Letting of 3/31/2004 LA DOTD Headquarters


READV
go back
Go Back
DBE GOAL FED
Lead Project: 450-34-0076
Parish: ORLEANS
Routes: I-610, I-10
Description: LEVELING RAMP ENDS, ROUTES I-610 AND I-10.
Type Const: elevated ramp end leveling with superpave asphaltic concrete and related work.
 
RankLicenseBidderAmount
102179 BOH BROS. CONSTRUCTION CO., LLC. $383,294.05
206276 BARRIERE CONSTRUCTION CO., LLC $390,390.85
 
Item Number Item Description Quantity Unit of Measure - 1 -
BOH BROS. CONSTRUCTION CO., LLC.
- 2 -
BARRIERE CONSTRUCTION CO., LLC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
203-08 borrow (vehicular measurement) 300      CUYD 25.00 7,500.00 15.00 4,500.00        
502-01 superpave asphaltic concrete 1,180.0    TON 125.00 147,500.00 100.00 118,000.00        
509-01 cold planing asphaltic pavement (1.5" thick) 340      SQYD 5.00 1,700.00 30.00 10,200.00        
602-05-I-01 full depth patching of jointed concrete pavement (9"
thick)(16.0 sq yds & under)
110.0    SQYD 200.00 22,000.00 200.00 22,000.00        
702-04-B adjusting catch basins 1      EACH 500.00 500.00 3,000.00 3,000.00        
707-01 concrete curb 1,100.0    LNFT 25.00 27,500.00 25.00 27,500.00        
713-01 temporary signs & barricades lump      LUMP 85,000.00 85,000.00 70,000.00 70,000.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
0.450  MILE 700.00 315.00 200.00 90.00        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
0.450  MILE 325.00 146.25 10.00 4.50        
713-05-A temporary pavement markings (solid line)(4" width) 3.537  MILE 650.00 2,299.05 15.00 53.05        
713-06-E temporary pavement legends and symbols (school
crossing)
1      EACH 250.00 250.00 10.00 10.00        
724-03 pavement joint repair 100.0    TON 50.00 5,000.00 100.00 10,000.00        
727-01 mobilization lump      LUMP 35,000.00 35,000.00 60,000.00 60,000.00        
731-02 reflectorized raised pavement markers 25      EACH 7.25 181.25 8.00 200.00        
732-01-C plastic pavement striping (8" width) 500      LNFT 1.50 750.00 2.00 1,000.00        
732-02-A plastic pavement striping (solid line) (4" width) 1.179  MILE 2,500.00 2,947.50 2,700.00 3,183.30        
732-03-A plastic pavement striping (broken line)(4" width) 0.150  MILE 2,600.00 390.00 1,000.00 150.00        
732-04-E plastic pavement legends & symbols (school crossing) 1      EACH 615.00 615.00 600.00 600.00        
736-09 loop detector 200      LNFT 15.00 3,000.00 14.00 2,800.00        
740-01 construction layout lump      LUMP 15,000.00 15,000.00 14,000.00 14,000.00        
S-001 milling p.c.c. pavement 1,170      SQYD 10.00 11,700.00 30.00 35,100.00        
S-002 variable message sign unit 2      EACH 7,000.00 14,000.00 4,000.00 8,000.00        
                       
 CONTRACTOR TOTAL       383,294.05   390,390.85        