Letting of 4/14/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 744-17-0018
Parish: E BATON ROUGE
Routes:
Description: LSU BICYCLE/PEDESTRIAN PATHS
Type Const: grading,drainage structures,portland cement concrete pvmt, landscaping,electrical
system(additive alternate a1), lighting structures, and related work.
 
RankLicenseBidderAmount
102074 CIRCLE, INC. $817,129.29
232044 QUALITY DESIGN & CONSTRUCTION, INC. $860,664.59
336764 LAMAY GROUP, LLC $919,660.00
440312 GRAY CONSTRUCTION CORP. $921,133.73
539462 DENTON-JAMES LLC $984,589.60
624299 BOINES CONST. & EQUIPMENT CO., INC. $1,036,516.76
36065 TRI CORE PROPERTIES INC IRREGULAR
 
Item Number Item Description Quantity Unit of Measure - 1 -
CIRCLE, INC.
- 2 -
QUALITY DESIGN & CONSTRUCTION, INC.
- 3 -
LAMAY GROUP, LLC
- 4 -
GRAY CONSTRUCTION CORP.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 11,900.00 11,900.00 42,609.92 42,609.92 30,000.00 30,000.00 1,050.00 1,050.00
202-01 removal of structures & obstructions lump      LUMP 17,800.00 17,800.00 8,833.61 8,833.61 10,000.00 10,000.00 22,600.00 22,600.00
203-08 borrow (vehicular measurement) 100      CUYD 14.15 1,415.00 22.90 2,290.00 60.00 6,000.00 30.00 3,000.00
701-01-G cross drain pipe (18" cmp) 375      LNFT 33.00 12,375.00 32.45 12,168.75 80.00 30,000.00 33.00 12,375.00
701-01-I cross drain pipe (24" cmp) 90      LNFT 38.00 3,420.00 38.83 3,494.70 100.00 9,000.00 49.00 4,410.00
702-03-A catch basins (cb-01)(type a grate) 3      EACH 1,990.00 5,970.00 2,393.49 7,180.47 2,200.00 6,600.00 1,900.00 5,700.00
702-03-E catch basins (cb-03)(type a grate) 4      EACH 1,944.00 7,776.00 2,633.29 10,533.16 2,500.00 10,000.00 1,850.00 7,400.00
702-04-A adjusting manholes 2      EACH 631.00 1,262.00 956.89 1,913.78 1,500.00 3,000.00 250.00 500.00
706-01-A concrete walk (4" thick) 4,558.5    SQYD 46.10 210,146.85 45.90 209,235.15 37.00 168,664.50 35.50 161,826.75
706-01-C concrete walk (6" thick) 2,112.7    SQYD 47.20 99,719.44 50.49 106,670.22 45.00 95,071.50 43.40 91,691.18
711-02-C riprap (30 lb) 664      CUYD 86.00 57,104.00 83.38 55,364.32 89.00 59,096.00 109.00 72,376.00
713-01 temporary signs & barricades lump      LUMP 14,000.00 14,000.00 4,460.80 4,460.80 12,000.00 12,000.00 40,000.00 40,000.00
719-04 landscaping lump      LUMP 22,600.00 22,600.00 19,250.00 19,250.00 14,900.00 14,900.00 22,800.00 22,800.00
727-01 mobilization lump      LUMP 6,541.00 6,541.00 60,000.00 60,000.00 75,000.00 75,000.00 63,800.00 63,800.00
729-01-A sign (type a)(pedestrian crossing no. w11a2) 10.0    EACH 48.00 480.00 82.90 829.00 150.00 1,500.00 150.00 1,500.00
729-21 u-channel post 10      EACH 40.00 400.00 38.40 384.00 100.00 1,000.00 105.00 1,050.00
732-01-D plastic pavement striping (12" width) 348      LNFT 4.00 1,392.00 2.97 1,033.56 3.50 1,218.00 1.70 591.60
732-01-E plastic pavement striping (24" width) 504      LNFT 7.00 3,528.00 2.97 1,496.88 5.00 2,520.00 3.30 1,663.20
740-01 construction layout lump      LUMP 3,000.00 3,000.00 14,100.00 14,100.00 15,000.00 15,000.00 17,500.00 17,500.00
S-001 50 ftlong premanufactured pedestrian bridge 2      EACH 61,000.00 122,000.00 72,153.80 144,307.60 67,500.00 135,000.00 105,300.00 210,600.00
S-002 concrete steps lump      LUMP 44,500.00 44,500.00 12,702.48 12,702.48 28,000.00 28,000.00 23,200.00 23,200.00
S-006 replace deck and handrails on existing foot bridge lump      LUMP 3,700.00 3,700.00 4,853.25 4,853.25 18,000.00 18,000.00 6,000.00 6,000.00
 SUBTOTAL GENERAL       651,029.29   723,711.65   731,570.00   771,633.73
                       
ALTERNATE A additive alternate a1                    
                       
ALTERNATE A1 additive alternate a1                    
730-05-A light pole (10 ft,cast aluminum)(decorative) 41      EACH 2,180.00 89,380.00 1,899.04 77,860.64 2,290.00 93,890.00 2,250.00 92,250.00
 SUBTOTAL ALT A1       89,380.00   77,860.64   93,890.00   92,250.00
                       
ALTERNATE B                      
                       
ALTERNATE B1                      
730-09 electrical system lump      LUMP 28,000.00 28,000.00 24,390.08 24,390.08 55,000.00 55,000.00 28,900.00 28,900.00
 SUBTOTAL ALT B1       28,000.00   24,390.08   55,000.00   28,900.00
                       
ALTERNATE C additive alternate c1                    
                       
ALTERNATE C1 additive alternate c1                    
S-003 benches 14      EACH 1,815.00 25,410.00 1,584.23 22,179.22 1,600.00 22,400.00 825.00 11,550.00
S-004 trash receptacles 14      EACH 1,665.00 23,310.00 894.50 12,523.00 1,200.00 16,800.00 1,200.00 16,800.00
 SUBTOTAL ALT C1       48,720.00   34,702.22   39,200.00   28,350.00
                       
 CONTRACTOR TOTAL       817,129.29   860,664.59   919,660.00   921,133.73
 
Item Number Item Description Quantity Unit of Measure - 5 -
DENTON-JAMES LLC
- 6 -
BOINES CONST. & EQUIPMENT CO., INC.

TRI CORE PROPERTIES INC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 105,000.00 105,000.00 18,000.00 18,000.00 9,182.80 9,182.80    
202-01 removal of structures & obstructions lump      LUMP 20,000.00 20,000.00 6,000.00 6,000.00 18,994.02 18,994.02    
203-08 borrow (vehicular measurement) 100      CUYD 120.00 12,000.00 11.00 1,100.00 25.05 2,505.00    
701-01-G cross drain pipe (18" cmp) 375      LNFT 55.00 20,625.00 45.00 16,875.00 49.98 18,742.50    
701-01-I cross drain pipe (24" cmp) 90      LNFT 75.00 6,750.00 50.00 4,500.00 56.23 5,060.70    
702-03-A catch basins (cb-01)(type a grate) 3      EACH 2,200.00 6,600.00 2,500.00 7,500.00 2,915.50 8,746.50    
702-03-E catch basins (cb-03)(type a grate) 4      EACH 2,200.00 8,800.00 3,000.00 12,000.00 2,655.19 10,620.76    
702-04-A adjusting manholes 2      EACH 1,200.00 2,400.00 850.00 1,700.00 1,499.40 2,998.80    
706-01-A concrete walk (4" thick) 4,558.5    SQYD 42.00 191,457.00 40.00 182,340.00 37.92 172,858.32    
706-01-C concrete walk (6" thick) 2,112.7    SQYD 48.00 101,409.60 50.00 105,635.00 52.48 110,874.49    
711-02-C riprap (30 lb) 664      CUYD 100.00 66,400.00 65.00 43,160.00 126.57 84,042.48    
713-01 temporary signs & barricades lump      LUMP 20,000.00 20,000.00 4,300.00 4,300.00 10,395.84 10,395.84    
719-04 landscaping lump      LUMP 20,000.00 20,000.00 14,000.00 14,000.00 24,052.88 24,052.88    
727-01 mobilization lump      LUMP 90,000.00 90,000.00 130,000.00 130,000.00 27,135.69 27,135.69    
729-01-A sign (type a)(pedestrian crossing no. w11a2) 10.0    EACH 120.00 1,200.00 145.00 1,450.00 124.95 1,249.50    
729-21 u-channel post 10      EACH 90.00 900.00 105.00 1,050.00 81.22 812.20    
732-01-D plastic pavement striping (12" width) 348      LNFT 1.40 487.20 1.65 574.20 1.69 588.12    
732-01-E plastic pavement striping (24" width) 504      LNFT 2.70 1,360.80 3.14 1,582.56 3.30 1,663.20    
740-01 construction layout lump      LUMP 14,000.00 14,000.00 10,000.00 10,000.00 14,300.53 14,300.53    
S-001 50 ftlong premanufactured pedestrian bridge 2      EACH 70,000.00 140,000.00 96,000.00 192,000.00 60,093.08 120,186.16    
S-002 concrete steps lump      LUMP 20,000.00 20,000.00 34,000.00 34,000.00 22,688.17 22,688.17    
S-006 replace deck and handrails on existing foot bridge lump      LUMP 15,000.00 15,000.00 6,500.00 6,500.00 4,081.12 4,081.12    
 SUBTOTAL GENERAL       864,389.60   794,266.76   671,779.78    
                       
ALTERNATE A additive alternate a1                    
                       
ALTERNATE A1 additive alternate a1                    
730-05-A light pole (10 ft,cast aluminum)(decorative) 41      EACH 1,800.00 73,800.00 3,750.00 153,750.00 2,334.54 95,716.14    
 SUBTOTAL ALT A1       73,800.00   153,750.00   95,716.14    
                       
ALTERNATE B                      
                       
ALTERNATE B1                      
730-09 electrical system lump      LUMP 24,000.00 24,000.00 64,000.00 64,000.00 35,286.60 35,286.60    
 SUBTOTAL ALT B1       24,000.00   64,000.00   35,286.60    
                       
ALTERNATE C additive alternate c1                    
                       
ALTERNATE C1 additive alternate c1                    
S-003 benches 14      EACH 1,000.00 14,000.00 875.00 12,250.00 0.00 0.00    
S-004 trash receptacles 14      EACH 600.00 8,400.00 875.00 12,250.00 0.00 0.00    
 SUBTOTAL ALT C1       22,400.00   24,500.00        
                       
 CONTRACTOR TOTAL       984,589.60   1,036,516.76   IRREGULAR    