DBE GOAL FED
Lead Project: 744-17-0021
Parish: E BATON ROUGE
Routes:
Description: RIVER ROAD LEVEE BICYCLE/PEDESTRIAN TRAIL, PHASE I
Type Const: grading, class ii base course, superpave asphaltic concrete pavement, concrete
walkway, fencing, lighting, pedestrian bridge, cattle shelter and related work.
 
RankLicenseBidderAmount
132044 QUALITY DESIGN & CONSTRUCTION, INC. $1,561,089.15
236065 TRI CORE PROPERTIES INC $1,768,107.98
336764 LAMAY GROUP, LLC $1,807,896.86
425747 KOSTMAYER CONSTRUCTION, LLC $1,815,140.87
502179 BOH BROS. CONSTRUCTION CO., LLC. $1,820,451.70
600481 COASTAL BRIDGE CO., L.L.C. $1,975,832.00
727634 PHYLWAY CONSTRUCTION LLC $1,995,235.70
800568 MERRICK CONSTRUCTION CO. $2,252,297.55
934567 JAMES CONSTRUCTION GROUP LLC $2,399,509.29
 
Item Number Item Description Quantity Unit of Measure - 1 -
QUALITY DESIGN & CONSTRUCTION, INC.
- 2 -
TRI CORE PROPERTIES INC
- 3 -
LAMAY GROUP, LLC
- 4 -
KOSTMAYER CONSTRUCTION, LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures and obstructions lump      LUMP 27,767.67 27,767.67 1,424.00 1,424.00 43,750.00 43,750.00 85,000.00 85,000.00
203-04 embankment 42,824      CUYD 8.75 374,710.00 13.26 567,846.24 11.70 501,040.80 10.50 449,652.00
203-09 geotextile fabric 2,090      SQYD 1.43 2,988.70 0.70 1,463.00 1.72 3,594.80 1.50 3,135.00
204-02 temporary hay or straw bales 12      EACH 8.00 96.00 5.93 71.16 8.00 96.00 12.00 144.00
204-06 temporary silt fencing 11,915      LNFT 1.20 14,298.00 0.86 10,246.90 1.25 14,893.75 2.50 29,787.50
401-02 aggregate surface course (adjusted vehicular
measurement)
416      CUYD 36.33 15,113.28 50.20 20,883.20 50.00 20,800.00 52.00 21,632.00
502-01-D superpave asphaltic concrete incidental paving (level
a)
5,003.4    TON 61.20 306,208.08 81.08 405,675.67 64.60 323,219.64 60.00 300,204.00
701-03-G storm drain pipe (18" rcp/pcp) 383      LNFT 27.94 10,701.02 59.33 22,723.39 23.00 8,809.00 25.00 9,575.00
701-05-G side drain pipe (18") 184      LNFT 17.82 3,278.88 29.66 5,457.44 22.00 4,048.00 30.00 5,520.00
701-05-I side drain pipe (24") 34      LNFT 28.27 961.18 29.66 1,008.44 28.00 952.00 35.00 1,190.00
702-03-A catch basins (cb-01) 3      EACH 2,393.49 7,180.47 1,973.87 5,921.61 2,500.00 7,500.00 2,500.00 7,500.00
702-04-B adjusting catch basins 1      EACH 956.89 956.89 890.00 890.00 2,000.00 2,000.00 2,200.00 2,200.00
704-03 blocked out guard rail 150.0    LNFT 23.00 3,450.00 27.29 4,093.50 21.00 3,150.00 19.20 2,880.00
704-11-B guard rail end treatment (tangent) 2      EACH 2,000.00 4,000.00 2,373.00 4,746.00 2,700.00 5,400.00 2,330.00 4,660.00
705-01 barbed wire fence 1,062      LNFT 5.17 5,490.54 5.93 6,297.66 5.80 6,159.60 8.00 8,496.00
705-06-C chain link fence (6-foot height) 88      LNFT 24.00 2,112.00 28.48 2,506.24 28.00 2,464.00 30.00 2,640.00
706-01-A concrete walk (4" thick)(w/wwf reinforcement) 1,506.4    SQYD 39.60 59,653.44 25.88 38,985.63 31.00 46,698.40 35.00 52,724.00
706-03-A incidental concrete paving (4" thick) 105.1    SQYD 36.00 3,783.60 32.20 3,384.22 50.00 5,255.00 40.00 4,204.00
706-03-C incidental concrete paving (6" thick)(w/wwf
reinforcement)
110.2    SQYD 38.00 4,187.60 45.34 4,996.46 62.00 6,832.40 45.00 4,959.00
707-03 combination concrete curb & gutter 389.7    LNFT 20.00 7,794.00 13.05 5,085.58 25.00 9,742.50 30.00 11,691.00
709-01 steel cattle guard 1      EACH 9,500.00 9,500.00 11,272.00 11,272.00 10,910.00 10,910.00 11,000.00 11,000.00
713-01 temporary signs & barricades lump      LUMP 5,175.10 5,175.10 9,723.00 9,723.00 11,180.00 11,180.00 6,000.00 6,000.00
714-01 slab sodding 2,050      SQYD 6.00 12,300.00 6.49 13,304.50 3.08 6,314.00 3.57 7,318.50
719-01-A plants (pistachio"chinese", 30 gallon) 4      EACH 380.00 1,520.00 332.22 1,328.88 350.00 1,400.00 129.02 516.08
719-01-B plants (hawthorn "clara", 3 gallon) 16      EACH 25.00 400.00 18.98 303.68 25.00 400.00 19.73 315.68
727-01 mobilization lump      LUMP 83,000.00 83,000.00 34,782.00 34,782.00 75,000.00 75,000.00 130,000.00 130,000.00
729-01 sign (type a) 265.8    SQFT 25.00 6,645.00 29.66 7,883.62 24.60 6,538.68 30.00 7,974.00
729-16-C object marker assembly (type 3) 2      EACH 65.00 130.00 77.12 154.24 78.00 156.00 83.00 166.00
729-21 u-channel post 63      EACH 65.00 4,095.00 77.12 4,858.56 81.00 5,103.00 85.00 5,355.00
730-01 trenching and backfilling 1,400      LNFT 3.30 4,620.00 3.86 5,404.00 1.25 1,750.00 2.00 2,800.00
730-02-A conduit with conductors (2"diam. sch. 40 pvc w/4-#10;
4-#8;4-#6;4-#4 awg xhhw;1-#8 awg bare ground)
150      LNFT 11.00 1,650.00 13.05 1,957.50 13.20 1,980.00 23.00 3,450.00
730-02-B conduit with conductors (1"diam. sch.40 pvc
w/4-#10 awg xhhw;1-#8 awg bare ground)
100      LNFT 2.80 280.00 3.32 332.00 3.60 360.00 8.00 800.00
730-02-C conduit with conductors (1" diam. sch. 40 pvc w/
4-#8 awg xhhw; 1-#8 awg bare ground)
100      LNFT 3.40 340.00 4.03 403.00 4.20 420.00 13.00 1,300.00
730-02-D conduit with conductors (1" diam. sch. 40 pvc w/ 2-#6,
2-#4 awg xhhw; 1-#8 awg bare ground)
1,100      LNFT 4.60 5,060.00 5.46 6,006.00 5.52 6,072.00 8.20 9,020.00
730-02-E conduit with conductors (1.5"diam.sch. 40 pvc w/ 4-#8;
4-#6; 4-#4 awg xhhw; 1-#8 awg bare ground)
25      LNFT 9.20 230.00 11.39 284.75 12.60 315.00 26.40 660.00
730-05-A light pole (14' seamless round,2 section, stepped pole
w/ 22" high, 23.5" extension arm & a duplex gfci
20a recept.)
20      EACH 2,720.00 54,400.00 3,203.55 64,071.00 3,240.00 64,800.00 3,530.00 70,600.00
730-07-A luminaire (100 watt, 120 volt, high pressure sodium,
type iii distribution)
20      EACH 1,500.00 30,000.00 1,779.75 35,595.00 1,800.00 36,000.00 1,500.00 30,000.00
730-08 electrical service point (pedestal) 1      EACH 1,700.00 1,700.00 2,017.05 2,017.05 2,034.00 2,034.00 9,700.00 9,700.00
730-16-A underground junction box (11"x18"x12",open bottom
precast polymer concrete)
3      EACH 600.00 1,800.00 474.60 1,423.80 720.00 2,160.00 800.00 2,400.00
732-01-E plastic pavement striping (24" width) 298      LNFT 2.70 804.60 4.27 1,272.46 4.40 1,311.20 4.29 1,278.42
732-02-A plastic pavement striping (solid line) (4") 2.100  MILE 2,076.00 4,359.60 2,859.47 6,004.88 2,892.00 6,073.20 2,330.20 4,893.42
732-03-A plastic pavement striping (broken line)(4") 2.450  MILE 1,214.40 2,975.28 865.71 2,120.98 876.00 2,146.20 963.06 2,359.49
732-04-A plastic pavement legends & symbols (arrow) 24      EACH 95.00 2,280.00 161.36 3,872.64 165.00 3,960.00 194.92 4,678.08
732-04-F plastic pavement legends & symbols (pedestrian) 4      EACH 95.00 380.00 272.90 1,091.60 276.00 1,104.00 303.60 1,214.40
732-04-G plastic pavement legends & symbols (bicycle) 4      EACH 95.00 380.00 308.49 1,233.96 312.00 1,248.00 343.20 1,372.80
739-01 hydro-seeding 13.60   ACRE 1,500.00 20,400.00 1,305.15 17,750.04 850.00 11,560.00 1,200.00 16,320.00
740-01 construction layout lump      LUMP 23,408.00 23,408.00 7,285.00 7,285.00 70,000.00 70,000.00 36,000.00 36,000.00
S-001 steel benches 12      EACH 1,599.47 19,193.64 1,963.41 23,560.92 2,662.50 31,950.00 1,700.00 20,400.00
S-002 trash receptacles 6      EACH 903.11 5,418.66 998.44 5,990.64 998.79 5,992.74 900.00 5,400.00
S-003 35 foot flagpole 1      EACH 4,179.21 4,179.21 2,069.00 2,069.00 4,171.25 4,171.25 2,500.00 2,500.00
S-004 30 foot flagpole 2      EACH 3,721.41 7,442.82 1,923.50 3,847.00 3,636.87 7,273.74 2,300.00 4,600.00
S-005 concrete stairs lump      LUMP 15,927.00 15,927.00 27,190.00 27,190.00 23,009.00 23,009.00 24,000.00 24,000.00
S-006 pedestrian bridge (40 feet long x17 feet wide) 1      EACH 51,426.90 51,426.90 57,258.00 57,258.00 60,715.00 60,715.00 63,000.00 63,000.00
S-007 mechanically stabilized earth wall 760      SQFT 37.07 28,173.20 44.22 33,607.20 25.27 19,205.20 10.00 7,600.00
S-008 pipe and cable fence 2,737      LNFT 18.00 49,266.00 17.79 48,691.23 19.98 54,685.26 20.00 54,740.00
S-009 bicycle loop rack 6      EACH 502.43 3,014.58 665.86 3,995.16 881.25 5,287.50 600.00 3,600.00
S-010 water supply system (north trailhead) lump      LUMP 8,732.73 8,732.73 11,134.61 11,134.61 6,840.00 6,840.00 10,000.00 10,000.00
S-011 water supply system (south trailhead) lump      LUMP 21,545.46 21,545.46 11,134.61 11,134.61 19,870.00 19,870.00 23,000.00 23,000.00
S-012 colored and patterned concrete paving(6" thick) 78      SQYD 64.60 5,038.80 94.58 7,377.24 74.00 5,772.00 76.00 5,928.00
S-013 cattle shelter lump      LUMP 17,806.32 17,806.32 18,526.00 18,526.00 49,000.00 49,000.00 56,000.00 56,000.00
S-014 pipe gate (6 feet) 2      EACH 333.80 667.60 228.40 456.80 690.00 1,380.00 400.00 800.00
S-015 pipe gate (8 feet) 4      EACH 483.80 1,935.20 229.88 919.52 750.00 3,000.00 500.00 2,000.00
S-016 pipe gate (12 feet) 5      EACH 483.80 2,419.00 255.00 1,275.00 800.00 4,000.00 600.00 3,000.00
S-017 pipe gate (14 feet) 4      EACH 583.80 2,335.20 278.75 1,115.00 800.00 3,200.00 700.00 2,800.00
S-018 concrete planters (8 feet x 8 feet) 4      EACH 4,233.50 16,934.00 3,796.75 15,187.00 4,071.00 16,284.00 3,500.00 14,000.00
S-019 lightweight potting soil 16.5    CUYD 40.00 660.00 42.05 693.82 50.00 825.00 75.00 1,237.50
S-020 metal bollards (fixed) 6      EACH 496.20 2,977.20 271.15 1,626.90 535.00 3,210.00 300.00 1,800.00
S-021 metal bollards (removable, locking) 5      EACH 966.50 4,832.50 462.74 2,313.70 575.00 2,875.00 400.00 2,000.00
S-022 spare light pole assembly w/ luminaire & gfci 20a
receptacle
2      EACH 2,600.00 5,200.00 3,085.00 6,170.00 4,000.00 8,000.00 3,400.00 6,800.00
S-023 crushed stone drainage layer 289      CUYD 39.80 11,502.20 45.35 13,106.15 50.00 14,450.00 50.00 14,450.00
S-025 class ii base course 2,900.0    CUYD 48.93 141,897.00 39.80 115,420.00 38.00 110,200.00 38.00 110,200.00
                       
 CONTRACTOR TOTAL       1,561,089.15   1,768,107.98   1,807,896.86   1,815,140.87
 
Item Number Item Description Quantity Unit of Measure - 5 -
BOH BROS. CONSTRUCTION CO., LLC.
- 6 -
COASTAL BRIDGE CO., L.L.C.
- 7 -
PHYLWAY CONSTRUCTION LLC
- 8 -
MERRICK CONSTRUCTION CO.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures and obstructions lump      LUMP 4,000.00 4,000.00 15,000.00 15,000.00 5,000.00 5,000.00 50,000.00 50,000.00
203-04 embankment 42,824      CUYD 12.40 531,017.60 14.00 599,536.00 15.00 642,360.00 16.00 685,184.00
203-09 geotextile fabric 2,090      SQYD 1.00 2,090.00 1.50 3,135.00 1.50 3,135.00 1.00 2,090.00
204-02 temporary hay or straw bales 12      EACH 8.00 96.00 15.00 180.00 25.00 300.00 1.00 12.00
204-06 temporary silt fencing 11,915      LNFT 1.20 14,298.00 2.00 23,830.00 1.30 15,489.50 0.25 2,978.75
401-02 aggregate surface course (adjusted vehicular
measurement)
416      CUYD 29.00 12,064.00 50.00 20,800.00 47.00 19,552.00 50.00 20,800.00
502-01-D superpave asphaltic concrete incidental paving (level
a)
5,003.4    TON 63.00 315,214.20 60.00 300,204.00 65.00 325,221.00 60.00 300,204.00
701-03-G storm drain pipe (18" rcp/pcp) 383      LNFT 57.00 21,831.00 25.00 9,575.00 39.00 14,937.00 50.00 19,150.00
701-05-G side drain pipe (18") 184      LNFT 50.00 9,200.00 30.00 5,520.00 30.00 5,520.00 50.00 9,200.00
701-05-I side drain pipe (24") 34      LNFT 50.00 1,700.00 35.00 1,190.00 36.00 1,224.00 75.00 2,550.00
702-03-A catch basins (cb-01) 3      EACH 2,000.00 6,000.00 3,000.00 9,000.00 2,200.00 6,600.00 3,000.00 9,000.00
702-04-B adjusting catch basins 1      EACH 1,000.00 1,000.00 2,500.00 2,500.00 2,600.00 2,600.00 500.00 500.00
704-03 blocked out guard rail 150.0    LNFT 20.00 3,000.00 16.00 2,400.00 18.00 2,700.00 16.00 2,400.00
704-11-B guard rail end treatment (tangent) 2      EACH 2,400.00 4,800.00 1,900.00 3,800.00 2,200.00 4,400.00 2,200.00 4,400.00
705-01 barbed wire fence 1,062      LNFT 5.00 5,310.00 8.00 8,496.00 5.50 5,841.00 2.50 2,655.00
705-06-C chain link fence (6-foot height) 88      LNFT 25.00 2,200.00 30.00 2,640.00 27.00 2,376.00 11.00 968.00
706-01-A concrete walk (4" thick)(w/wwf reinforcement) 1,506.4    SQYD 33.00 49,711.20 35.00 52,724.00 38.00 57,243.20 30.00 45,192.00
706-03-A incidental concrete paving (4" thick) 105.1    SQYD 45.00 4,729.50 45.00 4,729.50 38.00 3,993.80 25.00 2,627.50
706-03-C incidental concrete paving (6" thick)(w/wwf
reinforcement)
110.2    SQYD 60.00 6,612.00 50.00 5,510.00 40.00 4,408.00 30.00 3,306.00
707-03 combination concrete curb & gutter 389.7    LNFT 20.00 7,794.00 30.00 11,691.00 21.00 8,183.70 17.00 6,624.90
709-01 steel cattle guard 1      EACH 6,000.00 6,000.00 11,000.00 11,000.00 11,000.00 11,000.00 7,500.00 7,500.00
713-01 temporary signs & barricades lump      LUMP 5,000.00 5,000.00 15,000.00 15,000.00 10,000.00 10,000.00 75,000.00 75,000.00
714-01 slab sodding 2,050      SQYD 6.00 12,300.00 4.00 8,200.00 5.30 10,865.00 2.00 4,100.00
719-01-A plants (pistachio"chinese", 30 gallon) 4      EACH 400.00 1,600.00 400.00 1,600.00 275.00 1,100.00 100.00 400.00
719-01-B plants (hawthorn "clara", 3 gallon) 16      EACH 26.00 416.00 25.00 400.00 16.00 256.00 15.00 240.00
727-01 mobilization lump      LUMP 130,000.00 130,000.00 96,000.00 96,000.00 150,000.00 150,000.00 225,000.00 225,000.00
729-01 sign (type a) 265.8    SQFT 19.00 5,050.20 30.00 7,974.00 20.00 5,316.00 18.00 4,784.40
729-16-C object marker assembly (type 3) 2      EACH 70.00 140.00 70.00 140.00 75.00 150.00 65.00 130.00
729-21 u-channel post 63      EACH 70.00 4,410.00 100.00 6,300.00 70.00 4,410.00 65.00 4,095.00
730-01 trenching and backfilling 1,400      LNFT 3.00 4,200.00 3.25 4,550.00 3.50 4,900.00 3.00 4,200.00
730-02-A conduit with conductors (2"diam. sch. 40 pvc w/4-#10;
4-#8;4-#6;4-#4 awg xhhw;1-#8 awg bare ground)
150      LNFT 12.00 1,800.00 11.00 1,650.00 12.00 1,800.00 11.00 1,650.00
730-02-B conduit with conductors (1"diam. sch.40 pvc
w/4-#10 awg xhhw;1-#8 awg bare ground)
100      LNFT 3.00 300.00 2.80 280.00 3.00 300.00 3.00 300.00
730-02-C conduit with conductors (1" diam. sch. 40 pvc w/
4-#8 awg xhhw; 1-#8 awg bare ground)
100      LNFT 4.00 400.00 3.40 340.00 3.60 360.00 3.50 350.00
730-02-D conduit with conductors (1" diam. sch. 40 pvc w/ 2-#6,
2-#4 awg xhhw; 1-#8 awg bare ground)
1,100      LNFT 5.00 5,500.00 4.60 5,060.00 4.80 5,280.00 4.60 5,060.00
730-02-E conduit with conductors (1.5"diam.sch. 40 pvc w/ 4-#8;
4-#6; 4-#4 awg xhhw; 1-#8 awg bare ground)
25      LNFT 10.00 250.00 9.60 240.00 10.00 250.00 9.60 240.00
730-05-A light pole (14' seamless round,2 section, stepped pole
w/ 22" high, 23.5" extension arm & a duplex gfci
20a recept.)
20      EACH 2,800.00 56,000.00 2,720.00 54,400.00 2,800.00 56,000.00 2,700.00 54,000.00
730-07-A luminaire (100 watt, 120 volt, high pressure sodium,
type iii distribution)
20      EACH 1,500.00 30,000.00 1,500.00 30,000.00 1,900.00 38,000.00 1,500.00 30,000.00
730-08 electrical service point (pedestal) 1      EACH 1,700.00 1,700.00 1,700.00 1,700.00 1,800.00 1,800.00 1,700.00 1,700.00
730-16-A underground junction box (11"x18"x12",open bottom
precast polymer concrete)
3      EACH 630.00 1,890.00 600.00 1,800.00 650.00 1,950.00 600.00 1,800.00
732-01-E plastic pavement striping (24" width) 298      LNFT 4.00 1,192.00 4.00 1,192.00 4.00 1,192.00 3.50 1,043.00
732-02-A plastic pavement striping (solid line) (4") 2.100  MILE 2,500.00 5,250.00 3,000.00 6,300.00 2,000.00 4,200.00 1,800.00 3,780.00
732-03-A plastic pavement striping (broken line)(4") 2.450  MILE 800.00 1,960.00 800.00 1,960.00 800.00 1,960.00 750.00 1,837.50
732-04-A plastic pavement legends & symbols (arrow) 24      EACH 200.00 4,800.00 150.00 3,600.00 180.00 4,320.00 165.00 3,960.00
732-04-F plastic pavement legends & symbols (pedestrian) 4      EACH 300.00 1,200.00 250.00 1,000.00 180.00 720.00 165.00 660.00
732-04-G plastic pavement legends & symbols (bicycle) 4      EACH 300.00 1,200.00 300.00 1,200.00 180.00 720.00 165.00 660.00
739-01 hydro-seeding 13.60   ACRE 1,600.00 21,760.00 1,500.00 20,400.00 900.00 12,240.00 1,200.00 16,320.00
740-01 construction layout lump      LUMP 43,000.00 43,000.00 50,000.00 50,000.00 50,000.00 50,000.00 100,000.00 100,000.00
S-001 steel benches 12      EACH 1,900.00 22,800.00 1,700.00 20,400.00 1,500.00 18,000.00 1,700.00 20,400.00
S-002 trash receptacles 6      EACH 1,000.00 6,000.00 900.00 5,400.00 900.00 5,400.00 900.00 5,400.00
S-003 35 foot flagpole 1      EACH 4,000.00 4,000.00 2,500.00 2,500.00 2,100.00 2,100.00 2,600.00 2,600.00
S-004 30 foot flagpole 2      EACH 4,000.00 8,000.00 2,300.00 4,600.00 1,900.00 3,800.00 2,100.00 4,200.00
S-005 concrete stairs lump      LUMP 15,000.00 15,000.00 24,000.00 24,000.00 23,000.00 23,000.00 50,000.00 50,000.00
S-006 pedestrian bridge (40 feet long x17 feet wide) 1      EACH 51,000.00 51,000.00 63,000.00 63,000.00 65,000.00 65,000.00 100,000.00 100,000.00
S-007 mechanically stabilized earth wall 760      SQFT 50.00 38,000.00 50.00 38,000.00 38.00 28,880.00 35.00 26,600.00
S-008 pipe and cable fence 2,737      LNFT 19.00 52,003.00 40.00 109,480.00 20.00 54,740.00 15.00 41,055.00
S-009 bicycle loop rack 6      EACH 900.00 5,400.00 600.00 3,600.00 600.00 3,600.00 600.00 3,600.00
S-010 water supply system (north trailhead) lump      LUMP 8,000.00 8,000.00 10,000.00 10,000.00 9,000.00 9,000.00 10,000.00 10,000.00
S-011 water supply system (south trailhead) lump      LUMP 21,000.00 21,000.00 23,000.00 23,000.00 18,000.00 18,000.00 30,000.00 30,000.00
S-012 colored and patterned concrete paving(6" thick) 78      SQYD 80.00 6,240.00 76.00 5,928.00 60.00 4,680.00 65.00 5,070.00
S-013 cattle shelter lump      LUMP 40,000.00 40,000.00 56,000.00 56,000.00 56,000.00 56,000.00 50,000.00 50,000.00
S-014 pipe gate (6 feet) 2      EACH 300.00 600.00 400.00 800.00 340.00 680.00 300.00 600.00
S-015 pipe gate (8 feet) 4      EACH 500.00 2,000.00 500.00 2,000.00 500.00 2,000.00 450.00 1,800.00
S-016 pipe gate (12 feet) 5      EACH 500.00 2,500.00 600.00 3,000.00 500.00 2,500.00 450.00 2,250.00
S-017 pipe gate (14 feet) 4      EACH 600.00 2,400.00 700.00 2,800.00 600.00 2,400.00 550.00 2,200.00
S-018 concrete planters (8 feet x 8 feet) 4      EACH 3,200.00 12,800.00 3,500.00 14,000.00 3,200.00 12,800.00 3,000.00 12,000.00
S-019 lightweight potting soil 16.5    CUYD 42.00 693.00 75.00 1,237.50 45.00 742.50 65.00 1,072.50
S-020 metal bollards (fixed) 6      EACH 300.00 1,800.00 300.00 1,800.00 300.00 1,800.00 160.00 960.00
S-021 metal bollards (removable, locking) 5      EACH 500.00 2,500.00 400.00 2,000.00 400.00 2,000.00 300.00 1,500.00
S-022 spare light pole assembly w/ luminaire & gfci 20a
receptacle
2      EACH 2,700.00 5,400.00 2,600.00 5,200.00 2,800.00 5,600.00 2,600.00 5,200.00
S-023 crushed stone drainage layer 289      CUYD 70.00 20,230.00 60.00 17,340.00 60.00 17,340.00 42.00 12,138.00
S-025 class ii base course 2,900.0    CUYD 49.00 142,100.00 50.00 145,000.00 50.00 145,000.00 50.00 145,000.00
                       
 CONTRACTOR TOTAL       1,820,451.70   1,975,832.00   1,995,235.70   2,252,297.55
 
Item Number Item Description Quantity Unit of Measure - 9 -
JAMES CONSTRUCTION GROUP LLC

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures and obstructions lump      LUMP 22,155.00 22,155.00            
203-04 embankment 42,824      CUYD 18.65 798,667.60            
203-09 geotextile fabric 2,090      SQYD 1.65 3,448.50            
204-02 temporary hay or straw bales 12      EACH 8.50 102.00            
204-06 temporary silt fencing 11,915      LNFT 2.40 28,596.00            
401-02 aggregate surface course (adjusted vehicular
measurement)
416      CUYD 50.00 20,800.00            
502-01-D superpave asphaltic concrete incidental paving (level
a)
5,003.4    TON 63.00 315,214.20            
701-03-G storm drain pipe (18" rcp/pcp) 383      LNFT 45.90 17,579.70            
701-05-G side drain pipe (18") 184      LNFT 45.95 8,454.80            
701-05-I side drain pipe (24") 34      LNFT 60.00 2,040.00            
702-03-A catch basins (cb-01) 3      EACH 2,990.00 8,970.00            
702-04-B adjusting catch basins 1      EACH 2,500.00 2,500.00            
704-03 blocked out guard rail 150.0    LNFT 24.40 3,660.00            
704-11-B guard rail end treatment (tangent) 2      EACH 2,120.00 4,240.00            
705-01 barbed wire fence 1,062      LNFT 5.30 5,628.60            
705-06-C chain link fence (6-foot height) 88      LNFT 29.50 2,596.00            
706-01-A concrete walk (4" thick)(w/wwf reinforcement) 1,506.4    SQYD 37.25 56,113.40            
706-03-A incidental concrete paving (4" thick) 105.1    SQYD 34.20 3,594.42            
706-03-C incidental concrete paving (6" thick)(w/wwf
reinforcement)
110.2    SQYD 42.40 4,672.48            
707-03 combination concrete curb & gutter 389.7    LNFT 29.70 11,574.09            
709-01 steel cattle guard 1      EACH 11,770.00 11,770.00            
713-01 temporary signs & barricades lump      LUMP 7,950.00 7,950.00            
714-01 slab sodding 2,050      SQYD 3.20 6,560.00            
719-01-A plants (pistachio"chinese", 30 gallon) 4      EACH 255.00 1,020.00            
719-01-B plants (hawthorn "clara", 3 gallon) 16      EACH 51.40 822.40            
727-01 mobilization lump      LUMP 373,775.00 373,775.00            
729-01 sign (type a) 265.8    SQFT 26.50 7,043.70            
729-16-C object marker assembly (type 3) 2      EACH 68.90 137.80            
729-21 u-channel post 63      EACH 68.90 4,340.70            
730-01 trenching and backfilling 1,400      LNFT 2.10 2,940.00            
730-02-A conduit with conductors (2"diam. sch. 40 pvc w/4-#10;
4-#8;4-#6;4-#4 awg xhhw;1-#8 awg bare ground)
150      LNFT 15.00 2,250.00            
730-02-B conduit with conductors (1"diam. sch.40 pvc
w/4-#10 awg xhhw;1-#8 awg bare ground)
100      LNFT 5.30 530.00            
730-02-C conduit with conductors (1" diam. sch. 40 pvc w/
4-#8 awg xhhw; 1-#8 awg bare ground)
100      LNFT 5.30 530.00            
730-02-D conduit with conductors (1" diam. sch. 40 pvc w/ 2-#6,
2-#4 awg xhhw; 1-#8 awg bare ground)
1,100      LNFT 6.10 6,710.00            
730-02-E conduit with conductors (1.5"diam.sch. 40 pvc w/ 4-#8;
4-#6; 4-#4 awg xhhw; 1-#8 awg bare ground)
25      LNFT 12.20 305.00            
730-05-A light pole (14' seamless round,2 section, stepped pole
w/ 22" high, 23.5" extension arm & a duplex gfci
20a recept.)
20      EACH 1,855.00 37,100.00            
730-07-A luminaire (100 watt, 120 volt, high pressure sodium,
type iii distribution)
20      EACH 2,120.00 42,400.00            
730-08 electrical service point (pedestal) 1      EACH 6,360.00 6,360.00            
730-16-A underground junction box (11"x18"x12",open bottom
precast polymer concrete)
3      EACH 850.00 2,550.00            
732-01-E plastic pavement striping (24" width) 298      LNFT 3.75 1,117.50            
732-02-A plastic pavement striping (solid line) (4") 2.100  MILE 1,910.00 4,011.00            
732-03-A plastic pavement striping (broken line)(4") 2.450  MILE 795.00 1,947.75            
732-04-A plastic pavement legends & symbols (arrow) 24      EACH 175.00 4,200.00            
732-04-F plastic pavement legends & symbols (pedestrian) 4      EACH 175.00 700.00            
732-04-G plastic pavement legends & symbols (bicycle) 4      EACH 175.00 700.00            
739-01 hydro-seeding 13.60   ACRE 1,050.00 14,280.00            
740-01 construction layout lump      LUMP 62,000.00 62,000.00            
S-001 steel benches 12      EACH 1,750.00 21,000.00            
S-002 trash receptacles 6      EACH 985.00 5,910.00            
S-003 35 foot flagpole 1      EACH 2,340.00 2,340.00            
S-004 30 foot flagpole 2      EACH 1,960.00 3,920.00            
S-005 concrete stairs lump      LUMP 21,475.00 21,475.00            
S-006 pedestrian bridge (40 feet long x17 feet wide) 1      EACH 59,350.00 59,350.00            
S-007 mechanically stabilized earth wall 760      SQFT 54.60 41,496.00            
S-008 pipe and cable fence 2,737      LNFT 25.90 70,888.30            
S-009 bicycle loop rack 6      EACH 625.00 3,750.00            
S-010 water supply system (north trailhead) lump      LUMP 9,500.00 9,500.00            
S-011 water supply system (south trailhead) lump      LUMP 30,500.00 30,500.00            
S-012 colored and patterned concrete paving(6" thick) 78      SQYD 82.70 6,450.60            
S-013 cattle shelter lump      LUMP 31,800.00 31,800.00            
S-014 pipe gate (6 feet) 2      EACH 510.00 1,020.00            
S-015 pipe gate (8 feet) 4      EACH 675.00 2,700.00            
S-016 pipe gate (12 feet) 5      EACH 845.00 4,225.00            
S-017 pipe gate (14 feet) 4      EACH 1,100.00 4,400.00            
S-018 concrete planters (8 feet x 8 feet) 4      EACH 1,275.00 5,100.00            
S-019 lightweight potting soil 16.5    CUYD 37.50 618.75            
S-020 metal bollards (fixed) 6      EACH 275.00 1,650.00            
S-021 metal bollards (removable, locking) 5      EACH 395.00 1,975.00            
S-022 spare light pole assembly w/ luminaire & gfci 20a
receptacle
2      EACH 3,975.00 7,950.00            
S-023 crushed stone drainage layer 289      CUYD 47.00 13,583.00            
S-025 class ii base course 2,900.0    CUYD 42.50 123,250.00            
                       
 CONTRACTOR TOTAL       2,399,509.29            