Letting of 3/03/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 058-01-0024
Parish: ST TAMMANY
Routes: LA 41
Description: JUNCTION US 11 - JUNCTION LA 36
Type Const: grading, drainage structures, cement treated base course, superpave asphaltic concrete
pavement, pavement patching, and related work.
 
RankLicenseBidderAmount
106487 HUEY STOCKSTILL, INC. $2,058,615.40
202179 BOH BROS. CONSTRUCTION CO., LLC. $2,086,877.03
306276 BARRIERE CONSTRUCTION CO., LLC. $2,106,863.00
412487 DIAMOND B CONSTRUCTION CO., L.L.C. $2,424,048.65
522040 COVINGTON PAVING CO. $2,634,297.63
 
Item Number Item Description Quantity Unit of Measure - 1 -
HUEY STOCKSTILL, INC.
- 2 -
BOH BROS. CONSTRUCTION CO., LLC.
- 3 -
BARRIERE CONSTRUCTION CO., LLC.
- 4 -
DIAMOND B CONSTRUCTION CO., L.L.C.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks and drives 1,556      SQYD 9.00 14,004.00 10.00 15,560.00 9.00 14,004.00 7.70 11,981.20
202-02-H removal of guard rail 1,340      LNFT 4.00 5,360.00 3.60 4,824.00 7.00 9,380.00 3.30 4,422.00
202-02-I removal of shoulder surfacing 15,370.7    SQYD 1.00 15,370.70 1.60 24,593.12 2.00 30,741.40 1.44 22,133.80
202-02-J removal of surfacing 967      SQYD 9.00 8,703.00 7.00 6,769.00 4.00 3,868.00 2.41 2,330.47
203-08 borrow (vehicular measurement) 4,545      CUYD 10.00 45,450.00 8.50 38,632.50 10.00 45,450.00 14.00 63,630.00
203-08-A borrow (vehicular meas.)(selected soils) 1,520      CUYD 10.00 15,200.00 9.00 13,680.00 11.00 16,720.00 15.00 22,800.00
401-02 aggregate surface course (adjusted vehicular
measurement)
1,870      CUYD 40.00 74,800.00 48.00 89,760.00 42.00 78,540.00 37.00 69,190.00
502-01-B superpave asphaltic concrete (level 2) 8,943.8    TON 42.00 375,639.60 45.00 402,471.00 49.00 438,246.20 60.77 543,514.72
502-01-B-01 superpave asphaltic conc wearing course (level 2f) 10,333.5    TON 44.00 454,674.00 48.00 496,008.00 53.00 547,675.50 53.80 555,942.30
502-01-D superpave asphaltic concrete, incidental paving (level
a)
1,563.2    TON 80.00 125,056.00 80.00 125,056.00 53.00 82,849.60 91.27 142,673.26
507-01-B asphaltic surface treatment (2 applications) 52,883      SQYD 3.00 158,649.00 2.15 113,698.45 2.40 126,919.20 2.31 122,159.73
602-02-A cleaning and resealing existing longitudinal pavement
joints
6,917      LNFT 1.00 6,917.00 1.05 7,262.85 1.40 9,683.80 1.10 7,608.70
602-02-B cleaning and resealing existing transverse pavement
joints
9,178      LNFT 1.25 11,472.50 1.35 12,390.30 1.60 14,684.80 1.50 13,767.00
602-03 cleaning and sealing random cracks 4,600      LNFT 3.00 13,800.00 3.15 14,490.00 3.50 16,100.00 3.30 15,180.00
602-05-G-01 full depth patching of jointed conc pvmt (8" thick)
(16.0 sq yds & under)
98.2    SQYD 130.00 12,766.00 160.00 15,712.00 105.00 10,311.00 162.00 15,908.40
602-05-G-02 full depth patching of jointed conc pvmt (8" thick)
(16.1-48.0 sq yds)
272.8    SQYD 120.00 32,736.00 145.00 39,556.00 90.00 24,552.00 151.00 41,192.80
602-05-G-03 full depth patching of jointed conc pvmt (8" thick)
(48.1 sq yds & over)
1,214.1    SQYD 110.00 133,551.00 135.00 163,903.50 85.00 103,198.50 140.00 169,974.00
701-04-B storm drain pipe arch (18" equiv. rcpa) 16      LNFT 35.00 560.00 100.00 1,600.00 70.00 1,120.00 55.00 880.00
701-04-E storm drain pipe arch (30" equiv. rcpa) 138      LNFT 60.00 8,280.00 110.00 15,180.00 130.00 17,940.00 100.00 13,800.00
702-03-B catch basins (cb-02) 2      EACH 2,000.00 4,000.00 2,000.00 4,000.00 4,000.00 8,000.00 3,100.00 6,200.00
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 360.0    LNFT 23.00 8,280.00 23.00 8,280.00 28.00 10,080.00 25.00 9,000.00
704-03 blocked out guard rail 500.0    LNFT 14.00 7,000.00 14.50 7,250.00 15.00 7,500.00 15.00 7,500.00
704-08-B guard rail transitions (double thrie beam) 200.0    LNFT 37.00 7,400.00 40.00 8,000.00 36.00 7,200.00 40.00 8,000.00
704-11-A guard rail end treatment (flared) 8      EACH 1,500.00 12,000.00 1,530.00 12,240.00 1,800.00 14,400.00 1,600.00 12,800.00
713-01 temporary signs & barricades lump      LUMP 100,000.00 100,000.00 25,000.00 25,000.00 30,000.00 30,000.00 53,000.00 53,000.00
713-03-C temporary pavement markings (8" width) 150      LNFT 0.10 15.00 0.21 31.50 0.25 37.50 0.22 33.00
713-03-E temporary pavement markings (24" width) 52      LNFT 0.30 15.60 0.63 32.76 0.75 39.00 0.66 34.32
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
7.550  MILE 200.00 1,510.00 115.00 868.25 160.00 1,208.00 330.00 2,491.50
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
6.110  MILE 100.00 611.00 260.00 1,588.60 50.00 305.50 280.00 1,710.80
713-05-A temporary pavement markings (solid line)(4" width) 20.900  MILE 200.00 4,180.00 530.00 11,077.00 100.00 2,090.00 560.00 11,704.00
713-06-A temporary pavement legends and symbols (arrow) 2      EACH 10.00 20.00 43.00 86.00 40.00 80.00 45.00 90.00
713-06-B temporary pavement legends and symbols (double arrow) 2      EACH 10.00 20.00 48.00 96.00 45.00 90.00 51.00 102.00
713-06-D temporary pavement legends and symbols (rr crossing) 1      EACH 20.00 20.00 135.00 135.00 125.00 125.00 140.00 140.00
713-06-E temporary pavement legends and symbols (school
crossing)
12      EACH 20.00 240.00 185.00 2,220.00 175.00 2,100.00 196.00 2,352.00
713-07-A temporary reflectorized raised pavement markers (tabs) 1,000      EACH 1.50 1,500.00 3.16 3,160.00 2.00 2,000.00 2.00 2,000.00
714-02 water 40.0    MGAL FREE FREE 10.00 400.00 1.00 40.00 0.01 0.40
716-01-A mulch (vegetative) 4.00   ACRE 600.00 2,400.00 660.00 2,640.00 800.00 3,200.00 672.00 2,688.00
717-01 seeding 120      LB 7.00 840.00 7.50 900.00 8.00 960.00 7.50 900.00
718-01 fertilizer 4,000      LB 0.20 800.00 0.20 800.00 0.60 2,400.00 0.22 880.00
722-01 project site laboratory 1      EACH 1,000.00 1,000.00 2,000.00 2,000.00 2,000.00 2,000.00 23,200.00 23,200.00
724-01-B pavement patching (12" minimum thickness) 600      SQYD 50.00 30,000.00 80.00 48,000.00 50.00 30,000.00 92.00 55,200.00
726-01 bedding material 56.0    CUYD 25.00 1,400.00 70.00 3,920.00 35.00 1,960.00 56.00 3,136.00
727-01 mobilization lump      LUMP 196,000.00 196,000.00 92,000.00 92,000.00 139,000.00 139,000.00 139,000.00 139,000.00
729-16-C object marker assembly (type 3) 8      EACH 60.00 480.00 60.00 480.00 100.00 800.00 72.00 576.00
731-02 reflectorized raised pavement markers 700      EACH 6.00 4,200.00 5.15 3,605.00 6.00 4,200.00 6.00 4,200.00
732-01-C plastic pavement striping (8" width) 150      LNFT 1.00 150.00 0.66 99.00 1.00 150.00 0.75 112.50
732-01-E plastic pavement striping (24" width) 52      LNFT 3.00 156.00 2.65 137.80 4.00 208.00 3.00 156.00
732-02-A plastic pavement striping (solid line) (4" width) 15.760  MILE 2,000.00 31,520.00 1,800.00 28,368.00 1,900.00 29,944.00 2,000.00 31,520.00
732-03-A plastic pavement striping (broken line)(4" width) 3.050  MILE 700.00 2,135.00 610.00 1,860.50 700.00 2,135.00 685.00 2,089.25
732-04-A plastic pavement legends & symbols (arrow) 2      EACH 130.00 260.00 125.00 250.00 150.00 300.00 140.00 280.00
732-04-B plastic pavement legends & symbols (double arrow) 2      EACH 200.00 400.00 175.00 350.00 200.00 400.00 196.00 392.00
732-04-D plastic pavement legends & symbols (rr crossing) 1      EACH 300.00 300.00 300.00 300.00 340.00 340.00 336.00 336.00
732-04-E plastic pavement legends & symbols (school crossing) 6      EACH 400.00 2,400.00 400.00 2,400.00 500.00 3,000.00 448.00 2,688.00
736-09 loop detector 650      LNFT 10.00 6,500.00 10.00 6,500.00 11.00 7,150.00 12.00 7,800.00
736-10 underground junction box 1      EACH 300.00 300.00 630.00 630.00 300.00 300.00 672.00 672.00
740-01 construction layout lump      LUMP 5,000.00 5,000.00 15,000.00 15,000.00 20,000.00 20,000.00 22,000.00 22,000.00
S-001 cement treated base course (12 in depth) 33,583      SQYD 3.00 100,749.00 5.30 177,989.90 5.00 167,915.00 4.50 151,123.50
S-002 u-channel post installation 144      each 34.00 4,896.00 35.00 5,040.00 40.00 5,760.00 68.00 9,792.00
S-004 milling concrete pavement 533      SQYD 13.00 6,929.00 15.00 7,995.00 14.00 7,462.00 17.00 9,061.00
                       
 CONTRACTOR TOTAL       2,058,615.40   2,086,877.03   2,106,863.00   2,424,048.65
 
Item Number Item Description Quantity Unit of Measure - 5 -
COVINGTON PAVING CO.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks and drives 1,556      SQYD 7.15 11,125.40            
202-02-H removal of guard rail 1,340      LNFT 6.00 8,040.00            
202-02-I removal of shoulder surfacing 15,370.7    SQYD 0.08 1,229.65            
202-02-J removal of surfacing 967      SQYD 3.25 3,142.75            
203-08 borrow (vehicular measurement) 4,545      CUYD 11.00 49,995.00            
203-08-A borrow (vehicular meas.)(selected soils) 1,520      CUYD 23.50 35,720.00            
401-02 aggregate surface course (adjusted vehicular
measurement)
1,870      CUYD 36.57 68,385.90            
502-01-B superpave asphaltic concrete (level 2) 8,943.8    TON 54.50 487,437.10            
502-01-B-01 superpave asphaltic conc wearing course (level 2f) 10,333.5    TON 55.50 573,509.25            
502-01-D superpave asphaltic concrete, incidental paving (level
a)
1,563.2    TON 60.00 93,792.00            
507-01-B asphaltic surface treatment (2 applications) 52,883      SQYD 2.31 122,159.73            
602-02-A cleaning and resealing existing longitudinal pavement
joints
6,917      LNFT 1.10 7,608.70            
602-02-B cleaning and resealing existing transverse pavement
joints
9,178      LNFT 1.38 12,665.64            
602-03 cleaning and sealing random cracks 4,600      LNFT 3.30 15,180.00            
602-05-G-01 full depth patching of jointed conc pvmt (8" thick)
(16.0 sq yds & under)
98.2    SQYD 143.00 14,042.60            
602-05-G-02 full depth patching of jointed conc pvmt (8" thick)
(16.1-48.0 sq yds)
272.8    SQYD 132.00 36,009.60            
602-05-G-03 full depth patching of jointed conc pvmt (8" thick)
(48.1 sq yds & over)
1,214.1    SQYD 121.00 146,906.10            
701-04-B storm drain pipe arch (18" equiv. rcpa) 16      LNFT 61.00 976.00            
701-04-E storm drain pipe arch (30" equiv. rcpa) 138      LNFT 94.00 12,972.00            
702-03-B catch basins (cb-02) 2      EACH 3,900.00 7,800.00            
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 360.0    LNFT 24.75 8,910.00            
704-03 blocked out guard rail 500.0    LNFT 15.00 7,500.00            
704-08-B guard rail transitions (double thrie beam) 200.0    LNFT 40.00 8,000.00            
704-11-A guard rail end treatment (flared) 8      EACH 1,600.00 12,800.00            
713-01 temporary signs & barricades lump      LUMP 191,000.00 191,000.00            
713-03-C temporary pavement markings (8" width) 150      LNFT 0.20 30.00            
713-03-E temporary pavement markings (24" width) 52      LNFT 0.66 34.32            
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
7.550  MILE 300.00 2,265.00            
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
6.110  MILE 280.00 1,710.80            
713-05-A temporary pavement markings (solid line)(4" width) 20.900  MILE 560.00 11,704.00            
713-06-A temporary pavement legends and symbols (arrow) 2      EACH 45.00 90.00            
713-06-B temporary pavement legends and symbols (double arrow) 2      EACH 50.00 100.00            
713-06-D temporary pavement legends and symbols (rr crossing) 1      EACH 138.00 138.00            
713-06-E temporary pavement legends and symbols (school
crossing)
12      EACH 195.00 2,340.00            
713-07-A temporary reflectorized raised pavement markers (tabs) 1,000      EACH 1.65 1,650.00            
714-02 water 40.0    MGAL 0.01 0.40            
716-01-A mulch (vegetative) 4.00   ACRE 660.00 2,640.00            
717-01 seeding 120      LB 7.00 840.00            
718-01 fertilizer 4,000      LB 0.22 880.00            
722-01 project site laboratory 1      EACH 14,000.00 14,000.00            
724-01-B pavement patching (12" minimum thickness) 600      SQYD 69.00 41,400.00            
726-01 bedding material 56.0    CUYD 39.00 2,184.00            
727-01 mobilization lump      LUMP 385,000.00 385,000.00            
729-16-C object marker assembly (type 3) 8      EACH 66.00 528.00            
731-02 reflectorized raised pavement markers 700      EACH 5.65 3,955.00            
732-01-C plastic pavement striping (8" width) 150      LNFT 0.75 112.50            
732-01-E plastic pavement striping (24" width) 52      LNFT 2.90 150.80            
732-02-A plastic pavement striping (solid line) (4" width) 15.760  MILE 1,950.00 30,732.00            
732-03-A plastic pavement striping (broken line)(4" width) 3.050  MILE 670.00 2,043.50            
732-04-A plastic pavement legends & symbols (arrow) 2      EACH 138.00 276.00            
732-04-B plastic pavement legends & symbols (double arrow) 2      EACH 195.00 390.00            
732-04-D plastic pavement legends & symbols (rr crossing) 1      EACH 330.00 330.00            
732-04-E plastic pavement legends & symbols (school crossing) 6      EACH 440.00 2,640.00            
736-09 loop detector 650      LNFT 11.00 7,150.00            
736-10 underground junction box 1      EACH 300.00 300.00            
740-01 construction layout lump      LUMP 60,000.00 60,000.00            
S-001 cement treated base course (12 in depth) 33,583      SQYD 3.33 111,831.39            
S-002 u-channel post installation 144      each 45.00 6,480.00            
S-004 milling concrete pavement 533      SQYD 6.50 3,464.50            
                       
 CONTRACTOR TOTAL       2,634,297.63            