Letting of 3/03/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 315-02-0040
Parish: OUACHITA
Routes: LA 143
Description: D'ARBONNE BRIDGE - UNION PARISH LINE
Type Const: cold planing asphaltic concrete, superpave asphaltic concrete, pavement patching
and related work.
 
RankLicenseBidderAmount
105789 D & J CONSTRUCTION CO., INC. $1,720,393.94
212487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,836,299.71
 
Item Number Item Description Quantity Unit of Measure - 1 -
D & J CONSTRUCTION CO., INC.
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 538      LNFT 8.00 4,304.00 10.00 5,380.00        
203-08 borrow (vehicular measurement) 750      CUYD 27.00 20,250.00 16.00 12,000.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
1,316      CUYD 38.00 50,008.00 25.00 32,900.00        
502-01-B superpave asphaltic concrete (level 2) 11,783.3    TON 47.00 553,815.10 46.14 543,681.46        
502-01-B-01 superpave asphaltic conc wearing course (level 2f) 6,046.3    TON 47.00 284,176.10 51.99 314,347.13        
502-01-D superpave asphaltic concrete, incidental paving (level
a)
300.0    TON 90.00 27,000.00 150.00 45,000.00        
509-01 cold planing asphaltic pavement 70,002      SQYD 2.00 140,004.00 1.50 105,003.00        
509-02 contractor retained reclaimed asphaltic pavement - 3,717      CUYD 0.01 - 37.17 0.15 - 557.55        
704-03 blocked out guard rail 237.5    LNFT 14.00 3,325.00 17.00 4,037.50        
704-07-A guard rail bridge attachments (single thrie beam) 50.0    LNFT 28.00 1,400.00 32.00 1,600.00        
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 31.00 3,100.00 40.00 4,000.00        
704-11-A guard rail end treatment (flared) 4      EACH 1,525.00 6,100.00 2,000.00 8,000.00        
713-01 temporary signs & barricades lump      LUMP 99,185.20 99,185.20 100,000.00 100,000.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
15.440  MILE 160.00 2,470.40 220.00 3,396.80        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
13.648  MILE 150.00 2,047.20 220.03 3,002.96        
713-05-A temporary pavement markings (solid line)(4" width) 38.868  MILE 1.00 38.86 440.02 17,102.69        
714-02 water 47.2    MGAL 1.00 47.20 1.10 51.92        
716-01-A mulch (vegetative) 4.72   ACRE 500.00 2,360.00 550.00 2,596.00        
717-01 seeding 212      LB 6.00 1,272.00 6.60 1,399.20        
718-01 fertilizer 4,720      LB 0.25 1,180.00 0.22 1,038.40        
724-01-C pavement patching (15" minimum thickness) 5,709      SQYD 55.00 313,995.00 60.00 342,540.00        
727-01 mobilization lump      LUMP 150,000.00 150,000.00 175,000.00 175,000.00        
729-16-C object marker assembly (type 3) 4      EACH 65.00 260.00 80.00 320.00        
731-02 reflectorized raised pavement markers 680      EACH 7.50 5,100.00 4.95 3,366.00        
732-02-A plastic pavement striping (solid line) (4" width) 12.956  MILE 2,650.00 34,333.40 2,000.00 25,912.00        
732-03-A plastic pavement striping (broken line)(4" width) 4.546  MILE 1,025.00 4,659.65 700.00 3,182.20        
740-01 construction layout lump      LUMP 10,000.00 10,000.00 82,000.00 82,000.00        
                       
 CONTRACTOR TOTAL       1,720,393.94   1,836,299.71        