Letting of 3/03/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 194-06-0015
Parish: VERMILION
Routes: LA 333
Description: EAST END BEAU CHENE BRIDGE - JUNCTION LA 82 IN ESTHER
Type Const: grading, cold planing asphaltic pavement, class ii base course, superpave asphaltic
concrete pavement, and related work.
 
RankLicenseBidderAmount
112487 DIAMOND B CONSTRUCTION CO., L.L.C. $2,377,300.42
200183 R. E. HEIDT CONSTRUCTION CO., INC. $2,462,232.56
304089 H & S CONSTRUCTION CO., INC. $2,653,922.98
 
Item Number Item Description Quantity Unit of Measure - 1 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 2 -
R. E. HEIDT CONSTRUCTION CO., INC.
- 3 -
H & S CONSTRUCTION CO., INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 15      SQYD 24.00 360.00 110.00 1,650.00 30.00 450.00    
202-02-H removal of guard rail 1,256      LNFT 2.40 3,014.40 2.15 2,700.40 3.50 4,396.00    
203-08 borrow (vehicular measurement) 2,800      CUYD 13.00 36,400.00 16.00 44,800.00 18.00 50,400.00    
302-02-E class ii base course (8" thick) 26,083.2    SQYD 13.50 352,123.20 22.40 584,263.68 16.75 436,893.60    
401-02 aggregate surface course (adjusted vehicular
measurement)
1,728      CUYD 17.10 29,548.80 30.25 52,272.00 20.00 34,560.00    
502-01-A superpave asphaltic concrete (level 1) 25,886.6    TON 52.94 1,370,436.60 48.20 1,247,734.12 50.00 1,294,330.00    
502-01-D superpave asphaltic concrete, incidental paving (level
a)
3,182.5    TON 80.47 256,095.77 77.00 245,052.50 70.00 222,775.00    
509-01 cold planing asphaltic pavement 104,163      SQYD 0.78 81,247.14 0.88 91,663.44 1.65 171,868.95    
509-02 contractor retained reclaimed asphaltic pavement - 2,893      CUYD 0.50 - 1,446.50 1.00 - 2,893.00 0.01 - 28.93    
704-03 blocked out guard rail 1,256.3    LNFT 18.00 22,613.40 15.90 19,975.17 16.50 20,728.95    
713-01 temporary signs & barricades lump      LUMP 6,600.00 6,600.00 6,800.00 6,800.00 31,500.00 31,500.00    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
23.769  MILE 240.00 5,704.56 260.00 6,179.94 1,800.00 42,784.20    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
12.279  MILE 240.00 2,946.96 212.00 2,603.14 200.00 2,455.80    
713-05-A temporary pavement markings (solid line)(4" width) 76.696  MILE 480.00 36,814.08 425.00 32,595.80 320.00 24,542.72    
724-01-B pavement patching (12" minimum thickness) 675      SQYD 52.16 35,208.00 57.30 38,677.50 50.00 33,750.00    
727-01 mobilization lump      LUMP 39,000.00 39,000.00 21,000.00 21,000.00 178,000.00 178,000.00    
729-16-B object marker assembly (type 2) 32      EACH 66.00 2,112.00 58.30 1,865.60 70.00 2,240.00    
731-02 reflectorized raised pavement markers 1,047      EACH 5.40 5,653.80 4.80 5,025.60 6.50 6,805.50    
732-01-E plastic pavement striping (24" width) 26      LNFT 3.60 93.60 3.20 83.20 4.00 104.00    
732-02-A plastic pavement striping (solid line) (4" width) 25.565  MILE 2,010.00 51,385.65 1,800.00 46,017.00 2,200.00 56,243.00    
732-03-A plastic pavement striping (broken line)(4" width) 4.093  MILE 720.00 2,946.96 640.00 2,619.52 830.00 3,397.19    
735-01 mailboxes 79      EACH 18.00 1,422.00 1.05 82.95 13.00 1,027.00    
735-02 mailbox supports (single) 70      EACH 150.00 10,500.00 90.00 6,300.00 180.00 12,600.00    
735-03 mailbox supports (double) 3      EACH 240.00 720.00 133.00 399.00 240.00 720.00    
735-04 mailbox supports (multiple) 1      EACH 360.00 360.00 265.00 265.00 380.00 380.00    
740-01 construction layout lump      LUMP 25,440.00 25,440.00 4,500.00 4,500.00 21,000.00 21,000.00    
                       
 CONTRACTOR TOTAL       2,377,300.42   2,462,232.56   2,653,922.98    