Error processing SSI file
Error processing SSI file
Bid Tabs Error processing SSI file
Bid Tabulations Error processing SSI file
February 06, 2014 Error processing SSI file

Letting of 4/14/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 066-03-0021
Parish: VERNON
Routes: LA 10
Description: PITKIN - RAPIDES PARISH LINE BRIDGES
Type Const: grading, drainage structures, lime treatment, class ii base course, superpave asphaltic
conc. pvmt., concrete slab span bridges, concrete girder span bridges, and related work.
 
RankLicenseBidderAmount
134567 JAMES CONSTRUCTION GROUP LLC $8,799,276.01
212312 GILCHRIST CONSTRUCTION CO. LLC $9,365,313.40
325747 KOSTMAYER CONSTRUCTION, LLC $9,454,875.36
409090 GUINN BROTHERS, LLC. $10,277,781.16
539462 DENTON-JAMES LLC $10,383,506.14
608815 W. E. MCDONALD & SON, LLC. $12,372,234.97
 
Item Number Item Description Quantity Unit of Measure - 1 -
JAMES CONSTRUCTION GROUP LLC
- 2 -
GILCHRIST CONSTRUCTION CO. LLC
- 3 -
KOSTMAYER CONSTRUCTION, LLC
- 4 -
GUINN BROTHERS, LLC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 400,000.00 400,000.00 250,000.00 250,000.00 150,000.00 150,000.00 200,000.00 200,000.00
202-01 removal of structures & obstructions lump      lump 6,000.00 6,000.00 10,000.00 10,000.00 43,000.00 43,000.00 20,000.00 20,000.00
202-02-A-01 removal of bridge (sta. 10+167.03; 7.32 m x 53.04 m
timber bridge)
1      ea 14,000.00 14,000.00 15,000.00 15,000.00 10,500.00 10,500.00 10,000.00 10,000.00
202-02-A-02 removal of bridge (sta. 30+322.40; 7.62 m x 117.04 m
timber bridge)
1      ea 30,000.00 30,000.00 30,000.00 30,000.00 27,000.00 27,000.00 25,000.00 25,000.00
202-02-A-03 removal of bridge (sta. 60+292.89; 7.32 m x 23.47 m
timber bridge)
1      ea 4,000.00 4,000.00 6,500.00 6,500.00 5,500.00 5,500.00 5,000.00 5,000.00
202-02-A-04 removal of bridge (sta. 60+504.30; 7.66 m x 80.77 m
timber bridge)
1      ea 14,000.00 14,000.00 22,000.00 22,000.00 16,000.00 16,000.00 18,000.00 18,000.00
202-02-A-05 removal of bridge (sta. 60+745.30; 7.66 m x 46.99 m
timber bridge)
1      ea 8,000.00 8,000.00 10,000.00 10,000.00 10,500.00 10,500.00 10,000.00 10,000.00
202-02-A-06 removal of bridge (sta. 20+188.900; 7.32 m x 12.61 m
timber bridge)
1      ea 5,000.00 5,000.00 3,200.00 3,200.00 5,500.00 5,500.00 2,500.00 2,500.00
202-02-A-07 removal of bridge (sta. 40+152.930; 7.32 m x 17.78 m
timber bridge)
1      ea 10,000.00 10,000.00 6,500.00 6,500.00 5,500.00 5,500.00 4,000.00 4,000.00
202-02-A-08 removal of bridge (sta. 50+209.479; 7.32 m x 23.56 m
timber bridge)
1      ea 8,000.00 8,000.00 6,500.00 6,500.00 5,500.00 5,500.00 4,000.00 4,000.00
202-02-A-09 removal of bridge (sta. 60+085.938; 7.32 m x 24.38 m
timber bridge)
1      ea 4,000.00 4,000.00 6,500.00 6,500.00 5,500.00 5,500.00 5,000.00 5,000.00
202-02-A-10 removal of bridge (sta. 60+148.372; 7.32 m x 24.38 m
timber bridge)
1      ea 4,000.00 4,000.00 6,500.00 6,500.00 5,500.00 5,500.00 5,000.00 5,000.00
202-02-G removal of surfacing & stabilized base 12,414.0    sq m 4.00 49,656.00 3.00 37,242.00 1.50 18,621.00 4.00 49,656.00
202-02-H removal of guard rail 196      ln m 10.00 1,960.00 10.00 1,960.00 16.00 3,136.00 18.00 3,528.00
203-01 general excavation 6,399      cu m 5.00 31,995.00 4.75 30,395.25 5.00 31,995.00 6.50 41,593.50
203-02 drainage excavation 20,872      cu m 6.50 135,668.00 5.00 104,360.00 6.00 125,232.00 6.50 135,668.00
203-03 muck excavation 313      cu m 8.00 2,504.00 7.80 2,441.40 6.00 1,878.00 14.00 4,382.00
203-04 embankment 68,271      cu m 8.50 580,303.50 9.90 675,882.90 11.00 750,981.00 7.00 477,897.00
204-02 temporary hay or straw bales 42      ea 5.00 210.00 15.00 630.00 12.00 504.00 8.00 336.00
204-06 temporary silt fencing 5,567      ln m 3.00 16,701.00 6.00 33,402.00 6.00 33,402.00 3.00 16,701.00
302-02-B class ii base course (220 mm thick) 15,935.3    sq m 16.00 254,964.80 17.00 270,900.10 17.00 270,900.10 18.00 286,835.40
302-02-E class ii base course (192 mm average thickness) 7,383.7    sq m 15.00 110,755.50 15.00 110,755.50 17.00 125,522.90 16.00 118,139.20
304-01 lime 112.23   Mg 125.00 14,028.75 95.00 10,661.85 180.00 20,201.40 125.00 14,028.75
304-04-D lime treatment (type d) (300 mm thick) 7,423      sq m 1.25 9,278.75 0.50 3,711.50 5.50 40,826.50 6.50 48,249.50
401-01 aggregate surface course (net section) 73.8    cu m 80.00 5,904.00 80.00 5,904.00 70.00 5,166.00 80.00 5,904.00
402-01 traffic maintenance aggregate (vehicular measurement) 1,000.0    cu m 23.00 23,000.00 38.00 38,000.00 65.00 65,000.00 75.00 75,000.00
502-01-A superpave asphaltic concrete (level 1) 5,800.0    Mg 75.00 435,000.00 65.00 377,000.00 120.00 696,000.00 120.00 696,000.00
502-01-D superpave asphaltic concrete, incidental paving (level
a)
1,133.9    Mg 100.00 113,390.00 75.00 85,042.50 145.00 164,415.50 120.00 136,068.00
701-01-Q/S cross drain pipe (1500 mm rcp/pcp or 1800 mm cmp) 69.8    ln m 650.00 45,370.00 600.00 41,880.00 660.00 46,068.00 700.00 48,860.00
701-01-S/U cross drain pipe (1800 mm rcp/pcp or 2100 mm cmp) 138.6    ln m 760.00 105,336.00 750.00 103,950.00 770.00 106,722.00 950.00 131,670.00
701-05-I side drain pipe (600 mm) 125.2    ln m 145.00 18,154.00 180.00 22,536.00 155.00 19,406.00 130.00 16,276.00
702-05-A cross drain end treatment (three barrel rcb - 1200mm) 2      each 1,400.00 2,800.00 1,900.00 3,800.00 4,000.00 8,000.00 2,500.00 5,000.00
702-05-B cross drain end treatment (four barrel rcb - 1200mm) 2      each 1,600.00 3,200.00 2,300.00 4,600.00 4,000.00 8,000.00 3,500.00 7,000.00
702-05-C cross drain end treatment (four barrel rcb - 1500mm) 2      each 2,400.00 4,800.00 2,950.00 5,900.00 4,000.00 8,000.00 4,500.00 9,000.00
702-05-D cross drain end treatment (double pipes - 1500mm) 2      each 3,500.00 7,000.00 2,350.00 4,700.00 4,000.00 8,000.00 3,500.00 7,000.00
702-05-E cross drain end treatment (triple pipes - 1800mm) 2      each 5,500.00 11,000.00 3,500.00 7,000.00 4,000.00 8,000.00 5,500.00 11,000.00
704-03 blocked out guard rail 365.86   ln m 43.00 15,731.98 45.00 16,463.70 53.00 19,390.58 70.00 25,610.20
704-08-B guard rail transitions (double thrie beam) 152.40   ln m 114.00 17,373.60 120.00 18,288.00 143.00 21,793.20 160.00 24,384.00
704-11-A guard rail end treatment (flared) 20      ea 1,500.00 30,000.00 1,600.00 32,000.00 1,900.00 38,000.00 1,900.00 38,000.00
705-01 barbed wire fence 2,085      ln m 12.00 25,020.00 18.00 37,530.00 13.00 27,105.00 13.75 28,668.75
708-01 right-of-way monument 61      ea 160.00 9,760.00 250.00 15,250.00 100.00 6,100.00 180.00 10,980.00
708-02 right-of-way monument witness post 61      ea 160.00 9,760.00 250.00 15,250.00 100.00 6,100.00 180.00 10,980.00
711-01-C riprap (15 kg, 360 mm thickness) 2,629      sq m 46.00 120,934.00 45.00 118,305.00 44.00 115,676.00 50.00 131,450.00
711-04 geotextile fabric 6,151      sq m 3.00 18,453.00 2.10 12,917.10 3.00 18,453.00 2.25 13,839.75
712-04 flexible revetment 2,303      sq m 45.00 103,635.00 45.00 103,635.00 50.00 115,150.00 50.00 115,150.00
713-01 temporary signs & barricades lump      lump 60,000.00 60,000.00 70,000.00 70,000.00 102,000.00 102,000.00 135,000.00 135,000.00
713-03-A-01 temporary pavement markings (100 mm width)(type
1 removable)
1,394      ln m 7.00 9,758.00 7.00 9,758.00 16.50 23,001.00 7.00 9,758.00
714-02 water 121      cu m 4.00 484.00 1.20 145.20 3.50 423.50 1.00 121.00
716-01-A mulch (vegetative) 12.2    hctr 1,400.00 17,080.00 14,000.00 170,800.00 1,550.00 18,910.00 1,500.00 18,300.00
717-01 seeding 828      kg 13.00 10,764.00 12.00 9,936.00 14.00 11,592.00 14.00 11,592.00
718-01 fertilizer 13,633      kg 0.40 5,453.20 0.50 6,816.50 0.50 6,816.50 0.50 6,816.50
720-01-A erosion control system, slope protection (type a) 5,951      sq m 1.20 7,141.20 1.35 8,033.85 1.40 8,331.40 1.35 8,033.85
720-01-B erosion control system, slope protection (type b) 341      sq m 1.20 409.20 1.75 596.75 1.40 477.40 2.00 682.00
720-01-C erosion control system, flexible channel liner (type c) 2,139      sq m 1.40 2,994.60 1.75 3,743.25 3.00 6,417.00 2.00 4,278.00
722-01 project site laboratory 1      ea 6,000.00 6,000.00 25,000.00 25,000.00 14,000.00 14,000.00 6,500.00 6,500.00
725-02 temporary detour roads 26,647.2    sq m 43.00 1,145,829.60 36.00 959,299.20 38.00 1,012,593.60 50.30 1,340,354.16
725-03 temporary detour bridging 342.00   ln m 2,500.00 855,000.00 2,900.00 991,800.00 3,000.00 1,026,000.00 3,500.00 1,197,000.00
726-01 bedding material 739.7    cu m 55.00 40,683.50 50.00 36,985.00 65.00 48,080.50 80.00 59,176.00
727-01 mobilization lump      lump 804,000.00 804,000.00 900,000.00 900,000.00 110,000.00 110,000.00 485,000.00 485,000.00
729-16-B object marker assembly (type 2) 20      ea 50.00 1,000.00 55.00 1,100.00 65.00 1,300.00 65.00 1,300.00
729-16-C object marker assembly (type 3) 20      ea 60.00 1,200.00 65.00 1,300.00 75.00 1,500.00 85.00 1,700.00
731-01 nonreflectorized raised pavement markers 499      ea 8.00 3,992.00 8.50 4,241.50 18.00 8,982.00 9.00 4,491.00
731-02 reflectorized raised pavement markers 307      ea 4.90 1,504.30 5.50 1,688.50 14.00 4,298.00 6.00 1,842.00
732-02-A plastic pavement striping (solid line)(100 mm width) 7.347  km 1,225.00 9,000.07 1,400.00 10,285.80 1,800.00 13,224.60 1,500.00 11,020.50
732-03-A plastic pavement striping (broken line)(100 mm width) 3.674  km 540.00 1,983.96 600.00 2,204.40 1,020.00 3,747.48 650.00 2,388.10
732-05 removal of existing markings 2.675  km 1,600.00 4,280.00 1,700.00 4,547.50 4,800.00 12,840.00 2,000.00 5,350.00
740-01 construction layout lump      lump 75,000.00 75,000.00 180,000.00 180,000.00 50,000.00 50,000.00 125,000.00 125,000.00
804-01-B precast concrete piles (350 mm) 3,550.5    ln m 100.00 355,050.00 90.00 319,545.00 148.00 525,474.00 95.00 337,297.50
804-01-F precast concrete piles (600 mm) 1,947.5    ln m 180.00 350,550.00 200.00 389,500.00 253.00 492,717.50 255.00 496,612.50
804-12 loading permanent piles 5      ea 2,000.00 10,000.00 100.00 500.00 500.00 2,500.00 1.00 5.00
804-13 precast concrete indicator piles 1      ea 14,000.00 14,000.00 7,500.00 7,500.00 17,000.00 17,000.00 20,000.00 20,000.00
804-17 dynamic monitoring 15      ea 1,000.00 15,000.00 800.00 12,000.00 1,200.00 18,000.00 2,000.00 30,000.00
805-01-B class a concrete (box culvert headwalls) 51.19   cu m 1,000.00 51,190.00 775.00 39,672.25 950.00 48,630.50 1,000.00 51,190.00
805-01-F class a concrete (bents) 465.80   cu m 455.00 211,939.00 600.00 279,480.00 670.00 312,086.00 700.00 326,060.00
805-03 class aa concrete 1,466.65   cu m 420.00 615,993.00 600.00 879,990.00 620.00 909,323.00 575.00 843,323.75
805-08-B precast-prestressed concrete girders (type ii) 1,782.00   ln m 180.00 320,760.00 160.00 285,120.00 277.00 493,614.00 220.00 392,040.00
805-11 strip seal joints 132.00   ln m 300.00 39,600.00 450.00 59,400.00 335.00 44,220.00 350.00 46,200.00
805-12-E reinforced concrete box culverts (1200 mm x 1200 mm) 219.00   ln m 750.00 164,250.00 1,150.00 251,850.00 900.00 197,100.00 1,060.00 232,140.00
805-12-I reinforced concrete box culverts (1500 mm x 1500 mm) 98.00   ln m 1,000.00 98,000.00 1,125.00 110,250.00 1,200.00 117,600.00 1,530.00 149,940.00
806-01 deformed reinforcing steel 228,593      kg 1.50 342,889.50 1.30 297,170.90 1.40 320,030.20 2.25 514,334.25
807-06 structural metalwork lump      lump 7,500.00 7,500.00 10,000.00 10,000.00 5,000.00 5,000.00 8,000.00 8,000.00
810-01 concrete railing (barrier) 858.00   ln m 120.00 102,960.00 135.00 115,830.00 110.00 94,380.00 140.00 120,120.00
813-01 concrete approach slabs 1,116.00   sq m 165.00 184,140.00 155.00 172,980.00 120.00 133,920.00 185.00 206,460.00
S-101 dynamic analysis 15      each 750.00 11,250.00 750.00 11,250.00 1,000.00 15,000.00 1,000.00 15,000.00
                       
 CONTRACTOR TOTAL       8,799,276.01   9,365,313.40   9,454,875.36   10,277,781.16
 
Item Number Item Description Quantity Unit of Measure - 5 -
DENTON-JAMES LLC
- 6 -
W. E. MCDONALD & SON, LLC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 800,000.00 800,000.00 500,000.00 500,000.00        
202-01 removal of structures & obstructions lump      lump 25,000.00 25,000.00 10,000.00 10,000.00        
202-02-A-01 removal of bridge (sta. 10+167.03; 7.32 m x 53.04 m
timber bridge)
1      ea 14,000.00 14,000.00 10,000.00 10,000.00        
202-02-A-02 removal of bridge (sta. 30+322.40; 7.62 m x 117.04 m
timber bridge)
1      ea 25,000.00 25,000.00 10,000.00 10,000.00        
202-02-A-03 removal of bridge (sta. 60+292.89; 7.32 m x 23.47 m
timber bridge)
1      ea 10,000.00 10,000.00 10,000.00 10,000.00        
202-02-A-04 removal of bridge (sta. 60+504.30; 7.66 m x 80.77 m
timber bridge)
1      ea 16,000.00 16,000.00 10,000.00 10,000.00        
202-02-A-05 removal of bridge (sta. 60+745.30; 7.66 m x 46.99 m
timber bridge)
1      ea 14,000.00 14,000.00 10,000.00 10,000.00        
202-02-A-06 removal of bridge (sta. 20+188.900; 7.32 m x 12.61 m
timber bridge)
1      ea 5,000.00 5,000.00 10,000.00 10,000.00        
202-02-A-07 removal of bridge (sta. 40+152.930; 7.32 m x 17.78 m
timber bridge)
1      ea 6,000.00 6,000.00 10,000.00 10,000.00        
202-02-A-08 removal of bridge (sta. 50+209.479; 7.32 m x 23.56 m
timber bridge)
1      ea 10,000.00 10,000.00 10,000.00 10,000.00        
202-02-A-09 removal of bridge (sta. 60+085.938; 7.32 m x 24.38 m
timber bridge)
1      ea 10,000.00 10,000.00 10,000.00 10,000.00        
202-02-A-10 removal of bridge (sta. 60+148.372; 7.32 m x 24.38 m
timber bridge)
1      ea 10,000.00 10,000.00 10,000.00 10,000.00        
202-02-G removal of surfacing & stabilized base 12,414.0    sq m 3.50 43,449.00 5.00 62,070.00        
202-02-H removal of guard rail 196      ln m 6.00 1,176.00 10.00 1,960.00        
203-01 general excavation 6,399      cu m 7.00 44,793.00 8.00 51,192.00        
203-02 drainage excavation 20,872      cu m 7.00 146,104.00 10.00 208,720.00        
203-03 muck excavation 313      cu m 30.00 9,390.00 15.00 4,695.00        
203-04 embankment 68,271      cu m 9.00 614,439.00 9.00 614,439.00        
204-02 temporary hay or straw bales 42      ea 8.00 336.00 6.00 252.00        
204-06 temporary silt fencing 5,567      ln m 3.00 16,701.00 10.00 55,670.00        
302-02-B class ii base course (220 mm thick) 15,935.3    sq m 22.00 350,576.60 24.00 382,447.20        
302-02-E class ii base course (192 mm average thickness) 7,383.7    sq m 22.00 162,441.40 23.00 169,825.10        
304-01 lime 112.23   Mg 120.00 13,467.60 110.00 12,345.30        
304-04-D lime treatment (type d) (300 mm thick) 7,423      sq m 2.00 14,846.00 3.00 22,269.00        
401-01 aggregate surface course (net section) 73.8    cu m 70.00 5,166.00 100.00 7,380.00        
402-01 traffic maintenance aggregate (vehicular measurement) 1,000.0    cu m 70.00 70,000.00 1.00 1,000.00        
502-01-A superpave asphaltic concrete (level 1) 5,800.0    Mg 100.00 580,000.00 102.00 591,600.00        
502-01-D superpave asphaltic concrete, incidental paving (level
a)
1,133.9    Mg 100.00 113,390.00 102.00 115,657.80        
701-01-Q/S cross drain pipe (1500 mm rcp/pcp or 1800 mm cmp) 69.8    ln m 600.00 41,880.00 690.00 48,162.00        
701-01-S/U cross drain pipe (1800 mm rcp/pcp or 2100 mm cmp) 138.6    ln m 750.00 103,950.00 786.00 108,939.60        
701-05-I side drain pipe (600 mm) 125.2    ln m 160.00 20,032.00 155.00 19,406.00        
702-05-A cross drain end treatment (three barrel rcb - 1200mm) 2      each 1,200.00 2,400.00 6,000.00 12,000.00        
702-05-B cross drain end treatment (four barrel rcb - 1200mm) 2      each 1,400.00 2,800.00 5,500.00 11,000.00        
702-05-C cross drain end treatment (four barrel rcb - 1500mm) 2      each 2,000.00 4,000.00 7,000.00 14,000.00        
702-05-D cross drain end treatment (double pipes - 1500mm) 2      each 3,000.00 6,000.00 3,800.00 7,600.00        
702-05-E cross drain end treatment (triple pipes - 1800mm) 2      each 4,000.00 8,000.00 6,250.00 12,500.00        
704-03 blocked out guard rail 365.86   ln m 43.00 15,731.98 72.00 26,341.92        
704-08-B guard rail transitions (double thrie beam) 152.40   ln m 120.00 18,288.00 165.00 25,146.00        
704-11-A guard rail end treatment (flared) 20      ea 1,500.00 30,000.00 2,000.00 40,000.00        
705-01 barbed wire fence 2,085      ln m 13.00 27,105.00 18.50 38,572.50        
708-01 right-of-way monument 61      ea 100.00 6,100.00 150.00 9,150.00        
708-02 right-of-way monument witness post 61      ea 100.00 6,100.00 150.00 9,150.00        
711-01-C riprap (15 kg, 360 mm thickness) 2,629      sq m 45.00 118,305.00 49.50 130,135.50        
711-04 geotextile fabric 6,151      sq m 2.50 15,377.50 3.00 18,453.00        
712-04 flexible revetment 2,303      sq m 47.50 109,392.50 48.00 110,544.00        
713-01 temporary signs & barricades lump      lump 60,000.00 60,000.00 195,000.00 195,000.00        
713-03-A-01 temporary pavement markings (100 mm width)(type
1 removable)
1,394      ln m 6.60 9,200.40 7.25 10,106.50        
714-02 water 121      cu m 1.00 121.00 1.25 151.25        
716-01-A mulch (vegetative) 12.2    hctr 1,400.00 17,080.00 1,453.00 17,726.60        
717-01 seeding 828      kg 11.00 9,108.00 12.00 9,936.00        
718-01 fertilizer 13,633      kg 0.40 5,453.20 0.50 6,816.50        
720-01-A erosion control system, slope protection (type a) 5,951      sq m 1.30 7,736.30 1.40 8,331.40        
720-01-B erosion control system, slope protection (type b) 341      sq m 1.50 511.50 1.65 562.65        
720-01-C erosion control system, flexible channel liner (type c) 2,139      sq m 1.50 3,208.50 1.65 3,529.35        
722-01 project site laboratory 1      ea 20,000.00 20,000.00 15,000.00 15,000.00        
725-02 temporary detour roads 26,647.2    sq m 47.00 1,252,418.40 90.00 2,398,248.00        
725-03 temporary detour bridging 342.00   ln m 2,000.00 684,000.00 3,500.00 1,197,000.00        
726-01 bedding material 739.7    cu m 65.00 48,080.50 69.00 51,039.30        
727-01 mobilization lump      lump 1,000,000.00 1,000,000.00 500,000.00 500,000.00        
729-16-B object marker assembly (type 2) 20      ea 50.00 1,000.00 60.00 1,200.00        
729-16-C object marker assembly (type 3) 20      ea 60.00 1,200.00 70.00 1,400.00        
731-01 nonreflectorized raised pavement markers 499      ea 8.00 3,992.00 8.80 4,391.20        
731-02 reflectorized raised pavement markers 307      ea 5.00 1,535.00 5.35 1,642.45        
732-02-A plastic pavement striping (solid line)(100 mm width) 7.347  km 1,300.00 9,551.10 1,350.00 9,918.45        
732-03-A plastic pavement striping (broken line)(100 mm width) 3.674  km 540.00 1,983.96 600.00 2,204.40        
732-05 removal of existing markings 2.675  km 1,700.00 4,547.50 1,800.00 4,815.00        
740-01 construction layout lump      lump 150,000.00 150,000.00 100,000.00 100,000.00        
804-01-B precast concrete piles (350 mm) 3,550.5    ln m 110.00 390,555.00 125.00 443,812.50        
804-01-F precast concrete piles (600 mm) 1,947.5    ln m 230.00 447,925.00 225.00 438,187.50        
804-12 loading permanent piles 5      ea 2,000.00 10,000.00 100.00 500.00        
804-13 precast concrete indicator piles 1      ea 20,000.00 20,000.00 25,000.00 25,000.00        
804-17 dynamic monitoring 15      ea 2,000.00 30,000.00 1,200.00 18,000.00        
805-01-B class a concrete (box culvert headwalls) 51.19   cu m 900.00 46,071.00 975.00 49,910.25        
805-01-F class a concrete (bents) 465.80   cu m 850.00 395,930.00 865.00 402,917.00        
805-03 class aa concrete 1,466.65   cu m 600.00 879,990.00 805.00 1,180,653.25        
805-08-B precast-prestressed concrete girders (type ii) 1,782.00   ln m 180.00 320,760.00 240.00 427,680.00        
805-11 strip seal joints 132.00   ln m 320.00 42,240.00 350.00 46,200.00        
805-12-E reinforced concrete box culverts (1200 mm x 1200 mm) 219.00   ln m 600.00 131,400.00 790.00 173,010.00        
805-12-I reinforced concrete box culverts (1500 mm x 1500 mm) 98.00   ln m 900.00 88,200.00 1,070.00 104,860.00        
806-01 deformed reinforcing steel 228,593      kg 1.40 320,030.20 2.50 571,482.50        
807-06 structural metalwork lump      lump 6,000.00 6,000.00 7,900.00 7,900.00        
810-01 concrete railing (barrier) 858.00   ln m 130.00 111,540.00 200.00 171,600.00        
813-01 concrete approach slabs 1,116.00   sq m 150.00 167,400.00 180.00 200,880.00        
S-101 dynamic analysis 15      each 1,200.00 18,000.00 1,200.00 18,000.00        
                       
 CONTRACTOR TOTAL       10,383,506.14   12,372,234.97        

Error processing SSI file