| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - COASTAL BRIDGE CO., L.L.C. |
- 4 - BARRIERE CONSTRUCTION CO., LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
100.00 |
100.00 |
6,486.60 |
6,486.60 |
15,000.00 |
15,000.00 |
5,000.00 |
5,000.00 |
| 202-02-B |
removal of concrete box culverts
|
2   |
EACH |
1,000.00 |
2,000.00 |
5,405.50 |
10,811.00 |
1.00 |
2.00 |
5,000.00 |
10,000.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
3,410.8 |
SQYD |
5.00 |
17,054.00 |
2.70 |
9,209.16 |
5.00 |
17,054.00 |
2.00 |
6,821.60 |
| 202-02-I |
removal of headwalls
|
13   |
EACH |
100.00 |
1,300.00 |
2,165.00 |
28,145.00 |
100.00 |
1,300.00 |
1,500.00 |
19,500.00 |
| 203-01 |
general excavation
|
2,792   |
CUYD |
12.00 |
33,504.00 |
4.69 |
13,094.48 |
7.00 |
19,544.00 |
5.00 |
13,960.00 |
| 203-04 |
embankment
|
1,794   |
CUYD |
12.00 |
21,528.00 |
10.76 |
19,303.44 |
15.00 |
26,910.00 |
5.00 |
8,970.00 |
| 203-08 |
borrow (vehicular measurement)
|
750   |
CUYD |
5.00 |
3,750.00 |
14.88 |
11,160.00 |
12.00 |
9,000.00 |
10.00 |
7,500.00 |
| 302-02-C |
class ii base course (10" thick)
|
8,052.0 |
SQYD |
20.00 |
161,040.00 |
11.66 |
93,886.32 |
15.00 |
120,780.00 |
15.00 |
120,780.00 |
| 304-04-D |
lime treatment (type d) (12" thick)
|
8,052   |
SQYD |
4.50 |
36,234.00 |
4.97 |
40,018.44 |
3.50 |
28,182.00 |
1.00 |
8,052.00 |
| 502-01 |
superpave asphaltic concrete
|
41,381.0 |
TON |
41.50 |
1,717,311.50 |
54.56 |
2,257,747.36 |
40.00 |
1,655,240.00 |
45.00 |
1,862,145.00 |
| 502-01-D |
superpave asphaltic concrete, incidental paving (level
a) |
1,311.9 |
TON |
70.00 |
91,833.00 |
93.82 |
123,082.45 |
70.00 |
91,833.00 |
45.00 |
59,035.50 |
| 509-01 |
cold planing asphaltic pavement
|
292,340   |
SQYD |
1.25 |
365,425.00 |
0.57 |
166,633.80 |
1.85 |
540,829.00 |
1.00 |
292,340.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 9,665   |
CUYD |
0.10 |
- 966.50 |
0.10 |
- 966.50 |
25.00 |
- 241,625.00 |
15.00 |
- 144,975.00 |
| 701-01-M |
cross drain pipe (36" rcp)
|
120   |
LNFT |
120.00 |
14,400.00 |
157.74 |
18,928.80 |
125.00 |
15,000.00 |
200.00 |
24,000.00 |
| 701-01-O |
cross drain pipe (48" rcp)
|
280   |
LNFT |
200.00 |
56,000.00 |
181.88 |
50,926.40 |
200.00 |
56,000.00 |
220.00 |
61,600.00 |
| 701-02-J |
cross drain pipe arch (60" equiv. rcp)
|
240   |
LNFT |
300.00 |
72,000.00 |
282.13 |
67,711.20 |
300.00 |
72,000.00 |
320.00 |
76,800.00 |
| 701-03-I |
storm drain pipe (24" rcp)
|
32   |
LNFT |
100.00 |
3,200.00 |
167.57 |
5,362.24 |
80.00 |
2,560.00 |
120.00 |
3,840.00 |
| 701-03-K |
storm drain pipe (30" rcp)
|
4   |
LNFT |
150.00 |
600.00 |
243.25 |
973.00 |
400.00 |
1,600.00 |
240.00 |
960.00 |
| 701-10-I |
reinforced concrete pipe (extension) (24")
|
24   |
LNFT |
150.00 |
3,600.00 |
108.11 |
2,594.64 |
100.00 |
2,400.00 |
190.00 |
4,560.00 |
| 701-15 |
concrete collar
|
4   |
EACH |
600.00 |
2,400.00 |
648.66 |
2,594.64 |
600.00 |
2,400.00 |
550.00 |
2,200.00 |
| 707-04 |
asphaltic curb
|
1,360.0 |
LNFT |
10.00 |
13,600.00 |
5.41 |
7,357.60 |
8.00 |
10,880.00 |
10.00 |
13,600.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
101,000.00 |
101,000.00 |
10,300.00 |
10,300.00 |
50,000.00 |
50,000.00 |
200,000.00 |
200,000.00 |
| 713-03-A |
temporary pavement markings (4" width)
|
400   |
LNFT |
0.10 |
40.00 |
0.22 |
88.00 |
0.20 |
80.00 |
0.04 |
16.00 |
| 713-03-C |
temporary pavement markings (8" width)
|
18,268   |
LNFT |
0.15 |
2,740.20 |
0.32 |
5,845.76 |
0.30 |
5,480.40 |
0.08 |
1,461.44 |
| 713-03-D |
temporary pavement markings (12" width)
|
48   |
LNFT |
0.30 |
14.40 |
0.65 |
31.20 |
0.60 |
28.80 |
0.12 |
5.76 |
| 713-03-E |
temporary pavement markings (24" width)
|
1,440   |
LNFT |
0.50 |
720.00 |
0.97 |
1,396.80 |
0.90 |
1,296.00 |
0.24 |
345.60 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
30.716 |
MILE |
500.00 |
15,358.00 |
325.00 |
9,982.70 |
300.00 |
9,214.80 |
20.00 |
614.32 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
43.692 |
MILE |
120.00 |
5,243.04 |
260.00 |
11,359.92 |
240.00 |
10,486.08 |
20.00 |
873.84 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
63.440 |
MILE |
100.00 |
6,344.00 |
519.00 |
32,925.36 |
480.00 |
30,451.20 |
40.00 |
2,537.60 |
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
144   |
EACH |
25.00 |
3,600.00 |
54.06 |
7,784.64 |
50.00 |
7,200.00 |
5.00 |
720.00 |
| 713-06-C |
temporary pavement legends and symbols (only)
|
50   |
EACH |
25.00 |
1,250.00 |
54.06 |
2,703.00 |
50.00 |
2,500.00 |
5.00 |
250.00 |
| 724-01-B |
pavement patching (12" minimum thickness)
|
2,802   |
SQYD |
75.00 |
210,150.00 |
48.85 |
136,877.70 |
100.00 |
280,200.00 |
100.00 |
280,200.00 |
| 724-02 |
pavement widening
|
1,393.8 |
SQYD |
35.00 |
48,783.00 |
29.81 |
41,549.17 |
30.00 |
41,814.00 |
28.00 |
39,026.40 |
| 726-01 |
bedding material
|
329.0 |
CUYD |
50.00 |
16,450.00 |
54.06 |
17,785.74 |
45.00 |
14,805.00 |
50.00 |
16,450.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
85,000.00 |
85,000.00 |
42,170.00 |
42,170.00 |
400,000.00 |
400,000.00 |
400,000.00 |
400,000.00 |
| 729-01 |
sign (type a)
|
18.9 |
SQFT |
30.00 |
567.00 |
21.62 |
408.61 |
65.00 |
1,228.50 |
30.00 |
567.00 |
| 729-08-B |
mounting (3 1/2" size post)
|
3   |
EACH |
1,300.00 |
3,900.00 |
702.72 |
2,108.16 |
2,500.00 |
7,500.00 |
120.00 |
360.00 |
| 729-16-C |
object marker assembly (type 3)
|
113   |
EACH |
60.00 |
6,780.00 |
81.08 |
9,162.04 |
65.00 |
7,345.00 |
65.00 |
7,345.00 |
| 731-02 |
reflectorized raised pavement markers
|
3,682   |
EACH |
6.00 |
22,092.00 |
5.62 |
20,692.84 |
5.20 |
19,146.40 |
5.50 |
20,251.00 |
| 732-01-A |
plastic pavement striping (4" width)
|
200   |
LNFT |
0.50 |
100.00 |
0.41 |
82.00 |
0.38 |
76.00 |
0.40 |
80.00 |
| 732-01-C |
plastic pavement striping (8" width)
|
9,134   |
LNFT |
1.00 |
9,134.00 |
0.82 |
7,489.88 |
0.76 |
6,941.84 |
0.80 |
7,307.20 |
| 732-01-D |
plastic pavement striping (12" width)
|
24   |
LNFT |
1.50 |
36.00 |
1.30 |
31.20 |
1.20 |
28.80 |
1.30 |
31.20 |
| 732-01-E |
plastic pavement striping (24" width)
|
720   |
LNFT |
3.00 |
2,160.00 |
2.59 |
1,864.80 |
2.40 |
1,728.00 |
2.60 |
1,872.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
32.720 |
MILE |
2,000.00 |
65,440.00 |
1,935.00 |
63,313.20 |
1,790.00 |
58,568.80 |
2,000.00 |
65,440.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
22.598 |
MILE |
1,000.00 |
22,598.00 |
865.00 |
19,547.27 |
800.00 |
18,078.40 |
900.00 |
20,338.20 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
70   |
EACH |
150.00 |
10,500.00 |
146.00 |
10,220.00 |
135.00 |
9,450.00 |
140.00 |
9,800.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
26   |
EACH |
150.00 |
3,900.00 |
157.00 |
4,082.00 |
145.00 |
3,770.00 |
150.00 |
3,900.00 |
| 735-01 |
mailboxes
|
17   |
EACH |
1.00 |
17.00 |
13.00 |
221.00 |
1.00 |
17.00 |
1.00 |
17.00 |
| 735-02 |
mailbox supports (single)
|
17   |
EACH |
125.00 |
2,125.00 |
155.00 |
2,635.00 |
125.00 |
2,125.00 |
140.00 |
2,380.00 |
| 736-09 |
loop detector
|
1,500   |
LNFT |
12.00 |
18,000.00 |
11.89 |
17,835.00 |
11.00 |
16,500.00 |
12.00 |
18,000.00 |
| 736-10 |
underground junction box
|
2   |
EACH |
300.00 |
600.00 |
270.28 |
540.56 |
250.00 |
500.00 |
300.00 |
600.00 |
| 737-01-E |
painted traffic striping (solid line)(24" width)
|
0.774 |
MILE |
5,000.00 |
3,870.00 |
5,108.68 |
3,954.11 |
4,750.00 |
3,676.50 |
5,000.00 |
3,870.00 |
| 739-01 |
hydro-seeding
|
6.50 |
ACRE |
850.00 |
5,525.00 |
919.00 |
5,973.50 |
900.00 |
5,850.00 |
900.00 |
5,850.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
51,000.00 |
51,000.00 |
13,500.00 |
13,500.00 |
50,000.00 |
50,000.00 |
30,000.00 |
30,000.00 |
| 805-01-A |
class a concrete (pipe headwalls)
|
66.58 |
CUYD |
1,000.00 |
66,580.00 |
810.83 |
53,985.06 |
1,000.00 |
66,580.00 |
1,000.00 |
66,580.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
47.33 |
CUYD |
900.00 |
42,597.00 |
864.88 |
40,934.77 |
900.00 |
42,597.00 |
1,000.00 |
47,330.00 |
| 805-12-A |
reinforced concrete box culverts (4'x 3')
|
15.0 |
LNFT |
500.00 |
7,500.00 |
410.82 |
6,162.30 |
450.00 |
6,750.00 |
500.00 |
7,500.00 |
| 805-12-E |
reinforced concrete box culverts (4'x 4')
|
370.0 |
LNFT |
375.00 |
138,750.00 |
337.04 |
124,704.80 |
325.00 |
120,250.00 |
400.00 |
148,000.00 |
| 805-12-I |
reinforced concrete box culverts (5'x 5')
|
260.0 |
LNFT |
475.00 |
123,500.00 |
424.60 |
110,396.00 |
450.00 |
117,000.00 |
500.00 |
130,000.00 |
| 806-01 |
deformed reinforcing steel
|
7,214   |
LB |
1.00 |
7,214.00 |
2.16 |
15,582.24 |
1.00 |
7,214.00 |
1.00 |
7,214.00 |
| S-001 |
u-channel post installation
|
96   |
EACH |
50.00 |
4,800.00 |
81.08 |
7,783.68 |
200.00 |
19,200.00 |
50.00 |
4,800.00 |
| S-002 |
rumble strips (ground-in)
|
17.9 |
MILE |
750.00 |
13,425.00 |
750.00 |
13,425.00 |
625.00 |
11,187.50 |
600.00 |
10,740.00 |
| S-003 |
cleaning existing ditches
|
760   |
LNFT |
5.00 |
3,800.00 |
4.92 |
3,739.20 |
5.00 |
3,800.00 |
3.00 |
2,280.00 |
| S-970 |
ultrathin hmac wearing course (3/4" thick)
|
79,747.5 |
SQYD |
5.00 |
398,737.50 |
4.82 |
384,382.95 |
4.75 |
378,800.62 |
4.50 |
358,863.75 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
4,147,853.14 |
|
4,200,617.23 |
|
4,286,354.64 |
|
4,380,506.41 |
|