| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - C.E.C., INC. |
- 2 - DOUBLE AUGHT CONSTRUCTION LLC |
- 3 - BOH BROS. CONSTRUCTION CO., LLC. |
- 4 - KOSTMAYER CONSTRUCTION, LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02 |
removal of bridge deck, stringers, and diagonal
bracing |
1   |
EACH |
25,000.00 |
25,000.00 |
43,450.00 |
43,450.00 |
17,000.00 |
17,000.00 |
32,000.00 |
32,000.00 |
| 202-02-D |
removal of concrete walks & drives
|
34   |
SQYD |
30.00 |
1,020.00 |
140.00 |
4,760.00 |
50.00 |
1,700.00 |
19.00 |
646.00 |
| 302-02-A |
class ii base course (6" thick)
|
55.6 |
SQYD |
27.00 |
1,501.20 |
55.00 |
3,058.00 |
11.00 |
611.60 |
65.00 |
3,614.00 |
| 706-02-D |
concrete drive (8" thick)
|
55.6 |
SQYD |
100.00 |
5,560.00 |
205.00 |
11,398.00 |
75.00 |
4,170.00 |
90.00 |
5,004.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
27,000.00 |
27,000.00 |
32,875.00 |
32,875.00 |
32,000.00 |
32,000.00 |
31,000.00 |
31,000.00 |
| 713-05-A-01 |
temporary pavement markings (solid line)(4" width)
(type 1 removable) |
1.250 |
MILE |
17,425.00 |
21,781.25 |
9,000.00 |
11,250.00 |
18,000.00 |
22,500.00 |
19,200.00 |
24,000.00 |
| 713-09 |
temporary precast concrete barrier (department
furnished) |
55   |
EACH |
200.00 |
11,000.00 |
144.00 |
7,920.00 |
200.00 |
11,000.00 |
225.00 |
12,375.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
45,000.00 |
45,000.00 |
46,800.00 |
46,800.00 |
10,000.00 |
10,000.00 |
60,000.00 |
60,000.00 |
| 731-02 |
reflectorized raised pavement markers
|
150   |
EACH |
5.00 |
750.00 |
10.00 |
1,500.00 |
5.50 |
825.00 |
6.00 |
900.00 |
| 732-02-A-01 |
plastic pvmt striping (solid line)(4"width)(type-v
preformed) |
1.250 |
MILE |
17,425.00 |
21,781.25 |
12,000.00 |
15,000.00 |
18,000.00 |
22,500.00 |
19,200.00 |
24,000.00 |
| 732-03-A-01 |
plastic pvmt striping (broken line)(4"width)(type-v
preformed) |
1.250 |
MILE |
8,160.00 |
10,200.00 |
3,200.00 |
4,000.00 |
8,500.00 |
10,625.00 |
8,900.00 |
11,125.00 |
| 732-05 |
removal of existing markings
|
1.000 |
MILE |
4,600.00 |
4,600.00 |
3,000.00 |
3,000.00 |
5,000.00 |
5,000.00 |
5,100.00 |
5,100.00 |
| 805-01-H |
class a concrete (counterweights)
|
3.68 |
CUYD |
2,550.00 |
9,384.00 |
500.00 |
1,840.00 |
1,100.00 |
4,048.00 |
1,100.00 |
4,048.00 |
| 806-01 |
deformed reinforcing steel
|
100   |
LB |
12.00 |
1,200.00 |
1.00 |
100.00 |
3.00 |
300.00 |
2.75 |
275.00 |
| 807-01 |
steel (astm a709, grade 36)
|
14,883   |
LB |
2.70 |
40,184.10 |
1.10 |
16,371.30 |
2.00 |
29,766.00 |
1.55 |
23,068.65 |
| 807-02 |
steel (astm a709, grade 50)
|
41,971   |
LB |
1.65 |
69,252.15 |
1.20 |
50,365.20 |
2.00 |
83,942.00 |
1.55 |
65,055.05 |
| 807-06 |
structural metalwork
|
lump |
LUMP |
2,000.00 |
2,000.00 |
56,075.00 |
56,075.00 |
10,000.00 |
10,000.00 |
112,000.00 |
112,000.00 |
| 808-01 |
steel grid flooring
|
4,167   |
SQFT |
33.50 |
139,594.50 |
26.20 |
109,175.40 |
42.00 |
175,014.00 |
47.00 |
195,849.00 |
| S-101 |
anchored temporary precast barrier
|
7   |
each |
100.00 |
700.00 |
625.00 |
4,375.00 |
1,800.00 |
12,600.00 |
850.00 |
5,950.00 |
| S-103 |
hydraulic line removal/replacement
|
lump |
LUMP |
4,000.00 |
4,000.00 |
10,200.00 |
10,200.00 |
8,200.00 |
8,200.00 |
24,000.00 |
24,000.00 |
| S-104 |
pivot bearing replacement
|
lump |
LUMP |
30,000.00 |
30,000.00 |
29,200.00 |
29,200.00 |
37,000.00 |
37,000.00 |
76,000.00 |
76,000.00 |
| S-105 |
span jacking
|
lump |
LUMP |
10,000.00 |
10,000.00 |
18,600.00 |
18,600.00 |
18,000.00 |
18,000.00 |
13,000.00 |
13,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
481,508.45 |
|
481,312.90 |
|
516,801.60 |
|
729,009.70 |
|