Letting of 3/03/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 097-01-0027
Parish: CADDO
Routes: LA 525
Description: JUNCTION LA 169 - GILMER BAYOU
Type Const: grading, drainage structures, cold planing asphaltic concrete pvmt, superpave asphaltic
concrete overlay and related work.
 
RankLicenseBidderAmount
117464 BENTON & BROWN, LLC. $1,938,535.47
208584 MADDEN CONTRACTING CO., INC. $1,954,427.53
 
Item Number Item Description Quantity Unit of Measure - 1 -
BENTON & BROWN, LLC.
- 2 -
MADDEN CONTRACTING CO., INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 2,200.00 2,200.00 5,000.00 5,000.00        
202-02-D removal of concrete walks & drives 350      SQYD 23.00 8,050.00 5.00 1,750.00        
202-02-H removal of guard rail 2,200      LNFT 2.75 6,050.00 2.75 6,050.00        
202-02-I removal of culvert pipe 18.0    LNFT 11.00 198.00 10.00 180.00        
202-02-L removal of asphalt surfacing from bridge deck - 4"
average
1,320      SQYD 4.00 5,280.00 4.00 5,280.00        
203-08 borrow (vehicular measurement) 10,000      CUYD 9.25 92,500.00 8.00 80,000.00        
401-01 aggregate surface course (net section) 83.3    CUYD 60.00 4,998.00 45.00 3,748.50        
401-02 aggregate surface course (adjusted vehicular
measurement)
120      CUYD 60.00 7,200.00 45.00 5,400.00        
402-01 traffic maintenance aggregate (vehicular measurement) 500.0    CUYD 27.00 13,500.00 1.00 500.00        
502-01-A superpave asphaltic concrete (level 1) 11,388.5    TON 45.00 512,482.50 46.50 529,565.25        
502-01-A-01 superpave asphaltic conc wearing course (level 1f) 14,131.9    TON 45.00 635,935.50 48.00 678,331.20        
502-01-D superpave asphaltic concrete, incidental paving (level
a)
913.6    TON 45.00 41,112.00 52.00 47,507.20        
509-01 cold planing asphaltic pavement 9,013      SQYD 1.70 15,322.10 2.50 22,532.50        
509-02 contractor retained reclaimed asphaltic pavement - 272      CUYD 1.00 - 272.00 1.00 - 272.00        
701-01-I/K cross drain pipe (24" rcp/pcp or 30" cmp) 372      LNFT 70.00 26,040.00 45.00 16,740.00        
701-08 relaying pipe 16      LNFT 40.00 640.00 80.00 1,280.00        
701-10-I reinforced concrete pipe (extension)(24") 32      LNFT 100.00 3,200.00 80.00 2,560.00        
701-10-K reinforced concrete pipe (extension)(30") 32      LNFT 110.00 3,520.00 90.00 2,880.00        
701-12-I corrugated metal pipe (extension)(24") 4      LNFT 115.00 460.00 100.00 400.00        
701-12-K corrugated metal pipe (extension)(30") 7      LNFT 130.00 910.00 100.00 700.00        
701-15 concrete collar 12      EACH 550.00 6,600.00 800.00 9,600.00        
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 481.3    LNFT 33.00 15,882.90 33.00 15,882.90        
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 950.0    LNFT 44.00 41,800.00 44.00 41,800.00        
704-03 blocked out guard rail 350.0    LNFT 16.50 5,775.00 16.50 5,775.00        
704-11-A guard rail end treatment (flared) 1      EACH 1,650.00 1,650.00 1,700.00 1,700.00        
704-11-B guard rail end treatment (tangent) 19      EACH 1,760.00 33,440.00 1,800.00 34,200.00        
712-02 sacked concrete revetment 2,692      SQYD 45.00 121,140.00 40.00 107,680.00        
713-01 temporary signs & barricades lump      LUMP 30,000.00 30,000.00 60,000.00 60,000.00        
713-03-C temporary pavement markings (8" width) 218      LNFT 0.50 109.00 0.45 98.10        
713-03-E temporary pavement markings (24" width) 60      LNFT 2.00 120.00 1.40 84.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
12.976  MILE 330.00 4,282.08 200.00 2,595.20        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
4.404  MILE 325.00 1,431.30 310.00 1,365.24        
713-05-A temporary pavement markings (solid line)(4" width) 28.850  MILE 615.00 17,742.75 620.00 17,887.00        
716-01-B mulch (fiber) 20.00   ACRE 620.00 12,400.00 1,000.00 20,000.00        
724-01-B pavement patching (12" minimum thickness) 1,000      SQYD 45.00 45,000.00 40.00 40,000.00        
727-01 mobilization lump      LUMP 100,000.00 100,000.00 60,000.00 60,000.00        
729-16-B object marker assembly (type 2) 20      EACH 50.00 1,000.00 80.00 1,600.00        
729-16-C object marker assembly (type 3) 20      EACH 82.00 1,640.00 60.00 1,200.00        
731-02 reflectorized raised pavement markers 1,160      EACH 5.60 6,496.00 5.60 6,496.00        
732-01-C plastic pavement striping (8" width) 114      LNFT 1.00 114.00 1.00 114.00        
732-01-E plastic pavement striping (24" width) 30      LNFT 11.00 330.00 2.90 87.00        
732-02-A plastic pavement striping (solid line) (4" width) 19.040  MILE 1,950.00 37,128.00 2,000.00 38,080.00        
732-03-A plastic pavement striping (broken line)(4" width) 2.906  MILE 730.00 2,121.38 740.00 2,150.44        
732-05 removal of existing markings 0.064  MILE 4,640.00 296.96 5,000.00 320.00        
735-01 mailboxes 198      EACH 25.00 4,950.00 50.00 9,900.00        
735-02 mailbox supports (single) 142      EACH 130.00 18,460.00 130.00 18,460.00        
735-03 mailbox supports (double) 28      EACH 185.00 5,180.00 200.00 5,600.00        
739-01 hydro-seeding 20.00   ACRE 1,375.00 27,500.00 1,000.00 20,000.00        
740-01 construction layout lump      LUMP 10,000.00 10,000.00 10,000.00 10,000.00        
S-001 painting of asphaltic curb and island (white) 13.5    SQYD 120.00 1,620.00 120.00 1,620.00        
S-002 concrete bridge parapet repairs lump      LUMP 5,000.00 5,000.00 10,000.00 10,000.00        
                       
 CONTRACTOR TOTAL       1,938,535.47   1,954,427.53        