Letting of 3/03/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 270-03-0008
Parish: LIVINGSTON, ST HELENA
Routes: LA 441
Description: END OF ASPHALT SECTION - NORTH JUNCTION LA 1036
Type Const: grading, drainage structures, lime treatment, cement treated base course, superpave
asphaltic conrete overlay, and related work.
 
RankLicenseBidderAmount
112487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,637,692.14
206276 BARRIERE CONSTRUCTION CO., LLC. $1,692,776.02
300046 BARBER BROS. CONTRACTING CO., L.L.C $1,806,454.20
400849 F.G. SULLIVAN, JR. CONTRACTOR LLC $1,976,182.35
 
Item Number Item Description Quantity Unit of Measure - 1 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 2 -
BARRIERE CONSTRUCTION CO., LLC.
- 3 -
BARBER BROS. CONTRACTING CO., L.L.C
- 4 -
F.G. SULLIVAN, JR. CONTRACTOR LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-A-01 removal of bridges(c.s.l.m. 5.250; 39'x 19' treated
timber trestle bridge)
1      EACH 2,200.00 2,200.00 4,000.00 4,000.00 3,000.00 3,000.00 8,000.00 8,000.00
202-02-A-02 removal of bridges(c.s.l.m. 6.060; 39'x 19' treated
timber trestle bridge)
1      EACH 2,200.00 2,200.00 4,000.00 4,000.00 3,000.00 3,000.00 8,000.00 8,000.00
203-08 borrow (vehicular measurement) 3,222      CUYD 12.67 40,822.74 9.00 28,998.00 12.00 38,664.00 14.00 45,108.00
203-08-A borrow (vehicular meas.)(selected soils) 3,835      CUYD 10.49 40,229.15 9.00 34,515.00 10.50 40,267.50 14.00 53,690.00
303-02 removal of existing patches 600      SQYD 20.14 12,084.00 1.00 600.00 15.00 9,000.00 1.00 600.00
304-01 lime 137.45   TON 112.93 15,522.22 100.00 13,745.00 115.00 15,806.75 118.00 16,219.10
304-04-E lime treatment (type d)(15" thick) 4,987      SQYD 4.31 21,493.97 1.00 4,987.00 3.25 16,207.75 1.75 8,727.25
401-02 aggregate surface course (adjusted vehicular
measurement)
1,787      CUYD 40.08 71,622.96 10.00 17,870.00 35.00 62,545.00 40.00 71,480.00
502-01-A superpave asphaltic concrete (level 1) 15,340.6    TON 44.18 677,747.70 40.00 613,624.00 46.00 705,667.60 43.50 667,316.10
502-01-D superpave asphaltic concrete, incidental paving (level
a)
523.1    TON 81.91 42,847.12 1.00 523.10 60.00 31,386.00 75.00 39,232.50
701-02-D cross drain pipe arch (24" equiv. rcpa) 320      LNFT 60.50 19,360.00 90.00 28,800.00 60.50 19,360.00 120.00 38,400.00
701-02-E cross drain pipe arch (30" equiv. rcpa) 144      LNFT 71.50 10,296.00 105.00 15,120.00 75.00 10,800.00 135.00 19,440.00
701-02-F cross drain pipe arch (36" equiv. rcpa) 160      LNFT 99.00 15,840.00 145.00 23,200.00 100.00 16,000.00 140.00 22,400.00
701-02-H cross drain pipe arch (48" equiv. rcpa) 112      LNFT 165.00 18,480.00 185.00 20,720.00 165.00 18,480.00 235.00 26,320.00
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 356.0    LNFT 56.10 19,971.60 50.00 17,800.00 60.50 21,538.00 50.00 17,800.00
704-11-B guard rail end treatment (tangent) 8      EACH 2,255.00 18,040.00 2,400.00 19,200.00 2,500.00 20,000.00 2,100.00 16,800.00
712-02 sacked concrete revetment 33      SQYD 55.00 1,815.00 80.00 2,640.00 60.00 1,980.00 60.00 1,980.00
713-01 temporary signs & barricades lump      LUMP 7,706.60 7,706.60 60,000.00 60,000.00 25,000.00 25,000.00 115,000.00 115,000.00
713-03-E temporary pavement markings (24" width) 66      LNFT 0.66 43.56 1.00 66.00 2.00 132.00 0.50 33.00
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
10.800  MILE 275.00 2,970.00 1.00 10.80 300.00 3,240.00 500.00 5,400.00
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
10.420  MILE 220.00 2,292.40 1.00 10.42 260.00 2,709.20 100.00 1,042.00
713-05-A temporary pavement markings (solid line)(4" width) 24.000  MILE 440.00 10,560.00 1.00 24.00 FREE FREE 10.00 240.00
714-02 water 65.8    MGAL 0.01 0.65 1.00 65.80 12.00 789.60 0.01 0.65
716-01-A mulch (vegetative) 6.58   ACRE 550.00 3,619.00 550.00 3,619.00 660.00 4,342.80 600.00 3,948.00
717-01 seeding 198      LB 5.50 1,089.00 5.50 1,089.00 10.00 1,980.00 5.00 990.00
718-01 fertilizer 6,600      LB 0.19 1,254.00 0.20 1,320.00 0.25 1,650.00 0.17 1,122.00
722-01 project site laboratory 1      EACH 2,961.75 2,961.75 500.00 500.00 8,000.00 8,000.00 1,500.00 1,500.00
726-01 bedding material 239.1    CUYD 38.50 9,205.35 15.00 3,586.50 40.00 9,564.00 FREE FREE
727-01 mobilization lump      LUMP 39,488.46 39,488.46 165,000.00 165,000.00 65,000.00 65,000.00 125,000.00 125,000.00
729-16-C object marker assembly (type 3) 32      EACH 77.00 2,464.00 95.00 3,040.00 75.00 2,400.00 70.00 2,240.00
731-02 reflectorized raised pavement markers 715      EACH 4.95 3,539.25 5.50 3,932.50 6.00 4,290.00 6.00 4,290.00
732-01-E plastic pavement striping (24" width) 33      LNFT 3.30 108.90 3.00 99.00 4.00 132.00 5.00 165.00
732-02-A plastic pavement striping (solid line) (4" width) 12.000  MILE 1,815.00 21,780.00 1,900.00 22,800.00 2,000.00 24,000.00 2,200.00 26,400.00
732-03-A plastic pavement striping (broken line)(4" width) 5.210  MILE 660.00 3,438.60 650.00 3,386.50 700.00 3,647.00 700.00 3,647.00
735-01 mailboxes 23      EACH 12.79 294.17 1.10 25.30 2.00 46.00 2.00 46.00
735-02 mailbox supports (single) 23      EACH 192.97 4,438.31 100.00 2,300.00 100.00 2,300.00 125.00 2,875.00
740-01 construction layout lump      LUMP 8,250.00 8,250.00 35,000.00 35,000.00 55,000.00 55,000.00 50,000.00 50,000.00
805-01-B class a concrete (box culvert headwalls) 40.92   CUYD 770.00 31,508.40 850.00 34,782.00 800.00 32,736.00 750.00 30,690.00
805-12-H-01 reinforced concrete box culverts (7'x 4')(precast only,
astm c850)
420.0    LNFT 467.50 196,350.00 400.00 168,000.00 475.00 199,500.00 450.00 189,000.00
806-01 deformed reinforcing steel 3,682      LB 0.83 3,056.06 1.10 4,050.20 1.00 3,682.00 1.25 4,602.50
S-001 cement treated base course (12 in depth) 79,209      SQYD 3.08 243,963.72 4.10 324,756.90 4.00 316,836.00 4.25 336,638.25
S-002 cleaning existing ditches 1,400      LNFT 2.75 3,850.00 2.50 3,500.00 3.00 4,200.00 6.00 8,400.00
S-003 u-channel post installation 35      each 82.50 2,887.50 42.00 1,470.00 45.00 1,575.00 40.00 1,400.00
                       
 CONTRACTOR TOTAL       1,637,692.14   1,692,776.02   1,806,454.20   1,976,182.35