| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - MADDEN CONTRACTING CO., INC. |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
3,200.00 |
3,200.00 |
2,250.00 |
2,250.00 |
6,000.00 |
6,000.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
3,045   |
CUYD |
10.95 |
33,342.75 |
5.00 |
15,225.00 |
6.00 |
18,270.00 |
|
|
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
1,600   |
CUYD |
10.54 |
16,864.00 |
9.00 |
14,400.00 |
12.00 |
19,200.00 |
|
|
| 304-01 |
lime
|
52.92 |
TON |
110.99 |
5,873.59 |
120.00 |
6,350.40 |
115.00 |
6,085.80 |
|
|
| 304-03-D |
lime treatment (type c) (12" thick)
|
5,600   |
SQYD |
1.78 |
9,968.00 |
2.00 |
11,200.00 |
1.10 |
6,160.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
260   |
CUYD |
19.15 |
4,979.00 |
20.00 |
5,200.00 |
35.00 |
9,100.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
11,239.5 |
TON |
44.18 |
496,561.11 |
43.50 |
488,918.25 |
46.00 |
517,017.00 |
|
|
| 502-01-A |
superpave asphaltic concrete (paved drives and
turnouts) |
380.3 |
TON |
73.16 |
27,822.74 |
30.00 |
11,409.00 |
70.00 |
26,621.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
73,987   |
SQYD |
0.68 |
50,311.16 |
1.15 |
85,085.05 |
1.00 |
73,987.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,783   |
CUYD |
0.10 |
- 178.30 |
0.01 |
- 17.83 |
1.00 |
- 1,783.00 |
|
|
| 701-01-M |
cross drain pipe (36" rcp)
|
84   |
LNFT |
80.00 |
6,720.00 |
145.00 |
12,180.00 |
138.00 |
11,592.00 |
|
|
| 701-10-G |
reinforced concrete pipe (extension)(18")
|
4   |
LNFT |
100.00 |
400.00 |
115.00 |
460.00 |
180.00 |
720.00 |
|
|
| 701-10-K |
reinforced concrete pipe (extension)(30")
|
28   |
LNFT |
150.00 |
4,200.00 |
130.00 |
3,640.00 |
155.00 |
4,340.00 |
|
|
| 701-15 |
concrete collar
|
3   |
EACH |
850.00 |
2,550.00 |
500.00 |
1,500.00 |
700.00 |
2,100.00 |
|
|
| 710-01 |
flowable fill
|
105   |
CUYD |
70.00 |
7,350.00 |
80.00 |
8,400.00 |
100.00 |
10,500.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
4,050.00 |
4,050.00 |
38,500.00 |
38,500.00 |
6,000.00 |
6,000.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
10.291 |
MILE |
368.37 |
3,790.89 |
263.50 |
2,711.67 |
300.00 |
3,087.30 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
8.384 |
MILE |
315.63 |
2,646.24 |
1.00 |
8.38 |
225.00 |
1,886.40 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
28.314 |
MILE |
631.47 |
17,879.44 |
1.00 |
28.31 |
450.00 |
12,741.30 |
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
2,900.00 |
2,900.00 |
2,000.00 |
2,000.00 |
3,500.00 |
3,500.00 |
|
|
| 724-01-A |
pavement patching (6" minimum thickness)
|
200   |
SQYD |
40.07 |
8,014.00 |
32.25 |
6,450.00 |
48.00 |
9,600.00 |
|
|
| 724-01-C |
pavement patching (8" minimum thickness)
|
200   |
SQYD |
44.22 |
8,844.00 |
42.00 |
8,400.00 |
60.00 |
12,000.00 |
|
|
| 724-01-D |
pavement patching (15" minimum thickness)
|
300   |
SQYD |
58.79 |
17,637.00 |
61.00 |
18,300.00 |
75.00 |
22,500.00 |
|
|
| 724-03 |
pavement joint repair
|
140.0 |
TON |
95.78 |
13,409.20 |
155.00 |
21,700.00 |
175.00 |
24,500.00 |
|
|
| 726-01 |
bedding material
|
27.3 |
CUYD |
52.63 |
1,436.79 |
75.00 |
2,047.50 |
60.00 |
1,638.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
28,745.00 |
28,745.00 |
38,500.00 |
38,500.00 |
40,000.00 |
40,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
6   |
EACH |
78.95 |
473.70 |
100.00 |
600.00 |
70.00 |
420.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
679   |
EACH |
5.00 |
3,395.00 |
4.00 |
2,716.00 |
4.50 |
3,055.50 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
90   |
LNFT |
2.53 |
227.70 |
2.40 |
216.00 |
2.75 |
247.50 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
13.658 |
MILE |
1,968.65 |
26,887.82 |
1,600.00 |
21,852.80 |
1,700.00 |
23,218.60 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.192 |
MILE |
810.11 |
3,395.98 |
600.00 |
2,515.20 |
650.00 |
2,724.80 |
|
|
| 735-01 |
mailboxes
|
5   |
EACH |
12.53 |
62.65 |
40.00 |
200.00 |
6.00 |
30.00 |
|
|
| 735-02 |
mailbox supports (single)
|
5   |
EACH |
208.01 |
1,040.05 |
120.00 |
600.00 |
150.00 |
750.00 |
|
|
| 739-01 |
hydro-seeding
|
3.60 |
ACRE |
1,263.12 |
4,547.23 |
1,250.00 |
4,500.00 |
950.00 |
3,420.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,315.48 |
10,315.48 |
10,000.00 |
10,000.00 |
9,500.00 |
9,500.00 |
|
|
| S-001 |
cement treated base course (12 in depth)
|
25,939   |
SQYD |
1.81 |
46,949.59 |
6.00 |
155,634.00 |
4.80 |
124,507.20 |
|
|
| S-002 |
cleaning existing ditches
|
20   |
LNFT |
10.53 |
210.60 |
50.00 |
1,000.00 |
30.00 |
600.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
876,822.41 |
|
1,004,679.73 |
|
1,015,836.40 |
|
|
|