| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BOH BROS. CONSTRUCTION CO., LLC. |
- 2 - HUEY STOCKSTILL, INC. |
- 3 - BARRIERE CONSTRUCTION CO., LLC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-08 |
borrow (vehicular measurement)
|
234   |
CUYD |
15.00 |
3,510.00 |
12.00 |
2,808.00 |
13.00 |
3,042.00 |
|
|
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
229   |
CUYD |
6.00 |
1,374.00 |
8.00 |
1,832.00 |
13.00 |
2,977.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
3,434.3 |
TON |
55.00 |
188,886.50 |
47.00 |
161,412.10 |
56.00 |
192,320.80 |
|
|
| 502-01-D |
superpave asphaltic concrete, incidental paving (level
a) |
120.1 |
TON |
70.00 |
8,407.00 |
80.00 |
9,608.00 |
140.00 |
16,814.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
13,553   |
SQYD |
1.00 |
13,553.00 |
1.20 |
16,263.60 |
2.40 |
32,527.20 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 376   |
CUYD |
7.00 |
- 2,632.00 |
FREE |
FREE |
7.00 |
- 2,632.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
4,500.00 |
4,500.00 |
22,000.00 |
22,000.00 |
10,000.00 |
10,000.00 |
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
1,550   |
LNFT |
0.10 |
155.00 |
0.10 |
155.00 |
0.20 |
310.00 |
|
|
| 713-03-D |
temporary pavement markings (12" width)
|
144   |
LNFT |
0.15 |
21.60 |
0.15 |
21.60 |
0.30 |
43.20 |
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
1,500   |
LNFT |
0.30 |
450.00 |
0.30 |
450.00 |
0.50 |
750.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
4.130 |
MILE |
300.00 |
1,239.00 |
150.00 |
619.50 |
150.00 |
619.50 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
0.615 |
MILE |
270.00 |
166.05 |
100.00 |
61.50 |
20.00 |
12.30 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
6.342 |
MILE |
100.00 |
634.20 |
200.00 |
1,268.40 |
40.00 |
253.68 |
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
16   |
EACH |
5.00 |
80.00 |
10.00 |
160.00 |
50.00 |
800.00 |
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
12   |
EACH |
5.00 |
60.00 |
10.00 |
120.00 |
75.00 |
900.00 |
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
2,000.00 |
2,000.00 |
1,000.00 |
1,000.00 |
2,000.00 |
2,000.00 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
100   |
SQYD |
60.00 |
6,000.00 |
55.00 |
5,500.00 |
100.00 |
10,000.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
20,000.00 |
20,000.00 |
34,000.00 |
34,000.00 |
30,000.00 |
30,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
2   |
EACH |
100.00 |
200.00 |
150.00 |
300.00 |
70.00 |
140.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
299   |
EACH |
5.60 |
1,674.40 |
6.00 |
1,794.00 |
5.50 |
1,644.50 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
800   |
LNFT |
1.00 |
800.00 |
1.00 |
800.00 |
2.00 |
1,600.00 |
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
86   |
LNFT |
2.10 |
180.60 |
2.00 |
172.00 |
4.00 |
344.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
755   |
LNFT |
3.00 |
2,265.00 |
3.00 |
2,265.00 |
6.00 |
4,530.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
3.504 |
MILE |
2,150.00 |
7,533.60 |
2,000.00 |
7,008.00 |
2,200.00 |
7,708.80 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.205 |
MILE |
700.00 |
143.50 |
1,000.00 |
205.00 |
700.00 |
143.50 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
9   |
EACH |
145.00 |
1,305.00 |
200.00 |
1,800.00 |
150.00 |
1,350.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
7   |
EACH |
165.00 |
1,155.00 |
200.00 |
1,400.00 |
170.00 |
1,190.00 |
|
|
| 736-09 |
loop detector
|
1,125   |
LNFT |
10.75 |
12,093.75 |
15.00 |
16,875.00 |
11.00 |
12,375.00 |
|
|
| 736-10 |
underground junction box
|
3   |
EACH |
275.00 |
825.00 |
300.00 |
900.00 |
300.00 |
900.00 |
|
|
| 739-01 |
hydro-seeding
|
0.87 |
ACRE |
2,200.00 |
1,914.00 |
2,000.00 |
1,740.00 |
2,200.00 |
1,914.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
1,000.00 |
1,000.00 |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
|
|
| S-001 |
cement treated base course (12 in depth)
|
8,242   |
SQYD |
5.50 |
45,331.00 |
5.00 |
41,210.00 |
5.60 |
46,155.20 |
|
|
| S-002 |
u-channel post installation
|
15   |
EACH |
50.00 |
750.00 |
50.00 |
750.00 |
50.00 |
750.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
325,575.20 |
|
344,498.70 |
|
386,482.68 |
|
|
|