Letting of 3/31/2004 LA DOTD Headquarters


READV
go back
Go Back
 
Lead Project: 283-08-0146
Parish: ORLEANS
Routes: US 90
Description: C. C. C. INTERSECTION IMPROVEMENTS (MAGAZINE - SOUTH PETER)
Type Const: cold planing asph pvmt, class ii bc, drain struct,superpave acp, pccp, landscaping,
precast prestressed concrete girder spans bridge, traffic signalization, and related work.
 
RankLicenseBidderAmount
140038 COMMAND CONSTRUCTION LLC $1,395,551.53
234567 JAMES CONSTRUCTION GROUP LLC $1,641,919.66
336827 SHAVERS-WHITTLE CONSTRUCTION INC $1,679,329.66
402179 BOH BROS. CONSTRUCTION CO., LLC. $1,713,454.65
525747 KOSTMAYER CONSTRUCTION, INC. $1,962,517.89
 
Item Number Item Description Quantity Unit of Measure - 1 -
COMMAND CONSTRUCTION LLC
- 2 -
JAMES CONSTRUCTION GROUP LLC
- 3 -
SHAVERS-WHITTLE CONSTRUCTION INC
- 4 -
BOH BROS. CONSTRUCTION CO., LLC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 783      SQYD 10.00 7,830.00 7.00 5,481.00 10.00 7,830.00 5.00 3,915.00
202-02-E removal of concrete curbs 660.0    LNFT 50.00 33,000.00 3.00 1,980.00 20.00 13,200.00 3.00 1,980.00
202-02-F removal of concrete combination curb & gutter 740.0    LNFT 50.00 37,000.00 5.00 3,700.00 7.00 5,180.00 7.00 5,180.00
202-02-G removal of surfacing & stabilized base 164.0    SQYD 50.00 8,200.00 15.00 2,460.00 75.00 12,300.00 10.00 1,640.00
203-06 excavation & embankment lump      LUMP 40,000.00 40,000.00 80,000.00 80,000.00 29,000.00 29,000.00 26,000.00 26,000.00
302-02-E class ii base course (8" thick)(stone or recycled pcc
pavement)
1,398.0    SQYD 25.00 34,950.00 20.00 27,960.00 12.00 16,776.00 23.00 32,154.00
302-02-F class ii base course (11 3/4" thick)(stone or recycled
pcc pavement)
420.0    SQYD 25.00 10,500.00 27.00 11,340.00 18.00 7,560.00 26.00 10,920.00
502-01 superpave asphaltic concrete 1,341.5    TON 105.00 140,857.50 90.00 120,735.00 110.00 147,565.00 85.00 114,027.50
509-01 cold planing asphaltic pavement 2,640      SQYD 5.00 13,200.00 5.00 13,200.00 5.00 13,200.00 3.00 7,920.00
601-01-I portland cement concrete pavement (9" thick) 296.0    SQYD 80.00 23,680.00 55.00 16,280.00 90.00 26,640.00 75.00 22,200.00
701-03-F storm drain pipe (15" rcp/pcp) 240      LNFT 100.00 24,000.00 110.00 26,400.00 60.00 14,400.00 60.00 14,400.00
702-03-C catch basins (cb-06) 5      EACH 4,000.00 20,000.00 4,000.00 20,000.00 2,900.00 14,500.00 2,800.00 14,000.00
702-03-F catch basins (cb-08) 1      EACH 7,000.00 7,000.00 7,000.00 7,000.00 5,500.00 5,500.00 6,700.00 6,700.00
702-03-G catch basins (cb-09) 1      EACH 4,000.00 4,000.00 4,000.00 4,000.00 2,800.00 2,800.00 2,800.00 2,800.00
702-04-A adjusting manholes 3      EACH 500.00 1,500.00 600.00 1,800.00 850.00 2,550.00 600.00 1,800.00
702-04-B adjusting catch basins 5      EACH 100.00 500.00 800.00 4,000.00 1,300.00 6,500.00 700.00 3,500.00
706-01-A concrete walk (4" thick) 617.6    SQYD 32.00 19,763.20 40.00 24,704.00 40.00 24,704.00 40.00 24,704.00
706-02-C concrete drive (6" thick) 79.4    SQYD 35.00 2,779.00 48.00 3,811.20 50.00 3,970.00 50.00 3,970.00
707-01 concrete curb 562.5    LNFT 5.00 2,812.50 9.00 5,062.50 13.00 7,312.50 8.00 4,500.00
707-03 combination concrete curb & gutter 1,434.3    LNFT 20.00 28,686.00 19.00 27,251.70 20.00 28,686.00 24.00 34,423.20
713-01 temporary signs & barricades lump      LUMP 20,000.00 20,000.00 40,000.00 40,000.00 28,000.00 28,000.00 50,000.00 50,000.00
713-03-A temporary pavement markings (4" width) 19,330      LNFT 0.15 2,899.50 0.50 9,665.00 0.16 3,092.80 0.20 3,866.00
713-03-C temporary pavement markings (8" width) 2,442      LNFT 0.30 732.60 0.80 1,953.60 0.33 805.86 0.35 854.70
713-03-E temporary pavement markings (24" width) 877      LNFT 1.00 877.00 1.50 1,315.50 0.95 833.15 1.00 877.00
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
0.292  MILE 100.00 29.20 6,000.00 1,752.00 1,000.00 292.00 500.00 146.00
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
0.292  MILE 440.00 128.48 7,000.00 2,044.00 450.00 131.40 490.00 143.08
713-08 temporary precast concrete barrier (contractor
furnished)
140      EACH 30.00 4,200.00 920.00 128,800.00 500.00 70,000.00 740.00 103,600.00
713-09 temporary precast concrete barrier (department
furnished)
140      EACH 25.00 3,500.00 150.00 21,000.00 100.00 14,000.00 350.00 49,000.00
714-01-A slab sodding (bermuda) 166      SQYD 5.00 830.00 6.00 996.00 3.50 581.00 3.00 498.00
715-01 topsoil (6" depth) 15      CUYD 40.00 600.00 20.00 300.00 50.00 750.00 27.00 405.00
717-01-A seeding (bermuda) 50      LB 10.00 500.00 10.00 500.00 20.00 1,000.00 20.00 1,000.00
719-01-A plants (savannah holly, 8'-10' height (bush form,
branched to the ground)
9      EACH 500.00 4,500.00 295.00 2,655.00 330.00 2,970.00 300.00 2,700.00
719-01-B plants (east palatka holly, 9'-10' height) 5      EACH 500.00 2,500.00 295.00 1,475.00 330.00 1,650.00 300.00 1,500.00
722-01 project site laboratory 1      EACH 1,000.00 1,000.00 5,000.00 5,000.00 25,000.00 25,000.00 20,000.00 20,000.00
724-01 pavement patching 24      SQYD 125.00 3,000.00 75.00 1,800.00 175.00 4,200.00 100.00 2,400.00
727-01 mobilization lump      LUMP 130,000.00 130,000.00 160,000.00 160,000.00 85,000.00 85,000.00 160,000.00 160,000.00
729-01 sign (type a) 105.5    SQFT 25.00 2,637.50 25.00 2,637.50 25.00 2,637.50 25.00 2,637.50
729-04 sign (type d) 39.0    SQFT 30.00 1,170.00 25.00 975.00 30.00 1,170.00 31.00 1,209.00
729-08-A mounting (2 1/2" post) 15      EACH 900.00 13,500.00 700.00 10,500.00 900.00 13,500.00 900.00 13,500.00
729-08-H mounting (w8 x 24) 2      EACH 2,000.00 4,000.00 1,400.00 2,800.00 2,000.00 4,000.00 2,000.00 4,000.00
730-15 relocate light poles (40' w/6' arm, p&k) 2      EACH 2,000.00 4,000.00 2,000.00 4,000.00 2,600.00 5,200.00 3,000.00 6,000.00
731-02 reflectorized raised pavement markers 273      EACH 5.00 1,365.00 6.00 1,638.00 6.00 1,638.00 6.00 1,638.00
732-01-A plastic pavement striping (4" width) 9,665      LNFT 0.60 5,799.00 0.60 5,799.00 0.70 6,765.50 0.70 6,765.50
732-01-C plastic pavement striping (8" width) 1,221      LNFT 1.30 1,587.30 1.20 1,465.20 1.35 1,648.35 1.40 1,709.40
732-01-D plastic pavement striping (12" width) 935      LNFT 2.00 1,870.00 2.00 1,870.00 2.00 1,870.00 2.00 1,870.00
732-01-E plastic pavement striping (24" width) 877      LNFT 4.00 3,508.00 3.00 2,631.00 4.00 3,508.00 4.00 3,508.00
732-03-A plastic pavement striping (broken line)(4" width) 1.562  MILE 700.00 1,093.40 780.00 1,218.36 700.00 1,093.40 760.00 1,187.12
732-04-A plastic pavement legends & symbols (arrow) 7      EACH 150.00 1,050.00 150.00 1,050.00 150.00 1,050.00 150.00 1,050.00
732-04-B plastic pavement legends & symbols (double arrow) 12      EACH 200.00 2,400.00 185.00 2,220.00 225.00 2,700.00 200.00 2,400.00
732-04-C plastic pavement legends & symbols (only) 6      EACH 175.00 1,050.00 180.00 1,080.00 200.00 1,200.00 170.00 1,020.00
732-05 removal of existing markings 1.810  MILE 500.00 905.00 4,200.00 7,602.00 4,500.00 8,145.00 4,600.00 8,326.00
740-01 construction layout lump      LUMP 5,000.00 5,000.00 56,000.00 56,000.00 60,000.00 60,000.00 43,000.00 43,000.00
802-02 structural excavation for intermediate bents 100.0    CUYD 30.00 3,000.00 45.00 4,500.00 10.00 1,000.00 25.00 2,500.00
804-04-B cast-in-place concrete piles (14") 550      LNFT 60.00 33,000.00 79.00 43,450.00 85.00 46,750.00 97.00 53,350.00
804-04-C cast-in-place concrete piles (16") 865      LNFT 80.00 69,200.00 87.00 75,255.00 95.00 82,175.00 107.00 92,555.00
804-04-D cast-in-place concrete piles (18") 450      LNFT 90.00 40,500.00 169.00 76,050.00 100.00 45,000.00 128.00 57,600.00
804-12 loading permanent piles 1      EACH 2,500.00 2,500.00 18,700.00 18,700.00 1,000.00 1,000.00 15,000.00 15,000.00
805-01-D class a concrete (footings) 7.71   CUYD 1,300.00 10,023.00 1,085.00 8,365.35 1,000.00 7,710.00 1,000.00 7,710.00
805-01-F class a concrete (bents) 30.16   CUYD 1,100.00 33,176.00 715.00 21,564.40 1,500.00 45,240.00 1,200.00 36,192.00
805-01-I class a concrete (curtain walls) 44.17   CUYD 1,500.00 66,255.00 1,400.00 61,838.00 1,500.00 66,255.00 1,200.00 53,004.00
805-03 class aa concrete 108.53   CUYD 550.00 59,691.50 715.00 77,598.95 1,500.00 162,795.00 900.00 97,677.00
805-08-A precast-prestressed concrete girder (type i) 248.2    LNFT 75.00 18,615.00 80.00 19,856.00 80.00 19,856.00 100.00 24,820.00
805-09 expansion joint seal 37.59   LNFT 125.00 4,698.75 23.00 864.57 65.00 2,443.35 30.00 1,127.70
805-11 strip seal joints 11.94   LNFT 220.00 2,626.80 135.00 1,611.90 200.00 2,388.00 175.00 2,089.50
806-01 deformed reinforcing steel 33,720      LB 0.70 23,604.00 0.95 32,034.00 1.00 33,720.00 0.77 25,964.40
810-01-A concrete railing (45" to 10" barrier transition) 50.82   LNFT 100.00 5,082.00 160.00 8,131.20 150.00 7,623.00 90.00 4,573.80
810-01-B concrete railing (45" barrier) 208.83   LNFT 60.00 12,529.80 135.00 28,192.05 120.00 25,059.60 135.00 28,192.05
813-01 concrete approach slabs 109.08   SQYD 125.00 13,635.00 170.00 18,543.60 175.00 19,089.00 150.00 16,362.00
S-001 removal of existing signal equipment lump      LUMP 1,000.00 1,000.00 2,000.00 2,000.00 5,000.00 5,000.00 5,500.00 5,500.00
S-002 upgrade of existing controller cabinet 3      EACH 5,000.00 15,000.00 5,000.00 15,000.00 10,000.00 30,000.00 11,000.00 33,000.00
S-003 signal support (standard)(foundation, pedestal pole,
10')
2      EACH 550.00 1,100.00 3,000.00 6,000.00 1,300.00 2,600.00 1,300.00 2,600.00
S-004 signal support (standard)(foundation, pole, 25' arm) 1      EACH 4,800.00 4,800.00 2,930.00 2,930.00 5,000.00 5,000.00 5,200.00 5,200.00
S-005 signal support (standard)(foundation, pole, 25' & 25'
arm)
1      EACH 7,100.00 7,100.00 3,930.00 3,930.00 6,700.00 6,700.00 7,000.00 7,000.00
S-006 traffic signal head (3 section, 12" lens) 10      EACH 800.00 8,000.00 500.00 5,000.00 550.00 5,500.00 550.00 5,500.00
S-007 traffic signal head (5 section, 12" lens) 1      EACH 850.00 850.00 500.00 500.00 900.00 900.00 880.00 880.00
S-011 detector lead-in cable (no. 14/2/os) 2,530      LNFT 1.00 2,530.00 3.00 7,590.00 1.10 2,783.00 1.10 2,783.00
S-016 traffic signal cable (no. 14/7c) 1,900      LNFT 1.75 3,325.00 4.00 7,600.00 2.00 3,800.00 1.90 3,610.00
S-017 loop detector 23      EACH 1,200.00 27,600.00 100.00 2,300.00 1,500.00 34,500.00 1,600.00 36,800.00
S-018 conduit (2") 355      LNFT 6.00 2,130.00 5.00 1,775.00 6.50 2,307.50 7.00 2,485.00
S-020 conduit (4") 35      LNFT 11.00 385.00 6.00 210.00 9.50 332.50 9.00 315.00
S-023 electrical junction box (type e) 11      EACH 300.00 3,300.00 50.00 550.00 600.00 6,600.00 650.00 7,150.00
S-024 traffic manhole 4      EACH 700.00 2,800.00 1,000.00 4,000.00 1,750.00 7,000.00 1,400.00 5,600.00
S-028 cut and patch incidental paving 125      LNFT 25.00 3,125.00 27.00 3,375.00 35.00 4,375.00 35.00 4,375.00
S-031 cut and patch brick sidewalk 50      LNFT 50.00 2,500.00 45.00 2,250.00 60.00 3,000.00 50.00 2,500.00
S-036 nema ts type ii traffic signal master controller (all
inclusive)
1      EACH 20,000.00 20,000.00 1,000.00 1,000.00 25,000.00 25,000.00 25,000.00 25,000.00
S-038 vehicular signal heads, optically programmed
(3 section, 12" lens)
11      EACH 3,400.00 37,400.00 500.00 5,500.00 3,300.00 36,300.00 3,500.00 38,500.00
S-040 signal support (standard)(foundation, pole, 40' arm) 1      EACH 6,000.00 6,000.00 3,930.00 3,930.00 6,500.00 6,500.00 7,000.00 7,000.00
S-052 retaining wall & fence 159.0    LNFT 250.00 39,750.00 497.00 79,023.00 330.00 52,470.00 315.00 50,085.00
S-060 precast concrete detectable warning paver landing 25      SQFT 40.00 1,000.00 38.00 950.00 50.00 1,250.00 15.00 375.00
S-061 brick paver walk (ddd standard sidewalks) 273      SQFT 25.00 6,825.00 38.00 10,374.00 32.00 8,736.00 10.00 2,730.00
S-062 granite cobblestone paving 656      SQFT 35.00 22,960.00 25.00 16,400.00 45.00 29,520.00 35.00 22,960.00
S-063 transplanting trees (crape myrtles & hollies) 49      EACH 100.00 4,900.00 350.00 17,150.00 300.00 14,700.00 288.00 14,112.00
S-064 irrigation items lump      LUMP 12,000.00 12,000.00 6,800.00 6,800.00 10,000.00 10,000.00 10,000.00 10,000.00
S-065 relocate trailblazing signs 1      EACH 750.00 750.00 2,100.00 2,100.00 3,500.00 3,500.00 1,700.00 1,700.00
S-101 removal of barrier railing 226.65   LNFT 30.00 6,799.50 16.00 3,626.40 25.00 5,666.25 20.00 4,533.00
S-102 removal of concrete (deck, bents & curtain wall) 86.52   CUYD 125.00 10,815.00 134.00 11,593.68 250.00 21,630.00 135.00 11,680.20
S-103 mechanical butt splice 46      EACH 80.00 3,680.00 100.00 4,600.00 75.00 3,450.00 70.00 3,220.00
S-104 curtain wall design treatment lump      LUMP 50,000.00 50,000.00 25,000.00 25,000.00 25,000.00 25,000.00 40,000.00 40,000.00
S-105 deck drainage systems lump      LUMP 2,500.00 2,500.00 2,400.00 2,400.00 2,500.00 2,500.00 4,000.00 4,000.00
                       
 CONTRACTOR TOTAL       1,395,551.53   1,641,919.66   1,679,329.66   1,713,454.65
 
Item Number Item Description Quantity Unit of Measure - 5 -
KOSTMAYER CONSTRUCTION, INC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 783      SQYD 10.00 7,830.00            
202-02-E removal of concrete curbs 660.0    LNFT 7.00 4,620.00            
202-02-F removal of concrete combination curb & gutter 740.0    LNFT 10.00 7,400.00            
202-02-G removal of surfacing & stabilized base 164.0    SQYD 10.00 1,640.00            
203-06 excavation & embankment lump      LUMP 60.00 60.00            
302-02-E class ii base course (8" thick)(stone or recycled pcc
pavement)
1,398.0    SQYD 12.00 16,776.00            
302-02-F class ii base course (11 3/4" thick)(stone or recycled
pcc pavement)
420.0    SQYD 15.00 6,300.00            
502-01 superpave asphaltic concrete 1,341.5    TON 130.00 174,395.00            
509-01 cold planing asphaltic pavement 2,640      SQYD 6.00 15,840.00            
601-01-I portland cement concrete pavement (9" thick) 296.0    SQYD 65.00 19,240.00            
701-03-F storm drain pipe (15" rcp/pcp) 240      LNFT 65.00 15,600.00            
702-03-C catch basins (cb-06) 5      EACH 3,000.00 15,000.00            
702-03-F catch basins (cb-08) 1      EACH 8,000.00 8,000.00            
702-03-G catch basins (cb-09) 1      EACH 9,000.00 9,000.00            
702-04-A adjusting manholes 3      EACH 1,200.00 3,600.00            
702-04-B adjusting catch basins 5      EACH 1,200.00 6,000.00            
706-01-A concrete walk (4" thick) 617.6    SQYD 45.00 27,792.00            
706-02-C concrete drive (6" thick) 79.4    SQYD 55.00 4,367.00            
707-01 concrete curb 562.5    LNFT 10.00 5,625.00            
707-03 combination concrete curb & gutter 1,434.3    LNFT 48.00 68,846.40            
713-01 temporary signs & barricades lump      LUMP 21,000.00 21,000.00            
713-03-A temporary pavement markings (4" width) 19,330      LNFT 0.20 3,866.00            
713-03-C temporary pavement markings (8" width) 2,442      LNFT 0.35 854.70            
713-03-E temporary pavement markings (24" width) 877      LNFT 1.10 964.70            
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
0.292  MILE 3,600.00 1,051.20            
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
0.292  MILE 520.00 151.84            
713-08 temporary precast concrete barrier (contractor
furnished)
140      EACH 600.00 84,000.00            
713-09 temporary precast concrete barrier (department
furnished)
140      EACH 150.00 21,000.00            
714-01-A slab sodding (bermuda) 166      SQYD 5.00 830.00            
715-01 topsoil (6" depth) 15      CUYD 36.00 540.00            
717-01-A seeding (bermuda) 50      LB 6.00 300.00            
719-01-A plants (savannah holly, 8'-10' height (bush form,
branched to the ground)
9      EACH 155.00 1,395.00            
719-01-B plants (east palatka holly, 9'-10' height) 5      EACH 175.00 875.00            
722-01 project site laboratory 1      EACH 17,000.00 17,000.00            
724-01 pavement patching 24      SQYD 400.00 9,600.00            
727-01 mobilization lump      LUMP 150,000.00 150,000.00            
729-01 sign (type a) 105.5    SQFT 28.00 2,954.00            
729-04 sign (type d) 39.0    SQFT 36.00 1,404.00            
729-08-A mounting (2 1/2" post) 15      EACH 1,125.00 16,875.00            
729-08-H mounting (w8 x 24) 2      EACH 2,600.00 5,200.00            
730-15 relocate light poles (40' w/6' arm, p&k) 2      EACH 2,100.00 4,200.00            
731-02 reflectorized raised pavement markers 273      EACH 6.00 1,638.00            
732-01-A plastic pavement striping (4" width) 9,665      LNFT 0.76 7,345.40            
732-01-C plastic pavement striping (8" width) 1,221      LNFT 1.48 1,807.08            
732-01-D plastic pavement striping (12" width) 935      LNFT 2.30 2,150.50            
732-01-E plastic pavement striping (24" width) 877      LNFT 4.60 4,034.20            
732-03-A plastic pavement striping (broken line)(4" width) 1.562  MILE 860.00 1,343.32            
732-04-A plastic pavement legends & symbols (arrow) 7      EACH 165.00 1,155.00            
732-04-B plastic pavement legends & symbols (double arrow) 12      EACH 255.00 3,060.00            
732-04-C plastic pavement legends & symbols (only) 6      EACH 194.00 1,164.00            
732-05 removal of existing markings 1.810  MILE 4,400.00 7,964.00            
740-01 construction layout lump      LUMP 80,000.00 80,000.00            
802-02 structural excavation for intermediate bents 100.0    CUYD 7.00 700.00            
804-04-B cast-in-place concrete piles (14") 550      LNFT 68.00 37,400.00            
804-04-C cast-in-place concrete piles (16") 865      LNFT 71.00 61,415.00            
804-04-D cast-in-place concrete piles (18") 450      LNFT 74.00 33,300.00            
804-12 loading permanent piles 1      EACH 2,000.00 2,000.00            
805-01-D class a concrete (footings) 7.71   CUYD 1,200.00 9,252.00            
805-01-F class a concrete (bents) 30.16   CUYD 1,200.00 36,192.00            
805-01-I class a concrete (curtain walls) 44.17   CUYD 1,450.00 64,046.50            
805-03 class aa concrete 108.53   CUYD 1,450.00 157,368.50            
805-08-A precast-prestressed concrete girder (type i) 248.2    LNFT 175.00 43,435.00            
805-09 expansion joint seal 37.59   LNFT 85.00 3,195.15            
805-11 strip seal joints 11.94   LNFT 85.00 1,014.90            
806-01 deformed reinforcing steel 33,720      LB 1.70 57,324.00            
810-01-A concrete railing (45" to 10" barrier transition) 50.82   LNFT 205.00 10,418.10            
810-01-B concrete railing (45" barrier) 208.83   LNFT 75.00 15,662.25            
813-01 concrete approach slabs 109.08   SQYD 90.00 9,817.20            
S-001 removal of existing signal equipment lump      LUMP 4,800.00 4,800.00            
S-002 upgrade of existing controller cabinet 3      EACH 12,100.00 36,300.00            
S-003 signal support (standard)(foundation, pedestal pole,
10')
2      EACH 840.00 1,680.00            
S-004 signal support (standard)(foundation, pole, 25' arm) 1      EACH 6,120.00 6,120.00            
S-005 signal support (standard)(foundation, pole, 25' & 25'
arm)
1      EACH 7,960.00 7,960.00            
S-006 traffic signal head (3 section, 12" lens) 10      EACH 1,080.00 10,800.00            
S-007 traffic signal head (5 section, 12" lens) 1      EACH 1,200.00 1,200.00            
S-011 detector lead-in cable (no. 14/2/os) 2,530      LNFT 1.40 3,542.00            
S-016 traffic signal cable (no. 14/7c) 1,900      LNFT 2.60 4,940.00            
S-017 loop detector 23      EACH 860.00 19,780.00            
S-018 conduit (2") 355      LNFT 6.25 2,218.75            
S-020 conduit (4") 35      LNFT 26.20 917.00            
S-023 electrical junction box (type e) 11      EACH 400.00 4,400.00            
S-024 traffic manhole 4      EACH 1,950.00 7,800.00            
S-028 cut and patch incidental paving 125      LNFT 18.00 2,250.00            
S-031 cut and patch brick sidewalk 50      LNFT 36.00 1,800.00            
S-036 nema ts type ii traffic signal master controller (all
inclusive)
1      EACH 100,000.00 100,000.00            
S-038 vehicular signal heads, optically programmed
(3 section, 12" lens)
11      EACH 3,500.00 38,500.00            
S-040 signal support (standard)(foundation, pole, 40' arm) 1      EACH 7,700.00 7,700.00            
S-052 retaining wall & fence 159.0    LNFT 470.00 74,730.00            
S-060 precast concrete detectable warning paver landing 25      SQFT 42.00 1,050.00            
S-061 brick paver walk (ddd standard sidewalks) 273      SQFT 18.00 4,914.00            
S-062 granite cobblestone paving 656      SQFT 36.00 23,616.00            
S-063 transplanting trees (crape myrtles & hollies) 49      EACH 50.00 2,450.00            
S-064 irrigation items lump      LUMP 12,000.00 12,000.00            
S-065 relocate trailblazing signs 1      EACH 12,000.00 12,000.00            
S-101 removal of barrier railing 226.65   LNFT 120.00 27,198.00            
S-102 removal of concrete (deck, bents & curtain wall) 86.52   CUYD 360.00 31,147.20            
S-103 mechanical butt splice 46      EACH 185.00 8,510.00            
S-104 curtain wall design treatment lump      LUMP 48,000.00 48,000.00            
S-105 deck drainage systems lump      LUMP 38,000.00 38,000.00            
                       
 CONTRACTOR TOTAL       1,962,517.89            