Letting of 4/28/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 007-04-0043
Parish: ST JOHN
Routes: US 61
Description: AIRPORT RD - ST. JAMES PL & E. ST. JOHN SCHOOL - AIRPORT RD
Type Const: c & g, grading, drain structures, cold planing asph pvmt, lime trmt, class ii bc,
asphaltic curb, pavement patching, pavement widening, superpave ac overlay, and related work.
 
RankLicenseBidderAmount
100849 F.G. SULLIVAN, JR. CONTRACTOR LLC $4,147,853.14
212487 DIAMOND B CONSTRUCTION CO., L.L.C. $4,200,617.23
300481 COASTAL BRIDGE CO., L.L.C. $4,286,354.64
406276 BARRIERE CONSTRUCTION CO., LLC $4,380,506.41
 
Item Number Item Description Quantity Unit of Measure - 1 -
F.G. SULLIVAN, JR. CONTRACTOR LLC
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 3 -
COASTAL BRIDGE CO., L.L.C.
- 4 -
BARRIERE CONSTRUCTION CO., LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 100.00 100.00 6,486.60 6,486.60 15,000.00 15,000.00 5,000.00 5,000.00
202-02-B removal of concrete box culverts 2      EACH 1,000.00 2,000.00 5,405.50 10,811.00 1.00 2.00 5,000.00 10,000.00
202-02-G removal of surfacing & stabilized base 3,410.8    SQYD 5.00 17,054.00 2.70 9,209.16 5.00 17,054.00 2.00 6,821.60
202-02-I removal of headwalls 13      EACH 100.00 1,300.00 2,165.00 28,145.00 100.00 1,300.00 1,500.00 19,500.00
203-01 general excavation 2,792      CUYD 12.00 33,504.00 4.69 13,094.48 7.00 19,544.00 5.00 13,960.00
203-04 embankment 1,794      CUYD 12.00 21,528.00 10.76 19,303.44 15.00 26,910.00 5.00 8,970.00
203-08 borrow (vehicular measurement) 750      CUYD 5.00 3,750.00 14.88 11,160.00 12.00 9,000.00 10.00 7,500.00
302-02-C class ii base course (10" thick) 8,052.0    SQYD 20.00 161,040.00 11.66 93,886.32 15.00 120,780.00 15.00 120,780.00
304-04-D lime treatment (type d) (12" thick) 8,052      SQYD 4.50 36,234.00 4.97 40,018.44 3.50 28,182.00 1.00 8,052.00
502-01 superpave asphaltic concrete 41,381.0    TON 41.50 1,717,311.50 54.56 2,257,747.36 40.00 1,655,240.00 45.00 1,862,145.00
502-01-D superpave asphaltic concrete, incidental paving (level
a)
1,311.9    TON 70.00 91,833.00 93.82 123,082.45 70.00 91,833.00 45.00 59,035.50
509-01 cold planing asphaltic pavement 292,340      SQYD 1.25 365,425.00 0.57 166,633.80 1.85 540,829.00 1.00 292,340.00
509-02 contractor retained reclaimed asphaltic pavement - 9,665      CUYD 0.10 - 966.50 0.10 - 966.50 25.00 - 241,625.00 15.00 - 144,975.00
701-01-M cross drain pipe (36" rcp) 120      LNFT 120.00 14,400.00 157.74 18,928.80 125.00 15,000.00 200.00 24,000.00
701-01-O cross drain pipe (48" rcp) 280      LNFT 200.00 56,000.00 181.88 50,926.40 200.00 56,000.00 220.00 61,600.00
701-02-J cross drain pipe arch (60" equiv. rcp) 240      LNFT 300.00 72,000.00 282.13 67,711.20 300.00 72,000.00 320.00 76,800.00
701-03-I storm drain pipe (24" rcp) 32      LNFT 100.00 3,200.00 167.57 5,362.24 80.00 2,560.00 120.00 3,840.00
701-03-K storm drain pipe (30" rcp) 4      LNFT 150.00 600.00 243.25 973.00 400.00 1,600.00 240.00 960.00
701-10-I reinforced concrete pipe (extension) (24") 24      LNFT 150.00 3,600.00 108.11 2,594.64 100.00 2,400.00 190.00 4,560.00
701-15 concrete collar 4      EACH 600.00 2,400.00 648.66 2,594.64 600.00 2,400.00 550.00 2,200.00
707-04 asphaltic curb 1,360.0    LNFT 10.00 13,600.00 5.41 7,357.60 8.00 10,880.00 10.00 13,600.00
713-01 temporary signs & barricades lump      LUMP 101,000.00 101,000.00 10,300.00 10,300.00 50,000.00 50,000.00 200,000.00 200,000.00
713-03-A temporary pavement markings (4" width) 400      LNFT 0.10 40.00 0.22 88.00 0.20 80.00 0.04 16.00
713-03-C temporary pavement markings (8" width) 18,268      LNFT 0.15 2,740.20 0.32 5,845.76 0.30 5,480.40 0.08 1,461.44
713-03-D temporary pavement markings (12" width) 48      LNFT 0.30 14.40 0.65 31.20 0.60 28.80 0.12 5.76
713-03-E temporary pavement markings (24" width) 1,440      LNFT 0.50 720.00 0.97 1,396.80 0.90 1,296.00 0.24 345.60
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
30.716  MILE 500.00 15,358.00 325.00 9,982.70 300.00 9,214.80 20.00 614.32
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
43.692  MILE 120.00 5,243.04 260.00 11,359.92 240.00 10,486.08 20.00 873.84
713-05-A temporary pavement markings (solid line)(4" width) 63.440  MILE 100.00 6,344.00 519.00 32,925.36 480.00 30,451.20 40.00 2,537.60
713-06-A temporary pavement legends and symbols (arrow) 144      EACH 25.00 3,600.00 54.06 7,784.64 50.00 7,200.00 5.00 720.00
713-06-C temporary pavement legends and symbols (only) 50      EACH 25.00 1,250.00 54.06 2,703.00 50.00 2,500.00 5.00 250.00
724-01-B pavement patching (12" minimum thickness) 2,802      SQYD 75.00 210,150.00 48.85 136,877.70 100.00 280,200.00 100.00 280,200.00
724-02 pavement widening 1,393.8    SQYD 35.00 48,783.00 29.81 41,549.17 30.00 41,814.00 28.00 39,026.40
726-01 bedding material 329.0    CUYD 50.00 16,450.00 54.06 17,785.74 45.00 14,805.00 50.00 16,450.00
727-01 mobilization lump      LUMP 85,000.00 85,000.00 42,170.00 42,170.00 400,000.00 400,000.00 400,000.00 400,000.00
729-01 sign (type a) 18.9    SQFT 30.00 567.00 21.62 408.61 65.00 1,228.50 30.00 567.00
729-08-B mounting (3 1/2" size post) 3      EACH 1,300.00 3,900.00 702.72 2,108.16 2,500.00 7,500.00 120.00 360.00
729-16-C object marker assembly (type 3) 113      EACH 60.00 6,780.00 81.08 9,162.04 65.00 7,345.00 65.00 7,345.00
731-02 reflectorized raised pavement markers 3,682      EACH 6.00 22,092.00 5.62 20,692.84 5.20 19,146.40 5.50 20,251.00
732-01-A plastic pavement striping (4" width) 200      LNFT 0.50 100.00 0.41 82.00 0.38 76.00 0.40 80.00
732-01-C plastic pavement striping (8" width) 9,134      LNFT 1.00 9,134.00 0.82 7,489.88 0.76 6,941.84 0.80 7,307.20
732-01-D plastic pavement striping (12" width) 24      LNFT 1.50 36.00 1.30 31.20 1.20 28.80 1.30 31.20
732-01-E plastic pavement striping (24" width) 720      LNFT 3.00 2,160.00 2.59 1,864.80 2.40 1,728.00 2.60 1,872.00
732-02-A plastic pavement striping (solid line) (4" width) 32.720  MILE 2,000.00 65,440.00 1,935.00 63,313.20 1,790.00 58,568.80 2,000.00 65,440.00
732-03-A plastic pavement striping (broken line)(4" width) 22.598  MILE 1,000.00 22,598.00 865.00 19,547.27 800.00 18,078.40 900.00 20,338.20
732-04-A plastic pavement legends & symbols (arrow) 70      EACH 150.00 10,500.00 146.00 10,220.00 135.00 9,450.00 140.00 9,800.00
732-04-C plastic pavement legends & symbols (only) 26      EACH 150.00 3,900.00 157.00 4,082.00 145.00 3,770.00 150.00 3,900.00
735-01 mailboxes 17      EACH 1.00 17.00 13.00 221.00 1.00 17.00 1.00 17.00
735-02 mailbox supports (single) 17      EACH 125.00 2,125.00 155.00 2,635.00 125.00 2,125.00 140.00 2,380.00
736-09 loop detector 1,500      LNFT 12.00 18,000.00 11.89 17,835.00 11.00 16,500.00 12.00 18,000.00
736-10 underground junction box 2      EACH 300.00 600.00 270.28 540.56 250.00 500.00 300.00 600.00
737-01-E painted traffic striping (solid line)(24" width) 0.774  MILE 5,000.00 3,870.00 5,108.68 3,954.11 4,750.00 3,676.50 5,000.00 3,870.00
739-01 hydro-seeding 6.50   ACRE 850.00 5,525.00 919.00 5,973.50 900.00 5,850.00 900.00 5,850.00
740-01 construction layout lump      LUMP 51,000.00 51,000.00 13,500.00 13,500.00 50,000.00 50,000.00 30,000.00 30,000.00
805-01-A class a concrete (pipe headwalls) 66.58   CUYD 1,000.00 66,580.00 810.83 53,985.06 1,000.00 66,580.00 1,000.00 66,580.00
805-01-B class a concrete (box culvert headwalls) 47.33   CUYD 900.00 42,597.00 864.88 40,934.77 900.00 42,597.00 1,000.00 47,330.00
805-12-A reinforced concrete box culverts (4'x 3') 15.0    LNFT 500.00 7,500.00 410.82 6,162.30 450.00 6,750.00 500.00 7,500.00
805-12-E reinforced concrete box culverts (4'x 4') 370.0    LNFT 375.00 138,750.00 337.04 124,704.80 325.00 120,250.00 400.00 148,000.00
805-12-I reinforced concrete box culverts (5'x 5') 260.0    LNFT 475.00 123,500.00 424.60 110,396.00 450.00 117,000.00 500.00 130,000.00
806-01 deformed reinforcing steel 7,214      LB 1.00 7,214.00 2.16 15,582.24 1.00 7,214.00 1.00 7,214.00
S-001 u-channel post installation 96      EACH 50.00 4,800.00 81.08 7,783.68 200.00 19,200.00 50.00 4,800.00
S-002 rumble strips (ground-in) 17.9    MILE 750.00 13,425.00 750.00 13,425.00 625.00 11,187.50 600.00 10,740.00
S-003 cleaning existing ditches 760      LNFT 5.00 3,800.00 4.92 3,739.20 5.00 3,800.00 3.00 2,280.00
S-970 ultrathin hmac wearing course (3/4" thick) 79,747.5    SQYD 5.00 398,737.50 4.82 384,382.95 4.75 378,800.62 4.50 358,863.75
                       
 CONTRACTOR TOTAL       4,147,853.14   4,200,617.23   4,286,354.64   4,380,506.41