| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BOH BROS. CONSTRUCTION CO., LLC. |
- 2 - BARRIERE CONSTRUCTION CO., LLC. |
- 3 - COMMAND CONSTRUCTION LLC |
- 4 - JAMES CONSTRUCTION GROUP LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
8,000.00 |
8,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
10,000.00 |
10,000.00 |
18,000.00 |
18,000.00 |
| 202-02-C |
removal of portland cement concrete pavement
|
2,047   |
SQYD |
7.00 |
14,329.00 |
10.00 |
20,470.00 |
30.00 |
61,410.00 |
30.00 |
61,410.00 |
| 202-02-F |
removal of concrete combination curb & gutter
|
128.5 |
LNFT |
3.00 |
385.50 |
8.00 |
1,028.00 |
5.00 |
642.50 |
23.00 |
2,955.50 |
| 202-02-G |
removal of surfacing & stabilized base
|
697.7 |
SQYD |
6.00 |
4,186.20 |
5.00 |
3,488.50 |
5.00 |
3,488.50 |
5.00 |
3,488.50 |
| 202-02-I |
removal of existing signal equipment, signs and
related items |
lump |
LUMP |
1,400.00 |
1,400.00 |
1,500.00 |
1,500.00 |
500.00 |
500.00 |
1,500.00 |
1,500.00 |
| 202-02-J |
removal of incidental concrete
|
585   |
SQYD |
5.00 |
2,925.00 |
7.00 |
4,095.00 |
5.00 |
2,925.00 |
8.00 |
4,680.00 |
| 203-06 |
excavation & embankment
|
lump |
LUMP |
30,000.00 |
30,000.00 |
50,000.00 |
50,000.00 |
43,000.00 |
43,000.00 |
61,000.00 |
61,000.00 |
| 204-02 |
temporary hay or straw bales
|
48   |
EACH |
10.00 |
480.00 |
10.00 |
480.00 |
8.00 |
384.00 |
30.00 |
1,440.00 |
| 204-04 |
temporary sediment basins
|
1   |
EACH |
400.00 |
400.00 |
500.00 |
500.00 |
100.00 |
100.00 |
200.00 |
200.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
1   |
EACH |
60.00 |
60.00 |
50.00 |
50.00 |
200.00 |
200.00 |
500.00 |
500.00 |
| 204-06 |
temporary silt fencing
|
1,400   |
LNFT |
1.50 |
2,100.00 |
1.70 |
2,380.00 |
3.00 |
4,200.00 |
2.00 |
2,800.00 |
| 302-02-D |
class ii base course (12" thick)
|
1,113.2 |
SQYD |
22.00 |
24,490.40 |
20.00 |
22,264.00 |
17.00 |
18,924.40 |
20.00 |
22,264.00 |
| 302-02-E |
class ii base course (8" thick)
|
2,115.0 |
SQYD |
16.00 |
33,840.00 |
14.00 |
29,610.00 |
15.00 |
31,725.00 |
15.00 |
31,725.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
50.0 |
CUYD |
30.00 |
1,500.00 |
40.00 |
2,000.00 |
1.00 |
50.00 |
46.00 |
2,300.00 |
| 502-01-B |
superpave asphaltic concrete (level 2)
|
554.6 |
TON |
70.00 |
38,822.00 |
80.00 |
44,368.00 |
100.00 |
55,460.00 |
78.00 |
43,258.80 |
| 502-01-B-01 |
superpave asphaltic conc wearing course (level 2f)
|
123.2 |
TON |
70.00 |
8,624.00 |
135.00 |
16,632.00 |
165.00 |
20,328.00 |
110.00 |
13,552.00 |
| 601-01-K |
portland cement concrete pavement (10" thick)
|
1,410.7 |
SQYD |
60.00 |
84,642.00 |
49.00 |
69,124.30 |
40.00 |
56,428.00 |
58.00 |
81,820.60 |
| 601-03-K |
portland cement concrete shoulder (10" thick)
|
556.4 |
SQYD |
60.00 |
33,384.00 |
45.00 |
25,038.00 |
40.00 |
22,256.00 |
54.00 |
30,045.60 |
| 601-04 |
portland cement concrete pavement coring
|
5   |
EACH |
250.00 |
1,250.00 |
60.00 |
300.00 |
100.00 |
500.00 |
220.00 |
1,100.00 |
| 702-03-D |
catch basins (cb-07)
|
1   |
EACH |
6,600.00 |
6,600.00 |
3,500.00 |
3,500.00 |
5,000.00 |
5,000.00 |
6,000.00 |
6,000.00 |
| 706-02-C |
concrete drive (6" thick)
|
52.4 |
SQYD |
60.00 |
3,144.00 |
50.00 |
2,620.00 |
30.00 |
1,572.00 |
120.00 |
6,288.00 |
| 706-03-A |
incidental concrete paving (4" thick)
|
10.0 |
SQYD |
60.00 |
600.00 |
65.00 |
650.00 |
30.00 |
300.00 |
230.00 |
2,300.00 |
| 707-01 |
concrete curb
|
245.0 |
LNFT |
7.00 |
1,715.00 |
16.00 |
3,920.00 |
10.00 |
2,450.00 |
40.00 |
9,800.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
30,000.00 |
30,000.00 |
20,000.00 |
20,000.00 |
1,000.00 |
1,000.00 |
60,000.00 |
60,000.00 |
| 713-03-C-01 |
temporary pavement markings (8" width)(type
1 removable) |
1,137   |
LNFT |
4.00 |
4,548.00 |
4.00 |
4,548.00 |
4.00 |
4,548.00 |
4.00 |
4,548.00 |
| 713-03-E-01 |
temporary pavement markings (24" width)(type
1 removable) |
890   |
LNFT |
13.00 |
11,570.00 |
12.00 |
10,680.00 |
10.00 |
8,900.00 |
12.00 |
10,680.00 |
| 713-05-A-01 |
temporary pavement markings (solid line)(4" width)
(type 1 removable) |
0.412 |
MILE |
12,000.00 |
4,944.00 |
12,000.00 |
4,944.00 |
12,000.00 |
4,944.00 |
12,000.00 |
4,944.00 |
| 716-01-A |
mulch (vegetative)
|
1.00 |
ACRE |
500.00 |
500.00 |
1,000.00 |
1,000.00 |
800.00 |
800.00 |
800.00 |
800.00 |
| 717-01 |
seeding
|
30   |
LB |
18.00 |
540.00 |
11.00 |
330.00 |
10.00 |
300.00 |
10.00 |
300.00 |
| 718-01 |
fertilizer
|
1,000   |
LB |
0.50 |
500.00 |
0.40 |
400.00 |
0.50 |
500.00 |
0.40 |
400.00 |
| 726-01 |
bedding material
|
2.0 |
CUYD |
50.00 |
100.00 |
50.00 |
100.00 |
100.00 |
200.00 |
50.00 |
100.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
26,000.00 |
26,000.00 |
45,000.00 |
45,000.00 |
50,000.00 |
50,000.00 |
60,000.00 |
60,000.00 |
| 729-01 |
sign (type a)
|
20.0 |
SQFT |
32.00 |
640.00 |
35.00 |
700.00 |
30.00 |
600.00 |
30.00 |
600.00 |
| 729-19-A |
dead end road installations(type a)
|
1   |
EACH |
4,000.00 |
4,000.00 |
4,000.00 |
4,000.00 |
5,000.00 |
5,000.00 |
4,000.00 |
4,000.00 |
| 731-02 |
reflectorized raised pavement markers
|
313   |
EACH |
5.00 |
1,565.00 |
5.00 |
1,565.00 |
5.00 |
1,565.00 |
5.00 |
1,565.00 |
| 732-01-A |
plastic pavement striping (4" width)
|
3,182   |
LNFT |
0.40 |
1,272.80 |
0.45 |
1,431.90 |
0.50 |
1,591.00 |
0.40 |
1,272.80 |
| 732-01-C |
plastic pavement striping (8" width)
|
583   |
LNFT |
0.85 |
495.55 |
1.00 |
583.00 |
1.00 |
583.00 |
0.80 |
466.40 |
| 732-01-E |
plastic pavement striping (24" width)
|
389   |
LNFT |
2.75 |
1,069.75 |
3.00 |
1,167.00 |
3.00 |
1,167.00 |
2.70 |
1,050.30 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
2   |
EACH |
130.00 |
260.00 |
140.00 |
280.00 |
150.00 |
300.00 |
130.00 |
260.00 |
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
1   |
EACH |
200.00 |
200.00 |
200.00 |
200.00 |
200.00 |
200.00 |
200.00 |
200.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
2   |
EACH |
160.00 |
320.00 |
170.00 |
340.00 |
200.00 |
400.00 |
150.00 |
300.00 |
| 732-05 |
removal of existing markings
|
0.095 |
MILE |
4,800.00 |
456.00 |
5,000.00 |
475.00 |
5,000.00 |
475.00 |
4,300.00 |
408.50 |
| 736-01 |
trenching and backfilling
|
45   |
LNFT |
5.00 |
225.00 |
5.00 |
225.00 |
5.00 |
225.00 |
4.50 |
202.50 |
| 736-04 |
signal support (30' strain pole)
|
1   |
EACH |
6,300.00 |
6,300.00 |
6,500.00 |
6,500.00 |
7,000.00 |
7,000.00 |
6,100.00 |
6,100.00 |
| 736-05-A |
signal heads (3 face; r,y,g)
|
3   |
EACH |
550.00 |
1,650.00 |
600.00 |
1,800.00 |
550.00 |
1,650.00 |
530.00 |
1,590.00 |
| 736-05-B |
signal heads (3 face; r,<-y,<-g)
|
1   |
EACH |
600.00 |
600.00 |
600.00 |
600.00 |
600.00 |
600.00 |
560.00 |
560.00 |
| 736-05-C |
signal heads (4 face; r,y,<-g,g)
|
1   |
EACH |
750.00 |
750.00 |
800.00 |
800.00 |
750.00 |
750.00 |
715.00 |
715.00 |
| 736-05-D |
signal heads (3 face optically programmed; r,y,g)
|
2   |
EACH |
3,200.00 |
6,400.00 |
3,200.00 |
6,400.00 |
3,100.00 |
6,200.00 |
3,100.00 |
6,200.00 |
| 736-08 |
signal controller (8 phase nema controller)
|
1   |
EACH |
14,000.00 |
14,000.00 |
14,000.00 |
14,000.00 |
15,000.00 |
15,000.00 |
13,700.00 |
13,700.00 |
| 736-09 |
loop detector
|
405   |
LNFT |
10.00 |
4,050.00 |
10.00 |
4,050.00 |
10.00 |
4,050.00 |
9.00 |
3,645.00 |
| 736-10-A |
underground junction box (type e)
|
2   |
EACH |
400.00 |
800.00 |
400.00 |
800.00 |
350.00 |
700.00 |
360.00 |
720.00 |
| 736-10-B |
underground junction box (type h)
|
1   |
EACH |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
980.00 |
980.00 |
| 736-11-A |
conduit (2" diameter p.e.)
|
35   |
LNFT |
4.00 |
140.00 |
4.00 |
140.00 |
4.00 |
140.00 |
4.00 |
140.00 |
| 736-11-B |
conduit (3" diameter p.e.)
|
15   |
LNFT |
6.50 |
97.50 |
6.50 |
97.50 |
8.00 |
120.00 |
6.00 |
90.00 |
| 736-12-A |
conductor (6c signal/#14 awg)
|
380   |
LNFT |
2.00 |
760.00 |
2.00 |
760.00 |
2.00 |
760.00 |
2.00 |
760.00 |
| 736-12-B |
conductor (10c signal/#14 awg)
|
305   |
LNFT |
2.20 |
671.00 |
2.30 |
701.50 |
2.50 |
762.50 |
2.00 |
610.00 |
| 736-12-C |
conductor (2c loop lead-in/#16 awg)
|
30   |
LNFT |
1.40 |
42.00 |
1.40 |
42.00 |
1.50 |
45.00 |
1.50 |
45.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
6,000.00 |
6,000.00 |
7,000.00 |
7,000.00 |
1,000.00 |
1,000.00 |
16,000.00 |
16,000.00 |
| S-001 |
modify existing catch basins
|
3   |
EACH |
4,000.00 |
12,000.00 |
2,000.00 |
6,000.00 |
900.00 |
2,700.00 |
2,000.00 |
6,000.00 |
| S-002 |
full depth pavement sawcuts (concrete or asphalt)
|
1,120   |
LNFT |
7.00 |
7,840.00 |
4.20 |
4,704.00 |
10.00 |
11,200.00 |
5.00 |
5,600.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
467,183.70 |
|
482,381.70 |
|
488,818.90 |
|
631,980.50 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
RICHARD PRICE CONTRACTING CO., LLC |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
4,500.00 |
4,500.00 |
|
|
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
6,800.00 |
6,800.00 |
|
|
|
|
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
2,047   |
SQYD |
6.00 |
12,282.00 |
|
|
|
|
|
|
| 202-02-F |
removal of concrete combination curb & gutter
|
128.5 |
LNFT |
5.00 |
642.50 |
|
|
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
697.7 |
SQYD |
5.00 |
3,488.50 |
|
|
|
|
|
|
| 202-02-I |
removal of existing signal equipment, signs and
related items |
lump |
LUMP |
1,500.00 |
1,500.00 |
|
|
|
|
|
|
| 202-02-J |
removal of incidental concrete
|
585   |
SQYD |
6.00 |
3,510.00 |
|
|
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
28,000.00 |
28,000.00 |
|
|
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
48   |
EACH |
10.00 |
480.00 |
|
|
|
|
|
|
| 204-04 |
temporary sediment basins
|
1   |
EACH |
500.00 |
500.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
1   |
EACH |
500.00 |
500.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
1,400   |
LNFT |
1.00 |
1,400.00 |
|
|
|
|
|
|
| 302-02-D |
class ii base course (12" thick)
|
1,113.2 |
SQYD |
20.00 |
22,264.00 |
|
|
|
|
|
|
| 302-02-E |
class ii base course (8" thick)
|
2,115.0 |
SQYD |
13.50 |
28,552.50 |
|
|
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
50.0 |
CUYD |
50.00 |
2,500.00 |
|
|
|
|
|
|
| 502-01-B |
superpave asphaltic concrete (level 2)
|
554.6 |
TON |
101.00 |
56,014.60 |
|
|
|
|
|
|
| 502-01-B-01 |
superpave asphaltic conc wearing course (level 2f)
|
123.2 |
TON |
164.00 |
20,204.80 |
|
|
|
|
|
|
| 601-01-K |
portland cement concrete pavement (10" thick)
|
1,410.7 |
SQYD |
44.00 |
62,070.80 |
|
|
|
|
|
|
| 601-03-K |
portland cement concrete shoulder (10" thick)
|
556.4 |
SQYD |
44.00 |
24,481.60 |
|
|
|
|
|
|
| 601-04 |
portland cement concrete pavement coring
|
5   |
EACH |
250.00 |
1,250.00 |
|
|
|
|
|
|
| 702-03-D |
catch basins (cb-07)
|
1   |
EACH |
4,000.00 |
4,000.00 |
|
|
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
52.4 |
SQYD |
38.00 |
1,991.20 |
|
|
|
|
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
10.0 |
SQYD |
40.00 |
400.00 |
|
|
|
|
|
|
| 707-01 |
concrete curb
|
245.0 |
LNFT |
8.50 |
2,082.50 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
40,000.00 |
40,000.00 |
|
|
|
|
|
|
| 713-03-C-01 |
temporary pavement markings (8" width)(type
1 removable) |
1,137   |
LNFT |
4.40 |
5,002.80 |
|
|
|
|
|
|
| 713-03-E-01 |
temporary pavement markings (24" width)(type
1 removable) |
890   |
LNFT |
14.00 |
12,460.00 |
|
|
|
|
|
|
| 713-05-A-01 |
temporary pavement markings (solid line)(4" width)
(type 1 removable) |
0.412 |
MILE |
13,068.00 |
5,384.01 |
|
|
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
1.00 |
ACRE |
880.00 |
880.00 |
|
|
|
|
|
|
| 717-01 |
seeding
|
30   |
LB |
11.00 |
330.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
1,000   |
LB |
0.40 |
400.00 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
2.0 |
CUYD |
75.00 |
150.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
19,000.00 |
19,000.00 |
|
|
|
|
|
|
| 729-01 |
sign (type a)
|
20.0 |
SQFT |
33.00 |
660.00 |
|
|
|
|
|
|
| 729-19-A |
dead end road installations(type a)
|
1   |
EACH |
3,500.00 |
3,500.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
313   |
EACH |
5.50 |
1,721.50 |
|
|
|
|
|
|
| 732-01-A |
plastic pavement striping (4" width)
|
3,182   |
LNFT |
0.45 |
1,431.90 |
|
|
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
583   |
LNFT |
1.00 |
583.00 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
389   |
LNFT |
3.00 |
1,167.00 |
|
|
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
2   |
EACH |
138.00 |
276.00 |
|
|
|
|
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
1   |
EACH |
215.00 |
215.00 |
|
|
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
2   |
EACH |
165.00 |
330.00 |
|
|
|
|
|
|
| 732-05 |
removal of existing markings
|
0.095 |
MILE |
4,950.00 |
470.25 |
|
|
|
|
|
|
| 736-01 |
trenching and backfilling
|
45   |
LNFT |
5.00 |
225.00 |
|
|
|
|
|
|
| 736-04 |
signal support (30' strain pole)
|
1   |
EACH |
6,660.00 |
6,660.00 |
|
|
|
|
|
|
| 736-05-A |
signal heads (3 face; r,y,g)
|
3   |
EACH |
580.00 |
1,740.00 |
|
|
|
|
|
|
| 736-05-B |
signal heads (3 face; r,<-y,<-g)
|
1   |
EACH |
616.00 |
616.00 |
|
|
|
|
|
|
| 736-05-C |
signal heads (4 face; r,y,<-g,g)
|
1   |
EACH |
800.00 |
800.00 |
|
|
|
|
|
|
| 736-05-D |
signal heads (3 face optically programmed; r,y,g)
|
2   |
EACH |
3,400.00 |
6,800.00 |
|
|
|
|
|
|
| 736-08 |
signal controller (8 phase nema controller)
|
1   |
EACH |
15,000.00 |
15,000.00 |
|
|
|
|
|
|
| 736-09 |
loop detector
|
405   |
LNFT |
10.00 |
4,050.00 |
|
|
|
|
|
|
| 736-10-A |
underground junction box (type e)
|
2   |
EACH |
400.00 |
800.00 |
|
|
|
|
|
|
| 736-10-B |
underground junction box (type h)
|
1   |
EACH |
1,100.00 |
1,100.00 |
|
|
|
|
|
|
| 736-11-A |
conduit (2" diameter p.e.)
|
35   |
LNFT |
5.00 |
175.00 |
|
|
|
|
|
|
| 736-11-B |
conduit (3" diameter p.e.)
|
15   |
LNFT |
7.00 |
105.00 |
|
|
|
|
|
|
| 736-12-A |
conductor (6c signal/#14 awg)
|
380   |
LNFT |
2.00 |
760.00 |
|
|
|
|
|
|
| 736-12-B |
conductor (10c signal/#14 awg)
|
305   |
LNFT |
2.40 |
732.00 |
|
|
|
|
|
|
| 736-12-C |
conductor (2c loop lead-in/#16 awg)
|
30   |
LNFT |
2.00 |
60.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
9,000.00 |
9,000.00 |
|
|
|
|
|
|
| S-001 |
modify existing catch basins
|
3   |
EACH |
1,500.00 |
4,500.00 |
|
|
|
|
|
|
| S-002 |
full depth pavement sawcuts (concrete or asphalt)
|
1,120   |
LNFT |
9.00 |
10,080.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
IRREGULAR |
|
|
|
|
|
|
|