| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - C.E.C., INC. |
- 2 - BOH BROS. CONSTRUCTION CO., LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 713-01 |
temporary signs and barricades
|
lump |
LUMP |
150,000.00 |
150,000.00 |
155,000.00 |
155,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
80,000.00 |
80,000.00 |
85,000.00 |
85,000.00 |
|
|
|
|
| S-101 |
repair no. 1 - resetting of leaning rocker bearings
|
15   |
EACH |
2,700.00 |
40,500.00 |
2,100.00 |
31,500.00 |
|
|
|
|
| S-102-A |
repair no. 2a - repair of broken flexible drain pipes
|
48   |
EACH |
1,450.00 |
69,600.00 |
2,600.00 |
124,800.00 |
|
|
|
|
| S-102-B |
repair no. 2b - replace broken drain pipe units
|
18   |
EACH |
1,400.00 |
25,200.00 |
6,600.00 |
118,800.00 |
|
|
|
|
| S-103 |
repair no. 3 - replacement of bolts on/near ccc
#1 bridge catwalk |
lump |
LUMP |
20,000.00 |
20,000.00 |
8,300.00 |
8,300.00 |
|
|
|
|
| S-104-A |
repair no. 4a - inspection of bolts on approaches and
ramps |
lump |
LUMP |
524,000.00 |
524,000.00 |
950,000.00 |
950,000.00 |
|
|
|
|
| S-104-B |
repair no. 4b - tightening of bolts on approaches and
ramps |
20,000   |
EACH |
3.00 |
60,000.00 |
6.00 |
120,000.00 |
|
|
|
|
| S-104-C |
repair no. 4c - replacement of bolts on approaches and
ramps |
100   |
EACH |
30.00 |
3,000.00 |
20.00 |
2,000.00 |
|
|
|
|
| S-105 |
repair no. 5 - replacement of bolts on crescent city
connection bridge no 2 |
98   |
EACH |
170.00 |
16,660.00 |
260.00 |
25,480.00 |
|
|
|
|
| S-106-A |
repair no. 6a - increase slotted holes on ramp ip
girders |
32   |
EACH |
270.00 |
8,640.00 |
900.00 |
28,800.00 |
|
|
|
|
| S-106-B |
repair no. 6b - repair of spalls on ramp ip girder
bearing pedestals |
23   |
EACH |
430.00 |
9,890.00 |
900.00 |
20,700.00 |
|
|
|
|
| S-107 |
repair no. 7 - repair of bearing bolsters
|
lump |
LUMP |
60,000.00 |
60,000.00 |
28,000.00 |
28,000.00 |
|
|
|
|
| S-108-A |
repair no. 8a - drain cleaning on approaches and ramps
|
304   |
each |
500.00 |
152,000.00 |
250.00 |
76,000.00 |
|
|
|
|
| S-108-B |
repair no. 8b - extended cleaning of clogged drains on
approaches and ramps |
3,000   |
LNFT |
10.00 |
30,000.00 |
17.00 |
51,000.00 |
|
|
|
|
| S-108-C |
repair no. 8c - video inspection of clogged drains on
approaches and ramps |
1,000   |
LNFT |
10.00 |
10,000.00 |
13.80 |
13,800.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,259,490.00 |
|
1,839,180.00 |
|
|
|
|
|