Letting of 4/28/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 009-03-0027
Parish: GRANT
Routes: US 71
Description: 1.2 MI. S. LA 122 - WINN PH.
Type Const: grading, drainage structures, cement treated base course, cold planing asphaltic
concrete, superpave asphaltic concrete pavement, and related work.
 
RankLicenseBidderAmount
112487 DIAMOND B CONSTRUCTION CO., L.L.C. $876,822.41
208584 MADDEN CONTRACTING CO., INC. $1,004,679.73
312312 GILCHRIST CONSTRUCTION CO. LLC $1,015,836.40
 
Item Number Item Description Quantity Unit of Measure - 1 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 2 -
MADDEN CONTRACTING CO., INC.
- 3 -
GILCHRIST CONSTRUCTION CO. LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 3,200.00 3,200.00 2,250.00 2,250.00 6,000.00 6,000.00    
203-08 borrow (vehicular measurement) 3,045      CUYD 10.95 33,342.75 5.00 15,225.00 6.00 18,270.00    
203-08-A borrow (vehicular meas.)(selected soils) 1,600      CUYD 10.54 16,864.00 9.00 14,400.00 12.00 19,200.00    
304-01 lime 52.92   TON 110.99 5,873.59 120.00 6,350.40 115.00 6,085.80    
304-03-D lime treatment (type c) (12" thick) 5,600      SQYD 1.78 9,968.00 2.00 11,200.00 1.10 6,160.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
260      CUYD 19.15 4,979.00 20.00 5,200.00 35.00 9,100.00    
502-01 superpave asphaltic concrete 11,239.5    TON 44.18 496,561.11 43.50 488,918.25 46.00 517,017.00    
502-01-A superpave asphaltic concrete (paved drives and
turnouts)
380.3    TON 73.16 27,822.74 30.00 11,409.00 70.00 26,621.00    
509-01 cold planing asphaltic pavement 73,987      SQYD 0.68 50,311.16 1.15 85,085.05 1.00 73,987.00    
509-02 contractor retained reclaimed asphaltic pavement - 1,783      CUYD 0.10 - 178.30 0.01 - 17.83 1.00 - 1,783.00    
701-01-M cross drain pipe (36" rcp) 84      LNFT 80.00 6,720.00 145.00 12,180.00 138.00 11,592.00    
701-10-G reinforced concrete pipe (extension)(18") 4      LNFT 100.00 400.00 115.00 460.00 180.00 720.00    
701-10-K reinforced concrete pipe (extension)(30") 28      LNFT 150.00 4,200.00 130.00 3,640.00 155.00 4,340.00    
701-15 concrete collar 3      EACH 850.00 2,550.00 500.00 1,500.00 700.00 2,100.00    
710-01 flowable fill 105      CUYD 70.00 7,350.00 80.00 8,400.00 100.00 10,500.00    
713-01 temporary signs & barricades lump      LUMP 4,050.00 4,050.00 38,500.00 38,500.00 6,000.00 6,000.00    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
10.291  MILE 368.37 3,790.89 263.50 2,711.67 300.00 3,087.30    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
8.384  MILE 315.63 2,646.24 1.00 8.38 225.00 1,886.40    
713-05-A temporary pavement markings (solid line)(4" width) 28.314  MILE 631.47 17,879.44 1.00 28.31 450.00 12,741.30    
722-01 project site laboratory 1      EACH 2,900.00 2,900.00 2,000.00 2,000.00 3,500.00 3,500.00    
724-01-A pavement patching (6" minimum thickness) 200      SQYD 40.07 8,014.00 32.25 6,450.00 48.00 9,600.00    
724-01-C pavement patching (8" minimum thickness) 200      SQYD 44.22 8,844.00 42.00 8,400.00 60.00 12,000.00    
724-01-D pavement patching (15" minimum thickness) 300      SQYD 58.79 17,637.00 61.00 18,300.00 75.00 22,500.00    
724-03 pavement joint repair 140.0    TON 95.78 13,409.20 155.00 21,700.00 175.00 24,500.00    
726-01 bedding material 27.3    CUYD 52.63 1,436.79 75.00 2,047.50 60.00 1,638.00    
727-01 mobilization lump      LUMP 28,745.00 28,745.00 38,500.00 38,500.00 40,000.00 40,000.00    
729-16-C object marker assembly (type 3) 6      EACH 78.95 473.70 100.00 600.00 70.00 420.00    
731-02 reflectorized raised pavement markers 679      EACH 5.00 3,395.00 4.00 2,716.00 4.50 3,055.50    
732-01-E plastic pavement striping (24" width) 90      LNFT 2.53 227.70 2.40 216.00 2.75 247.50    
732-02-A plastic pavement striping (solid line) (4" width) 13.658  MILE 1,968.65 26,887.82 1,600.00 21,852.80 1,700.00 23,218.60    
732-03-A plastic pavement striping (broken line)(4" width) 4.192  MILE 810.11 3,395.98 600.00 2,515.20 650.00 2,724.80    
735-01 mailboxes 5      EACH 12.53 62.65 40.00 200.00 6.00 30.00    
735-02 mailbox supports (single) 5      EACH 208.01 1,040.05 120.00 600.00 150.00 750.00    
739-01 hydro-seeding 3.60   ACRE 1,263.12 4,547.23 1,250.00 4,500.00 950.00 3,420.00    
740-01 construction layout lump      LUMP 10,315.48 10,315.48 10,000.00 10,000.00 9,500.00 9,500.00    
S-001 cement treated base course (12 in depth) 25,939      SQYD 1.81 46,949.59 6.00 155,634.00 4.80 124,507.20    
S-002 cleaning existing ditches 20      LNFT 10.53 210.60 50.00 1,000.00 30.00 600.00    
                       
 CONTRACTOR TOTAL       876,822.41   1,004,679.73   1,015,836.40    