| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - JAMES CONSTRUCTION GROUP LLC |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - KOSTMAYER CONSTRUCTION, LLC |
- 4 - GUINN BROTHERS, LLC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
400,000.00 |
400,000.00 |
250,000.00 |
250,000.00 |
150,000.00 |
150,000.00 |
200,000.00 |
200,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
6,000.00 |
6,000.00 |
10,000.00 |
10,000.00 |
43,000.00 |
43,000.00 |
20,000.00 |
20,000.00 |
| 202-02-A-01 |
removal of bridge (sta. 10+167.03; 7.32 m x 53.04 m
timber bridge) |
1   |
ea |
14,000.00 |
14,000.00 |
15,000.00 |
15,000.00 |
10,500.00 |
10,500.00 |
10,000.00 |
10,000.00 |
| 202-02-A-02 |
removal of bridge (sta. 30+322.40; 7.62 m x 117.04 m
timber bridge) |
1   |
ea |
30,000.00 |
30,000.00 |
30,000.00 |
30,000.00 |
27,000.00 |
27,000.00 |
25,000.00 |
25,000.00 |
| 202-02-A-03 |
removal of bridge (sta. 60+292.89; 7.32 m x 23.47 m
timber bridge) |
1   |
ea |
4,000.00 |
4,000.00 |
6,500.00 |
6,500.00 |
5,500.00 |
5,500.00 |
5,000.00 |
5,000.00 |
| 202-02-A-04 |
removal of bridge (sta. 60+504.30; 7.66 m x 80.77 m
timber bridge) |
1   |
ea |
14,000.00 |
14,000.00 |
22,000.00 |
22,000.00 |
16,000.00 |
16,000.00 |
18,000.00 |
18,000.00 |
| 202-02-A-05 |
removal of bridge (sta. 60+745.30; 7.66 m x 46.99 m
timber bridge) |
1   |
ea |
8,000.00 |
8,000.00 |
10,000.00 |
10,000.00 |
10,500.00 |
10,500.00 |
10,000.00 |
10,000.00 |
| 202-02-A-06 |
removal of bridge (sta. 20+188.900; 7.32 m x 12.61 m
timber bridge) |
1   |
ea |
5,000.00 |
5,000.00 |
3,200.00 |
3,200.00 |
5,500.00 |
5,500.00 |
2,500.00 |
2,500.00 |
| 202-02-A-07 |
removal of bridge (sta. 40+152.930; 7.32 m x 17.78 m
timber bridge) |
1   |
ea |
10,000.00 |
10,000.00 |
6,500.00 |
6,500.00 |
5,500.00 |
5,500.00 |
4,000.00 |
4,000.00 |
| 202-02-A-08 |
removal of bridge (sta. 50+209.479; 7.32 m x 23.56 m
timber bridge) |
1   |
ea |
8,000.00 |
8,000.00 |
6,500.00 |
6,500.00 |
5,500.00 |
5,500.00 |
4,000.00 |
4,000.00 |
| 202-02-A-09 |
removal of bridge (sta. 60+085.938; 7.32 m x 24.38 m
timber bridge) |
1   |
ea |
4,000.00 |
4,000.00 |
6,500.00 |
6,500.00 |
5,500.00 |
5,500.00 |
5,000.00 |
5,000.00 |
| 202-02-A-10 |
removal of bridge (sta. 60+148.372; 7.32 m x 24.38 m
timber bridge) |
1   |
ea |
4,000.00 |
4,000.00 |
6,500.00 |
6,500.00 |
5,500.00 |
5,500.00 |
5,000.00 |
5,000.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
12,414.0 |
sq m |
4.00 |
49,656.00 |
3.00 |
37,242.00 |
1.50 |
18,621.00 |
4.00 |
49,656.00 |
| 202-02-H |
removal of guard rail
|
196   |
ln m |
10.00 |
1,960.00 |
10.00 |
1,960.00 |
16.00 |
3,136.00 |
18.00 |
3,528.00 |
| 203-01 |
general excavation
|
6,399   |
cu m |
5.00 |
31,995.00 |
4.75 |
30,395.25 |
5.00 |
31,995.00 |
6.50 |
41,593.50 |
| 203-02 |
drainage excavation
|
20,872   |
cu m |
6.50 |
135,668.00 |
5.00 |
104,360.00 |
6.00 |
125,232.00 |
6.50 |
135,668.00 |
| 203-03 |
muck excavation
|
313   |
cu m |
8.00 |
2,504.00 |
7.80 |
2,441.40 |
6.00 |
1,878.00 |
14.00 |
4,382.00 |
| 203-04 |
embankment
|
68,271   |
cu m |
8.50 |
580,303.50 |
9.90 |
675,882.90 |
11.00 |
750,981.00 |
7.00 |
477,897.00 |
| 204-02 |
temporary hay or straw bales
|
42   |
ea |
5.00 |
210.00 |
15.00 |
630.00 |
12.00 |
504.00 |
8.00 |
336.00 |
| 204-06 |
temporary silt fencing
|
5,567   |
ln m |
3.00 |
16,701.00 |
6.00 |
33,402.00 |
6.00 |
33,402.00 |
3.00 |
16,701.00 |
| 302-02-B |
class ii base course (220 mm thick)
|
15,935.3 |
sq m |
16.00 |
254,964.80 |
17.00 |
270,900.10 |
17.00 |
270,900.10 |
18.00 |
286,835.40 |
| 302-02-E |
class ii base course (192 mm average thickness)
|
7,383.7 |
sq m |
15.00 |
110,755.50 |
15.00 |
110,755.50 |
17.00 |
125,522.90 |
16.00 |
118,139.20 |
| 304-01 |
lime
|
112.23 |
Mg |
125.00 |
14,028.75 |
95.00 |
10,661.85 |
180.00 |
20,201.40 |
125.00 |
14,028.75 |
| 304-04-D |
lime treatment (type d) (300 mm thick)
|
7,423   |
sq m |
1.25 |
9,278.75 |
0.50 |
3,711.50 |
5.50 |
40,826.50 |
6.50 |
48,249.50 |
| 401-01 |
aggregate surface course (net section)
|
73.8 |
cu m |
80.00 |
5,904.00 |
80.00 |
5,904.00 |
70.00 |
5,166.00 |
80.00 |
5,904.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
1,000.0 |
cu m |
23.00 |
23,000.00 |
38.00 |
38,000.00 |
65.00 |
65,000.00 |
75.00 |
75,000.00 |
| 502-01-A |
superpave asphaltic concrete (level 1)
|
5,800.0 |
Mg |
75.00 |
435,000.00 |
65.00 |
377,000.00 |
120.00 |
696,000.00 |
120.00 |
696,000.00 |
| 502-01-D |
superpave asphaltic concrete, incidental paving (level
a) |
1,133.9 |
Mg |
100.00 |
113,390.00 |
75.00 |
85,042.50 |
145.00 |
164,415.50 |
120.00 |
136,068.00 |
| 701-01-Q/S |
cross drain pipe (1500 mm rcp/pcp or 1800 mm cmp)
|
69.8 |
ln m |
650.00 |
45,370.00 |
600.00 |
41,880.00 |
660.00 |
46,068.00 |
700.00 |
48,860.00 |
| 701-01-S/U |
cross drain pipe (1800 mm rcp/pcp or 2100 mm cmp)
|
138.6 |
ln m |
760.00 |
105,336.00 |
750.00 |
103,950.00 |
770.00 |
106,722.00 |
950.00 |
131,670.00 |
| 701-05-I |
side drain pipe (600 mm)
|
125.2 |
ln m |
145.00 |
18,154.00 |
180.00 |
22,536.00 |
155.00 |
19,406.00 |
130.00 |
16,276.00 |
| 702-05-A |
cross drain end treatment (three barrel rcb - 1200mm)
|
2   |
each |
1,400.00 |
2,800.00 |
1,900.00 |
3,800.00 |
4,000.00 |
8,000.00 |
2,500.00 |
5,000.00 |
| 702-05-B |
cross drain end treatment (four barrel rcb - 1200mm)
|
2   |
each |
1,600.00 |
3,200.00 |
2,300.00 |
4,600.00 |
4,000.00 |
8,000.00 |
3,500.00 |
7,000.00 |
| 702-05-C |
cross drain end treatment (four barrel rcb - 1500mm)
|
2   |
each |
2,400.00 |
4,800.00 |
2,950.00 |
5,900.00 |
4,000.00 |
8,000.00 |
4,500.00 |
9,000.00 |
| 702-05-D |
cross drain end treatment (double pipes - 1500mm)
|
2   |
each |
3,500.00 |
7,000.00 |
2,350.00 |
4,700.00 |
4,000.00 |
8,000.00 |
3,500.00 |
7,000.00 |
| 702-05-E |
cross drain end treatment (triple pipes - 1800mm)
|
2   |
each |
5,500.00 |
11,000.00 |
3,500.00 |
7,000.00 |
4,000.00 |
8,000.00 |
5,500.00 |
11,000.00 |
| 704-03 |
blocked out guard rail
|
365.86 |
ln m |
43.00 |
15,731.98 |
45.00 |
16,463.70 |
53.00 |
19,390.58 |
70.00 |
25,610.20 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
152.40 |
ln m |
114.00 |
17,373.60 |
120.00 |
18,288.00 |
143.00 |
21,793.20 |
160.00 |
24,384.00 |
| 704-11-A |
guard rail end treatment (flared)
|
20   |
ea |
1,500.00 |
30,000.00 |
1,600.00 |
32,000.00 |
1,900.00 |
38,000.00 |
1,900.00 |
38,000.00 |
| 705-01 |
barbed wire fence
|
2,085   |
ln m |
12.00 |
25,020.00 |
18.00 |
37,530.00 |
13.00 |
27,105.00 |
13.75 |
28,668.75 |
| 708-01 |
right-of-way monument
|
61   |
ea |
160.00 |
9,760.00 |
250.00 |
15,250.00 |
100.00 |
6,100.00 |
180.00 |
10,980.00 |
| 708-02 |
right-of-way monument witness post
|
61   |
ea |
160.00 |
9,760.00 |
250.00 |
15,250.00 |
100.00 |
6,100.00 |
180.00 |
10,980.00 |
| 711-01-C |
riprap (15 kg, 360 mm thickness)
|
2,629   |
sq m |
46.00 |
120,934.00 |
45.00 |
118,305.00 |
44.00 |
115,676.00 |
50.00 |
131,450.00 |
| 711-04 |
geotextile fabric
|
6,151   |
sq m |
3.00 |
18,453.00 |
2.10 |
12,917.10 |
3.00 |
18,453.00 |
2.25 |
13,839.75 |
| 712-04 |
flexible revetment
|
2,303   |
sq m |
45.00 |
103,635.00 |
45.00 |
103,635.00 |
50.00 |
115,150.00 |
50.00 |
115,150.00 |
| 713-01 |
temporary signs & barricades
|
lump |
lump |
60,000.00 |
60,000.00 |
70,000.00 |
70,000.00 |
102,000.00 |
102,000.00 |
135,000.00 |
135,000.00 |
| 713-03-A-01 |
temporary pavement markings (100 mm width)(type
1 removable) |
1,394   |
ln m |
7.00 |
9,758.00 |
7.00 |
9,758.00 |
16.50 |
23,001.00 |
7.00 |
9,758.00 |
| 714-02 |
water
|
121   |
cu m |
4.00 |
484.00 |
1.20 |
145.20 |
3.50 |
423.50 |
1.00 |
121.00 |
| 716-01-A |
mulch (vegetative)
|
12.2 |
hctr |
1,400.00 |
17,080.00 |
14,000.00 |
170,800.00 |
1,550.00 |
18,910.00 |
1,500.00 |
18,300.00 |
| 717-01 |
seeding
|
828   |
kg |
13.00 |
10,764.00 |
12.00 |
9,936.00 |
14.00 |
11,592.00 |
14.00 |
11,592.00 |
| 718-01 |
fertilizer
|
13,633   |
kg |
0.40 |
5,453.20 |
0.50 |
6,816.50 |
0.50 |
6,816.50 |
0.50 |
6,816.50 |
| 720-01-A |
erosion control system, slope protection (type a)
|
5,951   |
sq m |
1.20 |
7,141.20 |
1.35 |
8,033.85 |
1.40 |
8,331.40 |
1.35 |
8,033.85 |
| 720-01-B |
erosion control system, slope protection (type b)
|
341   |
sq m |
1.20 |
409.20 |
1.75 |
596.75 |
1.40 |
477.40 |
2.00 |
682.00 |
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
2,139   |
sq m |
1.40 |
2,994.60 |
1.75 |
3,743.25 |
3.00 |
6,417.00 |
2.00 |
4,278.00 |
| 722-01 |
project site laboratory
|
1   |
ea |
6,000.00 |
6,000.00 |
25,000.00 |
25,000.00 |
14,000.00 |
14,000.00 |
6,500.00 |
6,500.00 |
| 725-02 |
temporary detour roads
|
26,647.2 |
sq m |
43.00 |
1,145,829.60 |
36.00 |
959,299.20 |
38.00 |
1,012,593.60 |
50.30 |
1,340,354.16 |
| 725-03 |
temporary detour bridging
|
342.00 |
ln m |
2,500.00 |
855,000.00 |
2,900.00 |
991,800.00 |
3,000.00 |
1,026,000.00 |
3,500.00 |
1,197,000.00 |
| 726-01 |
bedding material
|
739.7 |
cu m |
55.00 |
40,683.50 |
50.00 |
36,985.00 |
65.00 |
48,080.50 |
80.00 |
59,176.00 |
| 727-01 |
mobilization
|
lump |
lump |
804,000.00 |
804,000.00 |
900,000.00 |
900,000.00 |
110,000.00 |
110,000.00 |
485,000.00 |
485,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
20   |
ea |
50.00 |
1,000.00 |
55.00 |
1,100.00 |
65.00 |
1,300.00 |
65.00 |
1,300.00 |
| 729-16-C |
object marker assembly (type 3)
|
20   |
ea |
60.00 |
1,200.00 |
65.00 |
1,300.00 |
75.00 |
1,500.00 |
85.00 |
1,700.00 |
| 731-01 |
nonreflectorized raised pavement markers
|
499   |
ea |
8.00 |
3,992.00 |
8.50 |
4,241.50 |
18.00 |
8,982.00 |
9.00 |
4,491.00 |
| 731-02 |
reflectorized raised pavement markers
|
307   |
ea |
4.90 |
1,504.30 |
5.50 |
1,688.50 |
14.00 |
4,298.00 |
6.00 |
1,842.00 |
| 732-02-A |
plastic pavement striping (solid line)(100 mm width)
|
7.347 |
km |
1,225.00 |
9,000.07 |
1,400.00 |
10,285.80 |
1,800.00 |
13,224.60 |
1,500.00 |
11,020.50 |
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
3.674 |
km |
540.00 |
1,983.96 |
600.00 |
2,204.40 |
1,020.00 |
3,747.48 |
650.00 |
2,388.10 |
| 732-05 |
removal of existing markings
|
2.675 |
km |
1,600.00 |
4,280.00 |
1,700.00 |
4,547.50 |
4,800.00 |
12,840.00 |
2,000.00 |
5,350.00 |
| 740-01 |
construction layout
|
lump |
lump |
75,000.00 |
75,000.00 |
180,000.00 |
180,000.00 |
50,000.00 |
50,000.00 |
125,000.00 |
125,000.00 |
| 804-01-B |
precast concrete piles (350 mm)
|
3,550.5 |
ln m |
100.00 |
355,050.00 |
90.00 |
319,545.00 |
148.00 |
525,474.00 |
95.00 |
337,297.50 |
| 804-01-F |
precast concrete piles (600 mm)
|
1,947.5 |
ln m |
180.00 |
350,550.00 |
200.00 |
389,500.00 |
253.00 |
492,717.50 |
255.00 |
496,612.50 |
| 804-12 |
loading permanent piles
|
5   |
ea |
2,000.00 |
10,000.00 |
100.00 |
500.00 |
500.00 |
2,500.00 |
1.00 |
5.00 |
| 804-13 |
precast concrete indicator piles
|
1   |
ea |
14,000.00 |
14,000.00 |
7,500.00 |
7,500.00 |
17,000.00 |
17,000.00 |
20,000.00 |
20,000.00 |
| 804-17 |
dynamic monitoring
|
15   |
ea |
1,000.00 |
15,000.00 |
800.00 |
12,000.00 |
1,200.00 |
18,000.00 |
2,000.00 |
30,000.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
51.19 |
cu m |
1,000.00 |
51,190.00 |
775.00 |
39,672.25 |
950.00 |
48,630.50 |
1,000.00 |
51,190.00 |
| 805-01-F |
class a concrete (bents)
|
465.80 |
cu m |
455.00 |
211,939.00 |
600.00 |
279,480.00 |
670.00 |
312,086.00 |
700.00 |
326,060.00 |
| 805-03 |
class aa concrete
|
1,466.65 |
cu m |
420.00 |
615,993.00 |
600.00 |
879,990.00 |
620.00 |
909,323.00 |
575.00 |
843,323.75 |
| 805-08-B |
precast-prestressed concrete girders (type ii)
|
1,782.00 |
ln m |
180.00 |
320,760.00 |
160.00 |
285,120.00 |
277.00 |
493,614.00 |
220.00 |
392,040.00 |
| 805-11 |
strip seal joints
|
132.00 |
ln m |
300.00 |
39,600.00 |
450.00 |
59,400.00 |
335.00 |
44,220.00 |
350.00 |
46,200.00 |
| 805-12-E |
reinforced concrete box culverts (1200 mm x 1200 mm)
|
219.00 |
ln m |
750.00 |
164,250.00 |
1,150.00 |
251,850.00 |
900.00 |
197,100.00 |
1,060.00 |
232,140.00 |
| 805-12-I |
reinforced concrete box culverts (1500 mm x 1500 mm)
|
98.00 |
ln m |
1,000.00 |
98,000.00 |
1,125.00 |
110,250.00 |
1,200.00 |
117,600.00 |
1,530.00 |
149,940.00 |
| 806-01 |
deformed reinforcing steel
|
228,593   |
kg |
1.50 |
342,889.50 |
1.30 |
297,170.90 |
1.40 |
320,030.20 |
2.25 |
514,334.25 |
| 807-06 |
structural metalwork
|
lump |
lump |
7,500.00 |
7,500.00 |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
8,000.00 |
8,000.00 |
| 810-01 |
concrete railing (barrier)
|
858.00 |
ln m |
120.00 |
102,960.00 |
135.00 |
115,830.00 |
110.00 |
94,380.00 |
140.00 |
120,120.00 |
| 813-01 |
concrete approach slabs
|
1,116.00 |
sq m |
165.00 |
184,140.00 |
155.00 |
172,980.00 |
120.00 |
133,920.00 |
185.00 |
206,460.00 |
| S-101 |
dynamic analysis
|
15   |
each |
750.00 |
11,250.00 |
750.00 |
11,250.00 |
1,000.00 |
15,000.00 |
1,000.00 |
15,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
8,799,276.01 |
|
9,365,313.40 |
|
9,454,875.36 |
|
10,277,781.16 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - DENTON-JAMES LLC |
- 6 - W. E. MCDONALD & SON, LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
800,000.00 |
800,000.00 |
500,000.00 |
500,000.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
25,000.00 |
25,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-A-01 |
removal of bridge (sta. 10+167.03; 7.32 m x 53.04 m
timber bridge) |
1   |
ea |
14,000.00 |
14,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-A-02 |
removal of bridge (sta. 30+322.40; 7.62 m x 117.04 m
timber bridge) |
1   |
ea |
25,000.00 |
25,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-A-03 |
removal of bridge (sta. 60+292.89; 7.32 m x 23.47 m
timber bridge) |
1   |
ea |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-A-04 |
removal of bridge (sta. 60+504.30; 7.66 m x 80.77 m
timber bridge) |
1   |
ea |
16,000.00 |
16,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-A-05 |
removal of bridge (sta. 60+745.30; 7.66 m x 46.99 m
timber bridge) |
1   |
ea |
14,000.00 |
14,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-A-06 |
removal of bridge (sta. 20+188.900; 7.32 m x 12.61 m
timber bridge) |
1   |
ea |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-A-07 |
removal of bridge (sta. 40+152.930; 7.32 m x 17.78 m
timber bridge) |
1   |
ea |
6,000.00 |
6,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-A-08 |
removal of bridge (sta. 50+209.479; 7.32 m x 23.56 m
timber bridge) |
1   |
ea |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-A-09 |
removal of bridge (sta. 60+085.938; 7.32 m x 24.38 m
timber bridge) |
1   |
ea |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-A-10 |
removal of bridge (sta. 60+148.372; 7.32 m x 24.38 m
timber bridge) |
1   |
ea |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
12,414.0 |
sq m |
3.50 |
43,449.00 |
5.00 |
62,070.00 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
196   |
ln m |
6.00 |
1,176.00 |
10.00 |
1,960.00 |
|
|
|
|
| 203-01 |
general excavation
|
6,399   |
cu m |
7.00 |
44,793.00 |
8.00 |
51,192.00 |
|
|
|
|
| 203-02 |
drainage excavation
|
20,872   |
cu m |
7.00 |
146,104.00 |
10.00 |
208,720.00 |
|
|
|
|
| 203-03 |
muck excavation
|
313   |
cu m |
30.00 |
9,390.00 |
15.00 |
4,695.00 |
|
|
|
|
| 203-04 |
embankment
|
68,271   |
cu m |
9.00 |
614,439.00 |
9.00 |
614,439.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
42   |
ea |
8.00 |
336.00 |
6.00 |
252.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
5,567   |
ln m |
3.00 |
16,701.00 |
10.00 |
55,670.00 |
|
|
|
|
| 302-02-B |
class ii base course (220 mm thick)
|
15,935.3 |
sq m |
22.00 |
350,576.60 |
24.00 |
382,447.20 |
|
|
|
|
| 302-02-E |
class ii base course (192 mm average thickness)
|
7,383.7 |
sq m |
22.00 |
162,441.40 |
23.00 |
169,825.10 |
|
|
|
|
| 304-01 |
lime
|
112.23 |
Mg |
120.00 |
13,467.60 |
110.00 |
12,345.30 |
|
|
|
|
| 304-04-D |
lime treatment (type d) (300 mm thick)
|
7,423   |
sq m |
2.00 |
14,846.00 |
3.00 |
22,269.00 |
|
|
|
|
| 401-01 |
aggregate surface course (net section)
|
73.8 |
cu m |
70.00 |
5,166.00 |
100.00 |
7,380.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
1,000.0 |
cu m |
70.00 |
70,000.00 |
1.00 |
1,000.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete (level 1)
|
5,800.0 |
Mg |
100.00 |
580,000.00 |
102.00 |
591,600.00 |
|
|
|
|
| 502-01-D |
superpave asphaltic concrete, incidental paving (level
a) |
1,133.9 |
Mg |
100.00 |
113,390.00 |
102.00 |
115,657.80 |
|
|
|
|
| 701-01-Q/S |
cross drain pipe (1500 mm rcp/pcp or 1800 mm cmp)
|
69.8 |
ln m |
600.00 |
41,880.00 |
690.00 |
48,162.00 |
|
|
|
|
| 701-01-S/U |
cross drain pipe (1800 mm rcp/pcp or 2100 mm cmp)
|
138.6 |
ln m |
750.00 |
103,950.00 |
786.00 |
108,939.60 |
|
|
|
|
| 701-05-I |
side drain pipe (600 mm)
|
125.2 |
ln m |
160.00 |
20,032.00 |
155.00 |
19,406.00 |
|
|
|
|
| 702-05-A |
cross drain end treatment (three barrel rcb - 1200mm)
|
2   |
each |
1,200.00 |
2,400.00 |
6,000.00 |
12,000.00 |
|
|
|
|
| 702-05-B |
cross drain end treatment (four barrel rcb - 1200mm)
|
2   |
each |
1,400.00 |
2,800.00 |
5,500.00 |
11,000.00 |
|
|
|
|
| 702-05-C |
cross drain end treatment (four barrel rcb - 1500mm)
|
2   |
each |
2,000.00 |
4,000.00 |
7,000.00 |
14,000.00 |
|
|
|
|
| 702-05-D |
cross drain end treatment (double pipes - 1500mm)
|
2   |
each |
3,000.00 |
6,000.00 |
3,800.00 |
7,600.00 |
|
|
|
|
| 702-05-E |
cross drain end treatment (triple pipes - 1800mm)
|
2   |
each |
4,000.00 |
8,000.00 |
6,250.00 |
12,500.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
365.86 |
ln m |
43.00 |
15,731.98 |
72.00 |
26,341.92 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
152.40 |
ln m |
120.00 |
18,288.00 |
165.00 |
25,146.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
20   |
ea |
1,500.00 |
30,000.00 |
2,000.00 |
40,000.00 |
|
|
|
|
| 705-01 |
barbed wire fence
|
2,085   |
ln m |
13.00 |
27,105.00 |
18.50 |
38,572.50 |
|
|
|
|
| 708-01 |
right-of-way monument
|
61   |
ea |
100.00 |
6,100.00 |
150.00 |
9,150.00 |
|
|
|
|
| 708-02 |
right-of-way monument witness post
|
61   |
ea |
100.00 |
6,100.00 |
150.00 |
9,150.00 |
|
|
|
|
| 711-01-C |
riprap (15 kg, 360 mm thickness)
|
2,629   |
sq m |
45.00 |
118,305.00 |
49.50 |
130,135.50 |
|
|
|
|
| 711-04 |
geotextile fabric
|
6,151   |
sq m |
2.50 |
15,377.50 |
3.00 |
18,453.00 |
|
|
|
|
| 712-04 |
flexible revetment
|
2,303   |
sq m |
47.50 |
109,392.50 |
48.00 |
110,544.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
60,000.00 |
60,000.00 |
195,000.00 |
195,000.00 |
|
|
|
|
| 713-03-A-01 |
temporary pavement markings (100 mm width)(type
1 removable) |
1,394   |
ln m |
6.60 |
9,200.40 |
7.25 |
10,106.50 |
|
|
|
|
| 714-02 |
water
|
121   |
cu m |
1.00 |
121.00 |
1.25 |
151.25 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
12.2 |
hctr |
1,400.00 |
17,080.00 |
1,453.00 |
17,726.60 |
|
|
|
|
| 717-01 |
seeding
|
828   |
kg |
11.00 |
9,108.00 |
12.00 |
9,936.00 |
|
|
|
|
| 718-01 |
fertilizer
|
13,633   |
kg |
0.40 |
5,453.20 |
0.50 |
6,816.50 |
|
|
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
5,951   |
sq m |
1.30 |
7,736.30 |
1.40 |
8,331.40 |
|
|
|
|
| 720-01-B |
erosion control system, slope protection (type b)
|
341   |
sq m |
1.50 |
511.50 |
1.65 |
562.65 |
|
|
|
|
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
2,139   |
sq m |
1.50 |
3,208.50 |
1.65 |
3,529.35 |
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
ea |
20,000.00 |
20,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 725-02 |
temporary detour roads
|
26,647.2 |
sq m |
47.00 |
1,252,418.40 |
90.00 |
2,398,248.00 |
|
|
|
|
| 725-03 |
temporary detour bridging
|
342.00 |
ln m |
2,000.00 |
684,000.00 |
3,500.00 |
1,197,000.00 |
|
|
|
|
| 726-01 |
bedding material
|
739.7 |
cu m |
65.00 |
48,080.50 |
69.00 |
51,039.30 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
lump |
1,000,000.00 |
1,000,000.00 |
500,000.00 |
500,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
20   |
ea |
50.00 |
1,000.00 |
60.00 |
1,200.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
20   |
ea |
60.00 |
1,200.00 |
70.00 |
1,400.00 |
|
|
|
|
| 731-01 |
nonreflectorized raised pavement markers
|
499   |
ea |
8.00 |
3,992.00 |
8.80 |
4,391.20 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
307   |
ea |
5.00 |
1,535.00 |
5.35 |
1,642.45 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line)(100 mm width)
|
7.347 |
km |
1,300.00 |
9,551.10 |
1,350.00 |
9,918.45 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
3.674 |
km |
540.00 |
1,983.96 |
600.00 |
2,204.40 |
|
|
|
|
| 732-05 |
removal of existing markings
|
2.675 |
km |
1,700.00 |
4,547.50 |
1,800.00 |
4,815.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
lump |
150,000.00 |
150,000.00 |
100,000.00 |
100,000.00 |
|
|
|
|
| 804-01-B |
precast concrete piles (350 mm)
|
3,550.5 |
ln m |
110.00 |
390,555.00 |
125.00 |
443,812.50 |
|
|
|
|
| 804-01-F |
precast concrete piles (600 mm)
|
1,947.5 |
ln m |
230.00 |
447,925.00 |
225.00 |
438,187.50 |
|
|
|
|
| 804-12 |
loading permanent piles
|
5   |
ea |
2,000.00 |
10,000.00 |
100.00 |
500.00 |
|
|
|
|
| 804-13 |
precast concrete indicator piles
|
1   |
ea |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| 804-17 |
dynamic monitoring
|
15   |
ea |
2,000.00 |
30,000.00 |
1,200.00 |
18,000.00 |
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
51.19 |
cu m |
900.00 |
46,071.00 |
975.00 |
49,910.25 |
|
|
|
|
| 805-01-F |
class a concrete (bents)
|
465.80 |
cu m |
850.00 |
395,930.00 |
865.00 |
402,917.00 |
|
|
|
|
| 805-03 |
class aa concrete
|
1,466.65 |
cu m |
600.00 |
879,990.00 |
805.00 |
1,180,653.25 |
|
|
|
|
| 805-08-B |
precast-prestressed concrete girders (type ii)
|
1,782.00 |
ln m |
180.00 |
320,760.00 |
240.00 |
427,680.00 |
|
|
|
|
| 805-11 |
strip seal joints
|
132.00 |
ln m |
320.00 |
42,240.00 |
350.00 |
46,200.00 |
|
|
|
|
| 805-12-E |
reinforced concrete box culverts (1200 mm x 1200 mm)
|
219.00 |
ln m |
600.00 |
131,400.00 |
790.00 |
173,010.00 |
|
|
|
|
| 805-12-I |
reinforced concrete box culverts (1500 mm x 1500 mm)
|
98.00 |
ln m |
900.00 |
88,200.00 |
1,070.00 |
104,860.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
228,593   |
kg |
1.40 |
320,030.20 |
2.50 |
571,482.50 |
|
|
|
|
| 807-06 |
structural metalwork
|
lump |
lump |
6,000.00 |
6,000.00 |
7,900.00 |
7,900.00 |
|
|
|
|
| 810-01 |
concrete railing (barrier)
|
858.00 |
ln m |
130.00 |
111,540.00 |
200.00 |
171,600.00 |
|
|
|
|
| 813-01 |
concrete approach slabs
|
1,116.00 |
sq m |
150.00 |
167,400.00 |
180.00 |
200,880.00 |
|
|
|
|
| S-101 |
dynamic analysis
|
15   |
each |
1,200.00 |
18,000.00 |
1,200.00 |
18,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
10,383,506.14 |
|
12,372,234.97 |
|
|
|
|
|