| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - COVINGTON PAVING CO. |
- 2 - BARRIERE CONSTRUCTION CO., LLC. |
DIAMOND B CONSTRUCTION CO., L.L.C. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-08 |
borrow (vehicular measurement)
|
444   |
CUYD |
12.00 |
5,328.00 |
13.00 |
5,772.00 |
14.84 |
6,588.96 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
192   |
CUYD |
25.00 |
4,800.00 |
50.00 |
9,600.00 |
22.88 |
4,392.96 |
|
|
| 502-01 |
superpave asphaltic concrete
|
6,139.6 |
TON |
51.00 |
313,119.60 |
50.00 |
306,980.00 |
59.38 |
364,569.44 |
|
|
| 502-01-A |
superpave asphaltic concrete (paved drives and
turnouts) |
1,299.5 |
TON |
75.00 |
97,462.50 |
50.00 |
64,975.00 |
91.32 |
118,670.34 |
|
|
| 507-01-B |
asphaltic surface treatment (2 applications)
|
20,252   |
SQYD |
2.76 |
55,895.52 |
3.00 |
60,756.00 |
3.06 |
61,971.12 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
32,958   |
SQYD |
1.67 |
55,039.86 |
2.30 |
75,803.40 |
1.17 |
38,560.86 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 916   |
CUYD |
2.00 |
- 1,832.00 |
10.00 |
- 9,160.00 |
0.10 |
- 91.60 |
|
|
| 702-04-A |
adjusting manholes
|
6   |
EACH |
400.00 |
2,400.00 |
500.00 |
3,000.00 |
1,180.00 |
7,080.00 |
|
|
| 702-04-B |
adjusting catch basins
|
6   |
EACH |
1,500.00 |
9,000.00 |
1,000.00 |
6,000.00 |
4,120.00 |
24,720.00 |
|
|
| 706-01-C |
concrete walk (6" thick)
|
14.2 |
SQYD |
50.00 |
710.00 |
300.00 |
4,260.00 |
52.94 |
751.74 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
27,500.00 |
27,500.00 |
50,000.00 |
50,000.00 |
6,400.00 |
6,400.00 |
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
506   |
LNFT |
0.55 |
278.30 |
1.00 |
506.00 |
1.06 |
536.36 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
6.840 |
MILE |
300.00 |
2,052.00 |
170.00 |
1,162.80 |
353.00 |
2,414.52 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
3.180 |
MILE |
275.00 |
874.50 |
100.00 |
318.00 |
295.00 |
938.10 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
19.760 |
MILE |
510.00 |
10,077.60 |
200.00 |
3,952.00 |
588.00 |
11,618.88 |
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
10   |
EACH |
60.00 |
600.00 |
60.00 |
600.00 |
58.83 |
588.30 |
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
2   |
EACH |
60.00 |
120.00 |
60.00 |
120.00 |
58.83 |
117.66 |
|
|
| 713-07-A |
temporary reflectorized raised pavement markers (tabs)
|
153   |
EACH |
3.00 |
459.00 |
2.00 |
306.00 |
1.76 |
269.28 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
100   |
SQYD |
61.00 |
6,100.00 |
92.00 |
9,200.00 |
84.00 |
8,400.00 |
|
|
| 724-02 |
pavement widening
|
2,094.4 |
SQYD |
36.00 |
75,398.40 |
37.00 |
77,492.80 |
29.86 |
62,538.78 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
31,500.00 |
31,500.00 |
84,000.00 |
84,000.00 |
26,570.00 |
26,570.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,797   |
EACH |
5.60 |
10,063.20 |
5.50 |
9,883.50 |
4.71 |
8,463.87 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
1,354   |
LNFT |
0.90 |
1,218.60 |
2.00 |
2,708.00 |
1.18 |
1,597.72 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
253   |
LNFT |
2.90 |
733.70 |
6.00 |
1,518.00 |
3.53 |
893.09 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
9.880 |
MILE |
1,970.00 |
19,463.60 |
1,900.00 |
18,772.00 |
2,106.00 |
20,807.28 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.590 |
MILE |
760.00 |
1,208.40 |
900.00 |
1,431.00 |
765.00 |
1,216.35 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
5   |
EACH |
150.00 |
750.00 |
300.00 |
1,500.00 |
147.00 |
735.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
1   |
EACH |
150.00 |
150.00 |
400.00 |
400.00 |
147.00 |
147.00 |
|
|
| 735-01 |
mailboxes
|
36   |
EACH |
10.00 |
360.00 |
2.00 |
72.00 |
14.25 |
513.00 |
|
|
| 735-02 |
mailbox supports (single)
|
36   |
EACH |
130.00 |
4,680.00 |
120.00 |
4,320.00 |
163.00 |
5,868.00 |
|
|
| 736-09 |
loop detector
|
900   |
LNFT |
10.00 |
9,000.00 |
11.00 |
9,900.00 |
14.12 |
12,708.00 |
|
|
| 739-01 |
hydro-seeding
|
1.00 |
ACRE |
2,500.00 |
2,500.00 |
2,000.00 |
2,000.00 |
2,950.00 |
2,950.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
3,000.00 |
3,000.00 |
10,000.00 |
10,000.00 |
7,650.00 |
7,650.00 |
|
|
| 741-11 |
adjusting water valve and meter box
|
8   |
EACH |
125.00 |
1,000.00 |
500.00 |
4,000.00 |
824.00 |
6,592.00 |
|
|
| S-001 |
surface preparation
|
lump |
LUMP |
20,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
20,008.10 |
20,008.10 |
|
|
| S-002 |
u-channel post installation
|
145   |
EACH |
125.00 |
18,125.00 |
50.00 |
7,250.00 |
88.00 |
12,760.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
789,135.78 |
|
849,398.50 |
|
IRREGULAR |
|
|
|