Letting of 3/31/2004 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 828-39-0024
Parish: LAFAYETTE
Routes: LA 3073
Description: VERMILION RIVER BRIDGE REDECKING
Type Const: removal and replacement of bridge deck, stringers, diagonal bracing, and related
work.
 
RankLicenseBidderAmount
126435 C.E.C., INC. $481,508.45
237302 DOUBLE AUGHT CONSTRUCTION LLC $481,312.90
302179 BOH BROS. CONSTRUCTION CO., LLC. $516,801.60
425747 KOSTMAYER CONSTRUCTION, LLC $729,009.70
 
Item Number Item Description Quantity Unit of Measure - 1 -
C.E.C., INC.
- 2 -
DOUBLE AUGHT CONSTRUCTION LLC
- 3 -
BOH BROS. CONSTRUCTION CO., LLC.
- 4 -
KOSTMAYER CONSTRUCTION, LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02 removal of bridge deck, stringers, and diagonal
bracing
1      EACH 25,000.00 25,000.00 43,450.00 43,450.00 17,000.00 17,000.00 32,000.00 32,000.00
202-02-D removal of concrete walks & drives 34      SQYD 30.00 1,020.00 140.00 4,760.00 50.00 1,700.00 19.00 646.00
302-02-A class ii base course (6" thick) 55.6    SQYD 27.00 1,501.20 55.00 3,058.00 11.00 611.60 65.00 3,614.00
706-02-D concrete drive (8" thick) 55.6    SQYD 100.00 5,560.00 205.00 11,398.00 75.00 4,170.00 90.00 5,004.00
713-01 temporary signs & barricades lump      LUMP 27,000.00 27,000.00 32,875.00 32,875.00 32,000.00 32,000.00 31,000.00 31,000.00
713-05-A-01 temporary pavement markings (solid line)(4" width)
(type 1 removable)
1.250  MILE 17,425.00 21,781.25 9,000.00 11,250.00 18,000.00 22,500.00 19,200.00 24,000.00
713-09 temporary precast concrete barrier (department
furnished)
55      EACH 200.00 11,000.00 144.00 7,920.00 200.00 11,000.00 225.00 12,375.00
727-01 mobilization lump      LUMP 45,000.00 45,000.00 46,800.00 46,800.00 10,000.00 10,000.00 60,000.00 60,000.00
731-02 reflectorized raised pavement markers 150      EACH 5.00 750.00 10.00 1,500.00 5.50 825.00 6.00 900.00
732-02-A-01 plastic pvmt striping (solid line)(4"width)(type-v
preformed)
1.250  MILE 17,425.00 21,781.25 12,000.00 15,000.00 18,000.00 22,500.00 19,200.00 24,000.00
732-03-A-01 plastic pvmt striping (broken line)(4"width)(type-v
preformed)
1.250  MILE 8,160.00 10,200.00 3,200.00 4,000.00 8,500.00 10,625.00 8,900.00 11,125.00
732-05 removal of existing markings 1.000  MILE 4,600.00 4,600.00 3,000.00 3,000.00 5,000.00 5,000.00 5,100.00 5,100.00
805-01-H class a concrete (counterweights) 3.68   CUYD 2,550.00 9,384.00 500.00 1,840.00 1,100.00 4,048.00 1,100.00 4,048.00
806-01 deformed reinforcing steel 100      LB 12.00 1,200.00 1.00 100.00 3.00 300.00 2.75 275.00
807-01 steel (astm a709, grade 36) 14,883      LB 2.70 40,184.10 1.10 16,371.30 2.00 29,766.00 1.55 23,068.65
807-02 steel (astm a709, grade 50) 41,971      LB 1.65 69,252.15 1.20 50,365.20 2.00 83,942.00 1.55 65,055.05
807-06 structural metalwork lump      LUMP 2,000.00 2,000.00 56,075.00 56,075.00 10,000.00 10,000.00 112,000.00 112,000.00
808-01 steel grid flooring 4,167      SQFT 33.50 139,594.50 26.20 109,175.40 42.00 175,014.00 47.00 195,849.00
S-101 anchored temporary precast barrier 7      each 100.00 700.00 625.00 4,375.00 1,800.00 12,600.00 850.00 5,950.00
S-103 hydraulic line removal/replacement lump      LUMP 4,000.00 4,000.00 10,200.00 10,200.00 8,200.00 8,200.00 24,000.00 24,000.00
S-104 pivot bearing replacement lump      LUMP 30,000.00 30,000.00 29,200.00 29,200.00 37,000.00 37,000.00 76,000.00 76,000.00
S-105 span jacking lump      LUMP 10,000.00 10,000.00 18,600.00 18,600.00 18,000.00 18,000.00 13,000.00 13,000.00
                       
 CONTRACTOR TOTAL       481,508.45   481,312.90   516,801.60   729,009.70