seeding 1,488      kg 12.00 17,856.00 12.08 17,975.04 12.50 18,600.00 11.50 17,112.00
718-01 fertilizer 26,454      kg 0.40 10,581.60 0.41 10,846.14 0.45 11,904.30 0.40 10,581.60
720-01-A erosion control system, slope protection (type a) 24,375      sq m 1.00 24,375.00 1.05 25,593.75 1.10 26,812.50 1.00 24,375.00
720-01-C erosion control system, flexible channel liner (type c) 1,561      sq m 1.00 1,561.00 1.05 1,639.05 1.10 1,717.10 1.00 1,561.00
720-01-D erosion control system, flexible channel liner (type d) 12,326      sq m 1.00 12,326.00 1.05 12,942.30 1.10 13,558.60 1.00 12,326.00
722-02 project site laboratory (equipped) 1      ea 30,000.00 30,000.00 20,420.59 20,420.59 24,000.00 24,000.00 30,000.00 30,000.00
724-02 pavement widening (temporary)(310mm thickness) 7,665.0    sq m 45.00 344,925.00 63.14 483,968.10 42.00 321,930.00 42.00 321,930.00
725-02 temporary detour roads 11,585.6    sq m 60.00 695,136.00 65.60 760,015.36 56.00 648,793.60 42.00 486,595.20
726-01 bedding material 4,032.8    cu m 70.00 282,296.00 52.50 211,722.00 50.00 201,640.00 44.00 177,443.20
727-01 mobilization lump      lump 1,600,000.00 1,600,000.00 1,400,000.00 1,400,000.00 1,600,000.00 1,600,000.00 1,500,000.00 1,500,000.00
729-19-A dead end road installation (type a) 1      ea 4,000.00 4,000.00 6,300.00 6,300.00 5,000.00 5,000.00 5,000.00 5,000.00
731-02 reflectorized raised pavement markers 4,032      ea 4.50 18,144.00 5.46 22,014.72 8.00 32,256.00 4.50 18,144.00
732-01-C plastic pavement striping (200 mm width) 208      ln m 3.00 624.00 3.10 644.80 28.00 5,824.00 2.70 561.60
732-01-E plastic pavement striping (600 mm width) 485      ln m 8.00 3,880.00 9.40 4,559.00 23.00 11,155.00 8.00 3,880.00
732-02-A plastic pavement striping (solid line)(100 mm width) 29.425  km 1,000.00 29,425.00 1,369.20 40,288.71 3,500.00 102,987.50 1,200.00 35,310.00
732-04-A plastic pavement legends & symbols (arrow) 100      ea 125.00 12,500.00 162.75 16,275.00 350.00 35,000.00 130.00 13,000.00
732-04-C plastic pavement legends & symbols (only) 5      ea 150.00 750.00 183.75 918.75 300.00 1,500.00 150.00 750.00
735-01 mailboxes 75      ea 5.00 375.00 15.75 1,181.25 60.00 4,500.00 1.00 75.00
735-02 mailbox supports (single) 75      ea 130.00 9,750.00 157.50 11,812.50 180.00 13,500.00 110.00 8,250.00
740-01 construction layout lump      lump 180,000.00 180,000.00 157,500.00 157,500.00 220,000.00 220,000.00 200,000.00 200,000.00
741-09 adjusting water house connections 20      ea 150.00 3,000.00 210.00 4,200.00 350.00 7,000.00 500.00 10,000.00
741-10 adjusting water service lines 400      ln m 50.00 20,000.00 31.50 12,600.00 40.00 16,000.00 70.00 28,000.00
742-02 adjusting sanitary sewer house connections 20      ea 300.00 6,000.00 525.00 10,500.00 500.00 10,000.00 600.00 12,000.00
742-03 adjusting sanitary sewer service lines 400      ln m 50.00 20,000.00 42.00 16,800.00 45.00 18,000.00 80.00 32,000.00
S-001 plugging existing waterwells 2      ea 1,500.00 3,000.00 5,250.00 10,500.00 6,000.00 12,000.00 500.00 1,000.00
 SUBTOTAL GENERAL       11,949,274.80   12,532,698.47   12,421,931.02   12,626,218.16
                       
ALTERNATE A alternate typical sections                    
                       
ALTERNATE A1 portland cement concrete pavement                    
502-01 superpave asphaltic concrete 1,765.2    Mg 87.00 153,572.40 0.00 0.00 0.00 0.00 95.00 167,694.00
502-01-A superpave asphaltic concrete, paved drives and
turnouts
1,525.6    Mg 87.00 132,727.20 0.00 0.00 0.00 0.00 95.00 144,932.00
601-01-G portland cement concrete pavement (200 mm thick) 128,419.3    sq m 34.00 4,366,256.20 0.00 0.00 0.00 0.00 33.00 4,237,836.90
601-02-G portland cement concrete pavement (200 mm thick)
(crossovers & turnouts)
4,065.4    sq m 48.00 195,139.20 0.00 0.00 0.00 0.00 45.00 182,943.00
601-04 portland cement concrete pavement coring 265      ea 150.00 39,750.00 0.00 0.00 0.00 0.00 100.00 26,500.00
707-01 concrete curb 9,225.8    ln m 8.00 73,806.40 0.00 0.00 0.00 0.00 13.00 119,935.40
732-03-A-01 plastic pvmt striping(broken line)(100mmwidth)
preformed marking tape(type v
21.508  km 2,850.00 61,297.80 0.00 0.00 0.00 0.00 2,900.00 62,373.20
 SUBTOTAL ALT A1       5,022,549.20           4,942,214.50
                       
ALTERNATE A2 superpave asphaltic concrete pavement                    
502-01 superpave asphaltic concrete 61,872.8    Mg 0.00 0.00 53.56 3,313,907.16 60.00 3,712,368.00 0.00 0.00
502-01-A superpave asphaltic concrete, paved drives and
turnouts
3,307.0    Mg 0.00 0.00 69.83 230,927.81 60.00 198,420.00 0.00 0.00
707-03 combination concrete curb & gutter 9,225.8    ln m 0.00 0.00 68.25 629,660.85 42.00 387,483.60 0.00 0.00
732-03-A plastic pavement striping (broken line)(100 mm width) 21.508  km 0.00 0.00 472.50 10,162.53 65.00 1,398.02 0.00 0.00
 SUBTOTAL ALT A2           4,184,658.35   4,299,669.62    
                       
 CONTRACTOR TOTAL       16,971,824.00   16,717,356.82   16,721,600.64   17,568,432.66
 
Item Number Item Description Quantity Unit of Measure - 5 -
HIGHWAY SPECIALISTS INC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 500,000.00 500,000.00            
202-01 removal of structures & obstructions lump      lump 100,000.00 100,000.00            
202-02-B-01 removal of concrete box culverts (sta. 44+692; 914mm x
610mm x 18.37 m)
1      ea 2,500.00 2,500.00            
202-02-B-02 removal of concrete box culverts (sta. 45+033; 610mm x
610mm x 17.10 m)
1      ea 2,500.00 2,500.00            
202-02-B-03 removal of concrete box culverts (sta. 45+843; 457mm x
910mm x 18.38 m)
1      ea 2,500.00 2,500.00            
202-02-B-04 removal of concrete box culverts (sta. 46+561; 610mm x
910mm x 20.94 m)
1      ea 2,500.00 2,500.00            
202-02-B-05 removal of concrete box culverts (sta. 47+126; 610mm x
910mm x 23.50 m)
1      ea 2,500.00 2,500.00            
202-02-B-06 removal of concrete box culverts (sta. 47+522; 610mm x
610mm x 16.15 m)
1      ea 2,500.00 2,500.00            
202-02-B-07 removal of concrete box culverts (sta. 48+220; 610mm x
610mm x 7.87 m)
1      ea 2,500.00 2,500.00            
202-02-B-08 removal of concrete box culverts (sta. 48+232; 610mm x
610mm x 18.29 m)
1      ea 2,500.00 2,500.00            
202-02-B-09 removal of concrete box culverts (sta. 48+512; 610mm x
914mm x 21.64 m)
1      ea 2,500.00 2,500.00            
202-02-B-10 removal of concrete box culverts (sta. 49+464; 610mm x
914mm x 28.35 m)
1      ea 2,500.00 2,500.00            
202-02-C removal of portland cement concrete pavement 55,996      sq m 1.50 83,994.00            
202-02-D removal of concrete walks & drives 717      sq m 6.00 4,302.00            
202-02-E removal of concrete curbs 235.0    ln m 18.00 4,230.00            
202-02-G removal of surfacing & stabilized base 38,984.4    sq m 0.50 19,492.20            
202-02-H removal of guard rail 693      ln m 9.00 6,237.00            
202-02-I removal of asphaltic concrete pavement (thickness
varies 50mm-220mm)
55,855      sq m 0.50 27,927.50            
202-02-J removal of 8m x 16m brick house on slab (sta.
47+632 lt.)
1      each 3,500.00 3,500.00            
202-02-K removal of 8m x 11m wood house on piers (sta.
45+911 lt.)
1      each 3,500.00 3,500.00            
203-01 general excavation 496,518      cu m 5.05 2,507,415.90            
203-04 embankment 357,398      cu m 5.60 2,001,428.80            
203-05-A nonplastic embankment (stone) 2,353      cu m 90.00 211,770.00            
204-02 temporary hay or straw bales 100      ea 5.00 500.00            
204-05-A temporary sediment check dams (hay) 15      ea 100.00 1,500.00            
204-05-B temporary sediment check dams (stone) 10      ea 350.00 3,500.00            
204-06 temporary silt fencing 4,300      ln m 3.00 12,900.00            
204-07 temporary stone construction entrance 2      ea 3,000.00 6,000.00            
302-01 class ii base course (stone or recycled pccp) 29,576.5    cu m 70.00 2,070,355.00            
304-01 lime 1,134.00   Mg 115.00 130,410.00            
304-04 lime treatment (type d) (300 mm thick) 75,000      sq m 1.50 112,500.00            
401-02 aggregate surface course (adjusted vehicular
measurement)
313      cu m 20.00 6,260.00            
402-01 traffic maintenance aggregate (vehicular measurement) 3,000.0    cu m 60.00 180,000.00            
509-01 cold planing asphaltic concrete pavement (50mm) thick 1,949      sq m 15.00 29,235.00            
701-01-G cross drain pipe (450 mm rcp/pcp) 156.0    ln m 140.00 21,840.00            
701-01-I cross drain pipe (600 mm rcp/pcp) 47.5    ln m 230.00 10,925.00            
701-01-K cross drain pipe (750 mm rcp/pcp) 124.0    ln m 240.00 29,760.00            
701-01-M cross drain pipe (900 mm rcp/pcp) 284.0    ln m 260.00 73,840.00            
701-01-N cross drain pipe (1050 mm rcp/pcp) 49.0    ln m 350.00 17,150.00            
701-01-Q cross drain pipe (1500 mm rcp/pcp) 72.5    ln m 550.00 39,875.00            
701-03-F storm drain pipe (375 mm rcp/pcp) 5,374.5    ln m 100.00 537,450.00            
701-03-G storm drain pipe (450 mm rcp/pcp) 1,091.0    ln m 110.00 120,010.00            
701-03-G-01 storm drain pipe (450mm rpvccp or rpecp)(outfall) 10.0    ln m 195.00 1,950.00            
701-03-I storm drain pipe (600 mm rcp/pcp) 699.5    ln m 130.00 90,935.00            
701-03-K storm drain pipe (750 mm rcp/pcp) 202.5    ln m 175.00 35,437.50            
701-05-G side drain pipe (450 mm) 109.0    ln m 85.00 9,265.00            
701-05-I side drain pipe (600 mm) 191.5    ln m 105.00 20,107.50            
701-05-K side drain pipe (750 mm) 90.5    ln m 150.00 13,575.00            
701-09-A fabricating pipe fittings (375 x 375 x 375 mm) 1      ea 1,000.00 1,000.00            
701-09-B fabricating pipe fittings (450 x 375 x 450 mm) 3      ea 900.00 2,700.00            
701-09-C fabricating pipe fittings (600 x 375 x 600 mm) 4      ea 1,200.00 4,800.00            
701-09-D fabricating pipe fittings (450mm-30 degree elbow) 2      ea 900.00 1,800.00            
702-02-F manholes (mh-01) 2      ea 2,800.00 5,600.00            
702-03-A catch basins (cb-01) 62      ea 2,200.00 136,400.00            
702-03-C catch basins (cb-06) 122      ea 2,500.00 305,000.00            
702-03-D catch basins (cb-07) 87      ea 3,300.00 287,100.00            
702-03-F catch basins (cb-08) 27      ea 6,200.00 167,400.00            
703-03 perforated pipe underdrains 8,375      ln m 12.00 100,500.00            
703-04 nonperforated pipe underdrains 177      ln m 30.00 5,310.00            
706-02-C concrete drive (150 mm thick) 4,686.2    sq m 40.00 187,448.00            
708-01 right-of-way monument 252      ea 100.00 25,200.00            
708-02 right-of-way monument witness post 252      ea 85.00 21,420.00            
711-02-C riprap (15 kg) 17      cu m 250.00 4,250.00            
711-04 geotextile fabric 50      sq m 1.00 50.00            
713-01 temporary signs & barricades lump      lump 800,000.00 800,000.00            
713-03-E temporary pavement markings (600 mm width) 70      ln m 15.00 1,050.00            
713-05-A temporary pavement markings (solid line)(100 mm width) 20.000  km 1,500.00 30,000.00            
713-05-A-01 temporary pavement markings (solid line)(100 mm width)
(type 1 removable)
50.000  km 1,450.00 72,500.00            
713-07 temporary reflectorized raised pavement markers 1,568      ea 5.50 8,624.00            
715-01 topsoil 1,161      cu m 20.00 23,220.00            
716-01-A mulch (vegetative) 30.0    hctr 900.00 27,000.00            
717-01 seeding 1,488      kg 11.50 17,112.00            
718-01 fertilizer 26,454      kg 0.39 10,317.06            
720-01-A erosion control system, slope protection (type a) 24,375      sq m 1.00 24,375.00            
720-01-C erosion control system, flexible channel liner (type c) 1,561      sq m 1.00 1,561.00            
720-01-D erosion control system, flexible channel liner (type d) 12,326      sq m 1.00 12,326.00            
722-02 project site laboratory (equipped) 1      ea 17,500.00 17,500.00            
724-02 pavement widening (temporary)(310mm thickness) 7,665.0    sq m 36.00 275,940.00            
725-02 temporary detour roads 11,585.6    sq m 36.00 417,081.60            
726-01 bedding material 4,032.8    cu m 70.00 282,296.00            
727-01 mobilization lump      lump 1,800,000.00 1,800,000.00            
729-19-A dead end road installation (type a) 1      ea 4,250.00 4,250.00            
731-02 reflectorized raised pavement markers 4,032      ea 6.75 27,216.00            
732-01-C plastic pavement striping (200 mm width) 208      ln m 25.00 5,200.00            
732-01-E plastic pavement striping (600 mm width) 485      ln m 20.00 9,700.00            
732-02-A plastic pavement striping (solid line)(100 mm width) 29.425  km 3,475.00 102,251.87            
732-04-A plastic pavement legends & symbols (arrow) 100      ea 350.00 35,000.00            
732-04-C plastic pavement legends & symbols (only) 5      ea 350.00 1,750.00            
735-01 mailboxes 75      ea 5.00 375.00            
735-02 mailbox supports (single) 75      ea 130.00 9,750.00            
740-01 construction layout lump      lump 300,000.00 300,000.00            
741-09 adjusting water house connections 20      ea 1,150.00 23,000.00            
741-10 adjusting water service lines 400      ln m 75.00 30,000.00            
742-02 adjusting sanitary sewer house connections 20      ea 500.00 10,000.00            
742-03 adjusting sanitary sewer service lines 400      ln m 55.00 22,000.00            
S-001 plugging existing waterwells 2      ea 3,500.00 7,000.00            
 SUBTOTAL GENERAL       14,738,450.93            
                       
ALTERNATE A alternate typical sections                    
                       
ALTERNATE A1 portland cement concrete pavement                    
502-01 superpave asphaltic concrete 1,765.2    Mg 0.00 0.00            
502-01-A superpave asphaltic concrete, paved drives and
turnouts
1,525.6    Mg 0.00 0.00            
601-01-G portland cement concrete pavement (200 mm thick) 128,419.3    sq m 0.00 0.00            
601-02-G portland cement concrete pavement (200 mm thick)
(crossovers & turnouts)
4,065.4    sq m 0.00 0.00            
601-04 portland cement concrete pavement coring 265      ea 0.00 0.00            
707-01 concrete curb 9,225.8    ln m 0.00 0.00            
732-03-A-01 plastic pvmt striping(broken line)(100mmwidth)
preformed marking tape(type v
21.508  km 0.00 0.00            
                       
ALTERNATE A2 superpave asphaltic concrete pavement                    
502-01 superpave asphaltic concrete 61,872.8    Mg 54.85 3,393,723.08            
502-01-A superpave asphaltic concrete, paved drives and
turnouts
3,307.0    Mg 54.85 181,388.95            
707-03 combination concrete curb & gutter 9,225.8    ln m 42.65 393,480.37            
732-03-A plastic pavement striping (broken line)(100 mm width) 21.508  km 1,350.00 29,035.80            
 SUBTOTAL ALT A2       3,997,628.20            
                       
 CONTRACTOR TOTAL       18,736,079.13            