| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - D & J CONSTRUCTION CO., INC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
538   |
LNFT |
8.00 |
4,304.00 |
10.00 |
5,380.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
750   |
CUYD |
27.00 |
20,250.00 |
16.00 |
12,000.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,316   |
CUYD |
38.00 |
50,008.00 |
25.00 |
32,900.00 |
|
|
|
|
| 502-01-B |
superpave asphaltic concrete (level 2)
|
11,783.3 |
TON |
47.00 |
553,815.10 |
46.14 |
543,681.46 |
|
|
|
|
| 502-01-B-01 |
superpave asphaltic conc wearing course (level 2f)
|
6,046.3 |
TON |
47.00 |
284,176.10 |
51.99 |
314,347.13 |
|
|
|
|
| 502-01-D |
superpave asphaltic concrete, incidental paving (level
a) |
300.0 |
TON |
90.00 |
27,000.00 |
150.00 |
45,000.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
70,002   |
SQYD |
2.00 |
140,004.00 |
1.50 |
105,003.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 3,717   |
CUYD |
0.01 |
- 37.17 |
0.15 |
- 557.55 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
237.5 |
LNFT |
14.00 |
3,325.00 |
17.00 |
4,037.50 |
|
|
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
50.0 |
LNFT |
28.00 |
1,400.00 |
32.00 |
1,600.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
31.00 |
3,100.00 |
40.00 |
4,000.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
1,525.00 |
6,100.00 |
2,000.00 |
8,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
99,185.20 |
99,185.20 |
100,000.00 |
100,000.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
15.440 |
MILE |
160.00 |
2,470.40 |
220.00 |
3,396.80 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
13.648 |
MILE |
150.00 |
2,047.20 |
220.03 |
3,002.96 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
38.868 |
MILE |
1.00 |
38.86 |
440.02 |
17,102.69 |
|
|
|
|
| 714-02 |
water
|
47.2 |
MGAL |
1.00 |
47.20 |
1.10 |
51.92 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
4.72 |
ACRE |
500.00 |
2,360.00 |
550.00 |
2,596.00 |
|
|
|
|
| 717-01 |
seeding
|
212   |
LB |
6.00 |
1,272.00 |
6.60 |
1,399.20 |
|
|
|
|
| 718-01 |
fertilizer
|
4,720   |
LB |
0.25 |
1,180.00 |
0.22 |
1,038.40 |
|
|
|
|
| 724-01-C |
pavement patching (15" minimum thickness)
|
5,709   |
SQYD |
55.00 |
313,995.00 |
60.00 |
342,540.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
150,000.00 |
150,000.00 |
175,000.00 |
175,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
65.00 |
260.00 |
80.00 |
320.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
680   |
EACH |
7.50 |
5,100.00 |
4.95 |
3,366.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
12.956 |
MILE |
2,650.00 |
34,333.40 |
2,000.00 |
25,912.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.546 |
MILE |
1,025.00 |
4,659.65 |
700.00 |
3,182.20 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
82,000.00 |
82,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,720,393.94 |
|
1,836,299.71 |
|
|
|
|
|