| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - PRAIRIE CONTRACTORS INC. |
- 2 - R. E. HEIDT CONSTRUCTION CO., INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-08 |
borrow (vehicular measurement)
|
617   |
CUYD |
16.00 |
9,872.00 |
20.00 |
12,340.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
64   |
CUYD |
50.00 |
3,200.00 |
71.00 |
4,544.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete (level 1)
|
8,478.5 |
TON |
45.00 |
381,532.50 |
48.25 |
409,087.62 |
|
|
|
|
| 502-01-D |
superpave asphaltic concrete, incidental paving (level
a) |
79.0 |
TON |
80.00 |
6,320.00 |
85.00 |
6,715.00 |
|
|
|
|
| 507-01-A-01 |
asphaltic surface treatment (1 application) (crushed
stone) |
71,804   |
SQYD |
1.30 |
93,345.20 |
1.40 |
100,525.60 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
71,804   |
SQYD |
0.90 |
64,623.60 |
0.75 |
53,853.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,995   |
CUYD |
0.01 |
- 19.95 |
1.00 |
- 1,995.00 |
|
|
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
264.5 |
LNFT |
23.00 |
6,083.50 |
24.50 |
6,480.25 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
456.3 |
LNFT |
14.00 |
6,388.20 |
14.90 |
6,798.87 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
6   |
EACH |
1,600.00 |
9,600.00 |
1,700.00 |
10,200.00 |
|
|
|
|
| 706-03-C |
incidental concrete paving (6" thick)
|
85.9 |
SQYD |
76.30 |
6,554.17 |
81.25 |
6,979.37 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
12,000.00 |
12,000.00 |
5,500.00 |
5,500.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
8.760 |
MILE |
250.00 |
2,190.00 |
220.00 |
1,927.20 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
7.394 |
MILE |
1.00 |
7.39 |
215.00 |
1,589.71 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
21.400 |
MILE |
1.00 |
21.40 |
425.00 |
9,095.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
22,000.00 |
22,000.00 |
11,000.00 |
11,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
16   |
EACH |
50.00 |
800.00 |
53.00 |
848.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
65.00 |
520.00 |
70.00 |
560.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
575   |
EACH |
4.00 |
2,300.00 |
4.25 |
2,443.75 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
10.700 |
MILE |
1,600.00 |
17,120.00 |
1,700.00 |
18,190.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.697 |
MILE |
600.00 |
2,218.20 |
640.00 |
2,366.08 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
100.00 |
100.00 |
2,750.00 |
2,750.00 |
|
|
|
|
| S-001 |
special anchor section
|
2   |
EACH |
745.00 |
1,490.00 |
800.00 |
1,600.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
648,266.21 |
|
673,398.45 |
|
|
|
|
|