| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - BOH BROS. CONSTRUCTION CO., LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives (4" thick)
|
65   |
SQYD |
20.00 |
1,300.00 |
18.00 |
1,170.00 |
|
|
|
|
| 202-02-F |
removal of concrete combination curb & gutter
|
390.0 |
LNFT |
20.00 |
7,800.00 |
4.00 |
1,560.00 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
60   |
LNFT |
10.00 |
600.00 |
5.50 |
330.00 |
|
|
|
|
| 202-02-I |
removal of asphaltic concrete curb and gutter
|
170   |
LNFT |
20.00 |
3,400.00 |
5.00 |
850.00 |
|
|
|
|
| 202-02-J |
removal of approach slabs
|
364   |
SQYD |
50.00 |
18,200.00 |
25.00 |
9,100.00 |
|
|
|
|
| 203-05 |
nonplastic embankment
|
28   |
CUYD |
35.00 |
980.00 |
25.00 |
700.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
20   |
EACH |
20.00 |
400.00 |
11.00 |
220.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
200   |
LNFT |
3.00 |
600.00 |
1.25 |
250.00 |
|
|
|
|
| 302-01 |
class ii base course
|
371.0 |
CUYD |
30.00 |
11,130.00 |
54.00 |
20,034.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete (level 1)
|
4,181.4 |
TON |
50.00 |
209,070.00 |
61.00 |
255,065.40 |
|
|
|
|
| 502-01-A-01 |
superpave asphaltic concrete wearing course (level 1f)
|
3,370.4 |
TON |
55.00 |
185,372.00 |
61.00 |
205,594.40 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
29,311   |
SQYD |
4.00 |
117,244.00 |
4.00 |
117,244.00 |
|
|
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
1,917   |
LNFT |
1.50 |
2,875.50 |
5.00 |
9,585.00 |
|
|
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
1,811   |
LNFT |
1.50 |
2,716.50 |
5.00 |
9,055.00 |
|
|
|
|
| 602-05-K-02 |
full depth patching of jointed conc pvmt
|
54.0 |
SQYD |
150.00 |
8,100.00 |
300.00 |
16,200.00 |
|
|
|
|
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
200   |
LNFT |
30.00 |
6,000.00 |
35.00 |
7,000.00 |
|
|
|
|
| 701-14 |
cleaning existing pipes
|
4,165   |
LNFT |
4.00 |
16,660.00 |
8.50 |
35,402.50 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
2   |
EACH |
1,800.00 |
3,600.00 |
1,900.00 |
3,800.00 |
|
|
|
|
| 702-03-C |
catch basins (cb-06)
|
2   |
EACH |
2,500.00 |
5,000.00 |
2,200.00 |
4,400.00 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
3   |
EACH |
800.00 |
2,400.00 |
500.00 |
1,500.00 |
|
|
|
|
| 702-04-B |
adjusting catch basins
|
4   |
EACH |
800.00 |
3,200.00 |
500.00 |
2,000.00 |
|
|
|
|
| 704-01-C |
guard rail (double thrie beam) (3'-1.5" post spacing)
|
175.0 |
LNFT |
48.00 |
8,400.00 |
45.00 |
7,875.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
50.0 |
LNFT |
26.00 |
1,300.00 |
25.00 |
1,250.00 |
|
|
|
|
| 704-05 |
guard rail anchor sections (bct)
|
12.5 |
LNFT |
68.00 |
850.00 |
65.00 |
812.50 |
|
|
|
|
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
12.5 |
LNFT |
80.00 |
1,000.00 |
75.00 |
937.50 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
12.5 |
LNFT |
55.00 |
687.50 |
50.00 |
625.00 |
|
|
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
1   |
EACH |
2,200.00 |
2,200.00 |
2,100.00 |
2,100.00 |
|
|
|
|
| 705-06-B |
chain link fence (5-foot height)
|
134   |
LNFT |
14.00 |
1,876.00 |
15.00 |
2,010.00 |
|
|
|
|
| 705-07-B |
5-foot single gates for chain link fence (5-foot
height) |
1   |
EACH |
600.00 |
600.00 |
275.00 |
275.00 |
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
64.8 |
SQYD |
50.00 |
3,240.00 |
50.00 |
3,240.00 |
|
|
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
57.0 |
SQYD |
65.00 |
3,705.00 |
50.00 |
2,850.00 |
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
531.0 |
LNFT |
32.00 |
16,992.00 |
32.00 |
16,992.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
105,000.00 |
105,000.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| 713-02 |
temporary pavement markings
|
lump |
LUMP |
2,500.00 |
2,500.00 |
2,700.00 |
2,700.00 |
|
|
|
|
| 717-01 |
seeding
|
20   |
LB |
20.00 |
400.00 |
18.00 |
360.00 |
|
|
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
500   |
SQYD |
2.50 |
1,250.00 |
3.00 |
1,500.00 |
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
6,000.00 |
6,000.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 724-01-C |
pavement patching (10" minimum thickness)
|
123   |
SQYD |
90.00 |
11,070.00 |
85.00 |
10,455.00 |
|
|
|
|
| 726-01 |
bedding material
|
25.0 |
CUYD |
30.00 |
750.00 |
50.00 |
1,250.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
110,000.00 |
110,000.00 |
360,800.00 |
360,800.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,724   |
EACH |
5.00 |
8,620.00 |
5.00 |
8,620.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
1,206   |
LNFT |
0.75 |
904.50 |
0.65 |
783.90 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
60   |
LNFT |
6.00 |
360.00 |
2.60 |
156.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
2.102 |
MILE |
2,000.00 |
4,204.00 |
1,850.00 |
3,888.70 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.102 |
MILE |
1,000.00 |
2,102.00 |
950.00 |
1,996.90 |
|
|
|
|
| 736-09 |
loop detector
|
480   |
LNFT |
12.00 |
5,760.00 |
13.00 |
6,240.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
18,000.00 |
18,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 813-01 |
concrete approach slabs
|
364.22 |
SQYD |
170.00 |
61,917.40 |
200.00 |
72,844.00 |
|
|
|
|
| S-001 |
sheriff traffic control
|
400   |
HOUR |
30.00 |
12,000.00 |
25.00 |
10,000.00 |
|
|
|
|
| S-002 |
roadway reinforcing mesh system
|
29,060   |
SQYD |
5.50 |
159,830.00 |
6.50 |
188,890.00 |
|
|
|
|
| S-003 |
cleaning and resealing random cracks in asphaltic
concrete pavement |
3,000   |
LNFT |
1.50 |
4,500.00 |
5.00 |
15,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,162,666.40 |
|
1,485,511.80 |
|
|
|
|
|