| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MERRICK CONSTRUCTION CO. |
- 2 - JAMES CONSTRUCTION GROUP LLC |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
- 4 - DENTON-JAMES LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
260,000.00 |
260,000.00 |
100,000.00 |
100,000.00 |
175,000.00 |
175,000.00 |
820,000.00 |
820,000.00 |
| 202-02-A-01 |
removal of bridges (sta. 1+161.748; 23.115m x 7.241m
concrete bridge) |
1   |
ea |
1,500.00 |
1,500.00 |
10,000.00 |
10,000.00 |
5,500.00 |
5,500.00 |
14,000.00 |
14,000.00 |
| 202-02-A-02 |
removal of bridges (sta. 1+219.933; 17.291m x 7.303m
concrete bridge) |
1   |
ea |
1,500.00 |
1,500.00 |
7,000.00 |
7,000.00 |
5,500.00 |
5,500.00 |
9,000.00 |
9,000.00 |
| 202-02-A-03 |
removal of bridges (sta. 1+242.702; 17.744m x 7.649m
timber bridge) |
1   |
ea |
750.00 |
750.00 |
8,000.00 |
8,000.00 |
5,500.00 |
5,500.00 |
7,000.00 |
7,000.00 |
| 202-02-A-04 |
removal of bridges (sta. 1+159.399; 17.670m x 7.542m
timber bridge) |
1   |
ea |
750.00 |
750.00 |
8,000.00 |
8,000.00 |
5,500.00 |
5,500.00 |
7,000.00 |
7,000.00 |
| 202-02-A-05 |
removal of bridges (sta. 1+161.823; 23.531m x 7.516m
timber bridge) |
1   |
ea |
750.00 |
750.00 |
9,000.00 |
9,000.00 |
5,500.00 |
5,500.00 |
9,000.00 |
9,000.00 |
| 202-02-A-06 |
removal of bridges (sta. 1+159.083; 17.714m 7.531m
timber bridge) |
1   |
ea |
750.00 |
750.00 |
8,000.00 |
8,000.00 |
5,500.00 |
5,500.00 |
7,000.00 |
7,000.00 |
| 202-02-A-07 |
removal of bridges (sta. 1+156.334; 17.708m x 7.517m
timber bridge) |
1   |
ea |
750.00 |
750.00 |
7,000.00 |
7,000.00 |
5,500.00 |
5,500.00 |
7,000.00 |
7,000.00 |
| 202-02-A-08 |
removal of bridges (sta. 1+364.156; 17.775m x 7.515m
timber bridge) |
1   |
ea |
750.00 |
750.00 |
8,000.00 |
8,000.00 |
5,500.00 |
5,500.00 |
7,000.00 |
7,000.00 |
| 202-02-A-09 |
removal of bridges (sta. 1+162.063; 23.398m x 7.992m
timber bridge) |
1   |
ea |
750.00 |
750.00 |
7,000.00 |
7,000.00 |
5,500.00 |
5,500.00 |
11,000.00 |
11,000.00 |
| 202-02-A-10 |
removal of bridges (sta. 1+156.007; 11.604m x 7.296m
concrete bridge) |
1   |
ea |
1,500.00 |
1,500.00 |
7,000.00 |
7,000.00 |
5,500.00 |
5,500.00 |
6,000.00 |
6,000.00 |
| 202-02-D |
removal of concrete walks & drives
|
223   |
sq m |
1.00 |
223.00 |
16.00 |
3,568.00 |
10.00 |
2,230.00 |
10.00 |
2,230.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
12,575.0 |
sq m |
1.50 |
18,862.50 |
1.60 |
20,120.00 |
4.00 |
50,300.00 |
4.00 |
50,300.00 |
| 203-01 |
general excavation
|
12,821   |
cu m |
2.00 |
25,642.00 |
5.40 |
69,233.40 |
6.00 |
76,926.00 |
8.00 |
102,568.00 |
| 203-03 |
muck excavation
|
6,100   |
cu m |
3.00 |
18,300.00 |
7.60 |
46,360.00 |
8.00 |
48,800.00 |
9.00 |
54,900.00 |
| 203-04 |
embankment
|
22,740   |
cu m |
5.00 |
113,700.00 |
20.00 |
454,800.00 |
13.00 |
295,620.00 |
14.00 |
318,360.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
80   |
ea |
20.00 |
1,600.00 |
80.00 |
6,400.00 |
200.00 |
16,000.00 |
90.00 |
7,200.00 |
| 204-06 |
temporary silt fencing
|
2,142   |
ln m |
1.00 |
2,142.00 |
5.00 |
10,710.00 |
7.50 |
16,065.00 |
2.00 |
4,284.00 |
| 302-02-B |
class ii base course (220 mm thick)
|
9,894.7 |
sq m |
15.00 |
148,420.50 |
20.00 |
197,894.00 |
20.00 |
197,894.00 |
16.00 |
158,315.20 |
| 304-01 |
lime (9% by volume)
|
23.10 |
Mg |
40.00 |
924.00 |
150.00 |
3,465.00 |
150.00 |
3,465.00 |
200.00 |
4,620.00 |
| 304-04-D |
lime treatment (type d) (300 mm thick)
|
1,528   |
sq m |
0.50 |
764.00 |
14.00 |
21,392.00 |
5.50 |
8,404.00 |
4.00 |
6,112.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
107   |
cu m |
75.00 |
8,025.00 |
90.00 |
9,630.00 |
115.00 |
12,305.00 |
75.00 |
8,025.00 |
| 502-01-A |
superpave asphaltic concrete (level 1)
|
5,450.5 |
Mg |
125.00 |
681,312.50 |
98.00 |
534,149.00 |
75.00 |
408,787.50 |
100.00 |
545,050.00 |
| 701-01-M |
cross drain pipe (900 mm rcp/pcp)
|
32.4 |
ln m |
200.00 |
6,480.00 |
260.00 |
8,424.00 |
275.00 |
8,910.00 |
300.00 |
9,720.00 |
| 701-05-K |
side drain pipe (750 mm cmp)
|
12.9 |
ln m |
150.00 |
1,935.00 |
170.00 |
2,193.00 |
215.00 |
2,773.50 |
200.00 |
2,580.00 |
| 701-05-M |
side drain pipe (900 mm cmp)
|
13.8 |
ln m |
175.00 |
2,415.00 |
200.00 |
2,760.00 |
230.00 |
3,174.00 |
240.00 |
3,312.00 |
| 704-03 |
blocked out guard rail
|
281.94 |
ln m |
50.00 |
14,097.00 |
48.00 |
13,533.12 |
52.00 |
14,660.88 |
48.00 |
13,533.12 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
91.44 |
ln m |
125.00 |
11,430.00 |
129.00 |
11,795.76 |
140.00 |
12,801.60 |
130.00 |
11,887.20 |
| 704-11-A |
guard rail end treatment (flared)
|
8   |
ea |
1,500.00 |
12,000.00 |
1,500.00 |
12,000.00 |
1,700.00 |
13,600.00 |
1,600.00 |
12,800.00 |
| 704-11-B |
guard rail end treatment (tangent)
|
4   |
ea |
1,800.00 |
7,200.00 |
1,700.00 |
6,800.00 |
1,950.00 |
7,800.00 |
1,800.00 |
7,200.00 |
| 705-01 |
barbed wire fence
|
624   |
ln m |
15.00 |
9,360.00 |
12.00 |
7,488.00 |
14.50 |
9,048.00 |
14.00 |
8,736.00 |
| 708-01 |
right-of-way monument
|
90   |
ea |
6.00 |
540.00 |
100.00 |
9,000.00 |
275.00 |
24,750.00 |
120.00 |
10,800.00 |
| 708-02 |
right-of-way monument witness post
|
90   |
ea |
25.00 |
2,250.00 |
75.00 |
6,750.00 |
275.00 |
24,750.00 |
120.00 |
10,800.00 |
| 711-01-C |
riprap (15 kg, 450 mm avg. thickness)
|
240   |
sq m |
55.00 |
13,200.00 |
45.00 |
10,800.00 |
62.50 |
15,000.00 |
55.00 |
13,200.00 |
| 711-04 |
geotextile fabric
|
240   |
sq m |
2.50 |
600.00 |
3.00 |
720.00 |
3.25 |
780.00 |
2.50 |
600.00 |
| 712-01-A |
concrete cast-in-place revetment (100mm thick)
|
62   |
sq m |
50.00 |
3,100.00 |
42.00 |
2,604.00 |
43.00 |
2,666.00 |
80.00 |
4,960.00 |
| 712-04 |
flexible revetment
|
1,203   |
sq m |
45.00 |
54,135.00 |
48.00 |
57,744.00 |
53.75 |
64,661.25 |
45.00 |
54,135.00 |
| 713-01 |
temporary signs & barricades
|
lump |
lump |
150,000.00 |
150,000.00 |
50,000.00 |
50,000.00 |
100,000.00 |
100,000.00 |
120,000.00 |
120,000.00 |
| 714-02 |
water
|
302   |
cu m |
1.00 |
302.00 |
2.00 |
604.00 |
1.10 |
332.20 |
1.00 |
302.00 |
| 716-01-A |
mulch (vegetative)
|
3.2 |
ha |
1,000.00 |
3,200.00 |
1,450.00 |
4,640.00 |
1,400.00 |
4,480.00 |
1,000.00 |
3,200.00 |
| 717-01 |
seeding
|
160   |
kg |
15.00 |
2,400.00 |
14.00 |
2,240.00 |
16.75 |
2,680.00 |
16.00 |
2,560.00 |
| 718-01 |
fertilizer
|
3,598   |
kg |
0.50 |
1,799.00 |
0.40 |
1,439.20 |
0.60 |
2,158.80 |
0.50 |
1,799.00 |
| 720-01-A |
erosion control system, slope protection (type a)
|
1,297   |
sq m |
1.60 |
2,075.20 |
1.05 |
1,361.85 |
1.35 |
1,750.95 |
1.60 |
2,075.20 |
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
530   |
sq m |
1.60 |
848.00 |
1.25 |
662.50 |
2.00 |
1,060.00 |
1.60 |
848.00 |
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
1,164   |
sq m |
3.00 |
3,492.00 |
1.25 |
1,455.00 |
2.00 |
2,328.00 |
3.00 |
3,492.00 |
| 720-01-E |
erosion control system, flexible channel liner (type e)
|
153   |
sq m |
5.00 |
765.00 |
2.95 |
451.35 |
4.00 |
612.00 |
5.00 |
765.00 |
| 720-01-F |
erosion control system, flexible channel liner (type f)
|
207   |
sq m |
5.00 |
1,035.00 |
2.95 |
610.65 |
5.50 |
1,138.50 |
5.00 |
1,035.00 |
| 722-01 |
project site laboratory
|
1   |
ea |
500.00 |
500.00 |
10,000.00 |
10,000.00 |
7,500.00 |
7,500.00 |
20,000.00 |
20,000.00 |
| 725-01 |
temporary detour roads
|
3,568.8 |
ln m |
300.00 |
1,070,640.00 |
390.00 |
1,391,832.00 |
500.00 |
1,784,400.00 |
300.00 |
1,070,640.00 |
| 726-01 |
bedding material
|
1,847.5 |
cu m |
25.00 |
46,187.50 |
65.00 |
120,087.50 |
50.00 |
92,375.00 |
65.00 |
120,087.50 |
| 727-01 |
mobilization
|
lump |
lump |
535,000.00 |
535,000.00 |
400,000.00 |
400,000.00 |
500,000.00 |
500,000.00 |
690,000.00 |
690,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
40   |
ea |
60.00 |
2,400.00 |
60.00 |
2,400.00 |
65.00 |
2,600.00 |
60.00 |
2,400.00 |
| 731-02 |
reflectorized raised pavement markers
|
107   |
ea |
5.00 |
535.00 |
5.00 |
535.00 |
6.50 |
695.50 |
6.00 |
642.00 |
| 732-02-A |
plastic pavement striping (solid line)(100 mm width)
|
2.559 |
km |
2,000.00 |
5,118.00 |
2,000.00 |
5,118.00 |
1,350.00 |
3,454.65 |
1,300.00 |
3,326.70 |
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
1.282 |
km |
1,000.00 |
1,282.00 |
1,000.00 |
1,282.00 |
450.00 |
576.90 |
450.00 |
576.90 |
| 735-01 |
mailboxes
|
1   |
ea |
6.00 |
6.00 |
25.00 |
25.00 |
20.00 |
20.00 |
1.00 |
1.00 |
| 735-02 |
mailbox supports (single)
|
1   |
ea |
100.00 |
100.00 |
125.00 |
125.00 |
150.00 |
150.00 |
200.00 |
200.00 |
| 740-01 |
construction layout
|
lump |
lump |
200,000.00 |
200,000.00 |
80,000.00 |
80,000.00 |
75,000.00 |
75,000.00 |
150,000.00 |
150,000.00 |
| 741-09 |
adjusting water house connections
|
7   |
ea |
FREE |
FREE |
350.00 |
2,450.00 |
2,000.00 |
14,000.00 |
500.00 |
3,500.00 |
| 804-01-C |
precast concrete piles (400 mm)
|
1,200.1 |
ln m |
130.00 |
156,013.00 |
140.00 |
168,014.00 |
150.00 |
180,015.00 |
300.00 |
360,030.00 |
| 804-05 |
precast concrete test piles
|
2   |
ea |
5,000.00 |
10,000.00 |
7,000.00 |
14,000.00 |
15,000.00 |
30,000.00 |
20,000.00 |
40,000.00 |
| 804-09 |
loading test piles
|
2   |
ea |
100.00 |
200.00 |
7,000.00 |
14,000.00 |
2,000.00 |
4,000.00 |
15,000.00 |
30,000.00 |
| 804-13 |
precast concrete indicator piles
|
1   |
ea |
4,000.00 |
4,000.00 |
5,000.00 |
5,000.00 |
4,000.00 |
4,000.00 |
16,000.00 |
16,000.00 |
| 804-17 |
dynamic monitoring
|
8   |
ea |
3,000.00 |
24,000.00 |
1,200.00 |
9,600.00 |
1,500.00 |
12,000.00 |
2,000.00 |
16,000.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
191.58 |
cu m |
435.00 |
83,337.30 |
840.00 |
160,927.20 |
1,100.00 |
210,738.00 |
900.00 |
172,422.00 |
| 805-01-F |
class a concrete (bents)
|
99.40 |
cu m |
435.00 |
43,239.00 |
640.00 |
63,616.00 |
750.00 |
74,550.00 |
900.00 |
89,460.00 |
| 805-03 |
class aa concrete
|
401.83 |
cu m |
435.00 |
174,796.05 |
500.00 |
200,915.00 |
450.00 |
180,823.50 |
550.00 |
221,006.50 |
| 805-12-M |
reinforced concrete box culverts (1800 mm x 1800 mm)
(precast only) |
509.68 |
ln m |
800.00 |
407,744.00 |
1,000.00 |
509,680.00 |
1,300.00 |
662,584.00 |
1,000.00 |
509,680.00 |
| 805-12-P |
reinforced concrete box culverts (2100 mm x 2100 mm)
(precast only) |
260.09 |
ln m |
1,560.00 |
405,740.40 |
1,500.00 |
390,135.00 |
1,600.00 |
416,144.00 |
1,200.00 |
312,108.00 |
| 805-12-S |
reinforced concrete box culverts (2400 mm x 2400 mm)
(precast only) |
284.25 |
ln m |
1,600.00 |
454,800.00 |
1,600.00 |
454,800.00 |
1,700.00 |
483,225.00 |
1,400.00 |
397,950.00 |
| 806-01 |
deformed reinforcing steel
|
58,464   |
kg |
0.50 |
29,232.00 |
1.40 |
81,849.60 |
1.50 |
87,696.00 |
1.50 |
87,696.00 |
| 810-01 |
concrete railing (barrier)
|
156.00 |
ln m |
100.00 |
15,600.00 |
140.00 |
21,840.00 |
125.00 |
19,500.00 |
160.00 |
24,960.00 |
| 813-01 |
concrete approach slabs
|
972.00 |
sq m |
95.00 |
92,340.00 |
160.00 |
155,520.00 |
175.00 |
170,100.00 |
160.00 |
155,520.00 |
| S-101 |
dynamic analysis
|
8   |
ea |
900.00 |
7,200.00 |
750.00 |
6,000.00 |
1,100.00 |
8,800.00 |
1,200.00 |
9,600.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
5,364,333.95 |
|
6,042,549.13 |
|
6,713,659.73 |
|
6,970,110.32 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - KOSTMAYER CONSTRUCTION, LLC |
- 6 - GILBERT SOUTHERN CORP |
- 7 - GUINN BROTHERS, LLC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
115,000.00 |
115,000.00 |
103,000.00 |
103,000.00 |
150,000.00 |
150,000.00 |
|
|
| 202-02-A-01 |
removal of bridges (sta. 1+161.748; 23.115m x 7.241m
concrete bridge) |
1   |
ea |
16,000.00 |
16,000.00 |
20,000.00 |
20,000.00 |
10,000.00 |
10,000.00 |
|
|
| 202-02-A-02 |
removal of bridges (sta. 1+219.933; 17.291m x 7.303m
concrete bridge) |
1   |
ea |
16,000.00 |
16,000.00 |
20,000.00 |
20,000.00 |
9,000.00 |
9,000.00 |
|
|
| 202-02-A-03 |
removal of bridges (sta. 1+242.702; 17.744m x 7.649m
timber bridge) |
1   |
ea |
8,000.00 |
8,000.00 |
20,000.00 |
20,000.00 |
7,000.00 |
7,000.00 |
|
|
| 202-02-A-04 |
removal of bridges (sta. 1+159.399; 17.670m x 7.542m
timber bridge) |
1   |
ea |
8,000.00 |
8,000.00 |
20,000.00 |
20,000.00 |
7,000.00 |
7,000.00 |
|
|
| 202-02-A-05 |
removal of bridges (sta. 1+161.823; 23.531m x 7.516m
timber bridge) |
1   |
ea |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
8,000.00 |
8,000.00 |
|
|
| 202-02-A-06 |
removal of bridges (sta. 1+159.083; 17.714m 7.531m
timber bridge) |
1   |
ea |
8,000.00 |
8,000.00 |
20,000.00 |
20,000.00 |
7,000.00 |
7,000.00 |
|
|
| 202-02-A-07 |
removal of bridges (sta. 1+156.334; 17.708m x 7.517m
timber bridge) |
1   |
ea |
8,000.00 |
8,000.00 |
20,000.00 |
20,000.00 |
7,000.00 |
7,000.00 |
|
|
| 202-02-A-08 |
removal of bridges (sta. 1+364.156; 17.775m x 7.515m
timber bridge) |
1   |
ea |
8,000.00 |
8,000.00 |
20,000.00 |
20,000.00 |
7,000.00 |
7,000.00 |
|
|
| 202-02-A-09 |
removal of bridges (sta. 1+162.063; 23.398m x 7.992m
timber bridge) |
1   |
ea |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
8,500.00 |
8,500.00 |
|
|
| 202-02-A-10 |
removal of bridges (sta. 1+156.007; 11.604m x 7.296m
concrete bridge) |
1   |
ea |
13,000.00 |
13,000.00 |
20,000.00 |
20,000.00 |
6,000.00 |
6,000.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
223   |
sq m |
20.00 |
4,460.00 |
14.00 |
3,122.00 |
8.00 |
1,784.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
12,575.0 |
sq m |
5.00 |
62,875.00 |
4.00 |
50,300.00 |
5.00 |
62,875.00 |
|
|
| 203-01 |
general excavation
|
12,821   |
cu m |
6.00 |
76,926.00 |
10.00 |
128,210.00 |
6.00 |
76,926.00 |
|
|
| 203-03 |
muck excavation
|
6,100   |
cu m |
14.00 |
85,400.00 |
10.00 |
61,000.00 |
8.00 |
48,800.00 |
|
|
| 203-04 |
embankment
|
22,740   |
cu m |
13.00 |
295,620.00 |
10.00 |
227,400.00 |
13.00 |
295,620.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
80   |
ea |
120.00 |
9,600.00 |
90.00 |
7,200.00 |
100.00 |
8,000.00 |
|
|
| 204-06 |
temporary silt fencing
|
2,142   |
ln m |
1.30 |
2,784.60 |
3.00 |
6,426.00 |
5.00 |
10,710.00 |
|
|
| 302-02-B |
class ii base course (220 mm thick)
|
9,894.7 |
sq m |
48.00 |
474,945.60 |
10.00 |
98,947.00 |
18.50 |
183,051.95 |
|
|
| 304-01 |
lime (9% by volume)
|
23.10 |
Mg |
160.00 |
3,696.00 |
100.00 |
2,310.00 |
200.00 |
4,620.00 |
|
|
| 304-04-D |
lime treatment (type d) (300 mm thick)
|
1,528   |
sq m |
5.00 |
7,640.00 |
8.00 |
12,224.00 |
28.00 |
42,784.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
107   |
cu m |
65.00 |
6,955.00 |
100.00 |
10,700.00 |
85.00 |
9,095.00 |
|
|
| 502-01-A |
superpave asphaltic concrete (level 1)
|
5,450.5 |
Mg |
107.00 |
583,203.50 |
100.00 |
545,050.00 |
105.00 |
572,302.50 |
|
|
| 701-01-M |
cross drain pipe (900 mm rcp/pcp)
|
32.4 |
ln m |
220.00 |
7,128.00 |
300.00 |
9,720.00 |
500.00 |
16,200.00 |
|
|
| 701-05-K |
side drain pipe (750 mm cmp)
|
12.9 |
ln m |
160.00 |
2,064.00 |
200.00 |
2,580.00 |
260.00 |
3,354.00 |
|
|
| 701-05-M |
side drain pipe (900 mm cmp)
|
13.8 |
ln m |
200.00 |
2,760.00 |
200.00 |
2,760.00 |
320.00 |
4,416.00 |
|
|
| 704-03 |
blocked out guard rail
|
281.94 |
ln m |
65.00 |
18,326.10 |
50.00 |
14,097.00 |
54.00 |
15,224.76 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
91.44 |
ln m |
159.00 |
14,538.96 |
135.00 |
12,344.40 |
145.00 |
13,258.80 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
8   |
ea |
1,925.00 |
15,400.00 |
1,600.00 |
12,800.00 |
1,875.00 |
15,000.00 |
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
4   |
ea |
2,300.00 |
9,200.00 |
1,900.00 |
7,600.00 |
2,400.00 |
9,600.00 |
|
|
| 705-01 |
barbed wire fence
|
624   |
ln m |
16.00 |
9,984.00 |
13.00 |
8,112.00 |
15.00 |
9,360.00 |
|
|
| 708-01 |
right-of-way monument
|
90   |
ea |
100.00 |
9,000.00 |
110.00 |
9,900.00 |
190.00 |
17,100.00 |
|
|
| 708-02 |
right-of-way monument witness post
|
90   |
ea |
100.00 |
9,000.00 |
100.00 |
9,000.00 |
190.00 |
17,100.00 |
|
|
| 711-01-C |
riprap (15 kg, 450 mm avg. thickness)
|
240   |
sq m |
70.00 |
16,800.00 |
70.00 |
16,800.00 |
50.00 |
12,000.00 |
|
|
| 711-04 |
geotextile fabric
|
240   |
sq m |
5.00 |
1,200.00 |
2.00 |
480.00 |
5.00 |
1,200.00 |
|
|
| 712-01-A |
concrete cast-in-place revetment (100mm thick)
|
62   |
sq m |
100.00 |
6,200.00 |
100.00 |
6,200.00 |
100.00 |
6,200.00 |
|
|
| 712-04 |
flexible revetment
|
1,203   |
sq m |
55.00 |
66,165.00 |
40.00 |
48,120.00 |
55.00 |
66,165.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
90,000.00 |
90,000.00 |
150,000.00 |
150,000.00 |
120,000.00 |
120,000.00 |
|
|
| 714-02 |
water
|
302   |
cu m |
2.65 |
800.30 |
1.00 |
302.00 |
1.00 |
302.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
3.2 |
ha |
1,700.00 |
5,440.00 |
1,000.00 |
3,200.00 |
2,500.00 |
8,000.00 |
|
|
| 717-01 |
seeding
|
160   |
kg |
26.00 |
4,160.00 |
16.00 |
2,560.00 |
30.00 |
4,800.00 |
|
|
| 718-01 |
fertilizer
|
3,598   |
kg |
0.70 |
2,518.60 |
0.50 |
1,799.00 |
1.10 |
3,957.80 |
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
1,297   |
sq m |
2.00 |
2,594.00 |
1.70 |
2,204.90 |
2.00 |
2,594.00 |
|
|
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
530   |
sq m |
2.00 |
1,060.00 |
1.70 |
901.00 |
3.50 |
1,855.00 |
|
|
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
1,164   |
sq m |
2.50 |
2,910.00 |
3.00 |
3,492.00 |
4.50 |
5,238.00 |
|
|
| 720-01-E |
erosion control system, flexible channel liner (type e)
|
153   |
sq m |
4.50 |
688.50 |
5.20 |
795.60 |
8.00 |
1,224.00 |
|
|
| 720-01-F |
erosion control system, flexible channel liner (type f)
|
207   |
sq m |
4.50 |
931.50 |
5.20 |
1,076.40 |
8.00 |
1,656.00 |
|
|
| 722-01 |
project site laboratory
|
1   |
ea |
12,000.00 |
12,000.00 |
16,000.00 |
16,000.00 |
15,000.00 |
15,000.00 |
|
|
| 725-01 |
temporary detour roads
|
3,568.8 |
ln m |
450.00 |
1,605,960.00 |
573.00 |
2,044,922.40 |
585.00 |
2,087,748.00 |
|
|
| 726-01 |
bedding material
|
1,847.5 |
cu m |
65.00 |
120,087.50 |
70.00 |
129,325.00 |
85.00 |
157,037.50 |
|
|
| 727-01 |
mobilization
|
lump |
lump |
477,000.00 |
477,000.00 |
700,000.00 |
700,000.00 |
400,000.00 |
400,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
40   |
ea |
77.00 |
3,080.00 |
63.00 |
2,520.00 |
95.00 |
3,800.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
107   |
ea |
7.00 |
749.00 |
5.25 |
561.75 |
7.50 |
802.50 |
|
|
| 732-02-A |
plastic pavement striping (solid line)(100 mm width)
|
2.559 |
km |
2,200.00 |
5,629.80 |
2,100.00 |
5,373.90 |
1,550.00 |
3,966.45 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
1.282 |
km |
1,100.00 |
1,410.20 |
1,050.00 |
1,346.10 |
650.00 |
833.30 |
|
|
| 735-01 |
mailboxes
|
1   |
ea |
17.00 |
17.00 |
12.00 |
12.00 |
100.00 |
100.00 |
|
|
| 735-02 |
mailbox supports (single)
|
1   |
ea |
170.00 |
170.00 |
125.00 |
125.00 |
100.00 |
100.00 |
|
|
| 740-01 |
construction layout
|
lump |
lump |
95,000.00 |
95,000.00 |
110,000.00 |
110,000.00 |
120,000.00 |
120,000.00 |
|
|
| 741-09 |
adjusting water house connections
|
7   |
ea |
1,000.00 |
7,000.00 |
200.00 |
1,400.00 |
500.00 |
3,500.00 |
|
|
| 804-01-C |
precast concrete piles (400 mm)
|
1,200.1 |
ln m |
150.00 |
180,015.00 |
220.00 |
264,022.00 |
135.00 |
162,013.50 |
|
|
| 804-05 |
precast concrete test piles
|
2   |
ea |
17,000.00 |
34,000.00 |
13,000.00 |
26,000.00 |
20,000.00 |
40,000.00 |
|
|
| 804-09 |
loading test piles
|
2   |
ea |
1.00 |
2.00 |
4,000.00 |
8,000.00 |
1.00 |
2.00 |
|
|
| 804-13 |
precast concrete indicator piles
|
1   |
ea |
500.00 |
500.00 |
13,000.00 |
13,000.00 |
20,000.00 |
20,000.00 |
|
|
| 804-17 |
dynamic monitoring
|
8   |
ea |
2,200.00 |
17,600.00 |
4,000.00 |
32,000.00 |
2,500.00 |
20,000.00 |
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
191.58 |
cu m |
750.00 |
143,685.00 |
1,300.00 |
249,054.00 |
1,000.00 |
191,580.00 |
|
|
| 805-01-F |
class a concrete (bents)
|
99.40 |
cu m |
650.00 |
64,610.00 |
1,000.00 |
99,400.00 |
1,000.00 |
99,400.00 |
|
|
| 805-03 |
class aa concrete
|
401.83 |
cu m |
650.00 |
261,189.50 |
1,000.00 |
401,830.00 |
650.00 |
261,189.50 |
|
|
| 805-12-M |
reinforced concrete box culverts (1800 mm x 1800 mm)
(precast only) |
509.68 |
ln m |
1,400.00 |
713,552.00 |
1,000.00 |
509,680.00 |
1,200.00 |
611,616.00 |
|
|
| 805-12-P |
reinforced concrete box culverts (2100 mm x 2100 mm)
(precast only) |
260.09 |
ln m |
1,620.00 |
421,345.80 |
1,000.00 |
260,090.00 |
1,610.00 |
418,744.90 |
|
|
| 805-12-S |
reinforced concrete box culverts (2400 mm x 2400 mm)
(precast only) |
284.25 |
ln m |
1,770.00 |
503,122.50 |
1,200.00 |
341,100.00 |
1,700.00 |
483,225.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
58,464   |
kg |
1.35 |
78,926.40 |
2.00 |
116,928.00 |
1.80 |
105,235.20 |
|
|
| 810-01 |
concrete railing (barrier)
|
156.00 |
ln m |
180.00 |
28,080.00 |
200.00 |
31,200.00 |
145.00 |
22,620.00 |
|
|
| 813-01 |
concrete approach slabs
|
972.00 |
sq m |
155.00 |
150,660.00 |
130.00 |
126,360.00 |
200.00 |
194,400.00 |
|
|
| S-101 |
dynamic analysis
|
8   |
ea |
2,400.00 |
19,200.00 |
800.00 |
6,400.00 |
1,200.00 |
9,600.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
7,077,566.36 |
|
7,279,383.45 |
|
7,331,387.66 |
|
|
|