Lead Project: 059-30-0009
Parish: ST TAMMANY
Routes: US 190
Description: US 190 RAMPS
Type Const: grading, drainage structures, class ii base course, superpave asphaltic concrete
pavement, portland cement concrete pavement, traffic signalization, and related work.
 
RankLicenseBidderAmount
102179 BOH BROS. CONSTRUCTION CO., LLC. $467,183.70
206276 BARRIERE CONSTRUCTION CO., LLC. $482,381.70
340038 COMMAND CONSTRUCTION LLC $488,818.90
434567 JAMES CONSTRUCTION GROUP LLC $631,980.50
14807 RICHARD PRICE CONTRACTING CO., LLC IRREGULAR
 
Item Number Item Description Quantity Unit of Measure - 1 -
BOH BROS. CONSTRUCTION CO., LLC.
- 2 -
BARRIERE CONSTRUCTION CO., LLC.
- 3 -
COMMAND CONSTRUCTION LLC
- 4 -
JAMES CONSTRUCTION GROUP LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 8,000.00 8,000.00
202-01 removal of structures & obstructions lump      LUMP 10,000.00 10,000.00 15,000.00 15,000.00 10,000.00 10,000.00 18,000.00 18,000.00
202-02-C removal of portland cement concrete pavement 2,047      SQYD 7.00 14,329.00 10.00 20,470.00 30.00 61,410.00 30.00 61,410.00
202-02-F removal of concrete combination curb & gutter 128.5    LNFT 3.00 385.50 8.00 1,028.00 5.00 642.50 23.00 2,955.50
202-02-G removal of surfacing & stabilized base 697.7    SQYD 6.00 4,186.20 5.00 3,488.50 5.00 3,488.50 5.00 3,488.50
202-02-I removal of existing signal equipment, signs and
related items
lump      LUMP 1,400.00 1,400.00 1,500.00 1,500.00 500.00 500.00 1,500.00 1,500.00
202-02-J removal of incidental concrete 585      SQYD 5.00 2,925.00 7.00 4,095.00 5.00 2,925.00 8.00 4,680.00
203-06 excavation & embankment lump      LUMP 30,000.00 30,000.00 50,000.00 50,000.00 43,000.00 43,000.00 61,000.00 61,000.00
204-02 temporary hay or straw bales 48      EACH 10.00 480.00 10.00 480.00 8.00 384.00 30.00 1,440.00
204-04 temporary sediment basins 1      EACH 400.00 400.00 500.00 500.00 100.00 100.00 200.00 200.00
204-05-A temporary sediment check dams (hay) 1      EACH 60.00 60.00 50.00 50.00 200.00 200.00 500.00 500.00
204-06 temporary silt fencing 1,400      LNFT 1.50 2,100.00 1.70 2,380.00 3.00 4,200.00 2.00 2,800.00
302-02-D class ii base course (12" thick) 1,113.2    SQYD 22.00 24,490.40 20.00 22,264.00 17.00 18,924.40 20.00 22,264.00
302-02-E class ii base course (8" thick) 2,115.0    SQYD 16.00 33,840.00 14.00 29,610.00 15.00 31,725.00 15.00 31,725.00
402-01 traffic maintenance aggregate (vehicular measurement) 50.0    CUYD 30.00 1,500.00 40.00 2,000.00 1.00 50.00 46.00 2,300.00
502-01-B superpave asphaltic concrete (level 2) 554.6    TON 70.00 38,822.00 80.00 44,368.00 100.00 55,460.00 78.00 43,258.80
502-01-B-01 superpave asphaltic conc wearing course (level 2f) 123.2    TON 70.00 8,624.00 135.00 16,632.00 165.00 20,328.00 110.00 13,552.00
601-01-K portland cement concrete pavement (10" thick) 1,410.7    SQYD 60.00 84,642.00 49.00 69,124.30 40.00 56,428.00 58.00 81,820.60
601-03-K portland cement concrete shoulder (10" thick) 556.4    SQYD 60.00 33,384.00 45.00 25,038.00 40.00 22,256.00 54.00 30,045.60
601-04 portland cement concrete pavement coring 5      EACH 250.00 1,250.00 60.00 300.00 100.00 500.00 220.00 1,100.00
702-03-D catch basins (cb-07) 1      EACH 6,600.00 6,600.00 3,500.00 3,500.00 5,000.00 5,000.00 6,000.00 6,000.00
706-02-C concrete drive (6" thick) 52.4    SQYD 60.00 3,144.00 50.00 2,620.00 30.00 1,572.00 120.00 6,288.00
706-03-A incidental concrete paving (4" thick) 10.0    SQYD 60.00 600.00 65.00 650.00 30.00 300.00 230.00 2,300.00
707-01 concrete curb 245.0    LNFT 7.00 1,715.00 16.00 3,920.00 10.00 2,450.00 40.00 9,800.00
713-01 temporary signs & barricades lump      LUMP 30,000.00 30,000.00 20,000.00 20,000.00 1,000.00 1,000.00 60,000.00 60,000.00
713-03-C-01 temporary pavement markings (8" width)(type
1 removable)
1,137      LNFT 4.00 4,548.00 4.00 4,548.00 4.00 4,548.00 4.00 4,548.00
713-03-E-01 temporary pavement markings (24" width)(type
1 removable)
890      LNFT 13.00 11,570.00 12.00 10,680.00 10.00 8,900.00 12.00 10,680.00
713-05-A-01 temporary pavement markings (solid line)(4" width)
(type 1 removable)
0.412  MILE 12,000.00 4,944.00 12,000.00 4,944.00 12,000.00 4,944.00 12,000.00 4,944.00
716-01-A mulch (vegetative) 1.00   ACRE 500.00 500.00 1,000.00 1,000.00 800.00 800.00 800.00 800.00
717-01 seeding 30      LB 18.00 540.00 11.00 330.00 10.00 300.00 10.00 300.00
718-01 fertilizer 1,000      LB 0.50 500.00 0.40 400.00 0.50 500.00 0.40 400.00
726-01 bedding material 2.0    CUYD 50.00 100.00 50.00 100.00 100.00 200.00 50.00 100.00
727-01 mobilization lump      LUMP 26,000.00 26,000.00 45,000.00 45,000.00 50,000.00 50,000.00 60,000.00 60,000.00
729-01 sign (type a) 20.0    SQFT 32.00 640.00 35.00 700.00 30.00 600.00 30.00 600.00
729-19-A dead end road installations(type a) 1      EACH 4,000.00 4,000.00 4,000.00 4,000.00 5,000.00 5,000.00 4,000.00 4,000.00
731-02 reflectorized raised pavement markers 313      EACH 5.00 1,565.00 5.00 1,565.00 5.00 1,565.00 5.00 1,565.00
732-01-A plastic pavement striping (4" width) 3,182      LNFT 0.40 1,272.80 0.45 1,431.90 0.50 1,591.00 0.40 1,272.80
732-01-C plastic pavement striping (8" width) 583      LNFT 0.85 495.55 1.00 583.00 1.00 583.00 0.80 466.40
732-01-E plastic pavement striping (24" width) 389      LNFT 2.75 1,069.75 3.00 1,167.00 3.00 1,167.00 2.70 1,050.30
732-04-A plastic pavement legends & symbols (arrow) 2      EACH 130.00 260.00 140.00 280.00 150.00 300.00 130.00 260.00
732-04-B plastic pavement legends & symbols (double arrow) 1      EACH 200.00 200.00 200.00 200.00 200.00 200.00 200.00 200.00
732-04-C plastic pavement legends & symbols (only) 2      EACH 160.00 320.00 170.00 340.00 200.00 400.00 150.00 300.00
732-05 removal of existing markings 0.095  MILE 4,800.00 456.00 5,000.00 475.00 5,000.00 475.00 4,300.00 408.50
736-01 trenching and backfilling 45      LNFT 5.00 225.00 5.00 225.00 5.00 225.00 4.50 202.50
736-04 signal support (30' strain pole) 1      EACH 6,300.00 6,300.00 6,500.00 6,500.00 7,000.00 7,000.00 6,100.00 6,100.00
736-05-A signal heads (3 face; r,y,g) 3      EACH 550.00 1,650.00 600.00 1,800.00 550.00 1,650.00 530.00 1,590.00
736-05-B signal heads (3 face; r,<-y,<-g) 1      EACH 600.00 600.00 600.00 600.00 600.00 600.00 560.00 560.00
736-05-C signal heads (4 face; r,y,<-g,g) 1      EACH 750.00 750.00 800.00 800.00 750.00 750.00 715.00 715.00
736-05-D signal heads (3 face optically programmed; r,y,g) 2      EACH 3,200.00 6,400.00 3,200.00 6,400.00 3,100.00 6,200.00 3,100.00 6,200.00
736-08 signal controller (8 phase nema controller) 1      EACH 14,000.00 14,000.00 14,000.00 14,000.00 15,000.00 15,000.00 13,700.00 13,700.00
736-09 loop detector 405      LNFT 10.00 4,050.00 10.00 4,050.00 10.00 4,050.00 9.00 3,645.00
736-10-A underground junction box (type e) 2      EACH 400.00 800.00 400.00 800.00 350.00 700.00 360.00 720.00
736-10-B underground junction box (type h) 1      EACH 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 980.00 980.00
736-11-A conduit (2" diameter p.e.) 35      LNFT 4.00 140.00 4.00 140.00 4.00 140.00 4.00 140.00
736-11-B conduit (3" diameter p.e.) 15      LNFT 6.50 97.50 6.50 97.50 8.00 120.00 6.00 90.00
736-12-A conductor (6c signal/#14 awg) 380      LNFT 2.00 760.00 2.00 760.00 2.00 760.00 2.00 760.00
736-12-B conductor (10c signal/#14 awg) 305      LNFT 2.20 671.00 2.30 701.50 2.50 762.50 2.00 610.00
736-12-C conductor (2c loop lead-in/#16 awg) 30      LNFT 1.40 42.00 1.40 42.00 1.50 45.00 1.50 45.00
740-01 construction layout lump      LUMP 6,000.00 6,000.00 7,000.00 7,000.00 1,000.00 1,000.00 16,000.00 16,000.00
S-001 modify existing catch basins 3      EACH 4,000.00 12,000.00 2,000.00 6,000.00 900.00 2,700.00 2,000.00 6,000.00
S-002 full depth pavement sawcuts (concrete or asphalt) 1,120      LNFT 7.00 7,840.00 4.20 4,704.00 10.00 11,200.00 5.00 5,600.00
                       
 CONTRACTOR TOTAL       467,183.70   482,381.70   488,818.90   631,980.50
 
Item Number Item Description Quantity Unit of Measure
RICHARD PRICE CONTRACTING CO., LLC

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 4,500.00 4,500.00            
202-01 removal of structures & obstructions lump      LUMP 6,800.00 6,800.00            
202-02-C removal of portland cement concrete pavement 2,047      SQYD 6.00 12,282.00            
202-02-F removal of concrete combination curb & gutter 128.5    LNFT 5.00 642.50            
202-02-G removal of surfacing & stabilized base 697.7    SQYD 5.00 3,488.50            
202-02-I removal of existing signal equipment, signs and
related items
lump      LUMP 1,500.00 1,500.00            
202-02-J removal of incidental concrete 585      SQYD 6.00 3,510.00            
203-06 excavation & embankment lump      LUMP 28,000.00 28,000.00            
204-02 temporary hay or straw bales 48      EACH 10.00 480.00            
204-04 temporary sediment basins 1      EACH 500.00 500.00            
204-05-A temporary sediment check dams (hay) 1      EACH 500.00 500.00            
204-06 temporary silt fencing 1,400      LNFT 1.00 1,400.00            
302-02-D class ii base course (12" thick) 1,113.2    SQYD 20.00 22,264.00            
302-02-E class ii base course (8" thick) 2,115.0    SQYD 13.50 28,552.50            
402-01 traffic maintenance aggregate (vehicular measurement) 50.0    CUYD 50.00 2,500.00            
502-01-B superpave asphaltic concrete (level 2) 554.6    TON 101.00 56,014.60            
502-01-B-01 superpave asphaltic conc wearing course (level 2f) 123.2    TON 164.00 20,204.80            
601-01-K portland cement concrete pavement (10" thick) 1,410.7    SQYD 44.00 62,070.80            
601-03-K portland cement concrete shoulder (10" thick) 556.4    SQYD 44.00 24,481.60            
601-04 portland cement concrete pavement coring 5      EACH 250.00 1,250.00            
702-03-D catch basins (cb-07) 1      EACH 4,000.00 4,000.00            
706-02-C concrete drive (6" thick) 52.4    SQYD 38.00 1,991.20            
706-03-A incidental concrete paving (4" thick) 10.0    SQYD 40.00 400.00            
707-01 concrete curb 245.0    LNFT 8.50 2,082.50            
713-01 temporary signs & barricades lump      LUMP 40,000.00 40,000.00            
713-03-C-01 temporary pavement markings (8" width)(type
1 removable)
1,137      LNFT 4.40 5,002.80            
713-03-E-01 temporary pavement markings (24" width)(type
1 removable)
890      LNFT 14.00 12,460.00            
713-05-A-01 temporary pavement markings (solid line)(4" width)
(type 1 removable)
0.412  MILE 13,068.00 5,384.01            
716-01-A mulch (vegetative) 1.00   ACRE 880.00 880.00            
717-01 seeding 30      LB 11.00 330.00            
718-01 fertilizer 1,000      LB 0.40 400.00            
726-01 bedding material 2.0    CUYD 75.00 150.00            
727-01 mobilization lump      LUMP 19,000.00 19,000.00            
729-01 sign (type a) 20.0    SQFT 33.00 660.00            
729-19-A dead end road installations(type a) 1      EACH 3,500.00 3,500.00            
731-02 reflectorized raised pavement markers 313      EACH 5.50 1,721.50            
732-01-A plastic pavement striping (4" width) 3,182      LNFT 0.45 1,431.90            
732-01-C plastic pavement striping (8" width) 583      LNFT 1.00 583.00            
732-01-E plastic pavement striping (24" width) 389      LNFT 3.00 1,167.00            
732-04-A plastic pavement legends & symbols (arrow) 2      EACH 138.00 276.00            
732-04-B plastic pavement legends & symbols (double arrow) 1      EACH 215.00 215.00            
732-04-C plastic pavement legends & symbols (only) 2      EACH 165.00 330.00            
732-05 removal of existing markings 0.095  MILE 4,950.00 470.25            
736-01 trenching and backfilling 45      LNFT 5.00 225.00            
736-04 signal support (30' strain pole) 1      EACH 6,660.00 6,660.00            
736-05-A signal heads (3 face; r,y,g) 3      EACH 580.00 1,740.00            
736-05-B signal heads (3 face; r,<-y,<-g) 1      EACH 616.00 616.00            
736-05-C signal heads (4 face; r,y,<-g,g) 1      EACH 800.00 800.00            
736-05-D signal heads (3 face optically programmed; r,y,g) 2      EACH 3,400.00 6,800.00            
736-08 signal controller (8 phase nema controller) 1      EACH 15,000.00 15,000.00            
736-09 loop detector 405      LNFT 10.00 4,050.00            
736-10-A underground junction box (type e) 2      EACH 400.00 800.00            
736-10-B underground junction box (type h) 1      EACH 1,100.00 1,100.00            
736-11-A conduit (2" diameter p.e.) 35      LNFT 5.00 175.00            
736-11-B conduit (3" diameter p.e.) 15      LNFT 7.00 105.00            
736-12-A conductor (6c signal/#14 awg) 380      LNFT 2.00 760.00            
736-12-B conductor (10c signal/#14 awg) 305      LNFT 2.40 732.00            
736-12-C conductor (2c loop lead-in/#16 awg) 30      LNFT 2.00 60.00            
740-01 construction layout lump      LUMP 9,000.00 9,000.00            
S-001 modify existing catch basins 3      EACH 1,500.00 4,500.00            
S-002 full depth pavement sawcuts (concrete or asphalt) 1,120      LNFT 9.00 10,080.00            
                       
 CONTRACTOR TOTAL       IRREGULAR            