Lead Project: 744-10-0012
Parish: CALCASIEU
Routes:
Description: IOWA SIDEWALK PROGRAM
Type Const: concrete walks, drainage structures and related work.
 
RankLicenseBidderAmount
139104 RMK CONSTRUCTION CO. LLC $150,811.60
233111 QUALITY CONSTR. SPECIALISTS, INC. $164,860.20
339155 HD TRUCK & TRACTOR, LLC $177,509.60
 
Item Number Item Description Quantity Unit of Measure - 1 -
RMK CONSTRUCTION CO. LLC
- 2 -
QUALITY CONSTR. SPECIALISTS, INC.
- 3 -
HD TRUCK & TRACTOR, LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-C removal of portland cement concrete pavement 18      SQYD 2.00 36.00 10.00 180.00 81.00 1,458.00    
202-02-F removal of concrete combination curb & gutter 128.0    LNFT 2.00 256.00 10.00 1,280.00 12.00 1,536.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
58      CUYD 30.00 1,740.00 40.00 2,320.00 64.00 3,712.00    
701-03-B storm drain pipe (6" pvc) 92      LNFT 5.00 460.00 20.00 1,840.00 28.00 2,576.00    
701-03-C storm drain pipe (8" pcp) 16      LNFT 6.00 96.00 35.00 560.00 68.00 1,088.00    
701-03-F storm drain pipe (15" rcp) 80      LNFT 25.00 2,000.00 40.00 3,200.00 35.00 2,800.00    
701-03-G storm drain pipe (18" rcp) 16      LNFT 30.00 480.00 45.00 720.00 56.00 896.00    
701-04-M storm drain pipe arch(36" rcpa) 16      LNFT 55.00 880.00 120.00 1,920.00 124.00 1,984.00    
701-10-F reinforced concrete pipe (extension)(15") 16      LNFT 25.00 400.00 76.00 1,216.00 68.00 1,088.00    
701-15 concrete collar 1      EACH 500.00 500.00 500.00 500.00 870.00 870.00    
702-03-A catch basins (cb-01) 2      EACH 2,000.00 4,000.00 2,300.00 4,600.00 2,000.00 4,000.00    
702-03-E catch basins (cb-03) 2      EACH 2,500.00 5,000.00 2,000.00 4,000.00 3,500.00 7,000.00    
705-09 rebuilt fence 60      LNFT 10.00 600.00 15.00 900.00 40.00 2,400.00    
706-01-A concrete walk (4" thick) 1,391.4    SQYD 26.00 36,176.40 32.00 44,524.80 45.00 62,613.00    
706-01-A-01 concrete walk (4" thick) with thickened edge 647.9    SQYD 36.00 23,324.40 38.00 24,620.20 46.00 29,803.40    
706-01-C concrete walk (6" thick) 260.8    SQYD 46.00 11,996.80 34.00 8,867.20 54.90 14,317.92    
706-01-C-01 concrete walk (6" thick) with thickened edge 161.2    SQYD 60.00 9,672.00 40.00 6,448.00 55.00 8,866.00    
706-02-C concrete drive (6" thick) 6.2    SQYD 50.00 310.00 40.00 248.00 63.00 390.60    
707-03 combination concrete curb & gutter 128.0    LNFT 5.00 640.00 32.00 4,096.00 17.00 2,176.00    
713-01 temporary signs & barricades lump      LUMP 8,396.00 8,396.00 10,000.00 10,000.00 3,500.00 3,500.00    
727-01 mobilization lump      LUMP 15,000.00 15,000.00 10,000.00 10,000.00 6,500.00 6,500.00    
732-01-B plastic pavement striping (6" width) 200      LNFT 15.00 3,000.00 15.00 3,000.00 5.00 1,000.00    
739-01 hydro-seeding 1.14   ACRE 700.00 798.00 3,000.00 3,420.00 2,662.00 3,034.68    
740-01 construction layout lump      LUMP 15,000.00 15,000.00 5,000.00 5,000.00 3,000.00 3,000.00    
810-03 pipe railing 40.00   LNFT 100.00 4,000.00 250.00 10,000.00 125.00 5,000.00    
S-001 adjusting water valves to grade 3      EACH 250.00 750.00 250.00 750.00 100.00 300.00    
S-002 adjusting sewer manholes to grade 1      EACH 500.00 500.00 750.00 750.00 500.00 500.00    
S-003 sidewalk trench drains 14      EACH 200.00 2,800.00 350.00 4,900.00 150.00 2,100.00    
S-004 tree trimming lump      LUMP 2,000.00 2,000.00 5,000.00 5,000.00 3,000.00 3,000.00    
                       
 CONTRACTOR TOTAL       150,811.60   164,860.20   177,509.60    