Letting of 4/28/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 020-08-0028
Parish: E CARROLL
Routes: US 65
Description: HOLLYBROOK - DELTA SOUTHERN R/R
Type Const: grading, drainage structures, lime treatment, cold planing asphaltic pavement, superpave
asphaltic concrete pavement, asphaltic surface treatment, and related work.
 
RankLicenseBidderAmount
105789 D & J CONSTRUCTION CO., INC. $2,272,795.98
212487 DIAMOND B CONSTRUCTION CO., L.L.C. $2,594,686.73
 
Item Number Item Description Quantity Unit of Measure - 1 -
D & J CONSTRUCTION CO., INC.
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 1,000.00 1,000.00 1,100.00 1,100.00        
202-02-G removal of surfacing & stabilized base 1,758.2    SQYD 8.00 14,065.60 5.29 9,300.87        
203-06 excavation & embankment lump      LUMP 40,000.00 40,000.00 22,000.00 22,000.00        
203-08 borrow (vehicular measurement) 3,900      CUYD 9.00 35,100.00 10.45 40,755.00        
203-08-A borrow (vehicular meas.)(selected soils) 885      CUYD 11.00 9,735.00 17.71 15,673.35        
304-01 lime 42.20   TON 150.00 6,330.00 116.40 4,912.08        
304-04-D lime treatment (type d) (12" thick) 3,825      SQYD 4.00 15,300.00 6.32 24,174.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
150      CUYD 19.00 2,850.00 27.57 4,135.50        
502-01 superpave asphaltic concrete 16,578.4    TON 58.00 961,547.20 66.85 1,108,266.04        
502-01-A superpave asphaltic concrete, paved drives and
turnouts
326.1    TON 58.00 18,913.80 176.59 57,585.99        
507-01-B asphaltic surface treatment (2 applications) 88,286      SQYD 1.75 154,500.50 2.75 242,786.50        
509-01 cold planing asphaltic pavement 80,711      SQYD 1.00 80,711.00 1.68 135,594.48        
509-02 contractor retained reclaimed asphaltic pavement - 2,934      CUYD 0.01 - 29.34 0.10 - 293.40        
701-10-E reinforced concrete pipe (extension)(12") 6      LNFT 125.00 750.00 132.00 792.00        
701-10-G reinforced concrete pipe (extension)(18") 4      LNFT 205.00 820.00 220.00 880.00        
701-10-I reinforced concrete pipe (extension)(24") 66      LNFT 155.00 10,230.00 165.00 10,890.00        
701-12-G corrugated metal pipe (extension)(18") 22      LNFT 80.00 1,760.00 82.50 1,815.00        
701-12-H corrugated metal pipe (extension)(21") 8      LNFT 84.00 672.00 85.25 682.00        
701-12-I corrugated metal pipe (extension)(24") 20      LNFT 90.00 1,800.00 93.50 1,870.00        
701-15 concrete collar 13      EACH 550.00 7,150.00 572.00 7,436.00        
702-03-A catch basins (cb-01) 1      EACH 2,500.00 2,500.00 2,640.00 2,640.00        
702-07-A cross drain safety end (type 1) 17      EACH 1,500.00 25,500.00 1,551.00 26,367.00        
702-07-B cross drain safety end (type 2) 2      EACH 3,700.00 7,400.00 3,850.00 7,700.00        
702-07-D cross drain safety end (type 4) 4      EACH 7,000.00 28,000.00 7,370.00 29,480.00        
702-08-A side drain safety end (type 1) 96      EACH 1,350.00 129,600.00 1,551.00 148,896.00        
713-01 temporary signs & barricades lump      LUMP 68,000.00 68,000.00 7,510.80 7,510.80        
713-03-C temporary pavement markings (8" width) 150      LNFT 2.00 300.00 0.22 33.00        
713-03-D temporary pavement markings (12" width) 2,594      LNFT 0.80 2,075.20 0.33 856.02        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
11.273  MILE 165.00 1,860.04 330.00 3,720.09        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
9.295  MILE 160.00 1,487.20 330.00 3,067.35        
713-05-A temporary pavement markings (solid line)(4" width) 29.527  MILE 255.00 7,529.38 660.00 19,487.82        
713-06-D temporary pavement legends and symbols (rr crossing) 3      EACH 200.00 600.00 1.65 4.95        
713-07 temporary reflectorized raised pavement markers 1,557      EACH 1.05 1,634.85 0.39 607.23        
716-01-A mulch (vegetative) 7.29   ACRE 325.00 2,369.25 660.00 4,811.40        
717-01 seeding 146      LB 7.00 1,022.00 7.70 1,124.20        
718-01 fertilizer 3,644      LB 0.45 1,639.80 0.28 1,020.32        
724-01-C pavement patching (18" minimum thickness) 1,828      SQYD 85.00 155,380.00 94.78 173,257.84        
724-03 pavement joint repair 1,200.0    TON 80.00 96,000.00 119.58 143,496.00        
726-01 bedding material 576.0    CUYD 67.50 38,880.00 74.25 42,768.00        
727-01 mobilization lump      LUMP 175,000.00 175,000.00 112,500.00 112,500.00        
731-02 reflectorized raised pavement markers 1,557      EACH 6.50 10,120.50 5.23 8,143.11        
732-01-C plastic pavement striping (8" width) 75      LNFT 11.00 825.00 0.88 66.00        
732-01-D plastic pavement striping (12" width) 1,297      LNFT 5.00 6,485.00 2.64 3,424.08        
732-02-A plastic pavement striping (solid line) (4" width) 9.842  MILE 3,250.00 31,986.50 2,057.00 20,244.99        
732-03-A plastic pavement striping (broken line)(4" width) 3.098  MILE 1,250.00 3,872.50 848.00 2,627.10        
732-04-D plastic pavement legends & symbols (rr crossing) 1      EACH 1,000.00 1,000.00 440.00 440.00        
735-01 mailboxes 14      EACH 5.00 70.00 16.00 224.00        
735-02 mailbox supports (single) 14      EACH 130.00 1,820.00 140.00 1,960.00        
740-01 construction layout lump      LUMP 20,000.00 20,000.00 18,000.00 18,000.00        
S-001 rumble strips (ground-in) 7.5    MILE 950.00 7,125.00 715.00 5,362.50        
S-002 cement treated base course 12,232      SQYD 6.50 79,508.00 9.36 114,491.52        
                       
 CONTRACTOR TOTAL       2,272,795.98   2,594,686.73        