| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BENTON & BROWN, LLC. |
- 2 - MADDEN CONTRACTING CO., INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
2,200.00 |
2,200.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
350   |
SQYD |
23.00 |
8,050.00 |
5.00 |
1,750.00 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
2,200   |
LNFT |
2.75 |
6,050.00 |
2.75 |
6,050.00 |
|
|
|
|
| 202-02-I |
removal of culvert pipe
|
18.0 |
LNFT |
11.00 |
198.00 |
10.00 |
180.00 |
|
|
|
|
| 202-02-L |
removal of asphalt surfacing from bridge deck - 4"
average |
1,320   |
SQYD |
4.00 |
5,280.00 |
4.00 |
5,280.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
10,000   |
CUYD |
9.25 |
92,500.00 |
8.00 |
80,000.00 |
|
|
|
|
| 401-01 |
aggregate surface course (net section)
|
83.3 |
CUYD |
60.00 |
4,998.00 |
45.00 |
3,748.50 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
120   |
CUYD |
60.00 |
7,200.00 |
45.00 |
5,400.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
500.0 |
CUYD |
27.00 |
13,500.00 |
1.00 |
500.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete (level 1)
|
11,388.5 |
TON |
45.00 |
512,482.50 |
46.50 |
529,565.25 |
|
|
|
|
| 502-01-A-01 |
superpave asphaltic conc wearing course (level 1f)
|
14,131.9 |
TON |
45.00 |
635,935.50 |
48.00 |
678,331.20 |
|
|
|
|
| 502-01-D |
superpave asphaltic concrete, incidental paving (level
a) |
913.6 |
TON |
45.00 |
41,112.00 |
52.00 |
47,507.20 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
9,013   |
SQYD |
1.70 |
15,322.10 |
2.50 |
22,532.50 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 272   |
CUYD |
1.00 |
- 272.00 |
1.00 |
- 272.00 |
|
|
|
|
| 701-01-I/K |
cross drain pipe (24" rcp/pcp or 30" cmp)
|
372   |
LNFT |
70.00 |
26,040.00 |
45.00 |
16,740.00 |
|
|
|
|
| 701-08 |
relaying pipe
|
16   |
LNFT |
40.00 |
640.00 |
80.00 |
1,280.00 |
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
32   |
LNFT |
100.00 |
3,200.00 |
80.00 |
2,560.00 |
|
|
|
|
| 701-10-K |
reinforced concrete pipe (extension)(30")
|
32   |
LNFT |
110.00 |
3,520.00 |
90.00 |
2,880.00 |
|
|
|
|
| 701-12-I |
corrugated metal pipe (extension)(24")
|
4   |
LNFT |
115.00 |
460.00 |
100.00 |
400.00 |
|
|
|
|
| 701-12-K |
corrugated metal pipe (extension)(30")
|
7   |
LNFT |
130.00 |
910.00 |
100.00 |
700.00 |
|
|
|
|
| 701-15 |
concrete collar
|
12   |
EACH |
550.00 |
6,600.00 |
800.00 |
9,600.00 |
|
|
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
481.3 |
LNFT |
33.00 |
15,882.90 |
33.00 |
15,882.90 |
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
950.0 |
LNFT |
44.00 |
41,800.00 |
44.00 |
41,800.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
350.0 |
LNFT |
16.50 |
5,775.00 |
16.50 |
5,775.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
1   |
EACH |
1,650.00 |
1,650.00 |
1,700.00 |
1,700.00 |
|
|
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
19   |
EACH |
1,760.00 |
33,440.00 |
1,800.00 |
34,200.00 |
|
|
|
|
| 712-02 |
sacked concrete revetment
|
2,692   |
SQYD |
45.00 |
121,140.00 |
40.00 |
107,680.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
30,000.00 |
30,000.00 |
60,000.00 |
60,000.00 |
|
|
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
218   |
LNFT |
0.50 |
109.00 |
0.45 |
98.10 |
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
60   |
LNFT |
2.00 |
120.00 |
1.40 |
84.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
12.976 |
MILE |
330.00 |
4,282.08 |
200.00 |
2,595.20 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
4.404 |
MILE |
325.00 |
1,431.30 |
310.00 |
1,365.24 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
28.850 |
MILE |
615.00 |
17,742.75 |
620.00 |
17,887.00 |
|
|
|
|
| 716-01-B |
mulch (fiber)
|
20.00 |
ACRE |
620.00 |
12,400.00 |
1,000.00 |
20,000.00 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
1,000   |
SQYD |
45.00 |
45,000.00 |
40.00 |
40,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
100,000.00 |
100,000.00 |
60,000.00 |
60,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
20   |
EACH |
50.00 |
1,000.00 |
80.00 |
1,600.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
20   |
EACH |
82.00 |
1,640.00 |
60.00 |
1,200.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,160   |
EACH |
5.60 |
6,496.00 |
5.60 |
6,496.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
114   |
LNFT |
1.00 |
114.00 |
1.00 |
114.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
30   |
LNFT |
11.00 |
330.00 |
2.90 |
87.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
19.040 |
MILE |
1,950.00 |
37,128.00 |
2,000.00 |
38,080.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.906 |
MILE |
730.00 |
2,121.38 |
740.00 |
2,150.44 |
|
|
|
|
| 732-05 |
removal of existing markings
|
0.064 |
MILE |
4,640.00 |
296.96 |
5,000.00 |
320.00 |
|
|
|
|
| 735-01 |
mailboxes
|
198   |
EACH |
25.00 |
4,950.00 |
50.00 |
9,900.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
142   |
EACH |
130.00 |
18,460.00 |
130.00 |
18,460.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
28   |
EACH |
185.00 |
5,180.00 |
200.00 |
5,600.00 |
|
|
|
|
| 739-01 |
hydro-seeding
|
20.00 |
ACRE |
1,375.00 |
27,500.00 |
1,000.00 |
20,000.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| S-001 |
painting of asphaltic curb and island (white)
|
13.5 |
SQYD |
120.00 |
1,620.00 |
120.00 |
1,620.00 |
|
|
|
|
| S-002 |
concrete bridge parapet repairs
|
lump |
LUMP |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,938,535.47 |
|
1,954,427.53 |
|
|
|
|
|