Lead Project: 025-04-0017
Parish: SABINE
Routes: US 171
Description: CONVERSE - DESOTO PARISH LINE
Type Const: grading, drainage structures, cold planing asphaltic conc. pavement, class ii base
course, superpave acp, pccp, conc slab span bridges and related work.
 
RankLicenseBidderAmount
139462 DENTON-JAMES LLC $11,487,769.52
212312 GILCHRIST CONSTRUCTION CO. LLC $11,555,279.30
334567 JAMES CONSTRUCTION GROUP LLC $11,783,975.10
428665 GILBERT SOUTHERN CORP $12,997,257.56
525747 KOSTMAYER CONSTRUCTION, LLC $17,318,498.83
 
Item Number Item Description Quantity Unit of Measure - 1 -
DENTON-JAMES LLC
- 2 -
GILCHRIST CONSTRUCTION CO. LLC
- 3 -
JAMES CONSTRUCTION GROUP LLC
- 4 -
GILBERT SOUTHERN CORP
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 570,000.00 570,000.00 300,000.00 300,000.00 650,000.00 650,000.00 200,000.00 200,000.00
202-01 removal of structures & obstructions lump      LUMP 15,000.00 15,000.00 12,000.00 12,000.00 20,000.00 20,000.00 90,000.00 90,000.00
202-02-C removal of portland cement concrete pavement 24,308      SQYD 4.00 97,232.00 4.00 97,232.00 6.00 145,848.00 4.50 109,386.00
202-02-H removal of guard rail 312      LNFT 3.00 936.00 5.00 1,560.00 3.00 936.00 4.20 1,310.40
203-01 general excavation 408,203      CUYD 2.20 898,046.60 3.00 1,224,609.00 2.50 1,020,507.50 4.00 1,632,812.00
203-02 drainage excavation 5,040      CUYD 6.50 32,760.00 5.00 25,200.00 6.00 30,240.00 8.50 42,840.00
203-03 muck excavation 74      CUYD 30.00 2,220.00 18.00 1,332.00 20.00 1,480.00 20.00 1,480.00
203-04 embankment 348,751      CUYD 2.50 871,877.50 3.20 1,116,003.20 3.10 1,081,128.10 3.50 1,220,628.50
203-05 nonplastic embankment 144      CUYD 110.00 15,840.00 13.60 1,958.40 125.00 18,000.00 80.00 11,520.00
204-03 temporary slope drains 780      LNFT 15.00 11,700.00 14.00 10,920.00 25.00 19,500.00 5.50 4,290.00
204-05-A temporary sediment check dams (hay) 29      EACH 70.00 2,030.00 225.00 6,525.00 100.00 2,900.00 90.00 2,610.00
204-05-B temporary sediment check dams (stone) 18      EACH 400.00 7,200.00 350.00 6,300.00 300.00 5,400.00 400.00 7,200.00
204-06 temporary silt fencing 14,500      LNFT 1.50 21,750.00 1.75 25,375.00 1.30 18,850.00 1.35 19,575.00
204-07 temporary stone construction entrance 2      EACH 1,500.00 3,000.00 2,400.00 4,800.00 1,300.00 2,600.00 1,500.00 3,000.00
302-01 class ii base course 16,863.0    CUYD 70.00 1,180,410.00 64.00 1,079,232.00 60.00 1,011,780.00 50.00 843,150.00
303-01-C in-place cement stabilized base course (10" thick) 121,426      SQYD 5.50 667,843.00 6.35 771,055.10 6.25 758,912.50 4.50 546,417.00
304-01 lime 568.01   TON 120.00 68,161.20 95.00 53,960.95 50.00 28,400.50 90.00 51,120.90
304-04-D lime treatment (type d) (12" thick) 40,071      SQYD 1.70 68,120.70 0.25 10,017.75 0.50 20,035.50 2.50 100,177.50
401-02 aggregate surface course (adjusted vehicular
measurement)
5,614      CUYD 50.00 280,700.00 50.00 280,700.00 60.00 336,840.00 60.00 336,840.00
402-01 traffic maintenance aggregate (vehicular measurement) 1,000.0    CUYD 50.00 50,000.00 45.00 45,000.00 35.00 35,000.00 70.00 70,000.00
502-01 superpave asphaltic concrete 38,829.1    TON 50.50 1,960,869.55 51.00 1,980,284.10 50.00 1,941,455.00 58.00 2,252,087.80
502-01-D superpave asphaltic concrete, incidental paving (level
a)
104.7    TON 130.00 13,611.00 130.00 13,611.00 125.00 13,087.50 150.00 15,705.00
509-01 cold planing asphaltic pavement 31,246      SQYD 1.00 31,246.00 1.00 31,246.00 1.00 31,246.00 1.25 39,057.50
509-02 contractor retained reclaimed asphaltic pavement - 1,736      CUYD 1.00 - 1,736.00 1.00 - 1,736.00 1.00 - 1,736.00 0.01 - 17.36
601-01-G portland cement concrete pavement (8" thick) 11,291.7    SQYD 45.00 508,126.50 40.00 451,668.00 35.00 395,209.50 45.00 508,126.50
601-04 portland cement concrete pavement coring 30      EACH 100.00 3,000.00 110.00 3,300.00 100.00 3,000.00 110.00 3,300.00
701-01-G cross drain pipe (18" rcp/pcp) 1,324      LNFT 36.00 47,664.00 30.00 39,720.00 51.00 67,524.00 37.00 48,988.00
701-01-K cross drain pipe (30" rcp/pcp) 278      LNFT 55.00 15,290.00 55.00 15,290.00 70.00 19,460.00 51.00 14,178.00
701-01-M cross drain pipe (36" rcp/pcp) 260      LNFT 65.00 16,900.00 71.00 18,460.00 85.00 22,100.00 63.00 16,380.00
701-01-O cross drain pipe (48" rcp) 256      LNFT 110.00 28,160.00 132.00 33,792.00 140.00 35,840.00 113.00 28,928.00
701-01-S cross drain pipe (72" rcp) 316      LNFT 240.00 75,840.00 275.00 86,900.00 240.00 75,840.00 260.00 82,160.00
701-03-F storm drain pipe (15" rcp/pcp) 1,307      LNFT 32.00 41,824.00 30.00 39,210.00 35.00 45,745.00 34.00 44,438.00
701-05-G side drain pipe (18") 372      LNFT 42.00 15,624.00 31.00 11,532.00 43.00 15,996.00 33.00 12,276.00
701-05-I side drain pipe (24") 280      LNFT 52.00 14,560.00 46.00 12,880.00 60.00 16,800.00 37.00 10,360.00
701-05-K side drain pipe (30") 98      LNFT 58.00 5,684.00 64.00 6,272.00 70.00 6,860.00 43.00 4,214.00
701-05-M side drain pipe (36") 46      LNFT 68.00 3,128.00 80.00 3,680.00 85.00 3,910.00 47.00 2,162.00
701-05-N side drain pipe (42") 228      LNFT 70.00 15,960.00 112.00 25,536.00 100.00 22,800.00 63.00 14,364.00
702-03-A catch basins (cb-01) 18      EACH 2,400.00 43,200.00 2,500.00 45,000.00 3,300.00 59,400.00 2,400.00 43,200.00
702-03-C catch basins (cb-06) 4      EACH 2,600.00 10,400.00 3,200.00 12,800.00 3,000.00 12,000.00 3,400.00 13,600.00
702-03-D catch basins (cb-07) 2      EACH 3,000.00 6,000.00 3,500.00 7,000.00 3,200.00 6,400.00 4,600.00 9,200.00
702-03-F catch basins (cb-08) 2      EACH 4,500.00 9,000.00 7,200.00 14,400.00 5,500.00 11,000.00 9,000.00 18,000.00
702-03-G catch basins (cb-09) 4      EACH 3,000.00 12,000.00 6,000.00 24,000.00 4,000.00 16,000.00 4,300.00 17,200.00
702-08-A side drain safety end (type 1) 2      EACH 1,200.00 2,400.00 1,250.00 2,500.00 1,500.00 3,000.00 1,100.00 2,200.00
703-01 shoulder underdrain systems 2,571      LNFT 7.50 19,282.50 8.50 21,853.50 10.00 25,710.00 4.50 11,569.50
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 125.0    LNFT 28.00 3,500.00 30.00 3,750.00 28.00 3,500.00 29.40 3,675.00
704-03 blocked out guard rail 1,287.5    LNFT 13.00 16,737.50 14.00 18,025.00 15.00 19,312.50 13.70 17,638.75
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
18.8    LNFT 83.00 1,560.40 90.00 1,692.00 83.00 1,560.40 87.20 1,639.36
704-08-B guard rail transitions (double thrie beam) 200.0    LNFT 34.00 6,800.00 36.50 7,300.00 34.00 6,800.00 35.70 7,140.00
704-11-A guard rail end treatment (flared) 11      EACH 1,500.00 16,500.00 1,600.00 17,600.00 1,500.00 16,500.00 1,575.00 17,325.00
705-01 barbed wire fence 8,104      LNFT 4.25 34,442.00 4.50 36,468.00 4.25 34,442.00 4.50 36,468.00
705-02 combination mesh & barbed wire fence 2,408      LNFT 4.50 10,836.00 5.00 12,040.00 4.75 11,438.00 4.75 11,438.00
705-05 double swinging driveway gates 9      DBGT 400.00 3,600.00 430.00 3,870.00 600.00 5,400.00 420.00 3,780.00
706-02-C concrete drive (6" thick) 889.1    SQYD 47.00 41,787.70 33.00 29,340.30 40.00 35,564.00 60.00 53,346.00
706-03-C incidental concrete paving (6" thick) 226.6    SQYD 70.00 15,862.00 45.00 10,197.00 38.00 8,610.80 70.00 15,862.00
707-01 concrete curb 3,018.8    LNFT 5.00 15,094.00 7.00 21,131.60 6.00 18,112.80 8.00 24,150.40
708-01 right-of-way monument 73      EACH 100.00 7,300.00 250.00 18,250.00 250.00 18,250.00 210.00 15,330.00
708-02 right-of-way monument witness post 73      EACH 100.00 7,300.00 250.00 18,250.00 250.00 18,250.00 210.00 15,330.00
712-01-A concrete cast-in-place revetment (4" thick) 2,412      SQYD 36.00 86,832.00 33.00 79,596.00 55.00 132,660.00 60.00 144,720.00
712-02 sacked concrete revetment 40      SQYD 80.00 3,200.00 65.00 2,600.00 200.00 8,000.00 400.00 16,000.00
712-04 flexible revetment 208      SQYD 70.00 14,560.00 39.00 8,112.00 38.00 7,904.00 50.00 10,400.00
713-01 temporary signs & barricades lump      LUMP 75,000.00 75,000.00 70,000.00 70,000.00 40,000.00 40,000.00 50,000.00 50,000.00
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
4.142  MILE 200.00 828.40 325.00 1,346.15 500.00 2,071.00 395.00 1,636.09
713-04-A-01 temporary pvmt. markings (broken line)(4" w)(4' l)
(type i removable)
0.500  MILE 3,000.00 1,500.00 1,600.00 800.00 500.00 250.00 9,450.00 4,725.00
713-05-A temporary pavement markings (solid line)(4" width) 16.568  MILE 500.00 8,284.00 625.00 10,355.00 500.00 8,284.00 718.00 11,895.82
716-01-A mulch (vegetative) 110.00   ACRE 600.00 66,000.00 650.00 71,500.00 500.00 55,000.00 630.00 69,300.00
717-01 seeding 6,600      LB 3.70 24,420.00 4.00 26,400.00 6.00 39,600.00 3.85 25,410.00
718-01 fertilizer 110,000      LB 0.20 22,000.00 0.20 22,000.00 0.20 22,000.00 0.20 22,000.00
720-01-A erosion control system, slope protection (type a) 35,294      SQYD 0.90 31,764.60 1.00 35,294.00 1.00 35,294.00 1.00 35,294.00
720-01-D erosion control system, flexible channel liner (type d) 9,526      SQYD 1.70 16,194.20 1.85 17,623.10 2.35 22,386.10 1.85 17,623.10
722-02 project site laboratory (equipped) 1      EACH 30,000.00 30,000.00 25,000.00 25,000.00 15,000.00 15,000.00 20,000.00 20,000.00
724-01-B pavement patching (12" minimum thickness) 1,000      SQYD 50.00 50,000.00 58.00 58,000.00 75.00 75,000.00 100.00 100,000.00
724-02 pavement widening 479.2    SQYD 85.00 40,732.00 36.00 17,251.20 75.00 35,940.00 37.00 17,730.40
724-03 pavement joint repair 50.0    TON 300.00 15,000.00 175.00 8,750.00 300.00 15,000.00 125.00 6,250.00
725-01 temporary detour roads 2,611.2    LNFT 140.00 365,568.00 98.00 255,897.60 125.00 326,400.00 150.00 391,680.00
726-01 bedding material 2,918.1    CUYD 40.00 116,724.00 42.00 122,560.20 60.00 175,086.00 55.00 160,495.50
727-01 mobilization lump      LUMP 1,000,000.00 1,000,000.00 900,000.00 900,000.00 1,100,000.00 1,100,000.00 1,113,000.00 1,113,000.00
729-16-B object marker assembly (type 2) 6      EACH 50.00 300.00 55.00 330.00 50.00 300.00 53.00 318.00
729-16-C object marker assembly (type 3) 22      EACH 60.00 1,320.00 65.00 1,430.00 60.00 1,320.00 63.00 1,386.00
731-02 reflectorized raised pavement markers 1,225      EACH 5.00 6,125.00 4.50 5,512.50 5.00 6,125.00 5.20 6,370.00
732-01-C plastic pavement striping (8" width) 375      LNFT 1.00 375.00 0.75 281.25 1.00 375.00 0.85 318.75
732-01-E plastic pavement striping (24" width) 270      LNFT 3.00 810.00 2.50 675.00 3.00 810.00 2.80 756.00
732-02-A plastic pavement striping (solid line) (4" width) 16.468  MILE 1,600.00 26,348.80 1,700.00 27,995.60 1,600.00 26,348.80 1,970.00 32,441.96
732-03-A plastic pavement striping (broken line)(4" width) 7.627  MILE 650.00 4,957.55 650.00 4,957.55 650.00 4,957.55 718.00 5,476.18
732-03-A-01 plastic pvmt striping (broken line)(4"width)preformed
marking tape (type v)
1.141  MILE 4,000.00 4,564.00 3,850.00 4,392.85 4,000.00 4,564.00 4,410.00 5,031.81
732-04-A plastic pavement legends & symbols (arrow) 10      EACH 130.00 1,300.00 125.00 1,250.00 125.00 1,250.00 142.00 1,420.00
732-04-C plastic pavement legends & symbols (only) 3      EACH 130.00 390.00 135.00 405.00 125.00 375.00 152.00 456.00
735-01 mailboxes 8      EACH 1.00 8.00 50.00 400.00 10.00 80.00 1.50 12.00
735-02 mailbox supports (single) 8      EACH 130.00 1,040.00 175.00 1,400.00 150.00 1,200.00 137.00 1,096.00
740-01 construction layout lump      LUMP 160,000.00 160,000.00 140,000.00 140,000.00 100,000.00 100,000.00 175,000.00 175,000.00
744-01 traffic control management lump      LUMP 50,000.00 50,000.00 30,000.00 30,000.00 30,000.00 30,000.00 100,000.00 100,000.00
804-01-C precast concrete piles (16") 3,765      LNFT 40.00 150,600.00 35.00 131,775.00 40.00 150,600.00 42.00 158,130.00
804-12 loading permanent piles 2      EACH 2,000.00 4,000.00 1,000.00 2,000.00 100.00 200.00 6,200.00 12,400.00
805-01-B class a concrete (box culvert headwalls) 102.32   CUYD 700.00 71,624.00 700.00 71,624.00 950.00 97,204.00 900.00 92,088.00
805-01-F class a concrete (bents) 144.35   CUYD 650.00 93,827.50 500.00 72,175.00 425.00 61,348.75 1,100.00 158,785.00
805-03 class aa concrete 570.40   CUYD 420.00 239,568.00 450.00 256,680.00 375.00 213,900.00 800.00 456,320.00
805-12-F reinforced concrete box culverts (5'x 4') 320.0    LNFT 230.00 73,600.00 325.00 104,000.00 250.00 80,000.00 240.00 76,800.00
805-12-I reinforced concrete box culverts (5'x 5') 230.0    LNFT 270.00 62,100.00 350.00 80,500.00 275.00 63,250.00 256.00 58,880.00
805-12-P reinforced concrete box culverts (7'x 7') 916.0    LNFT 420.00 384,720.00 490.00 448,840.00 350.00 320,600.00 408.00 373,728.00
805-12-Y reinforced concrete box culverts (3'x 3') 200.0    LNFT 140.00 28,000.00 150.00 30,000.00 200.00 40,000.00 141.00 28,200.00
806-01 deformed reinforcing steel 132,224      LB 0.58 76,689.92 0.75 99,168.00 0.60 79,334.40 1.00 132,224.00
810-01 concrete railing (barrier) 640.00   LNFT 40.00 25,600.00 40.00 25,600.00 35.00 22,400.00 90.00 57,600.00
813-01 concrete approach slabs 728.88   SQYD 130.00 94,754.40 130.00 94,754.40 130.00 94,754.40 140.00 102,043.20
S-001 rumble strips (ground-in) 12.1    MILE 600.00 7,260.00 800.00 9,680.00 575.00 6,957.50 600.00 7,260.00
S-002 temporary guard rail 150.0    LNFT 34.00 5,100.00 36.50 5,475.00 34.00 5,100.00 36.00 5,400.00
                       
 CONTRACTOR TOTAL       11,487,769.52   11,555,279.30   11,783,975.10   12,997,257.56
 
Item Number Item Description Quantity Unit of Measure - 5 -
KOSTMAYER CONSTRUCTION, LLC

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 190,000.00 190,000.00            
202-01 removal of structures & obstructions lump      LUMP 60,000.00 60,000.00            
202-02-C removal of portland cement concrete pavement 24,308      SQYD 7.50 182,310.00            
202-02-H removal of guard rail 312      LNFT 1.00 312.00            
203-01 general excavation 408,203      CUYD 3.60 1,469,530.80            
203-02 drainage excavation 5,040      CUYD 6.00 30,240.00            
203-03 muck excavation 74      CUYD 10.00 740.00            
203-04 embankment 348,751      CUYD 8.00 2,790,008.00            
203-05 nonplastic embankment 144      CUYD 48.00 6,912.00            
204-03 temporary slope drains 780      LNFT 36.00 28,080.00            
204-05-A temporary sediment check dams (hay) 29      EACH 100.00 2,900.00            
204-05-B temporary sediment check dams (stone) 18      EACH 700.00 12,600.00            
204-06 temporary silt fencing 14,500      LNFT 1.45 21,025.00            
204-07 temporary stone construction entrance 2      EACH 650.00 1,300.00            
302-01 class ii base course 16,863.0    CUYD 50.00 843,150.00            
303-01-C in-place cement stabilized base course (10" thick) 121,426      SQYD 12.00 1,457,112.00            
304-01 lime 568.01   TON 150.00 85,201.50            
304-04-D lime treatment (type d) (12" thick) 40,071      SQYD 2.00 80,142.00            
401-02 aggregate surface course (adjusted vehicular
measurement)
5,614      CUYD 60.00 336,840.00            
402-01 traffic maintenance aggregate (vehicular measurement) 1,000.0    CUYD 60.00 60,000.00            
502-01 superpave asphaltic concrete 38,829.1    TON 85.00 3,300,473.50            
502-01-D superpave asphaltic concrete, incidental paving (level
a)
104.7    TON 120.00 12,564.00            
509-01 cold planing asphaltic pavement 31,246      SQYD 1.50 46,869.00            
509-02 contractor retained reclaimed asphaltic pavement - 1,736      CUYD 0.10 - 173.60            
601-01-G portland cement concrete pavement (8" thick) 11,291.7    SQYD 45.00 508,126.50            
601-04 portland cement concrete pavement coring 30      EACH 250.00 7,500.00            
701-01-G cross drain pipe (18" rcp/pcp) 1,324      LNFT 40.00 52,960.00            
701-01-K cross drain pipe (30" rcp/pcp) 278      LNFT 60.00 16,680.00            
701-01-M cross drain pipe (36" rcp/pcp) 260      LNFT 70.00 18,200.00            
701-01-O cross drain pipe (48" rcp) 256      LNFT 110.00 28,160.00            
701-01-S cross drain pipe (72" rcp) 316      LNFT 230.00 72,680.00            
701-03-F storm drain pipe (15" rcp/pcp) 1,307      LNFT 40.00 52,280.00            
701-05-G side drain pipe (18") 372      LNFT 43.00 15,996.00            
701-05-I side drain pipe (24") 280      LNFT 48.00 13,440.00            
701-05-K side drain pipe (30") 98      LNFT 50.00 4,900.00            
701-05-M side drain pipe (36") 46      LNFT 69.00 3,174.00            
701-05-N side drain pipe (42") 228      LNFT 76.00 17,328.00            
702-03-A catch basins (cb-01) 18      EACH 2,500.00 45,000.00            
702-03-C catch basins (cb-06) 4      EACH 4,000.00 16,000.00            
702-03-D catch basins (cb-07) 2      EACH 3,200.00 6,400.00            
702-03-F catch basins (cb-08) 2      EACH 5,500.00 11,000.00            
702-03-G catch basins (cb-09) 4      EACH 6,000.00 24,000.00            
702-08-A side drain safety end (type 1) 2      EACH 1,300.00 2,600.00            
703-01 shoulder underdrain systems 2,571      LNFT 6.00 15,426.00            
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 125.0    LNFT 50.00 6,250.00            
704-03 blocked out guard rail 1,287.5    LNFT 17.00 21,887.50            
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
18.8    LNFT 95.00 1,786.00            
704-08-B guard rail transitions (double thrie beam) 200.0    LNFT 42.00 8,400.00            
704-11-A guard rail end treatment (flared) 11      EACH 1,700.00 18,700.00            
705-01 barbed wire fence 8,104      LNFT 5.25 42,546.00            
705-02 combination mesh & barbed wire fence 2,408      LNFT 5.75 13,846.00            
705-05 double swinging driveway gates 9      DBGT 680.00 6,120.00            
706-02-C concrete drive (6" thick) 889.1    SQYD 36.00 32,007.60            
706-03-C incidental concrete paving (6" thick) 226.6    SQYD 46.00 10,423.60            
707-01 concrete curb 3,018.8    LNFT 11.00 33,206.80            
708-01 right-of-way monument 73      EACH 125.00 9,125.00            
708-02 right-of-way monument witness post 73      EACH 125.00 9,125.00            
712-01-A concrete cast-in-place revetment (4" thick) 2,412      SQYD 35.00 84,420.00            
712-02 sacked concrete revetment 40      SQYD 40.00 1,600.00            
712-04 flexible revetment 208      SQYD 35.00 7,280.00            
713-01 temporary signs & barricades lump      LUMP 100,000.00 100,000.00            
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
4.142  MILE 250.00 1,035.50            
713-04-A-01 temporary pvmt. markings (broken line)(4" w)(4' l)
(type i removable)
0.500  MILE 11,000.00 5,500.00            
713-05-A temporary pavement markings (solid line)(4" width) 16.568  MILE 960.00 15,905.28            
716-01-A mulch (vegetative) 110.00   ACRE 591.00 65,010.00            
717-01 seeding 6,600      LB 11.00 72,600.00            
718-01 fertilizer 110,000      LB 0.26 28,600.00            
720-01-A erosion control system, slope protection (type a) 35,294      SQYD 1.20 42,352.80            
720-01-D erosion control system, flexible channel liner (type d) 9,526      SQYD 2.85 27,149.10            
722-02 project site laboratory (equipped) 1      EACH 14,000.00 14,000.00            
724-01-B pavement patching (12" minimum thickness) 1,000      SQYD 110.00 110,000.00            
724-02 pavement widening 479.2    SQYD 60.00 28,752.00            
724-03 pavement joint repair 50.0    TON 300.00 15,000.00            
725-01 temporary detour roads 2,611.2    LNFT 36.00 94,003.20            
726-01 bedding material 2,918.1    CUYD 47.00 137,150.70            
727-01 mobilization lump      LUMP 1,400,000.00 1,400,000.00            
729-16-B object marker assembly (type 2) 6      EACH 65.00 390.00            
729-16-C object marker assembly (type 3) 22      EACH 70.00 1,540.00            
731-02 reflectorized raised pavement markers 1,225      EACH 10.00 12,250.00            
732-01-C plastic pavement striping (8" width) 375      LNFT 7.00 2,625.00            
732-01-E plastic pavement striping (24" width) 270      LNFT 12.00 3,240.00            
732-02-A plastic pavement striping (solid line) (4" width) 16.468  MILE 3,000.00 49,404.00            
732-03-A plastic pavement striping (broken line)(4" width) 7.627  MILE 1,150.00 8,771.05            
732-03-A-01 plastic pvmt striping (broken line)(4"width)preformed
marking tape (type v)
1.141  MILE 10,000.00 11,410.00            
732-04-A plastic pavement legends & symbols (arrow) 10      EACH 480.00 4,800.00            
732-04-C plastic pavement legends & symbols (only) 3      EACH 660.00 1,980.00            
735-01 mailboxes 8      EACH 17.00 136.00            
735-02 mailbox supports (single) 8      EACH 120.00 960.00            
740-01 construction layout lump      LUMP 1,100,000.00 1,100,000.00            
744-01 traffic control management lump      LUMP 175,000.00 175,000.00            
804-01-C precast concrete piles (16") 3,765      LNFT 49.00 184,485.00            
804-12 loading permanent piles 2      EACH 1,000.00 2,000.00            
805-01-B class a concrete (box culvert headwalls) 102.32   CUYD 900.00 92,088.00            
805-01-F class a concrete (bents) 144.35   CUYD 700.00 101,045.00            
805-03 class aa concrete 570.40   CUYD 450.00 256,680.00            
805-12-F reinforced concrete box culverts (5'x 4') 320.0    LNFT 300.00 96,000.00            
805-12-I reinforced concrete box culverts (5'x 5') 230.0    LNFT 350.00 80,500.00            
805-12-P reinforced concrete box culverts (7'x 7') 916.0    LNFT 450.00 412,200.00            
805-12-Y reinforced concrete box culverts (3'x 3') 200.0    LNFT 290.00 58,000.00            
806-01 deformed reinforcing steel 132,224      LB 0.90 119,001.60            
810-01 concrete railing (barrier) 640.00   LNFT 30.00 19,200.00            
813-01 concrete approach slabs 728.88   SQYD 130.00 94,754.40            
S-001 rumble strips (ground-in) 12.1    MILE 700.00 8,470.00            
S-002 temporary guard rail 150.0    LNFT 52.00 7,800.00            
                       
 CONTRACTOR TOTAL       17,318,498.83            