| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - BARRIERE CONSTRUCTION CO., LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-A |
removal of bridges (log mile 1.21; 20'x25' tttres
bridge) struc. no 8533330121 |
1   |
EACH |
17,500.00 |
17,500.00 |
4,000.00 |
4,000.00 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
596   |
LNFT |
3.00 |
1,788.00 |
7.00 |
4,172.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
2,030   |
CUYD |
12.00 |
24,360.00 |
12.00 |
24,360.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
20   |
EACH |
6.00 |
120.00 |
7.00 |
140.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
200   |
LNFT |
2.00 |
400.00 |
2.00 |
400.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
100   |
CUYD |
12.19 |
1,219.00 |
50.00 |
5,000.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
4,564.5 |
TON |
49.38 |
225,395.01 |
44.00 |
200,838.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete (paved drives and
turnouts) |
1,576.2 |
TON |
60.61 |
95,533.48 |
44.00 |
69,352.80 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
9,564   |
SQYD |
1.51 |
14,441.64 |
2.00 |
19,128.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 265   |
CUYD |
0.10 |
- 26.50 |
10.00 |
- 2,650.00 |
|
|
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
1,447   |
LNFT |
1.00 |
1,447.00 |
2.00 |
2,894.00 |
|
|
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
852   |
LNFT |
1.25 |
1,065.00 |
2.00 |
1,704.00 |
|
|
|
|
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
64   |
LNFT |
55.00 |
3,520.00 |
70.00 |
4,480.00 |
|
|
|
|
| 701-01-K |
cross drain pipe (30" rcp/pcp)
|
80   |
LNFT |
65.00 |
5,200.00 |
100.00 |
8,000.00 |
|
|
|
|
| 701-02-D |
cross drain pipe arch (24" equiv. rcpa)
|
112   |
LNFT |
60.00 |
6,720.00 |
70.00 |
7,840.00 |
|
|
|
|
| 701-05-I |
side drain pipe (24")
|
48   |
LNFT |
55.00 |
2,640.00 |
70.00 |
3,360.00 |
|
|
|
|
| 701-05-K |
side drain pipe (30")
|
135   |
LNFT |
65.00 |
8,775.00 |
70.00 |
9,450.00 |
|
|
|
|
| 701-05-M |
side drain pipe (36")
|
120   |
LNFT |
75.00 |
9,000.00 |
80.00 |
9,600.00 |
|
|
|
|
| 701-05-N |
side drain pipe (42")
|
220   |
LNFT |
85.00 |
18,700.00 |
110.00 |
24,200.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
1   |
EACH |
3,500.00 |
3,500.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
3   |
EACH |
750.00 |
2,250.00 |
1,100.00 |
3,300.00 |
|
|
|
|
| 702-04-D |
adjusting valve covers
|
4   |
EACH |
300.00 |
1,200.00 |
220.00 |
880.00 |
|
|
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
175.0 |
LNFT |
34.00 |
5,950.00 |
35.00 |
6,125.00 |
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
98.0 |
LNFT |
45.00 |
4,410.00 |
47.00 |
4,606.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
87.5 |
LNFT |
15.00 |
1,312.50 |
16.00 |
1,400.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
7   |
EACH |
1,575.00 |
11,025.00 |
1,700.00 |
11,900.00 |
|
|
|
|
| 711-03-C |
riprap (30 lb)
|
60.0 |
TON |
50.00 |
3,000.00 |
65.00 |
3,900.00 |
|
|
|
|
| 711-04 |
geotextile fabric
|
1,200   |
SQYD |
2.00 |
2,400.00 |
2.20 |
2,640.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
6,500.00 |
6,500.00 |
30,000.00 |
30,000.00 |
|
|
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
225   |
LNFT |
0.48 |
108.00 |
0.50 |
112.50 |
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
1,314   |
LNFT |
0.95 |
1,248.30 |
1.00 |
1,314.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
3.490 |
MILE |
200.00 |
698.00 |
70.00 |
244.30 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
1.119 |
MILE |
310.00 |
346.89 |
20.00 |
22.38 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
18.580 |
MILE |
465.00 |
8,639.70 |
20.00 |
371.60 |
|
|
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
4   |
EACH |
54.00 |
216.00 |
55.00 |
220.00 |
|
|
|
|
| 713-06-D |
temporary pavement legends and symbols (rr crossing)
|
5   |
EACH |
200.00 |
1,000.00 |
200.00 |
1,000.00 |
|
|
|
|
| 713-06-E |
temporary pavement legends and symbols (school
crossing) |
4   |
EACH |
200.00 |
800.00 |
200.00 |
800.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
3.80 |
ACRE |
650.00 |
2,470.00 |
700.00 |
2,660.00 |
|
|
|
|
| 717-01 |
seeding
|
67   |
LB |
7.00 |
469.00 |
8.00 |
536.00 |
|
|
|
|
| 718-01 |
fertilizer
|
2,220   |
LB |
0.25 |
555.00 |
0.30 |
666.00 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
495   |
SQYD |
43.15 |
21,359.25 |
70.00 |
34,650.00 |
|
|
|
|
| 724-02 |
pavement widening
|
3,719.5 |
SQYD |
28.56 |
106,228.92 |
39.00 |
145,060.50 |
|
|
|
|
| 726-01 |
bedding material
|
59.8 |
CUYD |
40.00 |
2,392.00 |
50.00 |
2,990.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
16,275.00 |
16,275.00 |
75,000.00 |
75,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
22   |
EACH |
65.00 |
1,430.00 |
75.00 |
1,650.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
723   |
EACH |
5.40 |
3,904.20 |
6.00 |
4,338.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
567   |
LNFT |
3.20 |
1,814.40 |
4.00 |
2,268.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
9.290 |
MILE |
1,760.00 |
16,350.40 |
1,900.00 |
17,651.00 |
|
|
|
|
| 732-02-C |
plastic pavement striping (solid line) (8" width)
|
0.015 |
MILE |
2,950.00 |
44.25 |
5,000.00 |
75.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.749 |
MILE |
720.00 |
1,259.28 |
800.00 |
1,399.20 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
2   |
EACH |
135.00 |
270.00 |
200.00 |
400.00 |
|
|
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
2   |
EACH |
400.00 |
800.00 |
500.00 |
1,000.00 |
|
|
|
|
| 732-04-E |
plastic pavement legends & symbols (school crossing)
|
2   |
EACH |
520.00 |
1,040.00 |
600.00 |
1,200.00 |
|
|
|
|
| 735-01 |
mailboxes
|
62   |
EACH |
13.00 |
806.00 |
2.00 |
124.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
62   |
EACH |
135.00 |
8,370.00 |
190.00 |
11,780.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
7,800.00 |
7,800.00 |
8,000.00 |
8,000.00 |
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
20.33 |
CUYD |
725.00 |
14,739.25 |
900.00 |
18,297.00 |
|
|
|
|
| 805-12-K |
reinforced concrete box culverts (7'x 5')
|
126.0 |
LNFT |
510.00 |
64,260.00 |
590.00 |
74,340.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
1,585   |
LB |
1.00 |
1,585.00 |
3.00 |
4,755.00 |
|
|
|
|
| S-001 |
u-channel post installation
|
51   |
EACH |
65.00 |
3,315.00 |
60.00 |
3,060.00 |
|
|
|
|
| S-002 |
cleaning existing ditches
|
2,500   |
LNFT |
2.50 |
6,250.00 |
5.00 |
12,500.00 |
|
|
|
|
| S-003 |
surface preparation
|
lump |
LUMP |
12,000.00 |
12,000.00 |
22,000.00 |
22,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
788,188.97 |
|
914,504.28 |
|
|
|
|
|