Lead Project: 018-04-0042
Parish: ST TAMMANY
Routes: US 11
Description: BROWNSWITCH RD. - INDUSTRIAL PARK
Type Const: grading, cold planing asphaltic concrete, cement treated base course(shoulders),
superpave asphaltic concrete overlay and related work.
 
RankLicenseBidderAmount
102179 BOH BROS. CONSTRUCTION CO., LLC. $325,575.20
206487 HUEY STOCKSTILL, INC. $344,498.70
306276 BARRIERE CONSTRUCTION CO., LLC. $386,482.68
 
Item Number Item Description Quantity Unit of Measure - 1 -
BOH BROS. CONSTRUCTION CO., LLC.
- 2 -
HUEY STOCKSTILL, INC.
- 3 -
BARRIERE CONSTRUCTION CO., LLC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
203-08 borrow (vehicular measurement) 234      CUYD 15.00 3,510.00 12.00 2,808.00 13.00 3,042.00    
203-08-A borrow (vehicular meas.)(selected soils) 229      CUYD 6.00 1,374.00 8.00 1,832.00 13.00 2,977.00    
502-01 superpave asphaltic concrete 3,434.3    TON 55.00 188,886.50 47.00 161,412.10 56.00 192,320.80    
502-01-D superpave asphaltic concrete, incidental paving (level
a)
120.1    TON 70.00 8,407.00 80.00 9,608.00 140.00 16,814.00    
509-01 cold planing asphaltic pavement 13,553      SQYD 1.00 13,553.00 1.20 16,263.60 2.40 32,527.20    
509-02 contractor retained reclaimed asphaltic pavement - 376      CUYD 7.00 - 2,632.00 FREE FREE 7.00 - 2,632.00    
713-01 temporary signs & barricades lump      LUMP 4,500.00 4,500.00 22,000.00 22,000.00 10,000.00 10,000.00    
713-03-C temporary pavement markings (8" width) 1,550      LNFT 0.10 155.00 0.10 155.00 0.20 310.00    
713-03-D temporary pavement markings (12" width) 144      LNFT 0.15 21.60 0.15 21.60 0.30 43.20    
713-03-E temporary pavement markings (24" width) 1,500      LNFT 0.30 450.00 0.30 450.00 0.50 750.00    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
4.130  MILE 300.00 1,239.00 150.00 619.50 150.00 619.50    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
0.615  MILE 270.00 166.05 100.00 61.50 20.00 12.30    
713-05-A temporary pavement markings (solid line)(4" width) 6.342  MILE 100.00 634.20 200.00 1,268.40 40.00 253.68    
713-06-A temporary pavement legends and symbols (arrow) 16      EACH 5.00 80.00 10.00 160.00 50.00 800.00    
713-06-C temporary pavement legends and symbols (only) 12      EACH 5.00 60.00 10.00 120.00 75.00 900.00    
722-01 project site laboratory 1      EACH 2,000.00 2,000.00 1,000.00 1,000.00 2,000.00 2,000.00    
724-01-B pavement patching (12" minimum thickness) 100      SQYD 60.00 6,000.00 55.00 5,500.00 100.00 10,000.00    
727-01 mobilization lump      LUMP 20,000.00 20,000.00 34,000.00 34,000.00 30,000.00 30,000.00    
729-16-C object marker assembly (type 3) 2      EACH 100.00 200.00 150.00 300.00 70.00 140.00    
731-02 reflectorized raised pavement markers 299      EACH 5.60 1,674.40 6.00 1,794.00 5.50 1,644.50    
732-01-C plastic pavement striping (8" width) 800      LNFT 1.00 800.00 1.00 800.00 2.00 1,600.00    
732-01-D plastic pavement striping (12" width) 86      LNFT 2.10 180.60 2.00 172.00 4.00 344.00    
732-01-E plastic pavement striping (24" width) 755      LNFT 3.00 2,265.00 3.00 2,265.00 6.00 4,530.00    
732-02-A plastic pavement striping (solid line) (4" width) 3.504  MILE 2,150.00 7,533.60 2,000.00 7,008.00 2,200.00 7,708.80    
732-03-A plastic pavement striping (broken line)(4" width) 0.205  MILE 700.00 143.50 1,000.00 205.00 700.00 143.50    
732-04-A plastic pavement legends & symbols (arrow) 9      EACH 145.00 1,305.00 200.00 1,800.00 150.00 1,350.00    
732-04-C plastic pavement legends & symbols (only) 7      EACH 165.00 1,155.00 200.00 1,400.00 170.00 1,190.00    
736-09 loop detector 1,125      LNFT 10.75 12,093.75 15.00 16,875.00 11.00 12,375.00    
736-10 underground junction box 3      EACH 275.00 825.00 300.00 900.00 300.00 900.00    
739-01 hydro-seeding 0.87   ACRE 2,200.00 1,914.00 2,000.00 1,740.00 2,200.00 1,914.00    
740-01 construction layout lump      LUMP 1,000.00 1,000.00 10,000.00 10,000.00 5,000.00 5,000.00    
S-001 cement treated base course (12 in depth) 8,242      SQYD 5.50 45,331.00 5.00 41,210.00 5.60 46,155.20    
S-002 u-channel post installation 15      EACH 50.00 750.00 50.00 750.00 50.00 750.00    
                       
 CONTRACTOR TOTAL       325,575.20   344,498.70   386,482.68    