Letting of 4/28/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 020-08-0027
Parish: E CARROLL
Routes: US 65
Description: LA 581 - HOLLYBROOK
Type Const: grading,drainage structures, cold planing asphaltic pvmt., asphaltic surface treatment,
superpave asphaltic concrete overlay, pavement patching and related work.
 
RankLicenseBidderAmount
105789 D & J CONSTRUCTION CO., INC. $2,372,997.67
212487 DIAMOND B CONSTRUCTION CO., L.L.C. $2,388,702.84
 
Item Number Item Description Quantity Unit of Measure - 1 -
D & J CONSTRUCTION CO., INC.
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 80,000.00 80,000.00 11,000.00 11,000.00        
202-01 removal of structures & obstructions lump      LUMP 2,200.00 2,200.00 2,420.00 2,420.00        
202-02-H removal of guard rail 528      LNFT 12.00 6,336.00 3.30 1,742.40        
203-08 borrow (vehicular measurement) 4,426      CUYD 9.00 39,834.00 10.45 46,251.70        
203-08-A borrow (vehicular meas.)(selected soils) 1,622      CUYD 9.00 14,598.00 19.04 30,882.88        
401-02 aggregate surface course (adjusted vehicular
measurement)
204      CUYD 25.00 5,100.00 23.55 4,804.20        
502-01 superpave asphaltic concrete 14,114.7    TON 57.25 808,066.57 62.00 875,111.40        
502-01-A superpave asphaltic concrete, paved drives and
turnouts
617.2    TON 57.25 35,334.70 161.76 99,838.27        
507-01-B asphaltic surface treatment (2 applications) 90,578      SQYD 1.60 144,924.80 1.82 164,851.96        
509-01 cold planing asphaltic pavement 85,574      SQYD 1.00 85,574.00 1.30 111,246.20        
509-02 contractor retained reclaimed asphaltic pavement - 3,115      CUYD 0.01 - 31.15 0.10 - 311.50        
701-05-I side drain pipe (24") 8      LNFT 105.00 840.00 110.00 880.00        
701-10-G reinforced concrete pipe (extension)(18") 4      LNFT 205.00 820.00 220.00 880.00        
701-10-I reinforced concrete pipe (extension)(24") 92      LNFT 155.00 14,260.00 165.00 15,180.00        
701-10-M reinforced concrete pipe (extension)(36") 8      LNFT 205.00 1,640.00 220.00 1,760.00        
701-12-I corrugated metal pipe (extension)(24") 20      LNFT 90.00 1,800.00 93.50 1,870.00        
701-12-K corrugated metal pipe (extension)(30") 6      LNFT 120.00 720.00 126.50 759.00        
701-12-M corrugated metal pipe (extension)(36") 24      LNFT 95.00 2,280.00 99.00 2,376.00        
701-15 concrete collar 22      EACH 550.00 12,100.00 572.00 12,584.00        
702-01 junction boxes 1      EACH 1,500.00 1,500.00 1,430.00 1,430.00        
702-03-A catch basins (cb-01) 2      EACH 2,500.00 5,000.00 2,640.00 5,280.00        
702-07-A cross drain safety end (type 1) 5      EACH 1,500.00 7,500.00 1,551.00 7,755.00        
702-07-B cross drain safety end (type 2) 4      EACH 3,800.00 15,200.00 3,850.00 15,400.00        
702-07-C cross drain safety end (type 3) 2      EACH 7,500.00 15,000.00 7,798.00 15,596.00        
702-07-D cross drain safety end (type 4) 8      EACH 8,800.00 70,400.00 9,240.00 73,920.00        
702-08-A side drain safety end (type 1) 82      EACH 1,400.00 114,800.00 1,551.00 127,182.00        
702-08-B side drain safety end (type 2) 10      EACH 3,100.00 31,000.00 3,850.00 38,500.00        
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 156.7    LNFT 25.00 3,917.50 20.90 3,275.03        
704-03 blocked out guard rail 237.5    LNFT 16.00 3,800.00 14.85 3,526.87        
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 40.00 4,000.00 38.50 3,850.00        
704-11-A guard rail end treatment (flared) 4      EACH 1,650.00 6,600.00 1,705.00 6,820.00        
713-01 temporary signs & barricades lump      LUMP 75,000.00 75,000.00 7,150.00 7,150.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
11.648  MILE 160.00 1,863.68 330.06 3,844.53        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
11.635  MILE 155.00 1,803.42 330.14 3,841.17        
713-05-A temporary pavement markings (solid line)(4" width) 24.320  MILE 275.00 6,688.00 660.00 16,051.20        
713-07 temporary reflectorized raised pavement markers 513      EACH 1.05 538.65 1.65 846.45        
716-01-A mulch (vegetative) 3.76   ACRE 600.00 2,256.00 990.00 3,722.40        
717-01 seeding 169      LB 7.00 1,183.00 9.35 1,580.15        
718-01 fertilizer 3,760      LB 0.25 940.00 0.28 1,052.80        
724-01-C pavement patching (18" minimum thickness) 1,983      SQYD 85.00 168,555.00 85.05 168,654.15        
724-01-D pavement patching (8" minimum thickness) 200      SQYD 80.00 16,000.00 52.00 10,400.00        
724-03 pavement joint repair 1,200.0    TON 80.00 96,000.00 125.00 150,000.00        
726-01 bedding material 705.3    CUYD 67.50 47,607.75 74.25 52,368.52        
727-01 mobilization lump      LUMP 212,000.00 212,000.00 90,000.00 90,000.00        
729-16-C object marker assembly (type 3) 4      EACH 65.00 260.00 66.00 264.00        
731-02 reflectorized raised pavement markers 513      EACH 7.00 3,591.00 5.23 2,682.99        
732-02-A plastic pavement striping (solid line) (4" width) 8.107  MILE 3,150.00 25,537.05 2,058.00 16,684.20        
732-03-A plastic pavement striping (broken line)(4" width) 3.878  MILE 900.00 3,490.20 848.00 3,288.54        
735-01 mailboxes 24      EACH 5.00 120.00 14.00 336.00        
735-02 mailbox supports (single) 24      EACH 125.00 3,000.00 135.00 3,240.00        
740-01 construction layout lump      LUMP 15,000.00 15,000.00 6,457.00 6,457.00        
S-001 rumble strips (ground-in) 9.0    MILE 900.00 8,100.00 715.00 6,435.00        
S-002 cement treated base course 22,823      SQYD 6.50 148,349.50 6.71 153,142.33        
                       
 CONTRACTOR TOTAL       2,372,997.67   2,388,702.84        